Line items (Paint, Blank) BASE PAINT IDIQ Base 1 October 2020- 30 Sept. 2021
| LINE | ITEM | UNIT OF | QUANTITY | UNIT | TOTAL |
| NO. | ISSUE | COST | |||
| INTERIOR PAINTING | |||||
| 0001 | Prepare wall surface for painting up to 12' H | SF | 1,000 | ||
| 0002 | for work above 12' H | SF | 1,000 | ||
| 0003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 1,000 | ||
| 0004 | for work 12' H to 24' H | SF | 1,000 | ||
| 0005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 1,000 | ||
| 0006 | for work 12' H to 24' H | SF | 1,000 | ||
| 0007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 1,000 | ||
| 0008 | for work 12' H to 24' H | SF | 1,000 | ||
| 0009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 1,000 | ||
| 0010 | for work 12' H to 24' H | SF | 1,000 | ||
| 0011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 500 | ||
| 0012 | for work 12' H to 24' H | SF | 500 | ||
| 0013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 500 | ||
| 0014 | for work 12' H to 24' H | SF | 500 | ||
| 0015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 500 | ||
| 0016 | for work 12' H to 24' H | SF | 500 | ||
| 0017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 | ||
| INTERIOR FINISHES | |||||
| 0018 | Spray Texture on walls (knock-down or orange peel) | SF | 500 | ||
| 0019 | Skim Coat Walls | SF | 500 | ||
| 0020 | Drywall Overlay | SF | 500 | ||
| 0021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 | ||
| 0022 | Remove and install new vinyl cove base | LF | 500 | ||
| 0023 | Repair drywall taped joint up to 12' H. | LF | 500 | ||
| 0024 | for work 12 to 24 feet in height | LF | 500 | ||
| DOORS AND FRAMES | |||||
| 0025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 0026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 0027 | Prepare door frame and trim ONLY for paint both sides. | EA | 40 | ||
| 0028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 40 | ||
| 0029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 40 | ||
| 0030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 40 | ||
| 0031 | Prepare roll-up door for paint icluding frame and trim. | SF | 500 | ||
| 0032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 500 | ||
| 0033 | Prepare large sliding metal door for paint. | SF | 500 | ||
| 0034 | Spot prime large metal door. | SF | 200 | ||
| 0035 | Apply two (2) coats of paint to large metal door. | SF | 500 | ||
| EXTERIOR PAINTING/COATINGS | |||||
| 0036 | Prepare exterior wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 150,000 | ||
| 0037 | for work from 12' to 24' H | SF | 150,000 | ||
| 0038 | for work from 24' to 36' H | SF | 20,000 | ||
| 0039 | for work from 36' H to 60' H | SF | 10,000 | ||
| 0040 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 10,000 | ||
| 0041 | for work from 12' to 24' H | SF | 10,000 | ||
| 0042 | for work from 24' to 36' H | SF | 1,000 | ||
| 0043 | for work from 36' H to 60' H | SF | 500 | ||
| 0044 | Apply one (1) prime coat to exterior wall surfaces up to 12' H | SF | 150,000 | ||
| 0045 | for work from 12' to 24' H | SF | 150,000 | ||
| 0046 | for work from 24' to 36' H | SF | 20,000 | ||
| 0047 | for work from 36' H to 60' H | SF | 10,000 | ||
| 0048 | Apply two (2) coats of paint on all exterior wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 150,000 | ||
| 0049 | for work from 12' to 24' H | SF | 150,000 | ||
| 0050 | for work from 24' to 36' H | SF | 20,000 | ||
| 0051 | for work from 36' H to 60' H | SF | 10,000 | ||
| 0052 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 10,000 | ||
| 0053 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 2,500 | ||
| 0054 | Apply one (1) prime coat to metal roof surfaces. | SF | 10,000 | ||
| 0055 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 10,000 | ||
| 0056 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 5,000 | ||
| 0057 | for work from 12' to 24' H | SF | 2,500 | ||
| 0058 | for work from 24' to 36' H | SF | 1,000 | ||
| 0059 | for work from 36' H to 60' H | SF | 500 | ||
| 0060 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 | ||
| 0061 | for work from 12' to 24' H | SF | 5,000 | ||
| 0062 | for work from 24' to 36' H | SF | 1,000 | ||
| 0063 | for work from 36' H to 60' H | SF | 500 | ||
| 0064 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 2,000 | ||
| 0065 | for work from 12' to 24' H | SF | 1,000 | ||
| 0066 | for work from 24' to 36' H | SF | 500 | ||
| 0067 | for work from 36' H to 60' H | SF | 500 | ||
| 0068 | Prime window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 0069 | for work from 12' to 24' H | SF | 1,000 | ||
| 0070 | for work from 24' to 36' H | SF | 500 | ||
| 0071 | for work from 36' H to 60' H | SF | 500 | ||
| 0072 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 0073 | for work from 12' to 24' H | SF | 1,000 | ||
| 0074 | for work from 24' to 36' H | SF | 500 | ||
| 0075 | for work from 36' H to 60' H | SF | 500 | ||
| 0076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 | ||
| 0077 | for work from 12' to 24' H | LF | 1,000 | ||
| 0078 | for work from 24' to 36' H | LF | 500 | ||
| 0079 | for work from 36' H to 60' H | LF | 100 | ||
| 0080 | Prepare fascia/trim for painting up to 12' H. | LF | 500 | ||
| 0081 | for work from 12' to 24' H | LF | 500 | ||
| 0082 | for work from 24' to 36' H | LF | 500 | ||
| 0083 | for work from 36' H to 60' H | LF | 500 | ||
| 0084 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 | ||
| 0085 | for work from 12' to 24' H | LF | 500 | ||
| 0086 | for work from 24' to 36' H | LF | 500 | ||
| 0087 | for work from 36' H to 60' H | LF | 500 | ||
| 0088 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 | ||
| 0089 | for work from 12' to 24' H | LF | 500 | ||
| 0090 | for work from 24' to 36' H | LF | 500 | ||
| 0091 | for work from 36' H to 60' H | LF | 500 | ||
| 0092 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 | ||
| 0093 | for work from 12' to 24' H | LF | 500 | ||
| 0094 | for work from 24' to 36' H | LF | 500 | ||
| 0095 | for work from 36' H to 60' H | LF | 500 | ||
| MISCELLANEOUS | |||||
| 0096 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 10,000 | ||
| 0097 | for work from 12' to 24' H | SF | 5,000 | ||
| 0098 | for work from 24' to 36' H | SF | 1,000 | ||
| 0099 | for work from 36' H to 60' H | SF | 1,000 | ||
| 0100 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 500 | ||
| 0101 | for work from 12' to 24' H | SF | 500 | ||
| 0102 | for work from 24' to 36' H | SF | 250 | ||
| 0103 | for work from 36' H to 60' H | SF | 100 | ||
| 0104 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 500 | ||
| 0105 | for work from 12' to 24' H | SF | 500 | ||
| 0106 | for work from 24' to 36' H | SF | 250 | ||
| 0107 | for work from 36' H to 60' H | SF | 100 | ||
| 0108 | Apply one (1) prime coat to pipes up to 12' H. | SF | 500 | ||
| 0109 | for work from 12' to 24' H | SF | 500 | ||
| 0110 | for work from 24' to 36' H | SF | 250 | ||
| 0111 | for work from 36' H to 60' H | SF | 100 | ||
| 0112 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 500 | ||
| 0113 | for work from 12' to 24' H | SF | 500 | ||
| 0114 | for work from 24' to 36' H | SF | 250 | ||
| 0115 | for work from 36' H to 60' H | SF | 100 | ||
| 0116 | Stairs -Prepare for paint - per floor | EA | 5 | ||
| 0117 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 | ||
| 0118 | Apply one (1) prime coat to stairs. | EA | 5 | ||
| 0119 | Stairs -Apply 2 coats of paint - per floor | EA | 5 | ||
| EXTREIOR REPAIR | |||||
| 0120 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 | ||
| 0121 | for work from 12' to 24' H | in-ft | 1,000 | ||
| 0122 | for work from 24' to 36' H | in-ft | 500 | ||
| 0123 | for work from 36' H to 60' H | in-ft | 250 | ||
| 0124 | Repair/Replace exterior stucco to match existing surface for work up to 12' H. | SF | 500 | ||
| 0125 | for work from 12' to 24' H | SF | 500 | ||
| 0126 | for work from 24' to 36' H | SF | 250 | ||
| 0127 | for work from 36' H to 60' H | SF | 100 | ||
| FLOORING | |||||
| 0128 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 | ||
| 0129 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 | ||
| 0130 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 | ||
| 0131 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 | ||
| 0132 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 | ||
| 0133 | Prepare Concrete floor, stain and seal | SF | 100 | ||
| LEAD BASE PAINT ABATEMENT | |||||
| 0134 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 | ||
| 0135 | for work above 12' H | SF | 500 | ||
| 0136 | Doors, One side include frame | SF | 500 | ||
| 0137 | Door frame only, One side | LF | 250 | ||
| 0138 | Exterior walls up to 12' H. | SF | 1,000 | ||
| 0139 | for work from 12' to 24' H | SF | 1,000 | ||
| 0140 | for work from 24' to 36' H | SF | 1,000 | ||
| 0141 | for work from 36' H to 60' H | SF | 1,000 | ||
| 0142 | Window frame up to 12' H. (per sf of window) | SF | 1,000 | ||
| 0143 | for work from 12' to 24' H | SF | 500 | ||
| 0144 | for work from 24' to 36' H | SF | 500 | ||
| 0145 | for work from 36' H to 60' H | SF | 500 | ||
| 0146 | Grilles, one side | SF | 100 | ||
| 0147 | Trusses open (Cross Section area) | SF-Face | 500 | ||
| 0148 | Pipes - (average price 1" to 16") | LF | 500 | ||
| 0149 | for work from 12' to 24' H | LF | 500 | ||
| 0150 | for work from 24' to 36' H | LF | 250 | ||
| 0151 | for work from 36' H to 60' H | LF | 100 | ||
| 0152 | Stairs - per story | EA | 10 | ||
| 0153 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 | ||
| ABATEMENT MISC | |||||
| 0154 | Encapsulate walls or other flat surfaces | SF | 5,000 | ||
| 0155 | for work from 12' to 24' H | SF | 5,000 | ||
| 0156 | for work from 24' to 36' H | SF | 5,000 | ||
| 0157 | for work from 36' H to 60' H | SF | 5,000 | ||
| 0158 | Encapsulate trim or other complex surfaces | SF | 5,000 | ||
| 0159 | for work from 12' to 24' H | SF | 5,000 | ||
| 0160 | for work from 24' to 36' H | SF | 5,000 | ||
| 0161 | for work from 36' H to 60' H | SF | 5,000 |
TOTAL FOR PAINT ITEMS
Line items Option I BASE PAINT IDIQ Base 1 October 2020- 30 Sept. 2021
| LINE | ITEM | UNIT OF | QUANTITY | UNIT | TOTAL |
| NO. | ISSUE | COST | |||
| INTERIOR PAINTING | |||||
| 1001 | Prepare wall surface for painting up to 12' H | SF | 1,000 | ||
| 1002 | for work above 12' H | SF | 1,000 | ||
| 1003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 1,000 | ||
| 1004 | for work 12' H to 24' H | SF | 1,000 | ||
| 1005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 1,000 | ||
| 1006 | for work 12' H to 24' H | SF | 1,000 | ||
| 1007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 1,000 | ||
| 1008 | for work 12' H to 24' H | SF | 1,000 | ||
| 1009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 1,000 | ||
| 1010 | for work 12' H to 24' H | SF | 1,000 | ||
| 1011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 500 | ||
| 1012 | for work 12' H to 24' H | SF | 500 | ||
| 1013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 500 | ||
| 1014 | for work 12' H to 24' H | SF | 500 | ||
| 1015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 500 | ||
| 1016 | for work 12' H to 24' H | SF | 500 | ||
| 1017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 | ||
| INTERIOR FINISHES | |||||
| 1018 | Spray Texture on walls (knock-down or orange peel) | SF | 500 | ||
| 1019 | Skim Coat Walls | SF | 500 | ||
| 1020 | Drywall Overlay | SF | 500 | ||
| 1021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 | ||
| 1022 | Remove and install new vinyl cove base | LF | 500 | ||
| 1023 | Repair drywall taped joint up to 12' H. | LF | 500 | ||
| 1024 | for work 12 to 24 feet in height | LF | 500 | ||
| DOORS AND FRAMES | |||||
| 1025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 1026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 1027 | Prepare door frame and trim ONLY for paint both sides. | EA | 40 | ||
| 1028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 40 | ||
| 1029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 40 | ||
| 1030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 40 | ||
| 1031 | Prepare roll-up door for paint icluding frame and trim. | SF | 500 | ||
| 1032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 500 | ||
| 1033 | Prepare large sliding metal door for paint. | SF | 500 | ||
| 1034 | Spot prime large metal door. | SF | 200 | ||
| 1035 | Apply two (2) coats of paint to large metal door. | SF | 500 | ||
| EXTERIOR PAINTING/COATINGS | |||||
| 1036 | Prepare exterior wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 150,000 | ||
| 1037 | for work from 12' to 24' H | SF | 150,000 | ||
| 1038 | for work from 24' to 36' H | SF | 20,000 | ||
| 1039 | for work from 36' H to 60' H | SF | 10,000 | ||
| 1040 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 10,000 | ||
| 1041 | for work from 12' to 24' H | SF | 10,000 | ||
| 1042 | for work from 24' to 36' H | SF | 1,000 | ||
| 1043 | for work from 36' H to 60' H | SF | 500 | ||
| 1044 | Apply one (1) prime coat to exterior wall surfaces up to 12' H | SF | 150,000 | ||
| 1045 | for work from 12' to 24' H | SF | 150,000 | ||
| 1046 | for work from 24' to 36' H | SF | 20,000 | ||
| 1047 | for work from 36' H to 60' H | SF | 10,000 | ||
| 1048 | Apply two (2) coats of paint on all exterior wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 150,000 | ||
| 1049 | for work from 12' to 24' H | SF | 150,000 | ||
| 1050 | for work from 24' to 36' H | SF | 20,000 | ||
| 1051 | for work from 36' H to 60' H | SF | 10,000 | ||
| 1052 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 10,000 | ||
| 1053 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 2,500 | ||
| 1054 | Apply one (1) prime coat to metal roof surfaces. | SF | 10,000 | ||
| 1055 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 10,000 | ||
| 1056 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 5,000 | ||
| 1057 | for work from 12' to 24' H | SF | 2,500 | ||
| 1058 | for work from 24' to 36' H | SF | 1,000 | ||
| 1059 | for work from 36' H to 60' H | SF | 500 | ||
| 1060 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 | ||
| 1061 | for work from 12' to 24' H | SF | 5,000 | ||
| 1062 | for work from 24' to 36' H | SF | 1,000 | ||
| 1063 | for work from 36' H to 60' H | SF | 500 | ||
| 1064 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 2,000 | ||
| 1065 | for work from 12' to 24' H | SF | 1,000 | ||
| 1066 | for work from 24' to 36' H | SF | 500 | ||
| 1067 | for work from 36' H to 60' H | SF | 500 | ||
| 1068 | Prime window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 1069 | for work from 12' to 24' H | SF | 1,000 | ||
| 1070 | for work from 24' to 36' H | SF | 500 | ||
| 1071 | for work from 36' H to 60' H | SF | 500 | ||
| 1072 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 1073 | for work from 12' to 24' H | SF | 1,000 | ||
| 1074 | for work from 24' to 36' H | SF | 500 | ||
| 1075 | for work from 36' H to 60' H | SF | 500 | ||
| 1076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 | ||
| 1077 | for work from 12' to 24' H | LF | 1,000 | ||
| 1078 | for work from 24' to 36' H | LF | 500 | ||
| 1079 | for work from 36' H to 60' H | LF | 100 | ||
| 1080 | Prepare fascia/trim for painting up to 12' H. | LF | 500 | ||
| 1081 | for work from 12' to 24' H | LF | 500 | ||
| 1082 | for work from 24' to 36' H | LF | 500 | ||
| 1083 | for work from 36' H to 60' H | LF | 500 | ||
| 1084 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 | ||
| 1085 | for work from 12' to 24' H | LF | 500 | ||
| 1086 | for work from 24' to 36' H | LF | 500 | ||
| 1087 | for work from 36' H to 60' H | LF | 500 | ||
| 1088 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 | ||
| 1089 | for work from 12' to 24' H | LF | 500 | ||
| 1090 | for work from 24' to 36' H | LF | 500 | ||
| 1091 | for work from 36' H to 60' H | LF | 500 | ||
| 1092 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 | ||
| 1093 | for work from 12' to 24' H | LF | 500 | ||
| 1094 | for work from 24' to 36' H | LF | 500 | ||
| 1095 | for work from 36' H to 60' H | LF | 500 | ||
| MISCELLANEOUS | |||||
| 1096 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 10,000 | ||
| 1097 | for work from 12' to 24' H | SF | 5,000 | ||
| 1098 | for work from 24' to 36' H | SF | 1,000 | ||
| 1099 | for work from 36' H to 60' H | SF | 1,000 | ||
| 1100 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 500 | ||
| 1101 | for work from 12' to 24' H | SF | 500 | ||
| 1102 | for work from 24' to 36' H | SF | 250 | ||
| 1103 | for work from 36' H to 60' H | SF | 100 | ||
| 1104 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 500 | ||
| 1105 | for work from 12' to 24' H | SF | 500 | ||
| 1106 | for work from 24' to 36' H | SF | 250 | ||
| 1107 | for work from 36' H to 60' H | SF | 100 | ||
| 1108 | Apply one (1) prime coat to pipes up to 12' H. | SF | 500 | ||
| 1109 | for work from 12' to 24' H | SF | 500 | ||
| 1110 | for work from 24' to 36' H | SF | 250 | ||
| 1111 | for work from 36' H to 60' H | SF | 100 | ||
| 1112 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 500 | ||
| 1113 | for work from 12' to 24' H | SF | 500 | ||
| 1114 | for work from 24' to 36' H | SF | 250 | ||
| 1115 | for work from 36' H to 60' H | SF | 100 | ||
| 1116 | Stairs -Prepare for paint - per floor | EA | 5 | ||
| 1117 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 | ||
| 1118 | Apply one (1) prime coat to stairs. | EA | 5 | ||
| 1119 | Stairs -Apply 2 coats of paint - per floor | EA | 5 | ||
| EXTREIOR REPAIR | |||||
| 1120 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 | ||
| 1121 | for work from 12' to 24' H | in-ft | 1,000 | ||
| 1122 | for work from 24' to 36' H | in-ft | 500 | ||
| 1123 | for work from 36' H to 60' H | in-ft | 250 | ||
| 1124 | Repair/Replace exterior stucco to match existing surface for work up to 12' H. | SF | 500 | ||
| 1125 | for work from 12' to 24' H | SF | 500 | ||
| 1126 | for work from 24' to 36' H | SF | 250 | ||
| 1127 | for work from 36' H to 60' H | SF | 100 | ||
| FLOORING | |||||
| 1128 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 | ||
| 1129 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 | ||
| 1130 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 | ||
| 1131 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 | ||
| 1132 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 | ||
| 1133 | Prepare Concrete floor, stain and seal | SF | 100 | ||
| LEAD BASE PAINT ABATEMENT | |||||
| 1134 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 | ||
| 1135 | for work above 12' H | SF | 500 | ||
| 1136 | Doors, One side include frame | SF | 500 | ||
| 1137 | Door frame only, One side | LF | 250 | ||
| 1138 | Exterior walls up to 12' H. | SF | 1,000 | ||
| 1139 | for work from 12' to 24' H | SF | 1,000 | ||
| 1140 | for work from 24' to 36' H | SF | 1,000 | ||
| 1141 | for work from 36' H to 60' H | SF | 1,000 | ||
| 1142 | Window frame up to 12' H. (per sf of window) | SF | 1,000 | ||
| 1143 | for work from 12' to 24' H | SF | 500 | ||
| 1144 | for work from 24' to 36' H | SF | 500 | ||
| 1145 | for work from 36' H to 60' H | SF | 500 | ||
| 1146 | Grilles, one side | SF | 100 | ||
| 1147 | Trusses open (Cross Section area) | SF-Face | 500 | ||
| 1148 | Pipes - (average price 1" to 16") | LF | 500 | ||
| 1149 | for work from 12' to 24' H | LF | 500 | ||
| 1150 | for work from 24' to 36' H | LF | 250 | ||
| 1151 | for work from 36' H to 60' H | LF | 100 | ||
| 1152 | Stairs - per story | EA | 10 | ||
| 1153 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 | ||
| ABATEMENT MISC | |||||
| 1154 | Encapsulate walls or other flat surfaces | SF | 5,000 | ||
| 1155 | for work from 12' to 24' H | SF | 5,000 | ||
| 1156 | for work from 24' to 36' H | SF | 5,000 | ||
| 1157 | for work from 36' H to 60' H | SF | 5,000 | ||
| 1158 | Encapsulate trim or other complex surfaces | SF | 5,000 | ||
| 1159 | for work from 12' to 24' H | SF | 5,000 | ||
| 1160 | for work from 24' to 36' H | SF | 5,000 | ||
| 1161 | for work from 36' H to 60' H | SF | 5,000 |
TOTAL FOR PAINT ITEMS
Line items Option II BASE PAINT IDIQ Base 1 October 2020- 30 Sept. 2021
| LINE | ITEM | UNIT OF | QUANTITY | UNIT | TOTAL |
| NO. | ISSUE | COST | |||
| INTERIOR PAINTING | |||||
| 2001 | Prepare wall surface for painting up to 12' H | SF | 1,000 | ||
| 2002 | for work above 12' H | SF | 1,000 | ||
| 2003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 1,000 | ||
| 2004 | for work 12' H to 24' H | SF | 1,000 | ||
| 2005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 1,000 | ||
| 2006 | for work 12' H to 24' H | SF | 1,000 | ||
| 2007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 1,000 | ||
| 2008 | for work 12' H to 24' H | SF | 1,000 | ||
| 2009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 1,000 | ||
| 2010 | for work 12' H to 24' H | SF | 1,000 | ||
| 2011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 500 | ||
| 2012 | for work 12' H to 24' H | SF | 500 | ||
| 2013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 500 | ||
| 2014 | for work 12' H to 24' H | SF | 500 | ||
| 2015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 500 | ||
| 2016 | for work 12' H to 24' H | SF | 500 | ||
| 2017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 | ||
| INTERIOR FINISHES | |||||
| 2018 | Spray Texture on walls (knock-down or orange peel) | SF | 500 | ||
| 2019 | Skim Coat Walls | SF | 500 | ||
| 2020 | Drywall Overlay | SF | 500 | ||
| 2021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 | ||
| 2022 | Remove and install new vinyl cove base | LF | 500 | ||
| 2023 | Repair drywall taped joint up to 12' H. | LF | 500 | ||
| 2024 | for work 12 to 24 feet in height | LF | 500 | ||
| DOORS AND FRAMES | |||||
| 2025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 2026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 2027 | Prepare door frame and trim ONLY for paint both sides. | EA | 40 | ||
| 2028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 40 | ||
| 2029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 40 | ||
| 2030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 40 | ||
| 2031 | Prepare roll-up door for paint icluding frame and trim. | SF | 500 | ||
| 2032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 500 | ||
| 2033 | Prepare large sliding metal door for paint. | SF | 500 | ||
| 2034 | Spot prime large metal door. | SF | 200 | ||
| 2035 | Apply two (2) coats of paint to large metal door. | SF | 500 | ||
| EXTERIOR PAINTING/COATINGS | |||||
| 2036 | Prepare exterior wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 150,000 | ||
| 2037 | for work from 12' to 24' H | SF | 150,000 | ||
| 2038 | for work from 24' to 36' H | SF | 20,000 | ||
| 2039 | for work from 36' H to 60' H | SF | 10,000 | ||
| 2040 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 10,000 | ||
| 2041 | for work from 12' to 24' H | SF | 10,000 | ||
| 2042 | for work from 24' to 36' H | SF | 1,000 | ||
| 2043 | for work from 36' H to 60' H | SF | 500 | ||
| 2044 | Apply one (1) prime coat to exterior wall surfaces up to 12' H | SF | 150,000 | ||
| 2045 | for work from 12' to 24' H | SF | 150,000 | ||
| 2046 | for work from 24' to 36' H | SF | 20,000 | ||
| 2047 | for work from 36' H to 60' H | SF | 10,000 | ||
| 2048 | Apply two (2) coats of paint on all exterior wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 150,000 | ||
| 2049 | for work from 12' to 24' H | SF | 150,000 | ||
| 2050 | for work from 24' to 36' H | SF | 20,000 | ||
| 2051 | for work from 36' H to 60' H | SF | 10,000 | ||
| 2052 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 10,000 | ||
| 2053 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 2,500 | ||
| 2054 | Apply one (1) prime coat to metal roof surfaces. | SF | 10,000 | ||
| 2055 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 10,000 | ||
| 2056 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 5,000 | ||
| 2057 | for work from 12' to 24' H | SF | 2,500 | ||
| 2058 | for work from 24' to 36' H | SF | 1,000 | ||
| 2059 | for work from 36' H to 60' H | SF | 500 | ||
| 2060 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 | ||
| 2061 | for work from 12' to 24' H | SF | 5,000 | ||
| 2062 | for work from 24' to 36' H | SF | 1,000 | ||
| 2063 | for work from 36' H to 60' H | SF | 500 | ||
| 2064 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 2,000 | ||
| 2065 | for work from 12' to 24' H | SF | 1,000 | ||
| 2066 | for work from 24' to 36' H | SF | 500 | ||
| 2067 | for work from 36' H to 60' H | SF | 500 | ||
| 2068 | Prime window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 2069 | for work from 12' to 24' H | SF | 1,000 | ||
| 2070 | for work from 24' to 36' H | SF | 500 | ||
| 2071 | for work from 36' H to 60' H | SF | 500 | ||
| 2072 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 2073 | for work from 12' to 24' H | SF | 1,000 | ||
| 2074 | for work from 24' to 36' H | SF | 500 | ||
| 2075 | for work from 36' H to 60' H | SF | 500 | ||
| 2076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 | ||
| 2077 | for work from 12' to 24' H | LF | 1,000 | ||
| 2078 | for work from 24' to 36' H | LF | 500 | ||
| 2079 | for work from 36' H to 60' H | LF | 100 | ||
| 2080 | Prepare fascia/trim for painting up to 12' H. | LF | 500 | ||
| 2081 | for work from 12' to 24' H | LF | 500 | ||
| 2082 | for work from 24' to 36' H | LF | 500 | ||
| 2083 | for work from 36' H to 60' H | LF | 500 | ||
| 2084 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 | ||
| 2085 | for work from 12' to 24' H | LF | 500 | ||
| 2086 | for work from 24' to 36' H | LF | 500 | ||
| 2087 | for work from 36' H to 60' H | LF | 500 | ||
| 2088 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 | ||
| 2089 | for work from 12' to 24' H | LF | 500 | ||
| 2090 | for work from 24' to 36' H | LF | 500 | ||
| 2091 | for work from 36' H to 60' H | LF | 500 | ||
| 2092 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 | ||
| 2093 | for work from 12' to 24' H | LF | 500 | ||
| 2094 | for work from 24' to 36' H | LF | 500 | ||
| 2095 | for work from 36' H to 60' H | LF | 500 | ||
| MISCELLANEOUS | |||||
| 2096 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 10,000 | ||
| 2097 | for work from 12' to 24' H | SF | 5,000 | ||
| 2098 | for work from 24' to 36' H | SF | 1,000 | ||
| 2099 | for work from 36' H to 60' H | SF | 1,000 | ||
| 2100 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 500 | ||
| 2101 | for work from 12' to 24' H | SF | 500 | ||
| 2102 | for work from 24' to 36' H | SF | 250 | ||
| 2103 | for work from 36' H to 60' H | SF | 100 | ||
| 2104 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 500 | ||
| 2105 | for work from 12' to 24' H | SF | 500 | ||
| 2106 | for work from 24' to 36' H | SF | 250 | ||
| 2107 | for work from 36' H to 60' H | SF | 100 | ||
| 2108 | Apply one (1) prime coat to pipes up to 12' H. | SF | 500 | ||
| 2109 | for work from 12' to 24' H | SF | 500 | ||
| 2110 | for work from 24' to 36' H | SF | 250 | ||
| 2111 | for work from 36' H to 60' H | SF | 100 | ||
| 2112 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 500 | ||
| 2113 | for work from 12' to 24' H | SF | 500 | ||
| 2114 | for work from 24' to 36' H | SF | 250 | ||
| 2115 | for work from 36' H to 60' H | SF | 100 | ||
| 2116 | Stairs -Prepare for paint - per floor | EA | 5 | ||
| 2117 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 | ||
| 2118 | Apply one (1) prime coat to stairs. | EA | 5 | ||
| 2119 | Stairs -Apply 2 coats of paint - per floor | EA | 5 | ||
| EXTREIOR REPAIR | |||||
| 2120 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 | ||
| 2121 | for work from 12' to 24' H | in-ft | 1,000 | ||
| 2122 | for work from 24' to 36' H | in-ft | 500 | ||
| 2123 | for work from 36' H to 60' H | in-ft | 250 | ||
| 2124 | Repair/Replace exterior stucco to match existing surface for work up to 12' H. | SF | 500 | ||
| 2125 | for work from 12' to 24' H | SF | 500 | ||
| 2126 | for work from 24' to 36' H | SF | 250 | ||
| 2127 | for work from 36' H to 60' H | SF | 100 | ||
| FLOORING | |||||
| 2128 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 | ||
| 2129 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 | ||
| 2130 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 | ||
| 2131 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 | ||
| 2132 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 | ||
| 2133 | Prepare Concrete floor, stain and seal | SF | 100 | ||
| LEAD BASE PAINT ABATEMENT | |||||
| 2134 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 | ||
| 2135 | for work above 12' H | SF | 500 | ||
| 2136 | Doors, One side include frame | SF | 500 | ||
| 2137 | Door frame only, One side | LF | 250 | ||
| 2138 | Exterior walls up to 12' H. | SF | 1,000 | ||
| 2139 | for work from 12' to 24' H | SF | 1,000 | ||
| 2140 | for work from 24' to 36' H | SF | 1,000 | ||
| 2141 | for work from 36' H to 60' H | SF | 1,000 | ||
| 2142 | Window frame up to 12' H. (per sf of window) | SF | 1,000 | ||
| 2143 | for work from 12' to 24' H | SF | 500 | ||
| 2144 | for work from 24' to 36' H | SF | 500 | ||
| 2145 | for work from 36' H to 60' H | SF | 500 | ||
| 2146 | Grilles, one side | SF | 100 | ||
| 2147 | Trusses open (Cross Section area) | SF-Face | 500 | ||
| 2148 | Pipes - (average price 1" to 16") | LF | 500 | ||
| 2149 | for work from 12' to 24' H | LF | 500 | ||
| 2150 | for work from 24' to 36' H | LF | 250 | ||
| 2151 | for work from 36' H to 60' H | LF | 100 | ||
| 2152 | Stairs - per story | EA | 10 | ||
| 2153 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 | ||
| ABATEMENT MISC | |||||
| 2154 | Encapsulate walls or other flat surfaces | SF | 5,000 | ||
| 2155 | for work from 12' to 24' H | SF | 5,000 | ||
| 2156 | for work from 24' to 36' H | SF | 5,000 | ||
| 2157 | for work from 36' H to 60' H | SF | 5,000 | ||
| 2158 | Encapsulate trim or other complex surfaces | SF | 5,000 | ||
| 2159 | for work from 12' to 24' H | SF | 5,000 | ||
| 2160 | for work from 24' to 36' H | SF | 5,000 | ||
| 2161 | for work from 36' H to 60' H | SF | 5,000 |
TOTAL FOR PAINT ITEMS
Line items Option III BASE PAINT IDIQ Base 1 October 2020- 30 Sept. 2021
| LINE | ITEM | UNIT OF | QUANTITY | UNIT | TOTAL |
| NO. | ISSUE | COST | |||
| INTERIOR PAINTING | |||||
| 3001 | Prepare wall surface for painting up to 12' H | SF | 1,000 | ||
| 3002 | for work above 12' H | SF | 1,000 | ||
| 3003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 1,000 | ||
| 3004 | for work 12' H to 24' H | SF | 1,000 | ||
| 3005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 1,000 | ||
| 3006 | for work 12' H to 24' H | SF | 1,000 | ||
| 3007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 1,000 | ||
| 3008 | for work 12' H to 24' H | SF | 1,000 | ||
| 3009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 1,000 | ||
| 3010 | for work 12' H to 24' H | SF | 1,000 | ||
| 3011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 500 | ||
| 3012 | for work 12' H to 24' H | SF | 500 | ||
| 3013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 500 | ||
| 3014 | for work 12' H to 24' H | SF | 500 | ||
| 3015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 500 | ||
| 3016 | for work 12' H to 24' H | SF | 500 | ||
| 3017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 | ||
| INTERIOR FINISHES | |||||
| 3018 | Spray Texture on walls (knock-down or orange peel) | SF | 500 | ||
| 3019 | Skim Coat Walls | SF | 500 | ||
| 3020 | Drywall Overlay | SF | 500 | ||
| 3021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 | ||
| 3022 | Remove and install new vinyl cove base | LF | 500 | ||
| 3023 | Repair drywall taped joint up to 12' H. | LF | 500 | ||
| 3024 | for work 12 to 24 feet in height | LF | 500 | ||
| DOORS AND FRAMES | |||||
| 3025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 3026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 3027 | Prepare door frame and trim ONLY for paint both sides. | EA | 40 | ||
| 3028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 40 | ||
| 3029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 40 | ||
| 3030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 40 | ||
| 3031 | Prepare roll-up door for paint icluding frame and trim. | SF | 500 | ||
| 3032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 500 | ||
| 3033 | Prepare large sliding metal door for paint. | SF | 500 | ||
| 3034 | Spot prime large metal door. | SF | 200 | ||
| 3035 | Apply two (2) coats of paint to large metal door. | SF | 500 | ||
| EXTERIOR PAINTING/COATINGS | |||||
| 3036 | Prepare exterior wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 150,000 | ||
| 3037 | for work from 12' to 24' H | SF | 150,000 | ||
| 3038 | for work from 24' to 36' H | SF | 20,000 | ||
| 3039 | for work from 36' H to 60' H | SF | 10,000 | ||
| 3040 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 10,000 | ||
| 3041 | for work from 12' to 24' H | SF | 10,000 | ||
| 3042 | for work from 24' to 36' H | SF | 1,000 | ||
| 3043 | for work from 36' H to 60' H | SF | 500 | ||
| 3044 | Apply one (1) prime coat to exterior wall surfaces up to 12' H | SF | 150,000 | ||
| 3045 | for work from 12' to 24' H | SF | 150,000 | ||
| 3046 | for work from 24' to 36' H | SF | 20,000 | ||
| 3047 | for work from 36' H to 60' H | SF | 10,000 | ||
| 3048 | Apply two (2) coats of paint on all exterior wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 150,000 | ||
| 3049 | for work from 12' to 24' H | SF | 150,000 | ||
| 3050 | for work from 24' to 36' H | SF | 20,000 | ||
| 3051 | for work from 36' H to 60' H | SF | 10,000 | ||
| 3052 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 10,000 | ||
| 3053 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 2,500 | ||
| 3054 | Apply one (1) prime coat to metal roof surfaces. | SF | 10,000 | ||
| 3055 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 10,000 | ||
| 3056 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 5,000 | ||
| 3057 | for work from 12' to 24' H | SF | 2,500 | ||
| 3058 | for work from 24' to 36' H | SF | 1,000 | ||
| 3059 | for work from 36' H to 60' H | SF | 500 | ||
| 3060 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 | ||
| 3061 | for work from 12' to 24' H | SF | 5,000 | ||
| 3062 | for work from 24' to 36' H | SF | 1,000 | ||
| 3063 | for work from 36' H to 60' H | SF | 500 | ||
| 3064 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 2,000 | ||
| 3065 | for work from 12' to 24' H | SF | 1,000 | ||
| 3066 | for work from 24' to 36' H | SF | 500 | ||
| 3067 | for work from 36' H to 60' H | SF | 500 | ||
| 3068 | Prime window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 3069 | for work from 12' to 24' H | SF | 1,000 | ||
| 3070 | for work from 24' to 36' H | SF | 500 | ||
| 3071 | for work from 36' H to 60' H | SF | 500 | ||
| 3072 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 3073 | for work from 12' to 24' H | SF | 1,000 | ||
| 3074 | for work from 24' to 36' H | SF | 500 | ||
| 3075 | for work from 36' H to 60' H | SF | 500 | ||
| 3076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 | ||
| 3077 | for work from 12' to 24' H | LF | 1,000 | ||
| 3078 | for work from 24' to 36' H | LF | 500 | ||
| 3079 | for work from 36' H to 60' H | LF | 100 | ||
| 3080 | Prepare fascia/trim for painting up to 12' H. | LF | 500 | ||
| 3081 | for work from 12' to 24' H | LF | 500 | ||
| 3082 | for work from 24' to 36' H | LF | 500 | ||
| 3083 | for work from 36' H to 60' H | LF | 500 | ||
| 3084 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 | ||
| 3085 | for work from 12' to 24' H | LF | 500 | ||
| 3086 | for work from 24' to 36' H | LF | 500 | ||
| 3087 | for work from 36' H to 60' H | LF | 500 | ||
| 3088 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 | ||
| 3089 | for work from 12' to 24' H | LF | 500 | ||
| 3090 | for work from 24' to 36' H | LF | 500 | ||
| 3091 | for work from 36' H to 60' H | LF | 500 | ||
| 3092 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 | ||
| 3093 | for work from 12' to 24' H | LF | 500 | ||
| 3094 | for work from 24' to 36' H | LF | 500 | ||
| 3095 | for work from 36' H to 60' H | LF | 500 | ||
| MISCELLANEOUS | |||||
| 3096 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 10,000 | ||
| 3097 | for work from 12' to 24' H | SF | 5,000 | ||
| 3098 | for work from 24' to 36' H | SF | 1,000 | ||
| 3099 | for work from 36' H to 60' H | SF | 1,000 | ||
| 3100 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 500 | ||
| 3101 | for work from 12' to 24' H | SF | 500 | ||
| 3102 | for work from 24' to 36' H | SF | 250 | ||
| 3103 | for work from 36' H to 60' H | SF | 100 | ||
| 3104 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 500 | ||
| 3105 | for work from 12' to 24' H | SF | 500 | ||
| 3106 | for work from 24' to 36' H | SF | 250 | ||
| 3107 | for work from 36' H to 60' H | SF | 100 | ||
| 3108 | Apply one (1) prime coat to pipes up to 12' H. | SF | 500 | ||
| 3109 | for work from 12' to 24' H | SF | 500 | ||
| 3110 | for work from 24' to 36' H | SF | 250 | ||
| 3111 | for work from 36' H to 60' H | SF | 100 | ||
| 3112 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 500 | ||
| 3113 | for work from 12' to 24' H | SF | 500 | ||
| 3114 | for work from 24' to 36' H | SF | 250 | ||
| 3115 | for work from 36' H to 60' H | SF | 100 | ||
| 3116 | Stairs -Prepare for paint - per floor | EA | 5 | ||
| 3117 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 | ||
| 3118 | Apply one (1) prime coat to stairs. | EA | 5 | ||
| 3119 | Stairs -Apply 2 coats of paint - per floor | EA | 5 | ||
| EXTREIOR REPAIR | |||||
| 3120 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 | ||
| 3121 | for work from 12' to 24' H | in-ft | 1,000 | ||
| 3122 | for work from 24' to 36' H | in-ft | 500 | ||
| 3123 | for work from 36' H to 60' H | in-ft | 250 | ||
| 3124 | Repair/Replace exterior stucco to match existing surface for work up to 12' H. | SF | 500 | ||
| 3125 | for work from 12' to 24' H | SF | 500 | ||
| 3126 | for work from 24' to 36' H | SF | 250 | ||
| 3127 | for work from 36' H to 60' H | SF | 100 | ||
| FLOORING | |||||
| 3128 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 | ||
| 3129 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 | ||
| 3130 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 | ||
| 3131 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 | ||
| 3132 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 | ||
| 3133 | Prepare Concrete floor, stain and seal | SF | 100 | ||
| LEAD BASE PAINT ABATEMENT | |||||
| 3134 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 | ||
| 3135 | for work above 12' H | SF | 500 | ||
| 3136 | Doors, One side include frame | SF | 500 | ||
| 3137 | Door frame only, One side | LF | 250 | ||
| 3138 | Exterior walls up to 12' H. | SF | 1,000 | ||
| 3139 | for work from 12' to 24' H | SF | 1,000 | ||
| 3140 | for work from 24' to 36' H | SF | 1,000 | ||
| 3141 | for work from 36' H to 60' H | SF | 1,000 | ||
| 3142 | Window frame up to 12' H. (per sf of window) | SF | 1,000 | ||
| 3143 | for work from 12' to 24' H | SF | 500 | ||
| 3144 | for work from 24' to 36' H | SF | 500 | ||
| 3145 | for work from 36' H to 60' H | SF | 500 | ||
| 3146 | Grilles, one side | SF | 100 | ||
| 3147 | Trusses open (Cross Section area) | SF-Face | 500 | ||
| 3148 | Pipes - (average price 1" to 16") | LF | 500 | ||
| 3149 | for work from 12' to 24' H | LF | 500 | ||
| 3150 | for work from 24' to 36' H | LF | 250 | ||
| 3151 | for work from 36' H to 60' H | LF | 100 | ||
| 3152 | Stairs - per story | EA | 10 | ||
| 3153 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 | ||
| ABATEMENT MISC | |||||
| 3154 | Encapsulate walls or other flat surfaces | SF | 5,000 | ||
| 3155 | for work from 12' to 24' H | SF | 5,000 | ||
| 3156 | for work from 24' to 36' H | SF | 5,000 | ||
| 3157 | for work from 36' H to 60' H | SF | 5,000 | ||
| 3158 | Encapsulate trim or other complex surfaces | SF | 5,000 | ||
| 3159 | for work from 12' to 24' H | SF | 5,000 | ||
| 3160 | for work from 24' to 36' H | SF | 5,000 | ||
| 3161 | for work from 36' H to 60' H | SF | 5,000 |
TOTAL FOR PAINT ITEMS
Line items Option IV BASE PAINT IDIQ Base 1 October 2020- 30 Sept. 2021
| LINE | ITEM | UNIT OF | QUANTITY | UNIT | TOTAL |
| NO. | ISSUE | COST | |||
| INTERIOR PAINTING | |||||
| 4001 | Prepare wall surface for painting up to 12' H | SF | 1,000 | ||
| 4002 | for work above 12' H | SF | 1,000 | ||
| 4003 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated 70 to 100% surface loose and flaking paint) | SF | 1,000 | ||
| 4004 | for work 12' H to 24' H | SF | 1,000 | ||
| 4005 | Apply one (1) coat to interior wall surfaces up to 12', drywall, wood, metal, concrete and CMU | SF | 1,000 | ||
| 4006 | for work 12' H to 24' H | SF | 1,000 | ||
| 4007 | Apply two (2) finish coats to interior wall surfaces up to 12', drywall, wood, metal, and CMU | SF | 1,000 | ||
| 4008 | for work 12' H to 24' H | SF | 1,000 | ||
| 4009 | Prepare all specified ceiling surfaces below 12' for painting | SF | 1,000 | ||
| 4010 | for work 12' H to 24' H | SF | 1,000 | ||
| 4011 | Remove loose and flaking paint on ceilings up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 500 | ||
| 4012 | for work 12' H to 24' H | SF | 500 | ||
| 4013 | Apply one (1) prime coat to specified ceiling areas below 12' | SF | 500 | ||
| 4014 | for work 12' H to 24' H | SF | 500 | ||
| 4015 | Apply two (2) finish coast to specified ceiling areas below 12' | SF | 500 | ||
| 4016 | for work 12' H to 24' H | SF | 500 | ||
| 4017 | Prepare & apply two (2) finish coat (paint or stain) to wood trim | LF | 500 | ||
| INTERIOR FINISHES | |||||
| 4018 | Spray Texture on walls (knock-down or orange peel) | SF | 500 | ||
| 4019 | Skim Coat Walls | SF | 500 | ||
| 4020 | Drywall Overlay | SF | 500 | ||
| 4021 | Remove wallpaper (prep for paint, double rinse walls to remove glue residue) | SF | 500 | ||
| 4022 | Remove and install new vinyl cove base | LF | 500 | ||
| 4023 | Repair drywall taped joint up to 12' H. | LF | 500 | ||
| 4024 | for work 12 to 24 feet in height | LF | 500 | ||
| DOORS AND FRAMES | |||||
| 4025 | Prepare flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 4026 | Apply two (2) coats of paint or urethaneto flush door (metal or wood), one side including frame and trim. | EA | 40 | ||
| 4027 | Prepare door frame and trim ONLY for paint both sides. | EA | 40 | ||
| 4028 | Apply two (2) finish coats of paint or urethane to door frame and trim ONLY both sides. | EA | 40 | ||
| 4029 | Prepare metal or wood louvered door both sides including frame and trim for paint or urethane. | EA | 40 | ||
| 4030 | Apply two (2) coats of paint or urethane to metal or wood louvered door both sides including frame and trim . | EA | 40 | ||
| 4031 | Prepare roll-up door for paint icluding frame and trim. | SF | 500 | ||
| 4032 | Apply two (2) coats of paint to roll-up door including frame and trim. | SF | 500 | ||
| 4033 | Prepare large sliding metal door for paint. | SF | 500 | ||
| 4034 | Spot prime large metal door. | SF | 200 | ||
| 4035 | Apply two (2) coats of paint to large metal door. | SF | 500 | ||
| EXTERIOR PAINTING/COATINGS | |||||
| 4036 | Prepare exterior wall surfaces including appurtenances as specified by the Government for painting up to 12' H. | SF | 150,000 | ||
| 4037 | for work from 12' to 24' H | SF | 150,000 | ||
| 4038 | for work from 24' to 36' H | SF | 20,000 | ||
| 4039 | for work from 36' H to 60' H | SF | 10,000 | ||
| 4040 | Remove loose and flaking paint on wall surfaces up to 12' H and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 10,000 | ||
| 4041 | for work from 12' to 24' H | SF | 10,000 | ||
| 4042 | for work from 24' to 36' H | SF | 1,000 | ||
| 4043 | for work from 36' H to 60' H | SF | 500 | ||
| 4044 | Apply one (1) prime coat to exterior wall surfaces up to 12' H | SF | 150,000 | ||
| 4045 | for work from 12' to 24' H | SF | 150,000 | ||
| 4046 | for work from 24' to 36' H | SF | 20,000 | ||
| 4047 | for work from 36' H to 60' H | SF | 10,000 | ||
| 4048 | Apply two (2) coats of paint on all exterior wall surfaces including appurtenances as specified by the Government up to 12' H. | SF | 150,000 | ||
| 4049 | for work from 12' to 24' H | SF | 150,000 | ||
| 4050 | for work from 24' to 36' H | SF | 20,000 | ||
| 4051 | for work from 36' H to 60' H | SF | 10,000 | ||
| 4052 | Prepare exterior metal roof surfaces including appurtenances as specified by the Government for painting. | SF | 10,000 | ||
| 4053 | Remove loose and flaking paint on roof surfaces and prepare for painting. (Estimated SF of loose and flaking paint) | SF | 2,500 | ||
| 4054 | Apply one (1) prime coat to metal roof surfaces. | SF | 10,000 | ||
| 4055 | Apply two (2) coats of paint to metal roof surfaces including appurtenances as specified by the Government. | SF | 10,000 | ||
| 4056 | Apply one (1) coat of elastomeric paint to all exterior stucco, concrete and CMU walls surfaces, including appurtenances as specified by the Government up to 12' H. | SF | 5,000 | ||
| 4057 | for work from 12' to 24' H | SF | 2,500 | ||
| 4058 | for work from 24' to 36' H | SF | 1,000 | ||
| 4059 | for work from 36' H to 60' H | SF | 500 | ||
| 4060 | Apply one (1) coat of block filler up to 12' H. | SF | 5,000 | ||
| 4061 | for work from 12' to 24' H | SF | 5,000 | ||
| 4062 | for work from 24' to 36' H | SF | 1,000 | ||
| 4063 | for work from 36' H to 60' H | SF | 500 | ||
| 4064 | Prepare window frame (Use window square footage) for paint up to 12' H. | SF | 2,000 | ||
| 4065 | for work from 12' to 24' H | SF | 1,000 | ||
| 4066 | for work from 24' to 36' H | SF | 500 | ||
| 4067 | for work from 36' H to 60' H | SF | 500 | ||
| 4068 | Prime window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 4069 | for work from 12' to 24' H | SF | 1,000 | ||
| 4070 | for work from 24' to 36' H | SF | 500 | ||
| 4071 | for work from 36' H to 60' H | SF | 500 | ||
| 4072 | Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. | SF | 2,000 | ||
| 4073 | for work from 12' to 24' H | SF | 1,000 | ||
| 4074 | for work from 24' to 36' H | SF | 500 | ||
| 4075 | for work from 36' H to 60' H | SF | 500 | ||
| 4076 | Prepare and apply two (2) finish coat of paint to gutters and downspouts up to 12' H. | LF | 1,000 | ||
| 4077 | for work from 12' to 24' H | LF | 1,000 | ||
| 4078 | for work from 24' to 36' H | LF | 500 | ||
| 4079 | for work from 36' H to 60' H | LF | 100 | ||
| 4080 | Prepare fascia/trim for painting up to 12' H. | LF | 500 | ||
| 4081 | for work from 12' to 24' H | LF | 500 | ||
| 4082 | for work from 24' to 36' H | LF | 500 | ||
| 4083 | for work from 36' H to 60' H | LF | 500 | ||
| 4084 | Remove loose and flaking paint on fascia/trim up to 12' H - ready for painting. (Estimated SF of loose and flaking paint) | LF | 500 | ||
| 4085 | for work from 12' to 24' H | LF | 500 | ||
| 4086 | for work from 24' to 36' H | LF | 500 | ||
| 4087 | for work from 36' H to 60' H | LF | 500 | ||
| 4088 | Apply one (1) prime coat to fascia/trim up to 12' H | LF | 500 | ||
| 4089 | for work from 12' to 24' H | LF | 500 | ||
| 4090 | for work from 24' to 36' H | LF | 500 | ||
| 4091 | for work from 36' H to 60' H | LF | 500 | ||
| 4092 | Apply two (2) finish coat of paint to fascia/trim up to 12' H. | LF | 500 | ||
| 4093 | for work from 12' to 24' H | LF | 500 | ||
| 4094 | for work from 24' to 36' H | LF | 500 | ||
| 4095 | for work from 36' H to 60' H | LF | 500 | ||
| MISCELLANEOUS | |||||
| 4096 | Pressure Clean all exterior surfaces (not part of prep work, no painting associated with this line item) | SF | 10,000 | ||
| 4097 | for work from 12' to 24' H | SF | 5,000 | ||
| 4098 | for work from 24' to 36' H | SF | 1,000 | ||
| 4099 | for work from 36' H to 60' H | SF | 1,000 | ||
| 4100 | Pipes -Prepare for paint -(Pipes not on wall) up to 12' H. | SF | 500 | ||
| 4101 | for work from 12' to 24' H | SF | 500 | ||
| 4102 | for work from 24' to 36' H | SF | 250 | ||
| 4103 | for work from 36' H to 60' H | SF | 100 | ||
| 4104 | Remove loose and flaking paint on pipes up to 12' H. Ready for paint | SF | 500 | ||
| 4105 | for work from 12' to 24' H | SF | 500 | ||
| 4106 | for work from 24' to 36' H | SF | 250 | ||
| 4107 | for work from 36' H to 60' H | SF | 100 | ||
| 4108 | Apply one (1) prime coat to pipes up to 12' H. | SF | 500 | ||
| 4109 | for work from 12' to 24' H | SF | 500 | ||
| 4110 | for work from 24' to 36' H | SF | 250 | ||
| 4111 | for work from 36' H to 60' H | SF | 100 | ||
| 4112 | Pipes - Apply two (2) coats of paint to pipes and mark per Specs. - (Pipes not on wall) up to 12' H. | SF | 500 | ||
| 4113 | for work from 12' to 24' H | SF | 500 | ||
| 4114 | for work from 24' to 36' H | SF | 250 | ||
| 4115 | for work from 36' H to 60' H | SF | 100 | ||
| 4116 | Stairs -Prepare for paint - per floor | EA | 5 | ||
| 4117 | Stairs-Remove loose and flaking paint-per floor-Ready for paint | EA | 5 | ||
| 4118 | Apply one (1) prime coat to stairs. | EA | 5 | ||
| 4119 | Stairs -Apply 2 coats of paint - per floor | EA | 5 | ||
| EXTREIOR REPAIR | |||||
| 4120 | Remove existing caulk and apply new for work up to 12' H. | in-ft | 1,000 | ||
| 4121 | for work from 12' to 24' H | in-ft | 1,000 | ||
| 4122 | for work from 24' to 36' H | in-ft | 500 | ||
| 4123 | for work from 36' H to 60' H | in-ft | 250 | ||
| 4124 | Repair/Replace exterior stucco to match existing surface for work up to 12' H. | SF | 500 | ||
| 4125 | for work from 12' to 24' H | SF | 500 | ||
| 4126 | for work from 24' to 36' H | SF | 250 | ||
| 4127 | for work from 36' H to 60' H | SF | 100 | ||
| FLOORING | |||||
| 4128 | Prepare & Apply Two Coats of Epoxy Paint to Concrete Floor | SF | 100 | ||
| 4129 | Prepare & Apply Fuel Resistanct Epoxy/Urethane Coating | SF | 100 | ||
| 4130 | Prepare & Apply Epoxy/Urethane Floor Coating (3 layered process) | SF | 100 | ||
| 4131 | Prepare & Apply Quartz Expoxy/Urethane Floor Coating (3 Layer process) | SF | 100 | ||
| 4132 | Prepare & Apply Paint Flake Epoxy/Urethane Floor Coating (3 Layer Process) | SF | 100 | ||
| 4133 | Prepare Concrete floor, stain and seal | SF | 100 | ||
| LEAD BASE PAINT ABATEMENT | |||||
| 4134 | Interior walls, ducts or other surfaces up to 12' H. Industrial Area | SF | 1,000 | ||
| 4135 | for work above 12' H | SF | 500 | ||
| 4136 | Doors, One side include frame | SF | 500 | ||
| 4137 | Door frame only, One side | LF | 250 | ||
| 4138 | Exterior walls up to 12' H. | SF | 1,000 | ||
| 4139 | for work from 12' to 24' H | SF | 1,000 | ||
| 4140 | for work from 24' to 36' H | SF | 1,000 | ||
| 4141 | for work from 36' H to 60' H | SF | 1,000 | ||
| 4142 | Window frame up to 12' H. (per sf of window) | SF | 1,000 | ||
| 4143 | for work from 12' to 24' H | SF | 500 | ||
| 4144 | for work from 24' to 36' H | SF | 500 | ||
| 4145 | for work from 36' H to 60' H | SF | 500 | ||
| 4146 | Grilles, one side | SF | 100 | ||
| 4147 | Trusses open (Cross Section area) | SF-Face | 500 | ||
| 4148 | Pipes - (average price 1" to 16") | LF | 500 | ||
| 4149 | for work from 12' to 24' H | LF | 500 | ||
| 4150 | for work from 24' to 36' H | LF | 250 | ||
| 4151 | for work from 36' H to 60' H | LF | 100 | ||
| 4152 | Stairs - per story | EA | 10 | ||
| 4153 | Vertical and horizontal wood and metal framing-Columns etc. below 12' H | SF | 250 | ||
| ABATEMENT MISC | |||||
| 4154 | Encapsulate walls or other flat surfaces | SF | 5,000 | ||
| 4155 | for work from 12' to 24' H | SF | 5,000 | ||
| 4156 | for work from 24' to 36' H | SF | 5,000 | ||
| 4157 | for work from 36' H to 60' H | SF | 5,000 | ||
| 4158 | Encapsulate trim or other complex surfaces | SF | 5,000 | ||
| 4159 | for work from 12' to 24' H | SF | 5,000 | ||
| 4160 | for work from 24' to 36' H | SF | 5,000 | ||
| 4161 | for work from 36' H to 60' H | SF | 5,000 |
TOTAL FOR PAINT ITEMS