Wage Determination.doc

DOC document 208 KB Posted

Attached to
Replace HVAC and Fire Suppression system Federal contract opportunity
Solicitation number
FA8601-09-B-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC and Fire Suppression system, newest first.
File Type Posted
RFIs 26 August 2009.pdf PDF
Amendment 4.pdf PDF
Addendum_2.pdf PDF
RFI for FA8601-09-B-0011.xls XLS spreadsheet
Amendment 2.pdf PDF
Amendment 3.pdf PDF
Site visit roster 13 August 09.pdf PDF
Wage Decision OH29 Mod 21 08-07-09.doc DOC document
U0001.pdf PDF
Amendment 1.doc DOC document
Combined Spec.pdf PDF
Addendum 1 040204 —
HVAC RENOVATION OF FACILITY 20018A Drawings.pdf PDF
Solicitation.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: OH080029 07/03/2009 OH29

Superseded General Decision Number: OH20070029

State: Ohio

Construction Type: Building

Counties: Adams, Allen, Ashland, Auglaize, Belmont, Brown, Butler, Clermont, Clinton, Coshocton, Crawford, Delaware, Erie, Fairfield, Fayette, Franklin, Greene, Guernsey, Hancock, Harrison, Highland, Hocking, Holmes, Huron, Jackson, Jefferson, Knox, Licking, Madison, Miami, Monroe, Montgomery, Morgan, Morrow, Muskingum, Noble, Ottawa, Perry, Pickaway, Pike, Preble, Richland, Ross, Sandusky, Scioto, Seneca, Tuscarawas, Vinton, Warren, Washington, Wayne, Wood and Wyandot Counties in

Ohio.

BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including four (4) stories)

Modification Number Publication Date

0 02/08/2008

1 02/15/2008

2 03/07/2008

3 04/04/2008

4 05/02/2008

5 06/06/2008

6 07/04/2008

7 07/25/2008

8 08/01/2008

9 08/15/2008

10 09/05/2008

11 10/03/2008

12 11/07/2008

13 12/05/2008

14 01/02/2009

15 02/06/2009

16 03/06/2009

17 04/03/2009

18 05/01/2009

19 06/05/2009

20 07/03/2009

ASBE0003-001 07/28/2008

ERIE (to Sandusky city limits) & HURON

Rates Fringes

Asbestos Workers/Insulator

(Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 33.63 13.60

* ASBE0008-001 07/01/2009

ADAMS, BROWN, BUTLER (Including Fairfield, Hanover, Liberty, Milford, Morgan, Oxford, Ripley, Ross, St. Clair, Union & Wayne

Townships), CLERMONT, HIGHLAND & WARREN (Including Deerfield, Hamilton, Harlan, Salem, Union & Washington Townships)

Rates Fringes

Asbestos Workers/Insulator

(ncludes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 26.98 11.89

ASBE0041-003 07/06/2008

ALLEN

Rates Fringes

Asbestos Workers/Insulator

(Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems).........................$ 27.94 11.06

ASBE0045-001 07/01/2008

ERIE (City limits of Sandusky & Townships of Groton, Margaretta, Oxford & Perkins), HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD & WYANDOT

Rates Fringes

Asbestos Workers/Insulator

(Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 29.37 18.38

* ASBE0050-001 07/01/2009

CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY,

HOCKING, KNOX, LICKING, MADISON, MORGAN, MORROW, MUSKINGUM,

NOBLE, PERRY, PICKAWAY, ROSS & VINTON

Rates Fringes

Asbestos Worker/Insulator

(Includes application of all insulating materials, protective coverings, coatings & finisings to all types of mechanical systems).....$ 22.65 9.39

* ASBE0050-002 07/01/2009

AUGLAIZE, BUTLER (Lemon & Madison Townships), CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Clear Creek, Franklin, Massie, Turtle Creek & Wayne Townships)

Rates Fringes

Asbestos Worker/Insulator

(Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 25.13 10.39

* ASBE0080-004 03/02/2009

JACKSON, PIKE, SCIOTO & WASHINGTON

Rates Fringes

Insulator/asbestos worker

(Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems) and Hazardous Material

Handler.....................$ 30.00 16.17

ASBE0084-001 07/01/2008

ASHLAND, COSHOCTON, HARRISON, HOLMES, RICHLAND, TUSCARAWAS &

WAYNE

Rates Fringes

ASBESTOS WORKER/INSULATOR

(Includes application of all insulating materials, protective coverings coatings

& finishings to all types of mechanical systems)..............$ 26.72 12.80

ASBE0207-004 06/01/2007

ALLEN

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scraping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 18.75 9.70

ASBE0207-006 08/01/2008

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)

ADAMS, BROWN, BUTLER

(Townships of Fairfield, Hanover, Liberty, Milford, Morgan, Oxford, Ripley, Ross, St. Clair, Union &

Wayne), CLERMONT, HIGHLAND

& WARREN (Townships of

Deerfield, Hamilton, Harlan, Salem, Union &

Washington) COUNTIES........$ 22.60 9.40

ASHLAND, COSHOCTON, ERIE

(Post Offices & Townships of: Berlin, Berlin

Heights, Birmingham, Florence, Huron, Milan, Shinrock & Vermilion), HARRISON & HURON COUNTIES...$ 22.60 9.40

AUGLAIZE, BUTLER

(Townships of Lemon &

Madison), CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE

& WARREN (Townships of

Clear Creek, Franklin, Massie, Turtle Creek &

Wayne) COUNTIES.............$ 22.60 9.40

CRAWFORD, DELAWARE,

FAIRFIELD, FAYETTE,

FRANKLIN, GUERNSEY,

HOCKING, KNOX, LICKING,

MADISON, MORGAN, MORROW,

MUSKINGUM, NOBLE, PERRY,

PICKAWAY, ROSS & VINTON

COUNTIES....................$ 22.60 9.40

ERIE (Portion covered by the city limits of

Sandusky, Ohio & by the

Townships of Groton, Margaretta, Oxford &

Perkins), HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD &

WYANDOT COUNTIES............$ 24.95 9.05

HOLMES, RICHLAND,

TUSCARAWAS & WAYNE COUNTIES.$ 14.45 3.60

BOIL0085-001 07/07/2008

ALLEN, ASHLAND, AUGLAIZE, CRAWFORD, DELAWARE, ERIE, HANCOCK,

HURON, KNOX, MORROW, OTTAWA, RICHLAND, SANDUSKY, SENECA, WOOD &

WYANDOT

Rates Fringes

BOILERMAKER......................$ 31.93 17.07

BOIL0105-001 10/01/2008

ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, FAIRFIELD, FAYETTE,

FRANKLIN, GREENE, GUERNSEY, HIGHLAND, HOCKING, JACKSON,

LICKING, MADISON, MIAMI, MONTGOMERY, MORGAN, MUSKINGUM, NOBLE,

PERRY, PICKAWAY, PIKE, PREBLE, ROSS, SCIOTO, VINTON & WARREN

Rates Fringes

BOILERMAKER......................$ 33.09 16.32

BOIL0154-005 06/01/2008

JEFFERSON

Rates Fringes

BOILERMAKER......................$ 33.90 19.82

BOIL0667-002 10/01/2008

BELMONT, MONROE & WASHINGTON

Rates Fringes

BOILERMAKER......................$ 34.69 15.32

* BOIL0744-005 07/01/2009

COSHOCTON, HARRISON, HOLMES, TUSCARAWAS & WAYNE

Rates Fringes

BOILERMAKER......................$ 36.84 17.48

BROH0003-001 07/01/2008

WOOD COUNTY (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson &

Grand Rapids)

Rates Fringes

Bricklayer, Stonemason...........$ 28.65 12.40

BROH0003-004 07/01/2008

WOOD COUNTY (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson &

Grand Rapids)

Rates Fringes

FINISHER.........................$ 22.98 6.35

Marble Setter, Terrazzo

Worker & Tile Setter.............$ 28.73 8.40

BROH0005-005 05/01/2009

ASHLAND, ERIE, HURON & RICHLAND

Rates Fringes

Marble Setter Finisher/Tile

Setter Finisher..................$ 25.32 9.82

Terrazzo Worker Finisher.........$ 25.02 10.20

BROH0006-001 05/01/2009

TUSCARAWAS

Rates Fringes

Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.65 10.48

BROH0006-002 05/01/2009

TUSCARAWAS

Rates Fringes

FINISHER.........................$ 20.79 8.46

Marble Setter, Terrazzo

Worker, Terrazzo Grinder &

Tile Setter......................$ 23.29 8.46

BROH0006-004 05/01/2009

TUSCARAWAS

Rates Fringes

Cement Mason/Plasterer...........$ 25.65 10.48

BROH0008-004 06/01/2008

Rates Fringes

Marble Setter

Finisher/Terrazzo Worker

Finisher

COSHOCTON, HARRISON,

HOLMES, JEFFERSON & WAYNE

(Excluding Milton &

Chippewa Townships)

COUNTIES....................$ 22.17 10.23

Tile setter finisher

COSHOCTON, HOLMES,

JEFFERSON (Townships of

Mt. Pleasant, Warren, Salineville & the Village of Dillonvale), & WAYNE

(Excluding Milton &

Chippewa Townships)

COUNTIES....................$ 22.17 10.23

BROH0009-001 07/01/2008

BELMONT, JEFFERSON (Warren & Mt. Pleasant Townships & the

Village of Dillonvale) & MONROE

Rates Fringes

Bricklayer, Stonemason...........$ 23.00 13.75

Marble Setter, Terrazzo

Worker & Tile Setter.............$ 23.00 13.75

Refractory.......................$ 27.22 13.75

* BROH0010-001 07/01/2009

JEFFERSON COUNTY (Brush Creek & Saline Townships)

Rates Fringes

BRICKLAYER

BRICKLAYERS; CAULKERS;

CLEANERS; CEMENT

BLOCKLAYERS; MARBLE

SETTERS; POINTERS;

STONEMASONS & TERRAZZO

WORKERS.....................$ 24.70 12.91

TILE FINISHER....................$ 20.00 12.91

TILE SETTER......................$ 23.00 12.91

BROH0014-001 07/01/2005

HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale)

Rates Fringes

Tile setter finisher.............$ 20.61 8.85

BROH0018-001 06/01/2008

BROWN, BUTLER, CLERMONT, PREBLE Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN

Rates Fringes

Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 26.11 9.49

Refractory.......................$ 26.61 9.49

BROH0018-004 12/01/2008

BROWN, BUTLER, CLERMONT, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN

Rates Fringes

Marble Setter, Terrazzo

Worker & Tile Setter.............$ 26.37 9.39

BROH0018-006 12/01/2008

ADAMS, BROWN, BUTLER, CLERMONT, FAYETTE, JACKSON, PIKE, ROSS,

SCIOTO, VINTON, WARREN & WASHINGTON

Rates Fringes

Marble, terrazzo and tile finisher

Finishers...................$ 21.93 9.39

Marble Sanders, Polishers, Waxers, & Sawyers...........$ 22.00 9.39

Terrazzo Base Grinders

(While operating base grinding machine)...........$ 22.35 9.39

BROH0022-001 07/01/2007

CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships)

Rates Fringes

Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.20 9.24

BROH0022-002 03/01/2008

CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships)

Rates Fringes

Marble Setter, Terrazzo

Worker & Tile Setter.............$ 24.08 8.62

BROH0022-003 03/01/2008

AUGLAIZE, CLINTON, GREENE, HIGHLAND, MIAMI, MONTGOMERY & PREBLE

Rates Fringes

Base Machine Men.................$ 23.33 3.75

FINISHER.........................$ 22.83 3.75

BROH0035-001 07/01/2008

ALLEN & AUGLAIZE

Rates Fringes

Bricklayer, Caulkler, Cleaner, Pointer, Stonemason

& Tile Setter....................$ 24.46 9.84

BROH0039-001 06/01/2008

ADAMS & SCIOTO

Rates Fringes

BRICKLAYER

BRICKLAYERS; CAULKERS;

CLEANERS; MARBLE SETTERS;

POINTERS; STONEMASONS;

TERRAZZO WORKERS; & TILE

SETTERS.....................$ 25.62 13.85

BROH0040-001 06/01/2008

ASHLAND, CRAWFORD, HOLMES, MORROW, RICHLAND, WAYNE & WYANDOT

(Except Crawford, Ridge, Richland & Tymochtee Townships)

Rates Fringes

BRICKLAYER

BRICKLAYERS; BLOCKLAYERS;

CAULKERS; CLEANERS; MARBLE

SETTERS; POINTERS;

STONEMASONS; TERRAZZO

WORKERS & TILE SETTERS......$ 25.42 13.70

Layout Man and Sawman rate: $1.00 per hour above journeyman rate.

Free standing stack work ground level to top of stack;

Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.

"Hot" work: $2.50 above journeyman rate.

BROH0044-001 06/01/2008

Rates Fringes

BRICKLAYER

COSHOCTON, FAIRFIELD,

GUERNSEY, HOCKING, KNOX,

LICKING, MORGAN,

MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne

Townships) & PERRY COUNTIES

BRICKLAYERS; CAULKERS;

CLEANERS; POINTERS; &

STONEMASONS................$ 24.70 9.65

Cement Mason/Plasterer

COSHOCTON & GUERNSEY

COUNTIES

CEMENT MASONS & PLASTERERS.$ 24.70 9.65

BROH0045-001 06/01/2008

FAYETTE, JACKSON, PIKE, ROSS & VINTON

Rates Fringes

Bricklayer, Caulker, Cement

Mason, Cleaner, Pointer &

Stonemason.......................$ 27.22 9.85

BROH0046-001 06/01/2008

Rates Fringes

BRICKLAYER

ERIE, HANCOCK, HURON,

OTTAWA, SANDUSKY, SENECA,

WOOD (Perry & Bloom

Townships) & WYANDOT

(Tymochtee, Crawford, Ridge & Richland

Townships) COUNTIES & the islands of Lake Erie north of Sandusky

BRICKLAYERS; CAULKERS;

CEMENT BLOCK LAYERS;

CLEANERS; GUNNITE MASONS;

MARBLE SETTERS; POINTERS;

REFRACTORY MASONS;

STONEMASONS; TERRAZZO

WORKERS; & TILE SETTERS....$ 26.13 13.50

Cement Mason and plasterer

ERIE, HURON, OTTAWA,

SANDUSKY, SENECA, WOOD

(Perry & Bloom Townships)

& WYANDOT (Tymochtee, Crawford, Ridge & Richland

Townships) COUNTIES & the islands of Lake Erie north of Sandusky................$ 26.13 13.50

Marble Setter Finisher, Terrazzo Worker Finisher, Tile Setter Finisher

HANCOCK, OTTAWA, SANDUSKY,

SENECA, WOOD (Perry &

Bloom Townships) & WYANDOT

(Tymochtee, Crawford, Ridge & Richland

Townships) COUNTIES & the islands of Lake Erie north of Sandusky................$ 22.38 13.50

Colored or shake floors and epoxy floors: $.75 per hour above journeyman rate.

Layout Man and Sawman; Premium topping materials (emery, iron, etc.): $1.00 per hour above journeyman rate.

Free standing stack work ground level to top of stack;

Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Vertical slip forms, jump forms or continuous forming of any kind up to 50 feet; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.

Vertical slip forms, jump forms or continuous forming of any kind above 50 feet: 1 1/2 times journeyman rate.

"Hot" work: $2.50 above journeyman rate.

BROH0052-002 06/01/2008

NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) & WASHINGTON

Rates Fringes

Bricklayer, Blocklayer, Caulker, Cleaner, Marble

Setter, Pointer, Stonemason, Te rrazo Worker & Tile Setter..$ 24.93 10.50

BROH0055-001 06/01/2008

DELAWARE, FRANKLIN, MADISON & PICKAWAY

Rates Fringes

Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 26.30 10.90

BROH0055-002 06/01/2008

COSHOCTON, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY,

HOCKING, JACKSON, KNOX, LICKING, MADISON, MORGAN, MUSKINGUM,

NOBLE (Beaver, Buffalo, Seneca & Wayne Townships), PERRY, PICKAWAY, PIKE, ROSS & VINTON

Rates Fringes

Marble & Tile Setter and

Terrazzo Worker..................$ 24.62 9.12

BROH0055-004 06/01/2008

BELMONT, DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, HOCKING,

KNOX, LICKING, MADISON, MONROE, MORGAN, MORROW, MUSKINGUM,

NOBLE, PERRY & PICKAWAY

Rates Fringes

Marble, terrazzo and tile finisher.........................$ 25.34 1.85

* CARP0069-001 05/01/2009

TUSCARAWAS & WAYNE

Rates Fringes

Carpenter & Soft Floor Layer.....$ 24.29 10.72

* CARP0069-005 05/01/2009

COSHOCTON, HOLMES, KNOX & MORROW

Rates Fringes

Carpenter & Soft Floor Layer.....$ 22.95 10.10

* CARP0171-001 05/01/2009

BELMONT, HARRISON, JEFFERSON & MONROE

Rates Fringes

Carpenter & Soft Floor Layer.....$ 24.12 12.39

CARP0200-001 06/01/2009

DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, LICKING, MADISON,

MORGAN, MUSKINGUM, NOBLE, PERRY & PICKAWAY

Rates Fringes

Carpenter & Soft Floor Layer.....$ 24.86 9.88

PILEDRIVERMAN....................$ 25.54 9.88

CARP0248-002 07/01/2008

HANCOCK & WOOD

Rates Fringes

FLOOR LAYER: CARPET (SOFT)

FLOOR............................$ 26.35 14.78

CARP0248-003 07/01/2008

HANCOCK

Rates Fringes

Carpenter/Lather.................$ 23.71 13.28

CARP0356-001 06/01/2009

HOCKING, VINTON & WASHINGTON

Rates Fringes

CARPENTER........................$ 25.28 13.38

FLOOR LAYER: CARPET (SOFT)

FLOOR............................$ 24.85 13.38

PILEDRIVERMAN....................$ 25.58 13.38

CARP0372-001 07/01/2008

ALLEN & AUGLAIZE

Rates Fringes

Carpenter/Lather.................$ 23.18 13.28

CARP0437-001 06/01/2009

ADAMS, FAYETTE, HIGHLAND, JACKSON, PIKE, ROSS & SCIOTO

Rates Fringes

CARPENTER........................$ 25.36 14.26

* CARP0735-001 05/01/2009

ASHLAND, ERIE, HURON & RICHLAND

Rates Fringes

Carpenter & Soft Floor Layer.....$ 23.58 10.34

CARP1066-001 09/01/1999

BROWN, BUTLER, CLERMONT, CLINTON & WARREN

Rates Fringes

MILLWRIGHT.......................$ 21.90 7.92

CARP1066-002 09/01/1999

GREENE, MIAMI, MONTGOMERY & PREBLE

Rates Fringes

MILLWRIGHT.......................$ 21.90 9.02

CARP1241-001 06/01/2008

DELAWARE, FAIRFIELD, FRANKLIN, GUERNSEY, LICKING, MADISON,

MORGAN, MUSKINGUM, NOBLE, PERRY & PICKAWAY

Rates Fringes

MILLWRIGHT.......................$ 27.30 13.77

CARP1311-002 06/01/2008

BROWN, BUTLER, CLERMONT, CLINTON & WARREN

Rates Fringes

Carpenter & Piledrivermen

(Does not include Walls &

Ceiling Work)....................$ 23.85 9.67

CARP1311-004 06/01/2009

GREENE, MIAMI, MONTGOMERY & PREBLE

Rates Fringes

Carpenter & Piledrivermen

(Does not include Acoustic

Ceiling Installers, Drywall

Hangers or Metal Stud Framers)...$ 23.60 10.92

CARP1311-007 06/01/2008

BROWN, BUTLER, CLERMONT, CLINTON & WARREN

Rates Fringes

Carpenter/Lather (Walls &

Ceiling Work only)...............$ 23.85 9.67

CARP1311-014 09/01/2006

GREENE, MIAMI, MONTGOMERY & PREBLE

Rates Fringes

FLOOR LAYER: CARPET (SOFT)

FLOOR............................$ 21.79 8.83

CARP1311-015 06/01/2009

GREENE, MIAMI, MONTGOMERY & PREBLE

Rates Fringes

Acoustic Ceiling Installer, Drywall Hanger, Lather &

Metal Stud Framer................$ 23.60 10.92

CARP1393-001 07/01/2008

CRAWFORD, HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD

Rates Fringes

Millwright/Piledriverman.........$ 27.30 16.05

CARP1393-004 07/01/2008

ALLEN, AUGLAIZE & WYANDOT

Rates Fringes

Millwright/Piledriverman.........$ 25.15 15.92

CARP1519-002 06/01/2009

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON, PIKE, ROSS, SCIOTO

& VINTON

Rates Fringes

MILLWRIGHT.......................$ 30.11 14.14

CARP1755-002 06/01/2001

WASHINGTON

Rates Fringes

MILLWRIGHT.......................$ 24.39 10.16

* CARP1871-001 05/01/2009

ASHLAND, ERIE, HURON & RICHLAND

Rates Fringes

MILLWRIGHT.......................$ 28.46 12.91

* CARP1871-002 05/01/2009

ASHLAND, ERIE, HURON & RICHLAND

Rates Fringes

PILEDRIVERMAN....................$ 28.46 12.91

* CARP1871-003 05/01/2009

BELMONT, HARRISON, & MONROE

Rates Fringes

PILEDRIVERMAN....................$ 29.46 12.14

* CARP1871-004 05/01/2009

COSHOCTON, HOLMES, KNOX & MORROW

Rates Fringes

PILEDRIVERMAN....................$ 22.86 10.88

* CARP1871-005 05/01/2009

BELMONT, HARRISON, JEFFERSON & MONROE

Rates Fringes

MILLWRIGHT.......................$ 26.96 12.14

* CARP1871-011 05/01/2009

COSHOCTON, HOLMES, KNOX & MORROW

Rates Fringes

MILLWRIGHT.......................$ 22.86 10.88

* CARP1871-012 05/01/2009

TUSCARAWAS & WAYNE

Rates Fringes

MILLWRIGHT.......................$ 23.76 11.73

* CARP1871-013 05/01/2009

TUSCARAWAS & WAYNE

Rates Fringes

PILEDRIVERMAN....................$ 23.76 11.73

CARP2239-001 07/01/2008

CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT

Rates Fringes

CARPENTER........................$ 23.71 13.28

* ELEC0008-001 04/27/2009

HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD

Rates Fringes

CABLE SPLICER....................$ 35.70 17.06

ELECTRICIAN......................$ 34.00 16.98

ELEC0032-001 06/01/2009

ALLEN, AUGLAIZE & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships)

Rates Fringes

ELECTRICIAN......................$ 28.05 11.94

ELEC0032-002 06/01/1998

ALLEN & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Richland, Ridge & Salem Townships)

Rates Fringes

Line Construction

Equipment Operator..........$ 20.27 4.12+a

Groundman Truck Driver......$ 14.43 3.63+a

Lineman.....................$ 22.52 4.31+a

FOOTNOTE: a. Half a day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day

ELEC0071-002 05/29/2006

ASHLAND, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE,

FRANKLIN, GUERNSEY, HIGHLAND, HOCKING, JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston Townships), KNOX, LICKING, MADISON, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York Townships), VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships) &

WASHINGTON

Rates Fringes

Line Construction

Linemen; Cable Splicers.....$ 28.30 10.34

ELEC0071-003 05/29/2006

AUGLAIZE, CLINTON, GREENE, MIAMI, MONTGOMERY & PREBLE

Rates Fringes

Line Construction

Equipment Operator..........$ 25.47 9.78

Groundman...................$ 18.40 8.38

Lineman.....................$ 28.30 10.34

ELEC0071-011 05/29/2006

BELMONT, HARRISON, HOLMES, JEFFERSON & WAYNE

Rates Fringes

Line Construction

Equipment Operator..........$ 25.47 9.78

Groundman...................$ 18.40 8.38

Lineman.....................$ 28.30 10.34

ELEC0071-012 05/29/2006

BROWN, BUTLER, CLERMONT & WARREN

Rates Fringes

Line Construction

Equipment Operator..........$ 25.47 9.78

Groundman...................$ 18.40 8.38

Lineman.....................$ 28.30 10.34

ELEC0082-001 06/01/2009

CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Wayne, Clear Creek & Franklin Townships)

Rates Fringes

ELECTRICIAN......................$ 28.45 12.98

ELEC0082-005 05/24/2004

CLINTON, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (Wayne, Clear Creek & Franklin Townships)

Rates Fringes

Sound & Communication

Technician

Cable Puller................$ 9.14 4.91

Installer/Technician........$ 18.28 6.32

* ELEC0129-004 03/16/2009

ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships)

Rates Fringes

ELECTRICIAN......................$ 29.85 13.76

ELEC0141-003 09/01/2008

BELMONT

Rates Fringes

CABLE SPLICER....................$ 26.51 18.60

ELECTRICIAN......................$ 26.26 18.60

* ELEC0212-001 06/01/2009

BROWN & CLERMONT

Rates Fringes

ELECTRICIAN......................$ 26.11 13.32

ELEC0212-002 01/01/2006

BROWN & CLERMONT

Rates Fringes

Sound & Communication

Technician.......................$ 20.45 6.95

ELEC0245-001 09/01/2008

HANCOCK, OTTAWA, SANDUSKY, SENECA & WOOD

Rates Fringes

Line Construction

Cable Splicer...............$ 38.12 21.25%+4.75

Groundman/Truck Driver......$ 19.82 21.25%+4.75

Heli-arc Welding............$ 33.45 21.25%+4.75

Lineman.....................$ 33.15 21.25%+4.75

Operator - Class 1..........$ 26.52 21.25%+4.75

Operator - Class 2..........$ 23.21 21.25%+4.75

Traffic Signal & Lighting

Technician..................$ 29.84 21.25%+4.75

FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial

Day; Independence Day; Labor Day; Thanksgiving Day; &

Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.

ELEC0246-001 10/29/2007

HARRISON & JEFFERSON

Rates Fringes

ELECTRICIAN......................$ 31.00 18.29+a

FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday

ELEC0306-004 05/25/2009

WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton & Wayne Townships)

Rates Fringes

CABLE SPLICER....................$ 34.98 5%+11.76

ELECTRICIAN......................$ 32.39 5%+11.76

ELEC0317-007 06/01/1998

ADAMS, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union Townships), SCIOTO &

VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships)

Rates Fringes

Line Construction

Cable Splicers..............$ 23.66 8.48

Equipment Operators.........$ 17.14 8.25

Groundmen...................$ 13.92 8.14

Linemen.....................$ 21.42 8.40

ELEC0540-001 05/26/2008

HOLMES, TUSCARAWAS (North of Auburn Clay, Rush & York

Townships), & WAYNE (South of Baughman, Chester, Green & Wayne

Townships)

Rates Fringes

ELECTRICIAN......................$ 27.44 16.20

ELEC0540-003 06/05/1997

TUSCARAWAS COUNTY (North of Auburn, Clay, Rush & York Townships)

Rates Fringes

Line Construction

Groundman; & Truck Driver...$ 14.65 8.18

Line Equipment Operator.....$ 19.02 8.69

Lineman; & Cable Splicer....$ 21.86 9.01

ELEC0575-001 06/01/2009

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY

(Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion

Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)

Rates Fringes

ELECTRICIAN......................$ 30.55 11.87

ELEC0575-003 05/28/2007

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON, PICKAWAY (Deer

Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE, ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)

Rates Fringes

Sound & Communication

Technician

Cable Puller................$ 10.38 6.75

Installer...................$ 19.63 7.42

ELEC0648-001 09/04/2006

BUTLER & WARREN (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships)

Rates Fringes

CABLE SPLICER....................$ 25.30 8.80

ELECTRICIAN......................$ 24.80 8.80

ELEC0683-001 06/02/2008

DELAWARE, FAIRFIELD, FRANKLIN, MADISON & PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships)

Rates Fringes

Electricians:

Cable splicer...............$ 28.60 12.43

Electrician.................$ 28.00 12.41

ELEC0683-006 05/28/2007

DELAWARE, FAIRFIELD, FRANKLIN, MADISON & PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships)

Rates Fringes

Sound & Communication

Technician

Cable Puller................$ 11.75 4.20

Installer...................$ 22.11 4.95

ELEC0688-001 05/27/2009

ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley &

Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown &

Jefferson Townships), MORROW, RICHLAND & WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)

Rates Fringes

ELECTRICIAN......................$ 25.99 13.89

ELEC0688-004 05/28/2007

ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley &

Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown &

Jefferson Townships), MORROW, RICHLAND & WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)

Rates Fringes

Sound & Communication

Technician

Cable Puller................$ 11.16 5.22

Installer...................$ 21.04 5.93

ELEC0867-001 06/01/1998

ERIE

Rates Fringes

Line Construction

Lineman; Cable Splicer; &

Equipment Operator..........$ 20.75 4.09

Truck Driver (Winch)

Groundman; & Groundman......$ 13.49 3.87

ELEC0972-001 06/01/2008

MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton &

Wilkesville Townships) & WASHINGTON

Rates Fringes

Electricians:

Cable Splicer...............$ 28.48 18.27

Electrician.................$ 28.23 18.27

ELEC1105-001 06/01/2008

COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College

Townships), LICKING, MUSKINGUM, PERRY & TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry &

Bucks Townships)

Rates Fringes

ELECTRICIAN......................$ 26.94 11.64

ELEC1105-002 05/28/2007

COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hillard, Butler, Harrison, Pleasant & College

Townships), LICKING, MUSKINGUM, PERRY & TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry &

Bucks Townships)

Rates Fringes

Sound & Communication

Technician

Cable Puller................$ 10.09 7.27

Installer...................$ 19.10 7.93

ELEV0006-003 01/01/2009

Rates Fringes

ELEVATOR MECHANIC................$ 38.65 18.285+A&B

FOOTNOTE:

A. Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

ELEV0011-001 01/01/2009

ADAMS, BROWN, BUTLER, CLERMONT, CLINTON, GREENE, HIGHLAND,

MIAMI, MONTGOMERY, PREBLE & WARREN

Rates Fringes

ELEVATOR MECHANIC................$ 36.24 18.285+a+b

FOOTNOTES:

a. 8 Paid Holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Veterans' Day; Thanksgiving

Day; the Day after Thanksgiving; & Christmas Day

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.

ELEV0017-001 01/01/2009

ERIE & HURON

Rates Fringes

ELEVATOR MECHANIC................$ 40.41 18.285+a+b

FOOTNOTES:

a. 8 Paid Holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Veterans' Day; Thanksgiving

Day; Day After

Thanksgiving; & Christmas Day

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than

5 years; 6% for less than 5 years.

ELEV0037-001 01/01/2009

ASHLAND, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD, FAYETTE,

FRANKLIN, HOCKING, HOLMES, KNOX, LICKING, MADISON, MORGAN,

MORROW, MUSKINGUM, PERRY, PICKAWAY, RICHLAND, ROSS, TUSCARAWAS

& VINTON

Rates Fringes

ELEVATOR MECHANIC................$ 36.20 18.285+a+b

FOOTNOTES:

a. 8 Paid Holidays: New Year's Day; Memorial Day;

Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Day after

Thanksgiving; & Christmas Day

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than

5 years; 6% for less than 5 years.

ELEV0044-001 01/01/2009

ALLEN, AUGLAIZE, HANCOCK, OTTAWA, SANDUSKY, SENECA, WOOD &

WYANDOT

Rates Fringes

ELEVATOR MECHANIC................$ 39.43 18.285+a+b

FOOTNOTES:

a. 8 Paid Holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Veterans Day; Thanksgiving

Day; The Day after Thanksgiving; & Christmas Day

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than

5 yrs.; 6% for less than 5 yrs.

ELEV0045-001 01/01/2009

WAYNE

Rates Fringes

ELEVATOR MECHANIC................$ 38.29 18.285+a+b

FOOTNOTES:

a. 8 Paid Holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Veterans' Day; Thanksgiving

Day; Day after Thanksgiving; & Christmas Day

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years.

ELEV0048-002 01/01/2009

JACKSON, PIKE & SCIOTO

Rates Fringes

ELEVATOR MECHANIC................$ 37.30 18.285

FOOTNOTES:

a. 8 Paid Holidays: New Year's Day; Memorial Day;

Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Day after Thanksgiving

Day; & Christmas Day

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than

5 years; 6% for less than 5 years' service

ENGI0018-001 05/01/2009

ADAMS, ALLEN, ASHLAND, AUGLAIZE, BELMONT, BROWN, BUTLER,

CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DELAWARE, FAIRFIELD,

FAYETTE, FRANKLIN, GREENE, GUERNSEY, HANCOCK, HARRISON,

HIGHLAND, HOCKING, HOLMES, JACKSON, JEFFERSON, KNOX, LICKING,

MADISON, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM,

NOBLE, OTTAWA, PERRY, PICKAWAY, PIKE, PREBLE, RICHLAND, ROSS,

SANDUSKY, SCIOTO, SENECA, TUSCARAWAS, VINTON, WARREN,

WASHINGTON, WAYNE & WYANDOT

Rates Fringes

OPERATOR: Power Equipment

GROUP 1.....................$ 30.74 11.16

GROUP 2.....................$ 30.49 11.16

GROUP 3.....................$ 29.99 11.16

GROUP 4.....................$ 29.74 11.16

GROUP 5.....................$ 29.49 11.16

GROUP 6.....................$ 29.37 11.16

GROUP 7.....................$ 28.33 11.16

GROUP 8.....................$ 27.15 11.16

GROUP 9.....................$ 21.69 11.16

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Boom & Jib 250' & Over

GROUP 2 - Boom & Jib Over 180' through 249'

GROUP 3 - Boom & Jib 150' through 180'

GROUP 4 - Master Mechanic

GROUP 5 - Barrier Moving Machine; Boiler or Compressor

Mounted on Crane (Piggy-Back Operation); Boom Truck (All

Types); Cableway; Cherry Picker; Combination Concrete Mixer

& Tower; All Concrete Pumps with Booms; Crane (All Types);

Crane-Compact, Track or Rubber Over 4,000 lbs Capacity;

Crane-Self Erecting, Stationary, Track or Truck (All

Configurations); Derrick (All Types); Dragline; Dredge

(Dipper, Clam or Suction) 3 Man Crew; Elevating Grader or

Euclid Loader; Floating Equipment; Forklift(rough terrain with winch/hoist) Gradall; Helicopter Operator & Helicopter

Winch Operator (Hoisting Builders Materials); Hoe

(AllTypes); Hoist (Two or More Drums); Horizontal

Directional Drill; Hydraulic Gantry (Lift System); Laser

Finishing Machine; Laser Screed and Like Equipment; Lift

Slab or Panel Jack; Locomotive (All Types); Maintenance

Engineer (Mechanic and/or Welder); Mixer, Paving (Multiple

Drum); Mobile Concrete Pump With Boom; Panelboard (All

Types on Site); Pile Driver; Power Shovel; Prentice Loader;

Rail Tamper (with Automatic Lifting & Aligning device);

Rotary Drill (All) used on Caisson Work for Foundations &

Substructure work; Side Boom; Slip Form Paver; Straddle

Carrier (Building Construction on Site); Trench Machine

(Over 24" Wide); & Tug Boat

GROUP 6 - Asphalt Paver; Bobcat-type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Bulldozer;

C.M.I. Type Equipment; Endloader; Hydro Milling Machine;

Kolman Type Loader (Dirt Loading); Lead Greaseman; Mucking

Machine; Pettibone-Rail Equipment; Power Grader; Power

Scoop; Power Scraper; Push Cat; Rotomill (All), Grinders &

Planers of All Types & Vermeer Type Concrete Saw

GROUP 7 - A-Frame; Air Compressor Pressurizing Shafts or

Tunnels; Asphalt Roller (All); Bobcat-type and/or Skid

Steer Loader with or without Attachments; Boiler (15 lbs.

pressure & over); All Concrete Pumps without Booms & with

5" System; Forklift (Except Masonry); Highway Drills-All

Types (with Integral Power); Hoist (One Drum); House

Elevator (except those automatic call button controlled);

Man Lift; Material Hoist/Elevator; Mud Jack; Pressure

Grouting; Pump (Installing or Operating Well Points or other Type of Dewatering Systems); Pump (4" and over

Discharge); Railroad Tie Inserter/Remover; Rotovator (Lime soil Stabilizer); Submersible Pump (4" and over Discharge);

Switch & Tie Tamper (w/o lifting & aligning device); Trench

Machine (24" & under); & Utility

GROUP 8 - Ballast Relocator; Backfiller & Tamper; Batch

Plant; Bar & Joint Installing Machine; Bull Floats; Burlap

& Curing Machines; Clefplanes; Compressor on Building

Construction; Concrete Mixer, Capacity more than one bag;

Concrete Mixer, one bag capacity (side loader); All

Concrete Pumps without Booms with 4" or Smaller System;

Concrete Spreading Machine; Conveyor, used for handling building materials; Crusher; Deckhand; Drum Fireman in

Asphalt Plant; Farm Type Tractor, Pulling Attachments;

Finishing Machines; Form Trencher; Generator; Gunite

Machine; Hydro-Seeder; Pavement Breaker (Hydraulic or

Cable); Post Driver; Post Hole Digger; Pressure Pump (over

1/2" discharge); Road Widening Trencher; Roller (except

Asphalt); Self-propelled Power Spreader; Self-propelled

Sub-Grader; Shotcrete Mahine; Tire Repairman; Tractor

(Pulling Sheep Foot Roller or Grader); VAC/ALL; Vibratory

Compactor (with Integral Power) & Welder

GROUP 9 - Allen Screed Paver(concrete); Boiler (Less than 15 lbs. pressure); Crane-Compact, Track or Rubber under 4,000 lbs.; Directional Drill "Locator"; Inboard & Outboard Motor

Boat Launch; Light Plant; Masonry Forklift; Oiler; Power

Driven Heater (Oil Fired); Power Scrubber; Power Sweeper;

Pump (Under 4" discharge); & Submersible Pump (Under 4" discharge)

ENGI0018-002 05/01/2008

ERIE & HURON

Rates Fringes

OPERATOR: Power Equipment

Crane (Boom & Jib 200' &

Over, Up to 299'); Master

Mechanic....................$ 32.88 10.81

Crane (Boom & Jib 300' &

Over).......................$ 33.13 10.81

GROUP 1.....................$ 32.13 10.81

GROUP 2.....................$ 31.98 10.81

GROUP 3.....................$ 30.53 10.81

GROUP 4.....................$ 29.75 10.81

GROUP 5.....................$ 29.43 10.81

GROUP 6.....................$ 22.35 10.81

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - A-Frame; Boiler or Compressor Operator, Hydraulic

Pump & Power Pacs Mounted on Crane or Piggy-Back Operation;

Boom Truck (All Types); Cableway; Cherry Picker;

Combination Concrete Mixer & Tower; All Concrete Pumps;

Crane (All Types); Derrick (All Types); Dragline; Dredge

(Dipper, Clam or Suction); 3 Man Crew; Elevating Grader or

Euclid Loader; Floating Equipment; Gradall; Helicopter

Operator & Helicopter Winch Operator Hoisting Building

Materials; Hoe (All Types); Hoist (Two or More Drums); Lift

Slab or Panel Jack Operator; Locomotive (All Types);

Maintenance Engineer (Mechanic); Mixer; Paving (Multiple

Drum); Mobile Concrete Pump with Boom; Panelboard (All types on site); Pile Driver; Power Shovel; Robotic

Equipment Operator/Mechanic; Rotary Drill (all), used on

Caissons for Foundations & Sub-structure Work; Rough

Terrain Forklift with Winch/Hoist; Side Boom; Slip Form

Paver; Straddle Carrier; Trench Machine (Over 24" Wide); &

Tug Boat

GROUP 2 - Asphalt Paver; Bulldozer; CMI-Type Equipment;

Endloader; Horizontal Directional Drill Locator and

Operator; Kohlman Type Loader (Dirt Loading); Lead

Greaseman; Mucking Machine; Power Grader; Power Scoop;

Power Scraper; & Push Cat

GROUP 3 - Air Compressor, Pressurizing Shafts or Tunnels;

Asphalt Roller (all); Fork Lift; Hoist, One Drum; House

Elevator (Except Automatic Call Button-controlled); Laser

Screeds & Like Equipment; Man Lift; Mud Jack; Boiler (Over

15 lbs. Pressure); Pressure Grouting; Pump Operator (

Installing or operating Well Points or other type of

Dewatering system); Trencher (24" & under); & Utility

Operator

GROUP 4 - Compressor on Building construction; Conveyor, building material; Generator; Gunite Machine; Concrete

Mixer, Capacity more than one bag; Concrete Mixer, One Bag capacity (Side Loader); Pavement Breaker, Hydraulic or

Cable; Post Driver; Post Hole Digger; Road Widening

Trencher; Roller; & Welder Operator

GROUP 5 - Backfiller & Tamper; Bar & Joint Installing

Machine; Batch Plant; Bullfoat; Burlap and Curing Machine;

Cleaning Machine (decontamination included); Clefplane;

Concrete Spreading Machine; Crusher; Deckhand; Drum Fireman

(Asphalt); Farm-type Tractor, Pulling attachments;

Finishing Machine; Fork Lift (Masonry Work); Form Trencher;

High Pressure Pump (Over 1/2" discharge); Hydro Seeder;

Pump (4" and Over discharge); Submersible Pump (4" and Over discharge); Self-propelled Power Spreader; Self-propelled

Sub-grader; Tire Repairman; Tractor, Pulling Sheeps Foot

Roller or Grader; & Vibratory Compactor, With Integral Power

GROUP 6 - Inboard & Outboard Motor Boat Launch; Light Plant

Operator; Oiler; Signalman; Power Driven Heater (Oil

Fired); Power Scrubber; Power Sweeper; Power Boiler (Less than 15 lbs. Pressure); Pump (Under 4" discharge);

Submersible Pump (Under 4" discharge); Signalperson; Bob

Cat-type and/or Skid Steer Loader; Grade Checker; VAC/ALL;

Rod Man

ENGI0018-007 05/01/2009

WOOD

Rates Fringes

OPERATOR: Power Equipment

GROUP 1.....................$ 31.49 11.16

GROUP 2.....................$ 31.24 11.16

GROUP 3.....................$ 30.74 11.16

GROUP 4.....................$ 30.49 11.16

GROUP 5.....................$ 30.24 11.16

GROUP 6.....................$ 30.12 11.16

GROUP 7.....................$ 29.08 11.16

GROUP 8.....................$ 27.90 11.16

GROUP 9.....................$ 22.44 11.16

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Boom & Jib 250' & Over

GROUP 2 - Boom & Jib Over 180' through 249'

GROUP 3 - Boom & Jib 150' through 180'

GROUP 4 - Master Mechanic

GROUP 5 - Barrier Moving Machine; Boiler or Compressor

Mounted on Crane (Piggy-Back Operation); Boom Truck (all types); Cableway; Cherry Picker; Combination Concrete Mixer

& Tower; Concrete Pump with Booms; Crane (all types);

Crane-Compact, Track or Rubber over 4,000 lbs. Capacity;

Crane-Self Erecting, Stationary, Track or Truck (all configurations); Derrick (all types); Dragline; Dredge

(Dipper, Clam or Suction) 3 Man Crew; Elevating Grader or

Euclid Loader; Floating Equipment; Forklift (rough terrain with winch/hoist) Gradall; Helicopter Operator, Hoisting

Building Materials; Hoes (all types); Hoists (with two or more drums in use); Horizontal Directional Drill; Hydraulic

Gantry (lift system); Laser Finishing Machine; Laser Screed and Like Equipment; Lift Slab or Panel Jack; Locomotive

(all types); Maintenance Engineer (Mechanic and/or welder);

Mixer Paving (Multiple Drum); Mobile Concrete Pump (With

Boom); Panelboard (all types on site); Pile Driver; Power

Shovel; Prentice Loader; Rail Tamper (with automatic lifting & aligning device0; Rotary Drill (all) used on

Caissons for Foundations & Substructure work; Side Boom;

Slip Form Paver; Straddle Carrier (building construction on site); Trench Machine (Over 24" Wide); & Tug Boat

GROUP 6 - Asphalt Paver; Bobcat-type and/or Skid Steer Loader with Hoe Attachment greater than 7,000 lbs.; Bulldozer;

C.M.I. Type Equipment; Endloader; Hydro Milling Machine;

Kolman Type Loader (Dirt Loading); Lead Greaseman; Mucking

Machine; Pettibone-Rail Equipment; Power Grader; Power

Scoop; Power Scraper; Push Cat; Rotomill (all), Grinders and Planers of All Types; & Vermeer Type Concrete Saw

GROUP 7 - A-Frame; Air Compressor, Pressurizing Shafts or

Tunnels; Asphalt Roller (all); Bobcat-type and/or Skid

Steer Loader with or without Attachments; Boiler (15 lbs.

pressure and over); All concrete Pumps (without booms with

5" system); Fork Lifts (except masonry); Highway Drills-all types (with Integral Power); Hoist (One Drum); House

Elevator (except those automatic call button controlled);

Man Lift; Material Hoist/Elevator; Mud Jack; Pressure

Grouting; Pump (Installing or Operating Well Points or other Type of Dewatering Systems); Pump (4" and over

Discharge); Railroad Tie Inserter/Remover; Rotovator (lime soil stabilizer); Submersible Pump (4" and over Discharge);

Switch & Tie Tamper w/o lifting & aligning device; Trench

Machine (24" & under); & Utility

GROUP 8 - Ballast Relocator; Backfillers & Tampers; Batch

Plant; Bar & Joint Installing Machines; Bull Floats; Burlap

& Curing Machines; Clefplanes; Compressor on building construction; Concrete Mixer, Capacity more than one bag;

Concrete Mixer, one bag capacity, (side loader); All

Concrete Pumps without Booms and with 4" System or Smaller;

Concrete Spreader; Conveyor, used for handling building material; Crusher; Deckhands; Drum firemen (in asphalt plants); Farm Type Tractor, pulling attachments; Finishing

Machine; Form Trencher; Generator; Gunite Machine;

Hydro-seeder; Pavement Breaker (Hydraulic or Cable); Post

Driver; Post Hole Digger; Pressure Pump (over 1/2" discharge); Road Widening Trencher; Roller (except

Asphalt); Self-propelled Power Spreader; Self-propelled

Sub-Grader; Shotcrete Machine; Tire Repairman; Tractor, Pulling Sheep Foot Roller or Grader; VAC/ALL; & Vibratory

Compactor, with Integral Power

GROUP 9 - Allen Screed Paver(concrete); Boiler (Less than 15 lbs. pressure); Crane-Compact, Track or Rubber under 4,000 lbs. Cpacity; Directional Drill "Locator"; Inboard &

Outboard Motor Boat Launch; Light Plant; Masonry Fork Lift;

Oiler; Power Driven Heater (Oil Fired); Power Scrubber;

Power Sweeper; Pump (Under 4" discharge); Signal Person; &

Submersible Pump (Under 4" discharge)

IRON0017-001 08/01/2008

ERIE (Eastern 2/3) & HURON (East of a line drawn from the north border through Monroeville & Willard)

Rates Fringes

Ironworkers:

Ornamental; Reinforcing &

Structural..................$ 28.35 17.83

IRON0044-001 06/01/2009

ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line)

Rates Fringes

Ironworkers:

Fence Erector...............$ 23.55 16.72

Ornamental; Structural......$ 26.17 16.72

* IRON0055-001 07/01/2009

CRAWFORD (Area between lines drawn from where Hwy #598 & #30 meet through North Liberty to the northern border & from said

Hwy junction point due west to the border), ERIE (Western one-third), HANCOCK, HURON (West of a line drawn from the northern border through Monroeville & Willard), OTTAWA, SANDUSKY, SENECA, WOOD & WYANDOT (North of Rte. #30)

Rates Fringes

Ironworkers:

Fence Erector...............$ 19.10 16.97

Furnaces & Kilns

(Temperature units over

125 degrees Fahrenheit).....$ 29.00 18.00

Pre-Engineered Metal

Building....................$ 23.28 18.00

All Other Work..............$ 28.00 18.00

IRON0147-001 06/01/2009

ALLEN COUNTY (Northern half)

Rates Fringes

IRONWORKER.......................$ 24.07 16.82

IRON0172-001 06/01/2009

COSHOCTON (West of a line beginning at the northwest county line going through Walhonding & Tunnel Hill to the southern county line), CRAWFORD (South of Rte. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HIGHLAND (Eastern one-fifth), HOCKING, JACKSON (Northern half), KNOX, LICKING, MADISON, MORROW, MUSKINGUM (West of a line starting at Adams Mill going to Adamsville & going from Adamsville through Blue Rock to the southern border), PERRY, PICKAWAY, PIKE, ROSS, VINTON & WYANDOT

(South of Rte. #30)

Rates Fringes

IRONWORKER.......................$ 26.52 16.05

IRON0290-001 06/01/2009

ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawn from east to the west county line going through Oxford, Darrtown & Woodsdale), CLINTON (Excluding south of a line drawn from Blanchester to Lynchburg), GREENE, HIGHLAND (Inside lines drawn from Marshall to Lynchburg & from the northern county line through East Monroe to Marshall), MIAMI, MONTGOMERY, PREBLE & WARREN (Excluding south of a line drawn from

Blanchester through Morrow to the west county line)

Rates Fringes

IRONWORKER

Beyond 25 mile radius of

L.U. #290 Office, Dayton....$ 25.63 17.05

Within 25 mile radius of

L.U. #290 Office, Dayton....$ 25.48 17.05

* IRON0372-001 06/01/2009

ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line)

Rates Fringes

IRONWORKER, REINFORCING

Beyond 30-mile radius of

Hamilton County Courthouse..$ 26.45 16.70

Up to & including 30-mile radius of Hamilton County

Courthouse..................$ 26.20 16.70

IRON0549-003 12/01/2008

BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM

(Excluding portion west of a line starting at Adams Mill going to Adamsville and going from Adamsville through Blue Rock to the south border)

Rates Fringes

IRONWORKER.......................$ 28.75 15.69

IRON0550-001 05/01/2009

ASHLAND, COSHOCTON (E. of a line beginning at NW Co. line going through Walhonding & Tunnel Hill to the South Co. line), HOLMES, HURON (S. of Old Route #224), RICHLAND, TUSCARAWAS &

WAYNE

Rates Fringes

Ironworkers:Structural, Ornamental and Reinforcing.......$ 24.63 16.32

IRON0769-003 06/01/2009

ADAMS (Eastern Half), JACKSON (Southern Half) & SCIOTO

Rates Fringes

Ironworkers:

ZONE 1......................$ 28.38 17.37

ZONE 2......................$ 28.78 17.37

ZONE 3......................$ 30.38 17.37

ZONE 1 - Up to 10 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.

ZONE 2 - 10 to 50 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.

ZONE 3 - 50 mile radius & over of Union Hall, Ashland, Ky., 1643 Greenup Ave.

* IRON0787-002 06/01/2009

MORGAN, NOBLE & WASHINGTON

Rates Fringes

Ironworker.......................$ 28.11 16.75

LABO0083-001 06/01/2009

ADAMS, HIGHLAND, JACKSON, PIKE, ROSS, SCIOTO & VINTON

Rates Fringes

LABORER

GROUP 1.....................$ 29.20 7.72

GROUP 2.....................$ 29.45 7.72

GROUP 3.....................$ 29.70 7.72

LABORER CLASSIFICATIONS

GROUP 1 - Building & Construction; Carpenter Tender; Bottom

Man; Mason Tender; Mortar Mixer; Pipe Layer; Plasterer

Tender; Sheeting & Shoring Man; & Signalman

GROUP 2 - Air & Machine Driver Tool Operator; Asphalt Raker &

Smoother; Burning & Cutting Torch; Chain Saw; Form Setter

(Street & Highway); Hand Spiker; & Powered Concrete Buggy

GROUP 3 - Gunnite Machine Operator; Gunnite Nozzle Man; Miner

(Tunnel & Caisson); Mucker (Tunnel & Caisson); & Powder Man

& Blaster

HAZARDOUS & HIGH WORK IN EXCESS OF 25 FEET ABOVE SOLID BASE -

$.25 PREMIUM

WORKERS HANDLING CREOSOTED OR INJURIOUS CHEMICALLY TREATED

MATERIALS - $.25 PREMIUM

THE ERECTION, ALTERATION, REPAIR OR DEMOLITION OF REINFORCED

CONCRETE CHIMNEYS, MASONRY CHIMNEYS, SILOS, & FURNACES

RECEIVE THE FOLLOWING RATES:

0 TO 25 FEET - BASE RATE

25 TO 100 FEET - $1.00 PREMIUM

100 TO 150 FEET - $1.25 PREMIUM

150 TO 200 FEET - $1.50 PREMIUM

200 TO 250 FEET - $1.75 PREMIUM

OVER 250 FEET - $2.00 PREMIUM

LABO0134-001 05/01/2009

COSHOCTON, HOLMES & TUSCARAWAS

Rates Fringes

LABORER

GROUP 1.....................$ 21.88 7.45

GROUP 2.....................$ 22.28 7.45

GROUP 3.....................$ 22.81 7.45

GROUP 4.....................$ 23.13 7.45

LABORER CLASSIFICATIONS

GROUP 1 - Building & Construction; Signalman; Flagman;

Carpenter Tender; Finisher Tender; Concrete Handler;

Utility Construction; Guard Rail Erector; & Hazardous Waste

Removal (Level D) Personal Protective Equipment (PPE)

GROUP 2 - Bottom Man; Scaffold Builder; Tunnel; Pipe Layer;

Air & Power Driven Tool; Burner on Demolition Work;

Swinging Scaffold; Mucker; Caisson Worker; Cofferdam

Worker; Powder Man & Dynamite Blaster; Creosote Worker;

Form Setter; Plasterer Tender; Hod Carrier; All Confined

Space Work; Furnaces; Pickel Tubs; Acid Pits & Hazardous

Waste Removal (Level C) Personal Protective Equipment (PPE)

GROUP 3 - Mason Tender; Mortar Mixer; Stonemason Tender; Skid

Steer Loader; & Hazardous Waste Removal (Level B) Personal

Protective Equipment (PPE)

GROUP 4 - Gunnite Operator; & Hazardous Waste Removal (Level

A) Personal Protective Equipment (PPE)

LABO0265-001 06/01/2009

BROWN, CLERMONT & CLINTON

Rates Fringes

LABORER

GROUP 1.....................$ 23.15 7.50

GROUP 2.....................$ 23.25 7.50

GROUP 3.....................$ 23.30 7.50

GROUP 4.....................$ 23.35 7.50

GROUP 5.....................$ 23.65 7.50

GROUP 6.....................$ 23.90 7.50

LABORER CLASSIFICATIONS

GROUP 1 - Building and Common Laborer; Asbestos Removal;

Cement Mason Tender; Hand-Operated Mechanical Mule;

Mechanical Mule; Mechanical Sweeper; Signaler; Flagger;

Wrecking Laborer

GROUP 2 - Bottom Man; Pipe Layer

GROUP 3 - Skid Steer; Burning Torch Operator; Jack Hammer;

Air Spade; Chipping Hammer; Mechanical and Air Tamper

Operator; Mechanical Concrete Buggie; Power Operated

Mechanical Mule; Concrete Pump Hose Man; Vibrator Man;

CERCLA Trained Hazardous Material…