Contractor_questions_and_answers_group_two.docx

DOCX document 12 KB Posted

Attached to
Industry Day Invite Informational forum AIM 129 Missile Rail Launcher
Solicitation number
FA8554-17-R-0004
Issued by

About this file

Contractor questions and answers group two.

View the file

Other files

File Type Posted
Question_and_Answer_Group_One.pdf PDF
Industry_Day_Atendees.xlsx XLSX spreadsheet
Contractor_questions_and_answers_group_Five.docx DOCX document
Rolled_Back_Drawings.zip ZIP file
MRL_Industry_Day_Engineering_with_Exploded_Views_and_Changes_13_Apr_17.pptx PPTX presentation
Coating_Change_List.xlsx XLSX spreadsheet
Change_in_Coating_Decision.docx DOCX document
Contractor_questions_and_answers_group_four.pdf PDF
MRL_Industry_Day_Slides.pptx PPTX presentation
Coated_vs_No_Coating_List.xlsx XLSX spreadsheet
654477_Current_J-9.pdf PDF
Pre-Award_Qualification_due_date_extended.pdf PDF
Contractor_Questiond_And_Answers_Group_Three.docx DOCX document
Contractor_questions_and_answers_group_one.docx DOCX document
Pre-Award_Source_Qual_MRL_Final_12_Oct_2016_(003).pdf PDF
Agenda.pdf PDF
SOW.pdf PDF
Agenda.pdf PDF
CDRLs.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1:

Section C, paragraph g), refers to Test and Evaluation and/or Verification. Will a qualification test plan/procedure need to be provided in the SAR package or Just an example of a test plan? We normally are required by most contracts to provide a Test Plan within a certain required number of days after contract award. Then the Test Reports is then provided at a later date per the contract. I noticed it stated in this section that “Following any future contract award, the offeror will be required to submit a formal First Article of the assembly along with the Test Report” which is normally required. I was just questioning whether an official test plan would need to be included in the SAR. This is a very specific detailed plan that would require great Detail on meeting all quality assurance requirements. This is normally required after contract award.

Answer:

Just an example of a Plan in the Pre-Award. After the award for the FA, they would have to provide the Test Plan in detail on how testing and inspection will occur.