Addendum 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs 26 August 2009.pdf | ||
| Amendment 4.pdf | ||
| RFI for FA8601-09-B-0011.xls | XLS spreadsheet | |
| Amendment 2.pdf | ||
| Amendment 3.pdf | ||
| Site visit roster 13 August 09.pdf | ||
| Wage Decision OH29 Mod 21 08-07-09.doc | DOC document | |
| U0001.pdf | ||
| Amendment 1.doc | DOC document | |
| Combined Spec.pdf | ||
| Addendum 1 040204 | — | |
| Wage Determination.doc | DOC document | |
| Solicitation.pdf | ||
| HVAC RENOVATION OF FACILITY 20018A Drawings.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NUMBER 2
TO
DRAWINGS AND SPECIFICATIONS
FOR
HVAC RENOVATION
FACILITY 20018A
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
PROJECT NUMBER: ZHTV040204
1. The contract Drawings and Specifications are hereby amended in part as follows:
A. Specifications Section 08 71 00, page 3, paragraph 2.3.3, is hereby changed to the following:
Provide cylinders for new locks, including locks provided under other sections of this specification. Cylinders, mortise and rim, shall be 1E74, 7-pin tumbler as manufactured by Best Lock Corporation. Cores shall be Best type "TE" seven pin cores, and delivered directly from the supplier to the Base Lock Shop
(88 ABW/CEMS, 1450 Littrell Rd, Bldg 22, Area C, Wright-Patterson AFB, OH 45433, 937-257-5020). Furnish 2 blank keys for each core. The
Government shall combinate and install the permanent cores. Provide temporary cores as required for the protection of materials, equipment, and work area."
B. In the Communication rooms A123 and A225, add metal studs and gypsum board from top of existing walls to underside of structure above. Tape and mud all seam, texture and paint walls to underside of structure as there will not be any drop ceilings in these two rooms.
C. Remove carpet and abate asbestos floor tile and mastic in Communication rooms A123 and A225. Install static resistant tile floor, cove base, and transition strip.
D. Circuit LP2-11 on Drawing Sheet E201 needs to be three dedicated non-switched 20-amp, 120-VAC. The Contractor will be required to provide a 20 amp duplex receptacle in each of three new Government Furnished Equipment
(GFE) relay racks installed by 88 CS/SCO. Each on a dedicated circuit. Use
LP2-11, 13, 15. Make final connection with flexible steel conduit. Recircuit the loads for LP2-13 (receptacles in rooms 105, 111, 115, & 117) to Circuit
LP2-17.
E. Drawing Sheet M601, Air Handling Unit Schedule, Cooling Coil Data has been revised to the following:
COOLING COIL DATA
MAX
VEL
(FPM)
AIR TEMP (°F) WATER
TEMP (°F)
CAP (MBH) WATER
FLOW
(GPM)
MAX
WATER
PRESSURE
DROP
(FT WG)
MAX AIR
PRESSURE
DROP
(IN WG)
ENT LVG ENT LVG SENS/TOTAL
DB WB DB WB
672.1/810.6
1.00 500 78.9 63.0 49.6 49.5
2. This Addendum Number 2 hereby forms and is made a part of the above named project drawings and specifications.