Contractor_questions_and_answers_group_two.docx
DOCX document 12 KB Posted
- Solicitation number
- FA8554-17-R-0004
About this file
Contractor questions and answers group two.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_and_Answer_Group_One.pdf | ||
| Industry_Day_Atendees.xlsx | XLSX spreadsheet | |
| Contractor_questions_and_answers_group_Five.docx | DOCX document | |
| Rolled_Back_Drawings.zip | ZIP file | |
| MRL_Industry_Day_Engineering_with_Exploded_Views_and_Changes_13_Apr_17.pptx | PPTX presentation | |
| Coating_Change_List.xlsx | XLSX spreadsheet | |
| Change_in_Coating_Decision.docx | DOCX document | |
| Contractor_questions_and_answers_group_four.pdf | ||
| MRL_Industry_Day_Slides.pptx | PPTX presentation | |
| Coated_vs_No_Coating_List.xlsx | XLSX spreadsheet | |
| 654477_Current_J-9.pdf | ||
| Pre-Award_Qualification_due_date_extended.pdf | ||
| Contractor_Questiond_And_Answers_Group_Three.docx | DOCX document | |
| Contractor_questions_and_answers_group_one.docx | DOCX document | |
| Pre-Award_Source_Qual_MRL_Final_12_Oct_2016_(003).pdf | ||
| Agenda.pdf | ||
| SOW.pdf | ||
| Agenda.pdf | ||
| CDRLs.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 1:
Section C, paragraph g), refers to Test and Evaluation and/or Verification. Will a qualification test plan/procedure need to be provided in the SAR package or Just an example of a test plan? We normally are required by most contracts to provide a Test Plan within a certain required number of days after contract award. Then the Test Reports is then provided at a later date per the contract. I noticed it stated in this section that “Following any future contract award, the offeror will be required to submit a formal First Article of the assembly along with the Test Report” which is normally required. I was just questioning whether an official test plan would need to be included in the SAR. This is a very specific detailed plan that would require great Detail on meeting all quality assurance requirements. This is normally required after contract award.
Answer:
Just an example of a Plan in the Pre-Award. After the award for the FA, they would have to provide the Test Plan in detail on how testing and inspection will occur.