Attachment 09 Seed Task Call Sheet.pdf

PDF 166 KB Posted

Attached to
WPAFB Basewide Paint IDIQ
Solicitation number
FA8601-20-R-0017
Issued by

View the file

Other files

File Type Posted
Attachment_09_Seed Task Call Sheet_Amend08SEP2020.xlsx XLSX spreadsheet
Solicitation - FA860120R0017_09SEP2020.pdf PDF
Attachment 08 - Painting Call Sheet_Amend08SEP2020.xlsx XLSX spreadsheet
Attachment_09_Seed Task Call Sheet_Amend08SEP2020.xlsx XLSX spreadsheet
Solicitation - FA860120R0017_13AUG20.pdf PDF
Attachment_10_Experience Information Sheet rev1.pdf PDF
Solicitation - FA860120R0017_05AUG2020.pdf PDF
Attachment 01 Statement of Work_Amend01JUL2020.pdf PDF
Attachment_03_Section M_Amend28JUL2020.pdf PDF
Solicitation - FA860120R0017_28JUL2020.pdf PDF
Attachment_09_Seed Task Call Sheet_Amend28JUL2020.xlsx XLSX spreadsheet
Attachment 08 - Painting Call Sheet_Amend28JUL2020.xlsx XLSX spreadsheet
RFIs_04AUG2020.xlsx XLSX spreadsheet
Attachment_02_Section_L_Amend04 AUG2020.pdf PDF
Site Visit Sign-In.pdf PDF
Attachment 08 - Painting Call Sheet.xlsx XLSX spreadsheet
Attachment_09_Seed Task Call Sheet.xlsx XLSX spreadsheet
RFIs_30JUL2020.xlsx XLSX spreadsheet
Attachment_10_Experience Information Sheet.pdf PDF
Attachment_02_Section_L_Amend30JUL2020.pdf PDF
Attachment_03_Section M.pdf PDF
Solicitation - FA860120R0017.pdf PDF
Solicitation - FA860120R0017.pdf PDF
Requests for Information_Answered_20JUL2020.xlsx XLSX spreadsheet
Attachment 08 - Painting Call Sheet.xlsx XLSX spreadsheet
Solicitation - FA860120R0017.pdf PDF
Attachment_09_Seed Task Call Sheet.pdf PDF
Attachment 07 Wage Determination.pdf PDF
Attachment 06 Paint Formulas.pdf PDF
Attachment 08 Call Sheet.xlsx XLSX spreadsheet
Attachment 01 Statement of Work .pdf PDF
Attachment 04 - WPAFB Base Facility Standards.pdf PDF
Attachment 02 - Section L.pdf PDF
Solicitation - FA860120R0017.pdf PDF
Attachment 03 Section M .pdf PDF
Attachment 05 - WPAFB Master Specs.pdf PDF
Appendix A.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ORDER CALL INFORMATION (Painting) Task Order: # Project: ZHTV201700

Call Number: # Contract: FA860120R0017

OPP # : 1095562

Total Est Cost of Call: $ Date of Call: 2020????(yyyymmdd) EEIC 521: $0.00 Req Start Date: 20200701(yyyymmdd) EEIC 524: $ Req Completion Date: 20200831(yyyymmdd) EEIC 523: $0.00 Effective Date: (yyyymmdd) EEIC 529: $0.00 Revised Date: Total Cost: $

Work Location: FACILITY: 30001-30003 Contracting building

Work Description: FACILITY: Prepare, repair/replace as needed the exterior building material (i.e.

Stucco), scrape loose material, prepare doors, windows and trim apply paint on the exterior of facilities 30001/30003

PROJECT: # ZHTV201700 20R0017 EEIC:

PERIOD OF PERFORMANCE IS: 62 Days

ITEM DESCRIPTION COST PER AMOUNT TOTAL

Prepare flush door (metal or wood), one side including frame and trim. $ EA 16 $

Apply two (2) coats of paint or urethane to flush door (metal or wood), one side including frame and trim. $ EA 16 $

0031 Prepare roll‐up door for paint including frame and trim $ SF 701 $

Apply two (2) coats of paint to roll‐up door including frame and trim $ SF 701 $

Prepare exterior stucco, concrete and CMU wall surfaces including appurtenances as specified by the Government for painting up to 12' H. $ SF 26,549 $

0045 work above 12' H (RS Means +25% for equipment) $ SF 600 $

Remove loose and flaking paint on stucco, concrete and CMU wall surfaces up to 12' H and prepare for painting.

(Estimated SF of loose and flaking paint) $ SF 1500 $

0047 work above 12' H (RS Means +25% for equipment) $ SF 100 $

Apply one (1) prime coat to exterior stucco, concrete and CMU wall surfaces up to 12' H $ SF 26,549 $

0049 work above 12' H (RS Means +25% for equipment) $ SF 600 $

Apply two (2) coats of paint to all exterior stucco, concrete and CMU walls surfaces including appurtenances as specified by the Government up to 12' H. $ SF 26,549 $

0051 work above 12' H (RS Means +25% for equipment) $ SF 600 $

0053 work above 12' H (RS Means +25% for equipment) $ SF 29,690 $

0055 work above 12' H (RS Means +25% for equipment) $ SF 1000 $

0057 work above 12' H (RS Means +25% for equipment) $ SF 29,690 $

0059 work above 12' H (RS Means +25% for equipment) $ SF 29,690 $

0066 Apply one (1) coat of block filler up to 12' H. $ SF 100 $

Prepare window frame (Use window square footage) for paint up to 12' H. $ SF 742 $

Prime window frame (Use window square footage) up to 12' High $ SF 742 $

Apply Two (2) coats of paint to window frame (Use window square footage) up to 12' H. $ SF 742 $

0102 Remove existing caulk and apply new for work up to 12' H. $ In‐ft 300 $

Repair/Replace exterior stucco to match existing surface for work up to 12' H. $ SF 100 $

0105 work over 12' H $ SF 100 $

0110 Repair cracked of missing stucco prior to painting $ SF 500 $

TOTAL $

File details come from the government source that posted it. Updated .