CDRL A007 - OIM.pdf

PDF 88 KB Posted

Attached to
Tunner Aircraft Cargo Loader (ACL) Bridge Federal contract opportunity
Solicitation number
FA8534-24-R-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document is a Contract Data Requirements List (CDRL) for the Overhaul Instructions Manual (OIM) associated with the Tunner Aircraft Cargo Loader. The key details are:

The OIM shall be delivered no later than 60 days after contract award, with annual updates. The manual's revision designation (or date) shall be changed for each submission, with the second submission due no later than 36 months after contract award. The CDRL outlines the specific requirements for the OIM, including tailoring of MIL-PRF-32216A, contractor formatting, and distribution statements. A Letter of Transmittal (LT) is required for each deliverable, which must be approved by the Procuring Contracting Officer (PCO) within 45 days. The CDRL also specifies the required recipients for the OIM deliverables.

View the file

Other files for this federal contract opportunity

Other files attached to Tunner Aircraft Cargo Loader (ACL) Bridge, newest first.
File Type Posted
CDRL A010 - QAPP.pdf PDF
CDRL A002 - IPMDAR.pdf PDF
Atch_8-Cost_Proposal_Adequacy_Structure.pdf PDF
CDRL A009 - Accident Report.pdf PDF
CDRL A004 - Conference Minutes.pdf PDF
Atch_9Pricing_Instructions Final.docx DOCX document
CDRL A005 - CASR.pdf PDF
Atch 7 - Tunner Registration Number Final.docx DOCX document
Atch 4 Safety Appendix Final.docx DOCX document
CDRL A006 - Test Report.pdf PDF
CDRL A008 - IUID.pdf PDF
CDRL A003 - CFSR.pdf PDF
CDRL A001 - CWBS.pdf PDF
Atch 6. Tunner OH Incentives.docx DOCX document
Attachment 5- Tunner OH GFP. Final.xlsx XLSX spreadsheet
Atch 2- FD2060-24-31655 Tunner OH Bridge QASP_COR Final.pdf PDF
Atch 1-Tunner OH PWS Final (005).docx DOCX document
FA8534-24-R-0011 Final.pdf PDF
Atch_5-Tunner_GFP.xlsx XLSX spreadsheet
FA8534-24-R-0011 Draft 11 July 2024.pdf PDF
Atch_2-QASP.pdf PDF
Atch_9-Cost_Proposal_Adequacy_Structure.pdf PDF
Atch_8-Tunner_Registration_Numbers.docx DOCX document
Atch_7-Provisions_for_ROK.docx DOCX document
Atch_3-TDP.pdf PDF
Atch_4-Safety_Appendix.docx DOCX document
Atch_10-Pricing_Instructions.pdf PDF
Atch_6-Tunner_TSSA_Determination.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER

Form Approved OMB No. 0704-0188

15. TOTAL

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

DIST

22202-4302.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

0003/1003/2003/3003/4003 A/B/C/D/E X

Tunner Loader

A/B/C/D/E007 Evaluation of COTS Manuals Overhaul Instructions Manual (OIM)

MIL-PRF-32216A/T OH PWS 4.5.2.3.1 AFLCMC/WNZ

LT

A C

ANUALLY

N/A

SEE BLK 16

SEE BLK 16

DCMA 0 1 0

AFLCMC/WNZ 0 1 0

AFLCMC/WNKAC 0 1 0

0 0

Blk 4: MIL-PRF-32216A is hereby tailored as follows: Only paragraph 3.1.4.12 applies. MIL-STD-38784 and MIL-PRF-87268 shall be used for additional guidance. Contractor format is authorized.

Blk 7: Letter of transmittal (LT) only; no DD250 required. For each deliverable, the Contractor shall transmit the CDRL deliverable by an electronically signed LT to the Contracting Officer’s Representative (COR) via email and other agreed upon media. The LT shall provide the following elements: Transmittal Statement, Contractor's Name, LT Tracking umber, Contractor Number, CDRL Data Item Number, and Deliverable Description.

Blk 8: “A” indicates written approval from the PCO is required and applies to items of critical data (e.g., technical orders and engineering drawings) requiring specific advanced written approval prior to distribution of the final data item. The Government shall have 45 days after receipt of Contractor’s submission to approve/disapprove the submission. The Contractor shall have 15 days to respond with a revised submittal for any Government disapprovals.

Blk 9: Distribution Statement C: Distribution is authorized to U.S. Government agencies and their contractors (administrative or operational use). Other requests for this document shall be referred to AFLCMC/WNZ.

Blk's 10, 12-13: The Table of Contents for the OIM shall be delivered no later than 60 days after contract award. The OIM shall be updated annually to correct errors, incorporate continuous improvement, track with latest contractor overhaul manufacturing instructions, etc. The manual’s revision designation (or date) shall be changed for each submission. The second submission shall be delivered no later than 36 months after contract award. Subsequent submissions shall be delivered in the same month as the second submission.

Blk 14:

AFLCMC/WNZ AFLCMC/WNKAC

235 Byron Street, Suite 19A 235 Byron Street, Suite 19A Robins AFB, GA 31098-1813 Robins AFB, GA 31098-1813

N/A

NSP

BRANTLEY.KYLE.AN

DREW.1545276115

Digitally signed by

BRANTLEY.KYLE.ANDREW.154527611

Date: 2024.02.29 10:20:47 -05'00'

29 Feb 2024 GRIEPENBURG.DE

IDRE.H.1289435464

Digitally signed by

GRIEPENBURG.DEIDRE.H.1289435

Date: 2024.02.29 10:01:08 -05'00'

29 Feb 2024

1 1

File details come from the government source that posted it. Updated .