CDRL A006 - Test Report.pdf
PDF 89 KB Posted
- Attached to
- Tunner Aircraft Cargo Loader (ACL) Bridge Federal contract opportunity
- Solicitation number
- FA8534-24-R-0011
About this file
This document is a Contract Data Requirements List (CDRL) that defines the test report deliverable required for the overhaul of the Tunner Aircraft Cargo Loader (ACL) under a federal contract. The CDRL specifies that the contractor shall submit a post-overhaul test report for each overhauled loader, along with the associated inspection checklist, within 30 days of the loader's final acceptance by the Government Quality Assurance Representative (QAR). The report must be electronically signed and submitted via a letter of transmittal. The Government has 45 days to approve or disapprove the report, and the contractor has 15 days to respond with a revised submittal for any disapprovals. The CDRL also outlines tailored requirements for the test report format, with certain paragraphs from the applicable data item description deleted. Distribution of the test report is authorized for U.S. Government agencies and their contractors.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER
Form Approved OMB No. 0704-0188
15. TOTAL
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
DIST
22202-4302.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
0003/1003/2003/3003/4003 A/B/C/D/E X
Tunner Loader
A/B/C/D/E006 Test/Inspection Report SEE BLK 16
DI-NDTI-80809B/T OH PWS 4.5.3.14, 4.5.3.15 AFLCMC/WNZ
LT
N/A C
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
DCMA 0 1 0
AFLCMC/WNZ 0 1 0
AFLCMC/WNKAC 0 1 0
0 0
Blk 3: Post-Overhaul Inspection Checklist Template and Post-Overhaul Test Report for each Tunner Overhauled
Blk 4: DID-NDTI-80809B is tailored as follows:
Delete paragraphs 10.2.5, 10.2.6.1, 10.2.6.2, 10.2.6.3, and 10.2.7.2 with no substitutions.
Paragraph 10.2.7.3: Change last sentence to read as follows: “This authentication shall include the signature of a contractor representative authorized to make such authentication.”
Blk 7: Letter of transmittal (LT) only; no DD250 required. For each deliverable, the Contractor shall transmit the CDRL deliverable by an electronically signed LT to the Contracting Officer’s Representative (COR) via email and other agreed upon media. The LT shall provide the following elements: Transmittal Statement, Contractor's Name, LT Tracking umber, Contractor Number, CDRL Data Item Number, and Deliverable Description.
Blk 8: When there is “N/A” in block 8, the Government still has the inherent right to disapprove the data item deliverable. The Government shall have 45 days after receipt of Contractor’s submission to approve/disapprove the submission; if approval/disapproval is not received within 45 days of receipt, approval shall be automatic. The Contractor shall have 15 days to respond with a revised submittal for any Government disapprovals.
Blk 9: Distribution Statement C: Distribution is authorized to U.S. Government agencies and their contractors (administrative or operational use). Other requests for this document shall be referred to AFLCMC/WNZ.
N/A
NSP
BRANTLEY.KYLE.AN
DREW.1545276115
Digitally signed by
BRANTLEY.KYLE.ANDREW.154527611
Date: 2024.02.29 10:19:00 -05'00'
02 Feb 2024 GRIEPENBURG.DE
IDRE.H.1289435464
Digitally signed by
GRIEPENBURG.DEIDRE.H.1289435
Date: 2024.02.29 10:02:02 -05'00'
29 Feb 2024
1 2
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
0003/1003/2003/3003/4003 A/B/C/D/E X
Tunner Loader
Blk's 10-13: A Contractor shall submit a post-overhaul test report for each overhauled loader not later than 30 days after final acceptance of loader by QAR; attach the Contractor-generated, Government-approved inspection checklist signed by the QAR to each post overhaul test report for each overhauled loader. Submittals may be grouped such that one submittal per month is required.
Blk 14:
AFLCMC/WNZ
235 Byron Street, Suite 19A Robins AFB, GA 31098-1813
AFLCMC/WNKBBA
235 Byron Street, Suite 19A Robins AFB, GA 31098-1813
2 2
File details come from the government source that posted it. Updated .