Combined Spec.pdf
PDF 3 MB Posted
- Attached to
- Replace HVAC and Fire Suppression system Federal contract opportunity
- Solicitation number
- FA8601-09-B-0011
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs 26 August 2009.pdf | ||
| Amendment 4.pdf | ||
| Addendum_2.pdf | ||
| RFI for FA8601-09-B-0011.xls | XLS spreadsheet | |
| Amendment 2.pdf | ||
| Site visit roster 13 August 09.pdf | ||
| Amendment 3.pdf | ||
| Wage Decision OH29 Mod 21 08-07-09.doc | DOC document | |
| U0001.pdf | ||
| Amendment 1.doc | DOC document | |
| Wage Determination.doc | DOC document | |
| Solicitation.pdf | ||
| Addendum 1 040204 | — | |
| HVAC RENOVATION OF FACILITY 20018A Drawings.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S P E C I F I C A T I O N
M A N U A L
B U I L D I N G 1 8 A A R E A B R E P L A C E H V A C S Y S T E M 1 0 0 % D e s i g n S u b m i t t a l
A P R I L , 2 0 0 8
K Z F G O V E R N M E N T A N D J U S T I C E G R O U P
K Z F D e s i g n , I n c . 6 5 5 E d e n P a r k D r i v e C i n c i n n a t i , O H 4 5 2 0 2 m a i n 5 1 3 . 6 2 1 . 6 2 1 f a x 5 1 3 . 6 2 1 . 6 5 3 0 K Z F . C O M
P R O J E C T – Z H T V 0 4 0 2 0 4 5 6 6 4 . 0 1
Building 18A Specification Manual Wright-Patterson AFB, Ohio April, 2009 i
655 Eden Park Drive Cincinnati, OH 45202
Table of Contents:
Specifications
Asbestos Inspection Report
WPAFB Building 18A HVAC Renovation 566401
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 01 00 SUMMARY (WPAFB)
01 01 50 PROJECT GENERAL REQUIREMENTS (WPAFB)
01 02 20 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB)
DIVISION 02 - EXISTING CONDITIONS
02 08 10 REMOVAL AND DISPOSAL OF ASBESTOS CONTAINING MATERIALS
(WPAFB)
02 08 33 REMOVAL OF POLYCHLORINATED BIPHENYL FLUORESCENT LIGHT
BALLASTS (WPAFB)
02 08 34 REMOVAL OF MERCURY-CONTAINING LAMPS (WPAFB)
02 09 00 REMOVAL AND DISPOSAL OF PAINT CONTAINING LEAD MATERIAL
(OSHA COMPLIANCE) (WPAFB)
02 09 10 OZONE DEPLETING SUBSTANCE RECOVERY (WPAFB)
DIVISION 03 - CONCRETE
03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 00 01 BACKFLOW PREVENTION DEVICES (WPAFB)
PROJECT TABLE OF CONTENTS Page 1
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING
SYSTEMS (WPAFB)
23 21 13.00 20 LOW TEMPERATURE WATER [LTW] HEATING SYSTEM
23 22 13.35 STEAM TRAPS
23 22 23 STEAM CONDENSATE PUMPS
23 22 25 STEAM VALVES
23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS
23 64 26 CHILLED WATER PIPING SYSTEMS
23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 19 PAGES
WPAFB Building 18A HVAC Renovation
01 01 50 SD-01 Preconstruction Submittals
1.3 GConstruction Progress Schedule
1.3 GSite Layout Plan
SD-11 Closeout Submittals
1.15 GAs-Built Drawings
1.15 GProject Closeout Certification
01 02 20 SD-01 Preconstruction Submittals
3.1 GContractor's Environmental
Coordinator
3.4 GStorm Water Pollution Prevention
Plan
3.4 GNotice of Intent
3.4 GPermit to Install
3.4 GPlans Approval
3.5 G'Notification of Demolition and
Renovation' GFuel Storage Tank Permit to
Install GRecycling and Solid Waste
Summary Report
3.8 GSite Specific Spill Plan
GHazardous Waste Storage Permit (WPAFB Form 1433)
GResource Conservation and Recovery Act (RCRA) Training Certificate
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 19 PAGES
01 02 20 GDelegated Authority Permit
3.11 GAffirmative Procurement
Materials Submittal and Certification
GRadioactive Source Authorization Request
03 40 00.00 10 SD-01 Preconstruction Submittals 1.5.2.2Quality Control Procedures
SD-02 Shop Drawings 1.4.1Standard Precast Units 1.4.2Custom-Made Precast Units
SD-03 Product Data 1.4.1Standard Precast Units 1.4.3Proprietary Precast Units 3.1.3Embedded Items 2.1.11Accessories
SD-05 Design Data 1.4.2Design Calculations 1.4.5.1Concrete Mix Proportions
SD-06 Test Reports 1.5.2.2Test Reports
SD-07 Certificates 1.5.2.2Quality Control Procedures
05 50 13 SD-02 Shop Drawings
2.3 GAccess doors and panels
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 19 PAGES
05 50 13 2.3Access doors and panels Pipe guard
06 20 00 SD-02 Shop Drawings 1.3Detail Drawings
SD-03 Product Data Wood
07 21 16 SD-03 Product Data
2.1 GBlanket insulation
2.2Pressure sensitive tape 2.3Accessories
SD-08 Manufacturer’s Instructions 3.2.1Insulation
07 92 00 SD-03 Product Data
2.1 GSealants
2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.3 GFrames
2.3 GFrames
2.2Accessories
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 19 PAGES
08 11 13 2.1 GDoors
2.3 GFrames
2.2Accessories
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories
SD-04 Samples 2.1Doors
2.3.6.2 GDoor finish colors
08 71 00 SD-02 Shop Drawings
1.3 GHardware schedule
2.3.4Keying system
SD-03 Product Data
2.3 GHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.3 GHardware Schedule
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data
Cementitious backer units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 19 PAGES
09 29 00 Glass Mat Water-Resistant Gypsum Tile Backing Board
Water-Resistant Gypsum Backing Board
Glass Mat Covered or Reinforced Gypsum Sheathing
Glass Mat Covered or Reinforced Gypsum Sheathing Sealant
Impact Resistant Gypsum Board 2.1.7Accessories
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
3.8Waste Management 09 51 00 SD-02 Shop Drawings
1.3 GApproved Detail Drawings
SD-03 Product Data Acoustical Ceiling Systems
SD-04 Samples
2.1.1 GAcoustic Ceiling Tiles
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 19 PAGES
09 51 00 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings GResilient Flooring and
Accessories SD-03 Product Data
GResilient Flooring and Accessories
2.4Adhesives Vinyl Composition Tile
2.1Sheet Vinyl Flooring Rubber Tile Rubber Sheet Flooring Solid Vinyl Tile Cement-Fiber Board
SD-04 Samples GResilient Flooring and
Accessories SD-08 Manufacturer’s Instructions
3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data Resilient Flooring and Accessories
09 90 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 19 PAGES
09 90 00 3.10Piping identification 3.10stencil
SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.9 GColor
SD-07 Certificates
1.3Applicator's qualifications GQualification Testing
SD-08 Manufacturer’s Instructions 3.2.1Application instructions 3.6.2Mixing 1.6.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 GCoatings:
21 13 13.00 10 SD-02 Shop Drawings
Shop Drawings; G As-Built Drawings; G
SD-03 Product Data 3.1Fire Protection Related
Submittals Sway Bracing; G
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 19 PAGES
21 13 13.00 10 Materials and Equipment; G Hydraulic Calculations; G
1.11Spare Parts Preliminary Tests; G Final Acceptance Test; G On-site Training; G Fire Protection Specialist; G Sprinkler System Installer; G
SD-06 Test Reports Preliminary Test Report; G
3.11Final Acceptance Test Report SD-07 Certificates Inspection by Fire Protection Specialist; G
SD-10 Operation and Maintenance Data
3.12Operating and Maintenance Instructions
22 00 00 SD-03 Product Data Fixtures Backflow prevention assemblies
SD-06 Test Reports
3.4.1 GTest of Backflow Prevention
Assemblies SD-07 Certificates
1.3Materials and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 19 PAGES
22 00 00 SD-10 Operation and Maintenance Data
GBackflow Prevention Assemblies 22 00 01 SD-03 Product Data
Catalog cuts Technical data AF Form 843, 844 or 845
23 00 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data 2.1Standard Products 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts 2.9.2.2Fire Dampers 2.9.4Sound Attenuation Equipment 2.9.4Acoustical Duct Liner 2.9.5.1Diffusers 2.9.5.3Registers and Grilles 2.9.6Louvers
Air Vents, Penthouses, and Goosenecks
2.10.1.1Centrifugal Fans
2.11 GAir Handling Units
2.12.1.1 GVariable Volume, Single Duct
Terminal Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 19 PAGES
23 00 00 Test Procedures 3.11Operation and Maintenance
Training SD-06 Test Reports
3.9 GPerformance Tests
3.11 GPerformance Tests
3.7 GDamper Acceptance Test
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions 3.11Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.11Operation and Maintenance Manuals
2.9.2.2 GFire Dampers
2.10.1.1 GCentrifugal Fans
2.11 GAir Handling Units
2.12.1.1 GVariable Volume, Single Duct
Terminal Units 23 05 93 SD-01 Preconstruction Submittals
1.3 GRecords of Existing Conditions
1.3.3 GRecords of Existing Conditions
1.5.3.1 GTAB Firm
1.2 GTAB team assistants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 19 PAGES
23 05 93 1.2 GTAB team engineer
1.5.3.2 GTAB Specialist
1.2 GTAB team field leader
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.3.3 GSystems Readiness Check
1.5.4 GTAB Execution
GTAB Verification SD-06 Test Reports
1.3.3 GDesign review report
3.7 GDesign review report
SD-07 Certificates
1.5.1 GIndependent TAB agency and
personnel qualifications
1.5.3.1 GTAB Firm
1.3.3 GDesign review report
3.7 GDesign review report
GPre-field TAB engineering report 23 07 00 SD-03 Product Data
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 19 PAGES
23 07 00 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings 1.5.2.2Commissioning Plan
SD-03 Product Data 3.2.1Pre-Functional Performance Test
Checklists 3.2.2Functional Performance Tests
SD-06 Test Reports 3.3Commissioning Report
SD-07 Certificates 1.5.1Commissioning Firm 1.5.2Commissioning Specialist
23 21 13.00 20 SD-03 Product Data 2.4.1Convectors 2.3.1Pumps 2.3.2Expansion tanks 2.3.3External air separation tanks
SD-06 Test Reports 3.3.1Hydrostatic test of piping system 3.3.2Auxiliary equipment and accessory tests SD-07 Certificates
1.5.2.2Welding procedures 1.5.2.3Welder's qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 19 PAGES
23 21 13.00 20 SD-10 Operation and Maintenance Data
2.4.1 GConvectors
2.4.2 GUnit Heaters
2.3.1 GPumps
23 22 13.35 SD-03 Product Data 1.2Manufacturer's Catalog Data
SD-02 Shop Drawings 1.2Installation Drawings
SD-07 Certificates 1.2Listing of Product Installation 2.1Steam Traps 2.1Trap Bodies and Components
23 22 23 SD-02 Shop Drawings 1.3Connection Diagrams 1.3Control Diagrams 1.3Fabrication Drawings 1.3Installation Drawings
SD-06 Test Reports 3.2Testing 1.3.1Pump Flow Capacity Tests 1.3.1Efficiency Tests 1.3.1Vibration Tests
SD-07 Certificates 2.1Condensate Return Pump Units 2.1Condensate Return Pump Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 19 PAGES
23 22 25 SD-02 Shop Drawings Fabrication Drawings Valves Accessories
SD-07 Certificates 1.3Listing of Product Installation 2.2.1Gate Valves 2.2.2Globe and Angle Valves 2.2.3Check Valves 2.1.1Dial Cocks 2.1.2Diaphragm Control and
Instrument Valves 23 22 26.00 20 SD-03 Product Data
Convertors Strainers
SD-06 Test Reports Steam piping
2.1.6Valves 2.1Pipe and pipe system
Convertors SD-07 Certificates
1.4.1Welding procedure 1.4.2Welder's Performance
Qualification Record 1.4.2List of welders and welder's symbols
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 19 PAGES
23 22 26.00 20 SD-08 Manufacturer’s Instructions Convertors
23 64 26 SD-06 Test Reports 3.1.1.3Piping welds NDE report
3.4.2 GPressure tests reports
SD-07 Certificates 3.1.1.2Welding Procedures and
Qualifications 23 82 00.00 20 SD-03 Product Data
2.1Unit heaters SD-10 Operation and Maintenance Data
2.1Unit heaters 26 20 00 SD-02 Shop Drawings
2.11 G CDPanelboards
SD-03 Product Data
2.10 GReceptacles
2.11.3 GCircuit breakers
2.8 GSwitches
2.13 GMotor controllers
GCombination motor controllers
2.14 GManual motor starters
GMotor Inverter Duty SD-06 Test Reports
3.3.2 G600-volt wiring test
3.3.3 GGrounding system test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 19 PAGES
26 20 00 2.12 GInverter Duty 26 29 23 SD-02 Shop Drawings
1.5.1 GSchematic diagrams
SD-03 Product Data
2.1 GVariable frequency drives
SD-06 Test Reports
3.2.2Performance Verification Tests SD-08 Manufacturer’s Instructions
1.5.5Installation instructions SD-10 Operation and Maintenance Data
2.1Variable frequency drives 26 51 00 SD-03 Product Data
2.1 G CDFluorescent lighting fixtures
1.6.1 G CDFluorescent electronic ballasts
2.1.2 G CDFluorescent lamps
2.4 G CDExit signs
28 31 76 SD-02 Shop Drawings Wiring Diagrams; G System Layout; G System Operation; G
2.23Notification Appliances Amplifiers; G As-Built Drawings; G
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 19 PAGES
28 31 76 Technical Data And Computer Software; G
1.4.2Fire alarm control unit Fire Alarm And Mass Notification Control unit (FACU/FMCU); G
Manual stations; G Batteries; G Battery chargers; G Smoke sensors; G Thermal sensors; G
2.30Wiring Notification appliances; G Addressable interface devices; G Amplifiers; G Tone generators; G Digitalized voice generators; G Waterflow detectors; G Tamper switches; G Remote fire alarm control units; G
SD-05 Design Data System Operation; G Battery power; G
SD-06 Test Reports 3.7Field Quality Control
Testing Procedures; G 2.10.5Smoke sensor testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 19 PAGES
28 31 76 SD-07 Certificates Installer; G
SD-09 Manufacturer’s Field Reports Mass Notification System; G
SD-10 Operation and Maintenance Data Operation and Maintenance (O&M) Instructions; G
3.8Instruction of Government Employees
31 00 00 SD-03 Product Data 3.6Utilization of Excavated Materials
SD-06 Test Reports 3.13Testing 2.1Borrow Site Testing
SD-07 Certificates 3.13Testing
33 11 00 SD-03 Product Data Piping Materials
2.2Water service line 2.1.1.1Indicator posts
Corporation stops Valve boxes
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 19 PAGES
33 11 00 Design calculations of water piping
SD-07 Certificates 2.1Water distribution main 2.2Water service line lining SD-08 Manufacturer’s Instructions
3.1.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTION 01 01 00
SUMMARY (WPAFB)
PART 1 - GENERAL
1.01 SCOPE OF WORK
A. The work covered by these specifications consists of furnishing all labor, equipment, appliances, devices and materials, and performing all operations necessary in connection with A-E DSN - Repair HVAC & Renovate Interior - Building 18A, Area B, Construction Project ZHTV 040204 including removals and miscellaneous work as herein specified and as shown, indicated, or noted on the drawings.
B. The work shall conform to the drawings listed in the following schedule.
SCHEDULE OF DRAWINGS
Number Designation
G001 COVER/INDEX SHEET
C100 SITE PLAN
LS100 LOWER LEVEL LIFE SAFETY PLAN
LS101 FIRST LEVEL LIFE SAFETY PLAN
LS102 SECOND LEVEL LIFE SAFETY PLAN
A001 ARCHITECTURAL ABBREVIATIONS
A002 ARCHITECTURAL SYMBOLS
AD00 LOWER LEVEL DEMOLITION PLAN
AD01 FIRST LEVEL DEMOLITION PLAN
AD02 SECOND LEVEL DEMOLITION PLAN
A100 LOWER LEVEL FLOOR PLAN
A101 FIRST LEVEL FLOOR PLAN
A102 SECOND LEVEL FLOOR PLAN
A110 LOWER LEVEL REFLECTED CEILING PLAN
A111 FIRST LEVEL REFLECTED CEILING PLAN
A112 SECOND LEVEL REFLECTED CEILING PLAN
A301 SECTIONS AND SYMBOLS
A501 ENLARGED PLANS AND WALL TYPES
M001 MECHANICAL ABBREVIATIONS
M002 MECHANICAL SYMBOLS
MD00 LOWER LEVEL HVAC DEMOLITION
MD01 FIRST LEVEL HVAC DEMOLITION
MD02 SECOND LEVEL HVAC DEMOLITION
M100 LOWER LEVEL HVAC PLAN
M101 FIRST LEVEL HVAC PLAN
SECTION 01 01 00 Page 1
M102 SECOND LEVEL HVAC PLAN
M103 LOWER LEVEL HVAC PIPING PLAN
M104 FIRST LEVEL HVAC PIPING PLAN
M105 SECOND LEVEL HVAC PIPING PLAN
M301 HVAC FLOW DIAGRAMS
M401 ENLARGED MECHANICAL ROOM PLAN
M501 HVAC DETAILS
M502 HVAC DETAILS
M503 HVAC DETAILS AND SECTIONS
M601 HVAC SCHEDULES
M602 HVAC SCHEDULES
M603 HVAC SCHEDULES AND GENERAL NOTES
M701 HVAC CONTROL DIAGRAMS
M702 HVAC CONTROL DIAGRAMS
M703 HVAC CONTROL DIAGRAMS
FP001 FIRE PROTECTION NOTES AND LEGEND
FP100 LOWER LEVEL SPRINKLER PLAN
FP101 FIRST LEVEL SPRINKLER PLAN
FP102 SECOND LEVEL SPRINKLER PLAN
FP501 FIRE PROTECTION DETAILS
FA100 LOWER LEVEL FIRE ALARM DEMOLITION PLAN
FA101 FIRST LEVEL FIRE ALARM DEMOLITION PLAN
FA102 SECOND LEVEL FIRE ALARM DEMOLITION PLAN
FA200 LOWER LEVEL FIRE ALARM / MNS
FA201 FIRST LEVEL FIRE ALARM / MNS
FA202 SECOND LEVEL FIRE ALARM / MNS
ED00 LOWER LEVEL ELECTRICAL DEMOLITION PLAN
ED01 FIRST LEVEL ELECTRICAL DEMOLITION PLAN
ED02 SECOND LEVEL ELECTRICAL DEMOLITION PLAN
E100 LOWER LEVEL LIGHTING PLAN
E101 FIRST LEVEL LIGHTING PLAN
E102 SECOND FLOOR LIGHTING PLAN
E200 LOWER LEVEL POWER AND SYSTEMS PLAN
E201 FIRST LEVEL POWER AND SYSTEMS PLAN
E202 SECOND LEVEL POWER AND SYSTEMS PLAN
E301 LIGHITNG FIXTURE & MECH/ELEC SCHEDULES
E401 ELECTRICAL SINGLE LINE DIAGRAM
E402 ELECTRICAL SINGLE LINE DIAGRAM
E403 ELECTRICAL PANEL SCHEDULE
1.02 LOCATION
A. The site of the work is Building 18AWright-Patterson Air Force Base, Ohio.
SECTION 01 01 00 Page 2
1.03 GOVERNMENT FURNISHED PROPERTY
A. No Government furnished property will be included as part of this project.
1.04 REMOVALS AND SALVAGE
A. Remove and dismantle all items which are shown to be removed or which must be removed to complete the work.
B. All materials, equipment, and debris resulting from this work and not designated for reuse in new work nor designated to be salvaged for the Government, will become the property of the contractor and shall be removed from the work site as it accumulates.
C. The contractor shall properly dispose of removed materials outside Wright-Patterson Air Force Base.
1.05 INSTRUCTIONS TO THE CONTRACTOR
A. The superintendent in charge of this work shall personally contact the Engineering Division, [PR, DELETE INAPPROPRIATE OFFICE: "Engineering Support Branch, Building 11, Area C, 88 ABW/CECM"; "Patterson Field Team, Building 11, Area C, 88 ABW/CECP"; "Wright Field Team, Area C, 88 ABW/CECW"] and Contracting Officer, 88 ABW/PKE, 257-6571, a minimum of 72 hours before starting site operations of the contract, before resumption of seasonal work, before restarting work after a lengthy delay, and prior to moving men and equipment from one site of work to another.
B. Work areas to remain occupied by Government personnel are shown on the plans.
C. The display of signs of a commercial nature within the boundaries of the installation will not be permitted. In no event will the contractor be permitted to use the government installation for the resale of surplus, structures, other improvements, or related equipment.
END OF SECTION
SECTION 01 01 00 Page 3
SECTION 01 01 50
PROJECT GENERAL REQUIREMENTS (WPAFB)
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Submittals (1.2)
B. Coordination and scheduling requirements (1.3)
C. Protection of personnel and Government property (1.4)
D. Requirements for fire protection, welding and cutting (1.5)
E. Construction facilities and job site standards (1.6)
F. Utilities (1.7)
G. Temporary construction controls (1.8)
H. Definitions (1.9)
I. Acronyms and Abbreviations (1.10)
J. Applicable Publications (1.11)
K. Materials and Equipment (1.12)
L. Testing (1.13)
M. Cleaning Requirements (1.14)
N. Project Close-out (1.15)
O. Safety Requirements (1.16)
P. Warranty service (1.17)
Q. The requirements of this section apply to the entire project including all addenda or change orders which may be issued to modify the contract documents.
R. Due to the general nature of this section, paragraphs may exist which are not applicable to any required work. In general, every provision of this section applies to all of the work that the provision could conceivably relate.
1.2 SUBMITTALS
The following shall be submitted in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Construction Progress Schedule; G
SECTION 01 01 50 Page 1
Site Layout Plan; G
SD-11 Closeout Submittals
As-Built Drawings; G
Project Closeout Certification; G
1.3 COORDINATION AND SCHEDULING REQUIREMENTS
A. The Contractor shall visit the site to thoroughly familiarize himself with all details of the work and working conditions, to check and verify all dimensions in the field, and shall advise the Contracting Officer of any discrepancies before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of all work for the entire project and for the work of all trades, and for the neat appearance, correct fitting, required quantities, etc., of all work in this project.
B. Coordinate all construction activities with:
1. Project Inspector
2. Contracting Officer
3. Base Fire Department, 257-4075
4. Security Police, 257-6516
C. The Civil Engineering Directorate, 88 ABW/CE, Wright-Patterson Air Force Base, (Building 11, Area C) Ohio, is hereby designated as the representative of the Contracting Officer and responsibilities include but are not necessarily limited to the following:
1. Technical review of shop drawings, catalog cuts, and technical data for all material and equipment requiring approval.
2. Periodic inspection and final acceptance of the work under the contract.
3. Verifying progress is maintained in accordance with the contractor's approved progress schedule.
4. Verifying that contractor is accomplishing work in conformance with contract requirements.
D. Prior to the start of any construction operations, a schedule of work or operations in proper sequence shall be submitted by the contractor for approval by the Fire Protection Branch, Security Police, Safety Office, and the Contracting Officer so as to cause a minimum amount of disruption to the normal flow of traffic on streets, pedestrian travel, base security, and facility operations.
1. Submit to the Contracting Officer, who will submit to 88 ABW/CECM or CECP or CECW for approval, a construction progress schedule detailing on a weekly basis when work is to begin for each work area and what work is to be accomplished (including quantities), etc. While factors not under the contractor's control may cause the contractor to fall behind the schedule, the intent of the schedule is to inform base personnel of planned orderly progression of the work in proper sequence. Once the construction progress schedule is approved, do not deviate from the
SECTION 01 01 50 Page 2 sequence without prior approval.
2. The Government retains the right to limit the number and location of all material storage, construction and office trailers, temporary structures of any kind and open storage and staging areas requested by the contractor to support this project. The contractor shall be responsible to submit a site layout plan identifying number, purpose, proposed location and certification of compliance with section 01015, 1.6.B of any and all material storage, office and construction trailers and temporary structures required for accomplishment of this project. The plan shall also identify any and all required open storage and staging areas.
This plan must be submitted to 88 ABW/CEC for review and approval a minimum of two weeks prior to mobilization
E. Before starting any work where traffic will be impeded or hindered, especially fire trucks and security police vehicles, call and notify the Fire Protection Branch (extension 257-4075) and the Security Forces (257-6959, 257-3801, or cell 313-8446) 72 hours prior to placing barricades or starting any work. Under no circumstances place any barricades or start work until after the Fire Protection Branch and Security Police have been notified and have approved the barricading of work areas.
F. Furnish flagmen, barricades, and other warning devices as required to safely route traffic through the construction areas. Selected streets may be closed to traffic when necessary during the construction operations, upon prior approval of the Contracting Officer. When roads are closed, establish and mark safe detours for vehicles to follow. Detours, road closures and lane closures shall be marked and signed in accordance with "Work Zone Traffic Control-Standards and Guidelines" (US Department of Transportation; Federal Highway Administration) or with the Ohio Department of Transportation, Ohio Manual of Uniform Traffic Control Devices (MUTCD).
Furnish the Contracting Officer with the names, addresses and telephone numbers of two employees who will be responsible for warning light and barricade maintenance.
G. On site working hours for the contractor will be Monday through Friday between the hours of 7:30 a.m. and 5:00 p.m. unless otherwise noted. No on site work shall be performed on Saturdays, Sundays, and Federal holidays unless otherwise stated or shown. If the contractor wishes to work during periods other than above, permission must be requested from the contracting officer at least 48 hours in advance of his desire to work during these periods.
H. Perform all demolition operations on base between the hours of 8:30 a.m. and 4:00 p.m., Monday through Friday, except holidays. Movement of heavy or slow equipment within the base or work area before 8:30 a.m. and after 4:00 p.m. is prohibited.
1.4 PROTECTION OF PERSONNEL AND GOVERNMENT PROPERTY
A. Areas requiring protection shall include the following:
1. Actual Construction Site - Area or areas within the work limits.
2. Storage Areas - Area or areas used for the storage of materials, devices, appliances and equipment to be used in the work.
3. Office and Shed Areas - Area or areas for placing or setting of temporary field office, tool sheds or storage sheds.
SECTION 01 01 50 Page 3
4. Transportation Areas - Streets, roads, driveways, parking areas, etc., paved and unpaved, and grass areas used for transportation purposes.
5. Areas surrounding the construction site.
B. The contractor shall conduct his work so that all property to remain and all personnel, shall be protected at all times from damage of any nature and from injury resulting from this work until completion of the contract.
C. The contractor shall furnish and spread dropcloths in the work areas as necessary to protect surfaces.
D. In the event of damages of any nature caused by this work due to improper protection, precaution or safety measures, such damages shall be repaired or such property shall be replaced by the contractor at no cost to the Government. In the event the contractor does not satisfactorily repair or replace such damage caused by the work of this contract, the Government will make the necessary corrections and the contractor shall reimburse the Government for inconveniences, labor, and materials, involved.
E. The contractor shall furnish, place and maintain all required barricades as specified and as directed by the Safety Office and the Contracting Officer. Access drives and doors shall remain clear at all times.
F. Provide temporary, insulated enclosures of openings in exterior surfaces of interior spaces to provide acceptable working conditions and protection of materials and property, to allow for temporary space conditioning, and to prevent entry of unauthorized persons. Maintain all existing exits unless shown otherwise.
G. Erect and maintain dustproof partitions as required to prevent the spread of dust and dirt to parts of the building near work areas. On completion, remove partitions and repair damaged surfaces to match adjacent surfaces.
H. Contractor shall be responsible for proper application of weather sensitive materials and shall not apply any such materials when weather conditions fall below the minimum recommended by the material manufacturer.
I. Contractor shall maintain 50 degrees F minimum temperatures throughout unoccupied interior portions of buildings under construction.
Contractor shall maintain 65 degrees F minimum temperatures throughout occupied portions of buildings undergoing construction or alteration. This requirement shall apply also in the event that available heating supplied by the building heating system is rendered inadequate during the course of construction to maintain the above temperature. All costs incurred by the Government resulting from the Contractors failure to maintain the above temperatures shall be reimbursed by the Contractor to the Government.
J. It shall be the responsibility of the Contractor with assistance from base personnel to locate all existing utility lines in the field before starting excavation of any kind. Contractor shall process an AF Form 103, Base Civil Engineering Work Clearance Request. Contractor shall notify the inspector a minimum of 2 weeks prior to the expected start of work to schedule and complete an on-site work clearance.
SECTION 01 01 50 Page 4
K. In order to prevent damage, all digging around utilities shall be done by hand. The distance to stay clear from the utilities with power excavating equipment shall be as follows:
Minimum Clearance Type of Utility From Outside Face
Storm and Sanitary 15" size 1'-6" and larger
Storm and Sanitary less than 2'-0" 15" size
Gas, Electric, Water, Steam and 2'-0" Air, all sizes
Fuels, Communications, Cable TV, 5'-0" all sizes
These clearances shall not be measured from the centerline of the utility but from each outside face or limit of the utility in both the horizontal and vertical directions. It shall be the Contractor's responsibility to determine the clearances and layout or stake the distance around the utilities to be excavated by hand.
L. Damages of any nature caused by this work shall be repaired or damaged property replaced at no expense to the Government. If the Contractor does not satisfactorily repair or replace the damaged property, the Government reserves the right to make the necessary corrections. The Contractor shall reimburse the Government for consequential damages and for all materials and labor used for the corrections.
M. The contractor shall protect and preserve the existing vegetation (grass, flowers, shrubs, trees, etc.) and shall be liable for any damage to same.
N. Where temporary removal of plants is required to perform the work, each plant shall be removed, adequately balled, stored, watered, and replanted. The contractor shall be responsible for the replacement of plants which die within six months of replanting, at the contractors expense.
1.5 FIRE PROTECTION, WELDING AND CUTTING REQUIREMENTS
A. First Aid Fire Protection
1. Portable fire extinguishers shall be provided where needed and inspected and maintained in accordance with NFPA 10, Portable Fire Extinguishers.
2. Fire extinguishers shall be suitably placed, distinctly marked, readily accessible, and maintained in a fully charged and operable condition.
3. Fire barrels and buckets shall be painted red and marked "For Fire Only". Barrels shall be kept filled at all times. Anti-freeze protection shall be provided when necessary. Each barrel shall be provided with at least two fire buckets.
SECTION 01 01 50 Page 5
4. Approved fire blankets shall be provided and kept in conspicuous and accessible locations as warranted by the operations involved.
5. A fire extinguisher rated not less than 2-A:10-B:C, shall be provided for each 3,000 square feet of the protected building area, or major fraction thereof. Travel distance from any point of the protected area to the nearest fire extinguisher shall not exceed 75 feet.
6. One or more fire extinguishers, rated not less than 2-A:10-B:C, shall be provided on each floor. In multistory buildings, at least one fire extinguisher shall be located adjacent to each stairway.
7. A fire extinguisher, rated not less 10B shall be provided within 50 feet of wherever more than 5 gallons of flammable or combustible liquids or 5 pounds of flammable gas are being used on the worksite. This requirement does not apply to the integral fuel tanks of motor vehicles.
8. At least one portable fire extinguisher having a rating of not less than 20-B units shall be located outside of but not more than 10 feet from the door opening into any room used for storage of more than 60 gallons of flammable or combustible liquids.
9. At least one portable fire extinguisher having a rating of not less than 20-B units shall be located not less than 25 feet, nor more than 50 feet from any flammable liquid storage area located outside.
10. At least one portable fire extinguisher not less than 20-B:C units shall be provided on all tank trucks or other vehicles used for transporting and/or dispensing flammable or combustible liquids.
11. Each service or fueling area shall be provided with at least one fire extinguisher having a rating of not less than 20-B:C located so that an extinguisher will be within 50 feet of each pump, dispenser, underground fill pipe opening, and lubrication or service area.
12. Fire extinguisher equipment shall be provided in storage areas according to the hazard present.
13. Fire extinguisher or equivalent protection shall be provided at the head and tail pulleys of underground belt conveyors and at 300 foot intervals along the belt.
14. Fire extinguishers listed or approved by a nationally recognized testing laboratory shall be used.
15. No fire shall be fought where there is imminent danger of contact with explosives. All persons shall be removed to a safe area and the fire area guarded against intruders.
16. A fire extinguisher rated not less than 2-A:10-B:C shall be provided where melting pots, torches, or open flames are in use.
17. A 1/2-inch diameter garden hose line, not to exceed 100 feet in length and equipped with a nozzle, may be substituted for a 2-A rated fire extinguisher, provided it is capable of discharging a minimum of 5 gallons per minute with minimum hose stream range of 30 feet horizontally. The garden hose lines shall be mounted on conventional racks or reels. The number and location of hose racks or reels shall be such that at least one hose stream can be supplied to all points in the area.
SECTION 01 01 50 Page 6
18. Each bulldozer, scraper, dragline, crane, motor grader, front-end loader, mechanical shovel, backhoe, and other similar equipment shall be equipped with at least one dry chemical or carbon-dioxide fire extinguisher, having a minimum UL rating of 5-B:C.
B. Fire Patrols
1. When watchmen or guards are provided, they shall make frequent rounds through buildings and storage areas when work is suspended.
2. In any instance where combustible materials have been exposed to fire hazards, such as welding operations, hot metals, or open flame, a watcher shall be assigned to remain at the location for at least one hour after the exposure has ended.
C. Water Supply and Distribution
1. Where a water distribution system is required for the protection of buildings or other structures, water mains and hydrants shall be installed prior to or concurrently with the construction of the facilities.
2. Vehicles, equipment, materials, and supplies shall not be placed so that access to fire hydrants and other fire fighting equipment is obstructed.
3. If the facility being constructed includes the installation of automatic sprinkler protection, the installation shall closely follow the construction and be placed in service as soon as laws permit following completion of each story.
4. For demolition or alterations, existing automatic sprinkler installations shall be retained in service as long as reasonable. The operation of sprinkler control valves shall be permitted only when approved by the Contracting Officer. Modification of sprinkler systems to permit alterations or additional demolition should be expedited so that the automatic protection may be returned to service as quickly as possible.
Sprinkler control valves shall be checked daily at close of work to ascertain that the protection is in service.
5. In all structures in which standpipes are required, or where standpipes exist in structures being altered, they shall be brought up as soon as construction permits, and shall be maintained as construction progresses so that they are always ready for fire protection use. The standpipes shall be provided with conspicuously marked fire department connections on the outside of the structure at the street level. There shall be at least one standard hose outlet at each floor.
D. Fire Alarm Devices
1. An alarm system shall be established by the contractor whereby workers on the site and the local fire department will be alerted in the event of an emergency.
2. The alarm code and reporting instructions shall be conspicuously posted at phones and at worker entrances.
E. Welding and Cutting General
SECTION 01 01 50 Page 7
1. All welding and cutting equipment and operations shall be in accordance with standards and recommended practices of the American Welding Society, Safety in Welding and Cutting, ANSI 749.1, OSHA 1910.253 Oxygen-fuel gas welding and cutting and NFPA 51B Standard for Fire Protection During Welding, Cutting, and Other Hot Work.
2. Transformer-type electric welding apparatus shall be installed, maintained and operated in accordance with the National Electrical Code.
3. Gas, welding and cutting equipment shall be listed by Underwriters' Laboratories, Inc. Chicago, Illinois or by Factory Mutual Laboratories, Boston, Mass.
4. All welding equipment shall be inspected daily. Defective equipment shall be removed from service, replaced, or repaired and reinspected before again being placed in service.
5. Each welding or cutting unit shall be equipped with a compatible fire extinguisher.
6. Two 2-A:10-B:C fire extinguishers shall be provided in the immediate vicinity of the welding or torch operation whenever combustible material is exposed.
7. Objects to be welded, cut or heated shall be moved to a safe location or, if they cannot be moved, all movable fire hazards in the vicinity shall be taken to a safe place or the combustible material and construction shall be protected from the heat, sparks, and slag of welding.
8. Workers and the public shall be shielded from welding rays, flashes, sparks, molten metal, and slag.
9. Cable, hoses, and other equipment shall be kept clear of passageways, ladders, and stairways.
10. All hollow spaces, cavities, or containers shall be vented to permit the escape of air or gases before preheating, cutting, or welding.
Department of Transportation, Office of Pipeline Safety, 49 CFR Part 192, Minimum Federal Standards for Gas Pipelines, shall apply when welding, cutting, and heating on steel pipelines containing natural gas. Pipelines containing gases or flammable liquids or conduits containing electrical conductors shall not be used as a ground return.
11. When welding or cutting must be done an AF Form 592 USAF Welding, Cutting and Brazing Permit shall be obtained. Contact the WPAFB Fire Prevention Office at (937) 257-4075 at least 24 hours in advance to request a permit. Weekend Permits can only be authorized by the Contracting Officer who shall notify the Fire Prevention Office that work is authorized, Notification must be accomplished before Friday morning for permits to be issued for weekend work. The location shall be checked for latent fires after the work is completed.
12. Cylinders shall be kept beyond the range of sparks, hot slag, or flame and properly secured in a valve upright position. Backflash devices shall be installed on all tanks at the regulator location.
13. Positive mechanical and/or personal protective measures shall be taken when welding, cutting, or heating metals of toxic significance in enclosed spaces.
SECTION 01 01 50 Page 8
14. Oxygen shall not be used for ventilation, comfort cooling, blowing dust from clothing, or for cleaning the work area.
15. Before welding, cutting, or heating is commenced on any surface covered by a preservation coating whose flammability is not known, a test shall be made to determine its flammability. Preservation coatings shall be considered to be highly flammable when scrapings burn with extreme rapidity.
16. Precautions shall be taken to prevent ignition of highly flammable hardened preservation coatings. When coatings are determined to be highly flammable, they shall be stripped from the area to be heated to prevent ignition.
17. In enclosed spaces, all surfaces covered with toxic preservatives shall be stripped of all toxic coatings for a distance of at least 4 inches from the area of heat application or the employees…