Solicitation Amendment FA857125Q00920002 SF 30.pdf
PDF 2 MB Posted
- Attached to
- C-5 Scaffolding Rental
- Solicitation number
- FA8571-25-Q-0092
About this file
This is a Standard Form 30 (SF 30) Amendment to Solicitation FA857125Q0092 for C-5 Scaffolding Rental services. The amendment modifies multiple aspects of the original solicitation, including extending the response due date from 25 Jun 2025 to 15 Jul 2025 and revising the Performance Work Statement (PWS) dated to 02 July 2025. The solicitation includes various line items for scaffolding platform rental, installation/erection labor, platform inspection, and dismantling/removal labor for Phase I and newly added Phase II, covering different aircraft areas including fuselage, cargo compartment, and hayloft.
The amendment introduces several new option line items for additional rental weeks and services for both Phase I and Phase II, with performance periods ranging from 14 Oct 2025 to 13 Dec 2026. A notable header text addition indicates that Phase I will be incrementally funded when needed. The solicitation is a 100% small business set-aside for the Department of the Air Force Materiel Command Air Force Sustainment Center, with all line items priced as Firm Fixed Price (FFP) and covering activities such as pre-award/post-award site visits, work-site preparation, design/drawings, materials/supplies, modifications, inspections, training, and transportation logistics.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following modifications were made:
Information From To Response Due Date 25 Jun 2025 15 Jul 2025
Supplies or Services & Prices or Costs
Header Miscellaneous Text (Added):
NOTICE: Phase II will be Incrementally funded when needed, Line Item 0001
The following Line Item modifications were made:
Information From To
Description
Fuselage Scaffolding Platform Rental - Phase I (C-5 #1) - {Includes 28-day Rental(s), the pre-award/post-award site visit(s), work-site prep, design/ drawings, associated materials/supplies, any modifications, inspection/training add-on options, FOB destination delivery, freight pick up, and applicable tags/documentation.} IAW PWS dated 29
MAY 2025 FFP
Phase 1- Fuselage Scaffolding Platform Rental - Phase I (C-5 #1) - {Includes 28-day Rental(s), the pre-award/post-award site visit(s), work-site prep, design/ drawings, associated materials/supplies, any modifications, inspection/ training add-on options, FOB destination delivery, freight pick up, and applicable tags/documentation.} IAW PWS dated 02 July 2025 FFP
Line Item 0002
The following Line Item modifications were made:
Information From To Amount +/-
Description Fuselage Install/Erect (setup) Labor Phase I C-5 #1) - (Includes clean-up) IAW PWS dated
29 MAY 2025 FFP
Phase 1- Fuselage Install/Erect (setup) Labor Phase I C-5 #1) - (Includes clean-up) IAW PWS dated 02 July 2025 FFP
Quantity 4 3 -1
Line Item 0003
The following Line Item modifications were made:
Information From To
Description Fuselage Platform Inspection (Add-on Option) - Phase I (C-5 #1) - IAW PWS dated 29 MAY 2025 FFP
Phase 1- Fuselage Platform Inspection (Add-on Option) - Phase I (C-5 #1) - IAW PWS dated 02 July 2025 FFP
Line Item 0004
The following Line Item modifications were made:
Information From To
Description Scaffolding User Safety Training (Add-On Option) - IAW PWS dated 29 MAY 2025 FFP
Phase 1- Scaffolding User Safety Training (Add-On Option)
- IAW PWS dated 02 July 2025 FFP
Line Item 0005
The following Line Item modifications were made:
Information From To
Description Fuselage Dismantle (teardown)/Removal Labor - Phase I (C-5 #1) (Includes clean up) IAW PWS dated 29 MAY 2025
FFP
Phase 1- Fuselage Dismantle (teardown)/Removal Labor - Phase I (C-5 #1) (Includes clean up) IAW PWS dated 02 July 2025 FFP
Line Item 0006
The following Line Item modifications were made:
Information From To
Description
Cargo Compartment Platform Rental - Phase I (C-5 #1) {Includes 28-day Rental, the pre-award/post-award site visit(s), work-site prep, design/ drawings,associated materials/supplies, any modifications, inspection/training options, FOB destination delivery, freight pick up, and applicable tags/documentation.} IAW PWS dated 29 MAY
2025 FFP
Phase 1- Cargo Compartment Platform Rental - Phase I (C-5 #1) {Includes 28-day Rental, the pre-award/post-award site visit(s), work-site prep, design/ drawings, associated materials/supplies, any modifications, inspection/training options, FOB destination delivery, freight pick up, and applicable tags/documentation.} IAW PWS dated 02 July
2025 FFP
Line Item 0007
FA857125Q00920002
The following Line Item modifications were made:
Information From To
Description Cargo Install/Erect (setup) Labor Phase I (C-5 #1) - (Includes clean-up) IAW PWS dated 29 MAY 2025 FFP
Phase 1- Cargo Install/Erect (setup) Labor Phase I (C-5 #1)
- (Includes clean-up) IAW PWS dated 02 July 2025 FFP
Line Item 0008
The following Line Item modifications were made:
Information From To
Description Cargo Platform Inspection (Add-on Option) - Phase I (C-5/ MC) - IAW PWS dated 29 MAY 2025 FFP
Phase 1- Cargo Platform Inspection (Add-on Option) - Phase I (C-5 #1) - IAW PWS dated 02 July 2025 FFP
Line Item 0009
The following Line Item modifications were made:
Information From To
Description Cargo Dismantle (teardown)/Relocate Labor - Phase I (C-5 #1) (Includes clean up) IAW PWS dated 29 MAY 2025 FFP
Phase 1- Cargo Dismantle (teardown)/Relocate Labor - Phase I (C-5 #1) (Includes clean up) IAW PWS dated 02 July 2025 FFP
Option Line Item 0010
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Phase 1-Fuselage Scaffold Platform Rental Extension Option/Additional week - Phase I (C-5 #1)
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 0011
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Phase 2-Fuselage Scaffolding Platform Rental - Phase II (C-5 #2)
- 8 ea.
{Includes 28-day Rental, materials/supplies, any modifications, inspection, add-on options, FOB destination delivery, freight pick up, and applicable tags/documentation.} IAW PWS dated 02 July
2025 FFP
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
8 Each
Option Line Item 0012
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Phase 2- Fuselage Install/Erect (setup) Labor Phase II C-5 #2) - 3 ea.
(Includes clean-up) IAW PWS dated 02 July 2025 FFP
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
3 Each
Option Line Item 0013
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Phase 2- Fuselage Platform Inspection (Add-on Option) - Phase II (C-5 1 ea.
#2) - IAW PWS dated 02 July 2025FFP
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 0014
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Fuselage Dismantle (teardown)/Removal Labor - Phase II (C-5 1 ea.
#2) (Includes clean up) IAW PWS dated 02 July 2025 FFP
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 0015
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Phase 2-Hayloft Scaffolding Platform Rental - Phase II (C-5 #2) 8 ea.
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
8 Each
Option Line Item 0016
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Hayloft Install/Erect (setup) Labor Phase II (C-5 #2) - 3 ea.
(Includes clean-up) IAW PWS dated 02 July 2025 FFP
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
3 Each
Option Line Item 0017
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Hayloft Platform Inspection (Add-on Option) - Phase II (C-5 #2) 1 ea.
- IAW PWS dated 02 July 2025 FFP
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 0018
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option
Phase 2- Hayloft Dismantle (teardown)/Removal Labor - Phase II (C-5 #2) 1 ea.
(Includes clean up) IAW PWS dated
Line Item
02 JUN 2025 FFP
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 0019
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Phase 2- Fuselage Scaffold Platform Rental Extension Option/Additional week - Phase II (C-5 #2)
Product Service Code: W054 Pricing Arrangement: Firm Fixed Price
1 Each
Deliveries or Performance
Line Item 0001
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Line Item 0002
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Line Item 0003
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Line Item 0004
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Line Item 0005
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Line Item 0006
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Line Item 0007
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Line Item 0008
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Line Item 0009
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Aug 2025 to 31 Jul 2026 14 Oct 2025 to 13 May 2026
Option Line Item 0010
The following Delivery Information was added:
Information Value Period of Performance 14 Oct 2025 to 13 May 2026
Option Line Item 0011
The following Delivery Information was added:
Information Value Period of Performance 14 May 2026 to 13 Dec 2026
Option Line Item 0012
The following Delivery Information was added:
Information Value Period of Performance 14 May 2026 to 14 Dec 2026
Option Line Item 0013
The following Delivery Information was added:
Information Value Period of Performance 14 May 2026 to 13 Dec 2026
Option Line Item 0014
The following Delivery Information was added:
Information Value Period of Performance 14 May 2026 to 13 Dec 2026
Option Line Item 0015
The following Delivery Information was added:
Information Value Period of Performance 14 May 2026 to 13 Dec 2026
Option Line Item 0016
The following Delivery Information was added:
Information Value Period of Performance 14 May 2026 to 13 Dec 2026
Option Line Item 0017
The following Delivery Information was added:
Information Value Period of Performance 14 May 2026 to 13 Dec 2026
Option Line Item 0018
The following Delivery Information was added:
Information Value Period of Performance 01 Aug 2025 to 31 Jul 2026
Option Line Item 0019
The following Delivery Information was added:
Information Value Period of Performance 01 Aug 2025 to 31 Jul 2026
Contract Clauses
Header Miscellaneous Text (Added):
52.237-6 Incremental Payment by Contractor to Government.
As prescribed in , insert the following clause in solicitations and contracts for dismantling, demolition, or (c)37.304 removal of improvements (a) if the Contractor is to receive title to dismantled or demolished property and a net amount of compensation is due the Government; and (b) if the Contracting Officer determines that it would be advantageous to the Government for the Contractor to pay in increments, and for the Government to transfer title to the Contractor for increments of property, only upon receipt of those payment:
Incremental Payment by Contractor to Government (Apr 1984)
(a)The Contractor shall perform the work called for under this contract receipt of notice of award, IAW after The Schedule unless otherwise provided in the Schedule, and before proceeding with the work, shall pay Thereafter, . IAW proper invoice the Contractor shall make payment to the Government in the amount and frequency specified in the Schedule.
Checks shall be made payable to the office designated in the contract and shall be forwarded to the Contracting Officer.
(b)Upon the Government's receipt of each increment of payment, the Contractor shall receive title to such property as the Contracting Officer determines to be fair and reasonable for that increment of payment. Upon receipt of the Contractor's final payment, all title that has not passed to the Contractor shall vest in the Contractor, unless specifically designated in the Schedule as being retained by the Government. The Government shall not be responsible for the condition of, or any loss or damage to, the property.
(c)The Contractor shall promptly remove from the site all property acquired by the Contractor. The Government will not permit storage of property on the site beyond the completion date. If the Contractor does not wish to remove from the site any of the property acquired, the Contracting Officer may, upon written request, grant the Contractor permission to leave the property on the premises. As a condition of the granting of this permission, the Contractor agrees to waive any right, title, claim, or interest in and to the property.
(End of clause)
52.217-6 Option for Increased Quantity.
As prescribed in , insert a clause substantially the same as the following: (d)17.208
Option for Increased Quantity (Mar 1989)
The Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within . Delivery of the added 1 day items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.
52.217-7 Option for Increased Quantity-Separately Priced Line Item.
As prescribed in , insert a clause substantially the same as the following: (e)17.208
Option for Increased Quantity-Separately Priced Line Item (Mar 1989)
FA857125Q00920002
https://www.acquisition.gov/far/37.304#FAR_37_304 https://www.acquisition.gov/far/part-17#FAR_17_208 https://www.acquisition.gov/far/part-17#FAR_17_208
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within of Delivery of added items shall continue at the same rate that like items are 1 day called for under the contract, unless the parties otherwise agree.
(End of clause)
| SUMMARY OF CHANGES |
| Solicitation/Contract Form |
| Supplies or Services & Prices or Costs |
| Deliveries or Performance |
| Contract Clauses |
| IDCode: J |
| Page: 1 |
| Pages: 8 |
| AmendNo: 0002 |
| EffDate: 08 Jul 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: FA8571 |
| AdmCode: |
| IssuedBy: FA8571 AFSC PZIO MXW |
375 PERRY ST BLDG 255, CP 478 222 4098
ROBINS AFB, GA 31098-1672
UNITED STATES
Curtis Green, Email: curtis.green.9@us.af.mil Telephone: 312-472-0000 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA857125Q0092 |
| SolDate: 17 Jun 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amending requirement to add CLINS for Phase II and include revised PWS dated 02 July 2025 |
| ContNameTitle: |
| CoNameTitle: Jeffery W. Pruitt |
| ContDate: |
| CODate: 08 Jul 2025 |