Question_and_Answer_Group_One.pdf

PDF 56 KB Posted

Attached to
Industry Day Invite Informational forum AIM 129 Missile Rail Launcher
Solicitation number
FA8554-17-R-0004
Issued by

View the file

Other files

File Type Posted
Industry_Day_Atendees.xlsx XLSX spreadsheet
Contractor_questions_and_answers_group_Five.docx DOCX document
Rolled_Back_Drawings.zip ZIP file
MRL_Industry_Day_Engineering_with_Exploded_Views_and_Changes_13_Apr_17.pptx PPTX presentation
Coating_Change_List.xlsx XLSX spreadsheet
Change_in_Coating_Decision.docx DOCX document
Contractor_questions_and_answers_group_four.pdf PDF
MRL_Industry_Day_Slides.pptx PPTX presentation
Coated_vs_No_Coating_List.xlsx XLSX spreadsheet
654477_Current_J-9.pdf PDF
Pre-Award_Qualification_due_date_extended.pdf PDF
Contractor_Questiond_And_Answers_Group_Three.docx DOCX document
Contractor_questions_and_answers_group_two.docx DOCX document
Contractor_questions_and_answers_group_one.docx DOCX document
Pre-Award_Source_Qual_MRL_Final_12_Oct_2016_(003).pdf PDF
Agenda.pdf PDF
SOW.pdf PDF
Agenda.pdf PDF
CDRLs.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer Group One

Question : We are currently working on a proposal for this requirement. I appears that there are 2 solenoids needed for these sub-assemblies. One is P/N 654286-2 that is used on the Detent assemblies P/N’s 7002760-15 & 7002760-16. The other solenoid is P/N 653752-3 on the Actuator assembly P/N 7002590-3. The only reliable source for these part numbers is MOOG. Our technical team has contacted MOOG for pricing to find that this item is Proprietary to Marvin Engineering or the Air force, so we cannot purchase this item.

Answer: Contractors are responsible for establishing sources for P/N 654286-2 and P/N 653752-3 if they do not wish to use those shown on the two respective drawings. The new vendors will need to meet both the dimensional and performance requirements listed on each drawing. The results will be incorporated into the First Article package for the Sub-Assembly that each solenoid is attached to.