MRL_Industry_Day_Engineering_with_Exploded_Views_and_Changes_13_Apr_17.pptx
PPTX presentation 5 MB Posted
- Solicitation number
- FA8554-17-R-0004
About this file
MRL Industry Day Engineering with Exploded Views
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_and_Answer_Group_One.pdf | ||
| Industry_Day_Atendees.xlsx | XLSX spreadsheet | |
| Contractor_questions_and_answers_group_Five.docx | DOCX document | |
| Rolled_Back_Drawings.zip | ZIP file | |
| Coating_Change_List.xlsx | XLSX spreadsheet | |
| Change_in_Coating_Decision.docx | DOCX document | |
| Contractor_questions_and_answers_group_four.pdf | ||
| MRL_Industry_Day_Slides.pptx | PPTX presentation | |
| Coated_vs_No_Coating_List.xlsx | XLSX spreadsheet | |
| 654477_Current_J-9.pdf | ||
| Pre-Award_Qualification_due_date_extended.pdf | ||
| Contractor_Questiond_And_Answers_Group_Three.docx | DOCX document | |
| Contractor_questions_and_answers_group_two.docx | DOCX document | |
| Contractor_questions_and_answers_group_one.docx | DOCX document | |
| Pre-Award_Source_Qual_MRL_Final_12_Oct_2016_(003).pdf | ||
| Agenda.pdf | ||
| SOW.pdf | ||
| Agenda.pdf | ||
| CDRLs.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Changes to this presentation from the Original, dated 27 Mar 17
13 Apr 17 Added Pages 12 and 13 Deleted Page 31 of 27 Mar Presentation
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
UNCLASSIFIED//FOUO
LAU-128 and LAU-129 Missile Rail Launcher (MRL) Industry Day Michael Oliver, Ph.D.
AFLCMC/EBREM
27 Mar 17
MRL Industry Day Agenda MRL Overview What is required on MRL contract (Engineering Perspective) MRL Assemblies Sub-Assemblies Changes in current configurations Government Furnished Assets (GFA’s)
MRL Overview LAU-128 and CATM-120 Missile is not part of contracting effort MRL can hold
CATM/AIM-120
CATM/AIM-9
PODS
LAU-128
F-15 Aircraft
LAU-129
F-16 Aircraft MRL Overview (cont.)
F-15 Missile and MRL @ 3/9 O’clock F-16 Missile and MRL @ 3/9 O'clock Missile and MRL @ 6 O’clock
MRL Overview (cont.)
On the F-15, the missile or POD is going to be loaded always at the 3 o’clock or 9 o’clock position. This creates a rather large bending moment on the launcher and hence the most stress.
On the F-16, there will always be a missile loaded on the wingtips, with the same moment as on the F-15. There will also be a loaded asset at the 6 o’clock position, creating less stress on the launcher.
MRL Industry Day MRL Overview (cont.)
Major differences between LAU-128 and LAU-129 LAU-129 has Audio Switching Unit (ASU) Power Switching Unit (PSU) Advanced Missile Remote Interface Unit (AMRIU) Is not part of the MRL manufacturing effort but is part of the First Article Testing
What is required per the contract First Article (FA) One which will be representative MRL Variants
LAU-128 A/A
LAU-129 A/A
LAU-129 B/A
LAU-129 C/A
LAU-129 D/A
LAU-129 E/A
LAU-129 F/A
Clean-up of the current Tech Data Package (TDP)
What is Required FA Requirements Meet requirements of DS32050-116 Part II (Prime Item Product Fabrication Specification for ….)
Electrical and Mechanical Testing at and after thermal soak Vibration Testing With and without CATM-120 installed Appropriate Electrical Tests (EMI) Dimensional Checks of all Parts and Assemblies
Dimensional checks will involve verifying that the parts, sub-assemblies, and assemblies meet dimensions called out on the associated drawings. The tool(s) used for these measurements will be based on tolerances, type of measurement, and magnitude of measurement.
MRL Industry Day What is Required (cont.)
FA Requirements Material Certifications Chemistry Heat Treat Tensile Country of Origin Preapproval of materials from Asia will be required Finish Certifications
PEO
DLC
Passivation Chem Film Paint
SFL
Form-Fit-Function (FFF) at Robins AFB and various AF bases
Any time a process is performed or applied on a part, sub-assembly, or assembly, a certification by the vendor performing the task will be provided. This includes certifications on raw material which show that it meets required MIL or Industry specification for physical and chemical parameters. This also includes pre or post processing, plating, or finishing as well as marking. If a specification is called out, a certification will be required to prove that it was met.
MRL Industry Day What is Required (cont.)
TDP Clean-up Re-create each drawing Software is Solidworks v17 Update Industry Specifications Change coating requirements as needed Incorporate hanging ECO’s and NOR’s Roll revision Work with EBREM and Tech Data personnel on incorporation of revised drawings into JEDMICS Update Test and Process Specifications Update 3D models If required Electrical Harness will be completed independently Update assembly torque specs Data will be provided
There are ~120 drawings which will need to be recreated. This will involve taking the existing drawing and then creating a new drawing based on the 3D models which will be given as GFA. The same part views and dimensions can be used but the format and boiler plate from the layout will follow current Air Force templates. The Notes and BOM will need to be updated to account for changes to MIL specs and standards which may have to be changed as well as changes to part coating requirements .
All hanging ECO’s and NOR’s will need to be incorporated into any associated drawing.
The only time a 3D model might have to be updated is if there is a dimensional issue between the current drawing and the given 3D model.
Solidworks Premium or Professional will be required to create the drawings as well as to modify any 3D model.
MRL Industry Day What is Required (cont.)
TDP Clean-up (cont.)
There are 187 Parts with drawings in LAU-128 There are 185 Parts with drawings in LAU-129 There are 181 drawings for two PWR Supplies Source Control Drawing will not be updated 450 Industry Specifications
MIL
ASTM
AMS-QQ-A
34 MS/NAS Specifications ~900 Fasteners Threaded and Non-Threaded 67 Drawings have been updated with respect to coatings as of 27 March 17 ~36% Complete
What is Required (cont.)
TDP Clean-up (cont.)
64 Drawings have been updated with respect to coatings as of 27 March 17 ~36% Complete Due to the cost of the two new coatings, only 11 parts will receive the new coatings Drawings which will receive the new coatings have already been updated Excel Spreadsheet will identify what components will roll back and the individual rolled back drawings will be posted The remaining 56 drawings will need to be rolled back but changes made to the part itself will need to remain.
What is Required (cont.)
TDP Clean-up (cont.)
PEO Coating
| 7002791-6 | LAU-129 Rail Structure | |
| 7002736-2 | LAU-128 Rail Structure | |
| 7002792 | Nose Fairing | |
| 7002731-4 | AFT Dampener Housing | |
| 7002762-5 | Detent Housing |
DLC Coating
| 7002194-1 / 201324703-01 | Spacer | |
| 7002192-1 / 201324701-1 | Fin Holder Bracket | |
| 7002191-1 / 201324702-1 | Retainer Arm | |
| 201113846-01 | Detent Bushing Bolt | |
| 201113847-01 | Detent Bushing | |
| 201113825-01 | AFT Dampener Blade |
What is Required (cont.)
MRL Assemblies and Sub-Assemblies Sub-Assembly Drawings have been updated Nose Fairing Fastener Assembly Detent Assembly Both 128/129 Umbilical Assembly AFT Dampener Assembly Structural Rail Section Both 128/129 Associated Test and Process Specifications will need to be updated Industry Specifications System Specifications Weights
CG
The three main Test and Processing specs will need to be updated, DS32050-116 Part I DS32050-116 Part II DS32050-550 Part II
They are in PDF form and would need to be converted to Word to edit then changed back to PDF for final delivery back to the Air Force.
MRL Assemblies and Sub-Assemblies (cont.)
MRL Assemblies and Sub-Assemblies (cont.)
Sub-Assemblies of the MRL Structural Rail Section Nose Fairing Fastener Assembly (Wrench Point) Detent Assembly Umbilical Assembly (Linear Actuator) Power Supply AFT Dampener Assembly Electrical Harness
Structural Rail Section
99.06 in long LAU-128 has a flatness requirement of .103 over its length LAU-129 has a flatness requirement of .075 over its length Material is 7075-T7351 All Sub-Assemblies and parts are secured to the Rail Structure (most critical)
MRL Assemblies and Sub-Assemblies (cont.)
Structural Rail Section
LAU-128
MRL Assemblies and Sub-Assemblies (cont.)
Structural Rail Section
LAU-129
Nose Fairing
MRL Assemblies and Sub-Assemblies (cont.)
Fastener Assembly (Wrench Point) Spring Loaded Assembly Secures Nose Fairing onto Rail Structure Material is 17- 4PH H1025
Fastener Assembly (Wrench Point)
Detent Assembly Dampens (secures) FWD Hook of loaded asset Slight difference between the 7002760-15 (LAU-128) and 7002760-16 LAU-129) Secures loaded asset in case of inadvertent rocket motor fire Keeps loaded asset from sliding AFT Material is 17- 4PH, 13-8, 300M, and 7075-T7351
Detent Assembly
Umbilical Assembly Engages and Disengages launcher J-9 Electrical Connector to the loaded asset’s J-1 Electrical Connector Has a Retraction speed requirement Material is 17- 4PH H1025 and 7075-T7351
Umbilical Assembly
MRL Assemblies and Sub-Assemblies (cont.)
Power Supply Supplies 28VDC and 175VDC to loaded asset One Source Controlled Drawing Standard Industries, CAGE 23951 One Drawing Robins CAGE
AFT Dampener Assembly Dampens (secures) AFT Hook of loaded asset Keeps loaded asset from coming off back end of the launcher Material is 17- 4PH, H1025 and 7075-T7351
AFT Dampener Assembly
MRL Assemblies and Sub-Assemblies (cont.)
Electrical Harness Current J-9 connector (P/N 654477) is source controlled to one vendor Can be manufactured elsewhere but will need to be validated
J-9 Connector
Changes in current configurations Coatings to Most aluminum and PH steel parts Aluminum: Removes Primer, Paint, and SFL which is replaced by Plasma Electrolytic Oxidation (PEO) PEO is “green”, much harder than Type III anodization, and passes ASTM G85 Annex 4 (336 hrs) 17-4PH: Removes SFL which is replaced with Diamond Like Carbon (DLC) DLC is “green” and passes ASTM G85 Annex 4 (336 hrs) Only paint on MRL is on side of Rail Structure for color requirement Currently flying 8 rails with PEO Currently flying 24 rails with DLC AFT Dampener Blades Currently flying 24 CATM-120C with new AFT Hook with DLC
The coatings of DLC and PEO and sole sourced to IBC Materials and Technologies out of Lebanon, IN.
MRL Industry Day Changes in current configurations (cont.)
Geometry change to FWD section of Rail Structure for both LAU-128 and LAU-129 Matches that of the LAU-127
.105 R .06 R
GFAs
CATM-120C
AMRIU
3D Solid Models LAU-128 and LAU-129 (one each)
Source Controlled Drawings Solenoids (2) Two vendors J-9 Connector Vendor Controlled, P/N 654477 Drawing 9579722-10, CAGE 98752 is build to print Will require update to include three piece trunnion Power Supply P/N 3000, Standard Industries, CAGE 23951 P/N 9018869 is build to print
Solenoids and Power Supplies can be purchased from two different approved vendors, per the respective drawings, or new vendors can be developed. If the latter course is chosen, then validation testing on the solenoid and/or the power supply itself will have to be made available to the ESA.
The J-9 can be made per the Reversed Engineered Drawing (P/N 9579722).
MRL Industry Day Future Changes planned during Contract period
LAU-128 D/A
New Power Supply Removes 175VDC Umbilical Assembly Offers vertical adjustment and linear travel of J-9 Material changes to In-Flight Latch (IFL) and FWD Missile Stop 7002763 and 3825042 Both are currently 300M Looking at 17-4PH with a design change Elimination of Cadmium on all fasteners Substitution of 6 Lobe (Torx™) threaded fasteners for the current Offset Cruciform
This is just an FYI page which indicates possible changes to the MRL that might occur in the future. These changes will be made through contract mods.
MRL Industry Day Data available with this presentation DS32050-116 Part I DS32050-116 Part II DS32050-550 Part II Drawing 9579722-10 (J-9), CAGE 98752 Itemized list of what items will be coated and with which coating (LAU-128) Data available with RFQ Complete TDP as it currently exists 3D Models of LAU-128 and LAU-129 MRLs
Questions?
image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.JPG image10.JPG image11.JPG image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.JPG image17.jpeg image18.JPG image19.jpeg image20.jpeg image21.jpeg image22.JPG image23.jpeg image24.png image25.jpeg image26.jpeg image27.jpeg