This is a Questions and Answers document from solicitation FA857126Q0050 addressing clarifications raised during the site visit held on March 10, 2026. The document provides government responses to contractor inquiries regarding the installation and specifications of a 40-ton temporary AC unit to be leased and installed outside Building 185 at Robins Air Force Base, Georgia.
Key technical clarifications include: ductwork will extend from the unit to the building exterior and an additional 3 feet inside the building, terminating under the roll-up door; electrical connection will tie into an existing 100-ampere disconnect and breaker located on the building's exterior; the contractor is responsible for providing all equipment necessary for proper installation, including any crane requirements; the unit will serve as primary cooling for a currently unconditioned building; and the requirement specifies a 40-ton unit, not a larger package alternative. The contractor remains responsible for all labor, materials, transportation (drop-off and pick-up), and project oversight to support the 402 Commodities Maintenance Group at Robins AFB in supplying cooling for the Conformal Fuel Tank shop. Additional questions in response to this solicitation were required to be submitted by end of business March 16, 2026, following the March 10 site visit.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA857126Q0050 – Temporary AC for B185 – Q&As from Solicitation Posting
1. How much duct and cable are needed for the temp unit?
The duct work would go from the unit to the building and then an additional 3 ft of ductwork inside the building.
1. Where will electrical tie into and what size disconnect / breaker will be tied into?
There is a disconnect on the outside of the building and it has a 100A breaker.
1. Where will duct tie in occur or is something needed to be made for temp duct to tie into?
The ductwork will run from the unit to under the roll up door.
1. If the need for a crane, will it be contractor or government supplied?
The contractor is responsible for providing all equipment needed to ensure the A/C unit is installed properly.
1. Is this unit supplying “primary” or “secondary” cooling for the facility?
The building is currently not conditioned.
1. Is the government open to a “package” 50-ton unit?
This requirement is for a 40-ton unit.