Replace HVAC and Fire Suppression system Federal contract opportunity
Solicitation number
FA8601-09-B-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Addendum 2

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC and Fire Suppression system, newest first.
File Type Posted
RFIs 26 August 2009.pdf PDF
Amendment 4.pdf PDF
RFI for FA8601-09-B-0011.xls XLS spreadsheet
Amendment 2.pdf PDF
Amendment 3.pdf PDF
Site visit roster 13 August 09.pdf PDF
Wage Decision OH29 Mod 21 08-07-09.doc DOC document
U0001.pdf PDF
Amendment 1.doc DOC document
Combined Spec.pdf PDF
Addendum 1 040204 —
Wage Determination.doc DOC document
Solicitation.pdf PDF
HVAC RENOVATION OF FACILITY 20018A Drawings.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER 2

TO

DRAWINGS AND SPECIFICATIONS

FOR

HVAC RENOVATION

FACILITY 20018A

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

PROJECT NUMBER: ZHTV040204

1. The contract Drawings and Specifications are hereby amended in part as follows:

A. Specifications Section 08 71 00, page 3, paragraph 2.3.3, is hereby changed to the following:

Provide cylinders for new locks, including locks provided under other sections of this specification. Cylinders, mortise and rim, shall be 1E74, 7-pin tumbler as manufactured by Best Lock Corporation. Cores shall be Best type "TE" seven pin cores, and delivered directly from the supplier to the Base Lock Shop

(88 ABW/CEMS, 1450 Littrell Rd, Bldg 22, Area C, Wright-Patterson AFB, OH 45433, 937-257-5020). Furnish 2 blank keys for each core. The

Government shall combinate and install the permanent cores. Provide temporary cores as required for the protection of materials, equipment, and work area."

B. In the Communication rooms A123 and A225, add metal studs and gypsum board from top of existing walls to underside of structure above. Tape and mud all seam, texture and paint walls to underside of structure as there will not be any drop ceilings in these two rooms.

C. Remove carpet and abate asbestos floor tile and mastic in Communication rooms A123 and A225. Install static resistant tile floor, cove base, and transition strip.

D. Circuit LP2-11 on Drawing Sheet E201 needs to be three dedicated non-switched 20-amp, 120-VAC. The Contractor will be required to provide a 20 amp duplex receptacle in each of three new Government Furnished Equipment

(GFE) relay racks installed by 88 CS/SCO. Each on a dedicated circuit. Use

LP2-11, 13, 15. Make final connection with flexible steel conduit. Recircuit the loads for LP2-13 (receptacles in rooms 105, 111, 115, & 117) to Circuit

LP2-17.

E. Drawing Sheet M601, Air Handling Unit Schedule, Cooling Coil Data has been revised to the following:

COOLING COIL DATA

MAX

VEL

(FPM)

AIR TEMP (°F) WATER

TEMP (°F)

CAP (MBH) WATER

FLOW

(GPM)

MAX

WATER

PRESSURE

DROP

(FT WG)

MAX AIR

PRESSURE

DROP

(IN WG)

ENT LVG ENT LVG SENS/TOTAL

DB WB DB WB

672.1/810.6

1.00 500 78.9 63.0 49.6 49.5

2. This Addendum Number 2 hereby forms and is made a part of the above named project drawings and specifications.

August 2009