FA8534-24-R-0011 Final.pdf

PDF 694 KB Posted

Attached to
Tunner Aircraft Cargo Loader (ACL) Bridge Federal contract opportunity
Solicitation number
FA8534-24-R-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document is a solicitation for a 5-year, Fixed Price Incentive Firm Target (FPIF)/Firm Fixed Price (FFP) Indefinite Delivery/Requirements-type contract for the overhaul and unscheduled depot-level maintenance of the 60K Tunner Aircraft Cargo Loader. The Tunner is a self-propelled aircraft cargo transporter used to transfer loads to and from warehouses and cargo aircraft.

The contract will include overhaul and PPU overhaul of the Tunner, as well as unscheduled depot-level maintenance, to be performed in accordance with the attached Performance Work Statement. The contract has a one-year basic period with four one-year option periods. The government intends to award a sole source bridge contract to the incumbent, Leonardo DRS. The solicitation is anticipated to be released on or around May 20, 2024. Foreign participation is not permitted on this requirement. Interested offerors are encouraged to register on the government's website to receive notifications regarding the solicitation and any amendments.

View the file

Other files for this federal contract opportunity

Other files attached to Tunner Aircraft Cargo Loader (ACL) Bridge, newest first.
File Type Posted
CDRL A010 - QAPP.pdf PDF
CDRL A002 - IPMDAR.pdf PDF
Atch_8-Cost_Proposal_Adequacy_Structure.pdf PDF
CDRL A007 - OIM.pdf PDF
CDRL A005 - CASR.pdf PDF
Atch 7 - Tunner Registration Number Final.docx DOCX document
Atch 4 Safety Appendix Final.docx DOCX document
CDRL A006 - Test Report.pdf PDF
CDRL A008 - IUID.pdf PDF
CDRL A003 - CFSR.pdf PDF
CDRL A001 - CWBS.pdf PDF
Atch 6. Tunner OH Incentives.docx DOCX document
Attachment 5- Tunner OH GFP. Final.xlsx XLSX spreadsheet
Atch 2- FD2060-24-31655 Tunner OH Bridge QASP_COR Final.pdf PDF
Atch 1-Tunner OH PWS Final (005).docx DOCX document
CDRL A009 - Accident Report.pdf PDF
CDRL A004 - Conference Minutes.pdf PDF
Atch_9Pricing_Instructions Final.docx DOCX document
Atch_5-Tunner_GFP.xlsx XLSX spreadsheet
Atch_8-Tunner_Registration_Numbers.docx DOCX document
Atch_7-Provisions_for_ROK.docx DOCX document
Atch_3-TDP.pdf PDF
Atch_4-Safety_Appendix.docx DOCX document
Atch_10-Pricing_Instructions.pdf PDF
Atch_6-Tunner_TSSA_Determination.docx DOCX document
FA8534-24-R-0011 Draft 11 July 2024.pdf PDF
Atch_2-QASP.pdf PDF
Atch_9-Cost_Proposal_Adequacy_Structure.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8534-24-R-0011

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 333924

8(A) SIZE STANDARD: 900

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 30 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *30

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8534

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Industrial Truck, Tractor, Trailer and Stacker Machinery Manufacturin

9. (Agency Use) Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

8-NOV-2024 5:00 PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

MOBILITY SUPPORT, AFLCMC/WNKAC

235 BYRON ST BLDG 300 STE 19A

ROBINS AFB GA 31098-1670

BUYER: Christopher A. Greene/WNKC christopher.greene.37@us.af.mil

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JL

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 8-NOV 2024 5:00 PM

SOLICITATION NUMBER FA853424R0011

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Christophe A Greene/WNKC

MOBILITY SUPPORT, AFLCMC/WNKAC

235 BYRON ST BLDG 300 STE 19A

ROBINS AFB GA 31098-1670

FA8534-24-R-0011

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

(Applicable when certified cost or pricing data and data other than certified cost or pricing data is required/anticipated other than FAR Table 15-2 format)

(A) GENERAL:

This is a FixedPrice Incentive (Firm) Target (FP(I)F)/FirmFixedPrice (FFP) Indefinite Delivery Requirements Type contract for the issuance of orders in support of the Tunner Aircraft Cargo Loaders Overhauls. The contractor shall provide all parts, tools, labor, and materials necessary for this effort.

Work accomplished in support of Aircraft Cargo Loaders shall be accomplished in accordance with the PerformanceBased Work Statement (PWS) attached hereto.

(B) BEST ESTIMATED QUANTITIES/COSTS (BEQ/BEC):

The required quantity is not known at this time. The quantities identified are Best Estimated Quantities (BEQs) and Best Estimated Costs based on the actual history and projected requirements. Any single order may be issued for quantities in excess of or less than the BEQ. The failure of the Government to order the BEQ/BEC will not entitle the contractor to an equitable adjustment in price under the contract.

(C) OPTIONS:

Each option may be exercised on or before the last day of the previous basic contract period or option period. An option is considered to have been exercised at the time the Government provides contract modification to the contractor via email.

(D) PERIOD OF PERFORMANCE:

The period of performance for this effort is five (5) years, consisting of a 1year Basic, and four (4) 1year annual options.

*Should an effort ordered under this contract cross contract years, the CLIN cited on the order shall reflect the contract year in which the order was originally awarded.

(E) CEILING PRICE:

As noted in Schedule B, the ceiling price shall be 120% of Total Target Cost.

(F) RIGHT TO CANCEL:

The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels the solicitation, the Government has no obligation to reimburse the offeror for any costs.

BASIC CONTRACT PERIOD: Effective date of contract award to twelve (12) months

Overhaul

Item No.

Incentive Firm Target Best Estimated Qty

U/I Unit Target Cost Unit Target Profit Total Target Price

25 EA

J017 Overhaul In accordance with (IAW) Performance Based Work Statement (PWS).

Ceiling Price = 120% of Target Cost = $________________

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012015 31DEC2015

Class I ODS Substance Application/Use Quantity

NONE

NOTE FOR CLIN 0002:

The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.

UDLMs to be negotiated as FFP.

Loaded labor rates and material burden rates shall be proposed for CLIN 0002.

Unscheduled Depot Level Maintenance (UDLM)

Item No.

Firm Fixed Price Quantity U/I Estimated Total Price

1 LO

UDLM IAW the attached PWS, paragraph 4.6, and the unique PWS to be provided with each individual task order.

This contract line item is to be negotiated as FirmFixedPrice.

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: TBD

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Data

Item No.

Incentive Firm Target Quantity U/I Target Price 1 LO Not Separately Priced

Data IAW attached DD 1423s, ELINs A001 - A010

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

PPU Overhaul

Item No.

Firm Fixed Price - Firm Quantity Quantity U/I Amount

3 EA

J017 PPU Overhaul IAW attached PWS This contract line item is to be negotiated as Firm-Fixed-Price (or as otherwise deemed appropriate).

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity

NONE

Overhaul OPTION I - (12 months after the Basic Contract Period)

Item No.

Incentive Firm Target

Overhaul OPTION I - (12 months after the Basic Contract Period)

Best Estimated Qty

U/I Unit Target Cost Unit Target Profit Total Target Price

25 EA

J017 Overhaul In accordance with (IAW) Performance Based Work Statement (PWS).

Ceiling Price = 120% of Target Cost = $________________

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Class I ODS Substance Application/Use Quantity

NONE

NOTE FOR CLIN 1002:

The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.

UDLMs to be negotiated as FFP.

Loaded labor rates and material burden rates shall be proposed for CLIN 1002.

Unscheduled Depot Level Maintenance (UDLM)

Item No.

Firm Fixed Price Quantity U/I Estimated Total Price

1 LO

UDLM IAW the attached PWS, paragraph 4.6, and the unique PWS to be provided with each individual task order.

This contract line item is to be negotiated as FirmFixedPrice.

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: TBD Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Data

Item No.

Incentive Firm Target Quantity U/I Target Price 1 LO Not Separately Priced

Data IAW attached DD 1423s, ELINs B001 - B010

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Overhaul OPTION II - (12 months following the end of Option I)

Item No.

Incentive Firm Target Best Estimated Qty

U/I Unit Target Cost Unit Target Profit Total Target Price

25 EA

J017 Overhaul In accordance with (IAW) Performance Based Work Statement (PWS).

Ceiling Price = 120% of Target Cost = $________________

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Class I ODS Substance Application/Use Quantity

NONE

NOTE FOR CLIN 2002:

The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.

UDLMs to be negotiated as FFP.

Loaded labor rates and material burden rates shall be proposed for CLIN 2002.

Unscheduled Depot Level Maintenance (UDLM)

Item No.

Firm Fixed Price Quantity U/I Estimated Total Price

1 LO

UDLM IAW the attached PWS, paragraph 4.6, and the unique PWS to be provided with each individual task order.

This contract line item is to be negotiated as FirmFixedPrice.

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: TBD Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Data

Item No.

Incentive Firm Target Quantity U/I Target Price 1 LO Not Separately Priced

Data IAW attached DD 1423s, ELINs C001 - C010

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Overhaul OPTION III - (12 months following the end of OPTION II)

Item No.

Incentive Firm Target Best Estimated Qty

U/I Unit Target Cost Unit Target Profit Total Target Price

25 EA

J017 Overhaul In accordance with (IAW) Performance Based Work Statement (PWS).

Ceiling Price = 120% of Target Cost = $________________

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Class I ODS Substance Application/Use Quantity

NONE

NOTE FOR CLIN 3002:

The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.

UDLMs to be negotiated as FFP.

Loaded labor rates and material burden rates shall be proposed for CLIN 3002.

Unscheduled Depot Level Maintenance (UDLM)

Item No.

Firm Fixed Price Quantity U/I Estimated Total Price

1 LO

UDLM IAW the attached PWS, paragraph 4.6, and the unique PWS to be provided with each individual task order.

This contract line item is to be negotiated as FirmFixedPrice.

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: TBD

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Data

Item No.

Incentive Firm Target Quantity U/I Target Price 1 LO Not Separately Priced

Data IAW attached DD 1423s, ELINs D001 - D010

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Overhaul OPTION IV - (12 months following the end of OPTION III)

Item No.

Incentive Firm Target Best Estimated Qty

U/I Unit Target Cost Unit Target Profit Total Target Price

25 EA

J017 Overhaul In accordance with (IAW) Performance Based Work Statement (PWS).

Ceiling Price = 120% of Target Cost = $________________

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Class I ODS Substance Application/Use Quantity

NONE

NOTE FOR CLIN 4002:

The ‘Estimated Total Price’ represents best estimated costs only and is based on the projected quantity of UDLMs per year. There is no presumption on the part of the contractor that the 'Estimated Total Price’ represents the total payment for the CLIN under a task order.

UDLMs to be negotiated as FFP.

Loaded labor rates and material burden rates shall be proposed for CLIN 4002.

Unscheduled Depot Level Maintenance (UDLM)

Item No.

Firm Fixed Price Quantity U/I Estimated Total Price

1 LO

UDLM IAW the attached PWS, paragraph 4.6, and the unique PWS to be provided with each individual task order.

This contract line item is to be negotiated as FirmFixedPrice.

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: TBD Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 31DEC2015

Data

Item No.

Incentive Firm Target Quantity U/I Target Price 1 LO Not Separately Priced

Data IAW attached DD 1423s, ELINs E001 - E010

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

DATA

Item No.

A001

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 0003 Contract Work Breakdown Structure (CWBS)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

A002

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 0003 Integrated Program Managment Data and Analysis Report (IPMDAR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

DATA

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

A003

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 0003 Contract Funds Status Report (CFSR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

A004

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 0003 Conference Minutes

Limitations of Liability: Other Than High Value Item

DATA

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

A005

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 0003 Configuration Audit Summary Report (CASR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

A006

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Test/Inspection Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

A007

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Overhaul Instructions Manual (OIM)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

DATA

Item No.

A008

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

IUID Marking Plan

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

A009

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 0003 Accident/Incident Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

DATA

+ IAW1423 1 LO

DATA

Item No.

A010

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 0003 Quality Assurance Program Plan (QAPP)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

B001

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 1003 Contract Work Breakdown Structure (CWBS)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DATA

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

B002

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 1003 Integrated Program Managment Data and Analysis Report (IPMDAR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

B003

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

DATA

Associated with LI: 1003 Contract Funds Status Report (CFSR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

B004

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 1003 Conference Minutes

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

DATA

Item No.

B005

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 1003 Configuration Audit Summary Report (CASR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

B006

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Test/Inspection Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

DATA

+ IAW1423 1 LO

DATA

Item No.

B007

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Overhaul Instructions Manual (OIM)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

B008

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

IUID Marking Plan

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

DATA

+ IAW1423 1 LO

DATA

Item No.

B009

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 1003 Accident/Incident Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

B010

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 1003 Quality Assurance Program Plan (QAPP)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B

The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DATA

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C001

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 2003 Contract Work Breakdown Structure (CWBS)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C002

Not Separately Priced Quantity U/I Unit Price

DATA

Associated with LI: 2003 Integrated Program Managment Data and Analysis Report (IPMDAR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C003

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 2003 Contract Funds Status Report (CFSR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

DATA

Item No.

C004

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 2003 Conference Minutes

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C005

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 2003 Configuration Audit Summary Report (CASR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

DATA

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C006

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Test/Inspection Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C007

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Overhaul Instructions Manual (OIM)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

DATA

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C008

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

IUID Marking Plan

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C009

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 2003 Accident/Incident Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C

The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

DATA

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

C010

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 2003 Quality Assurance Program Plan (QAPP)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: C Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D001

Not Separately Priced Quantity U/I Unit Price

DATA

Associated with LI: 3003 Contract Work Breakdown Structure (CWBS)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D002

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 3003 Integrated Program Managment Data and Analysis Report (IPMDAR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

DATA

Item No.

D003

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 3003 Contract Funds Status Report (CFSR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D004

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 3003 Conference Minutes

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

DATA

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D005

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 3003 Configuration Audit Summary Report (CASR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D006

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Test/Inspection Report

DATA

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D007

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Overhaul Instructions Manual (OIM)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D008

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

IUID Marking Plan

DATA

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D009

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 3003 Accident/Incident Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

D010

Not Separately Priced Quantity U/I Unit Price

DATA

1 LO NSP

DATA

Associated with LI: 3003 Quality Assurance Program Plan (QAPP)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: D Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

E001

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 4003 Contract Work Breakdown Structure (CWBS)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required

DATA

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

E002

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 4003 Integrated Program Managment Data and Analysis Report (IPMDAR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

E003

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 4003 Contract Funds Status Report (CFSR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E

DATA

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

E004

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 4003 Conference Minutes

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

E005

Not Separately Priced Quantity U/I Unit Price

DATA

1 LO NSP

DATA

Associated with LI: 4003 Configuration Audit Summary Report (CASR)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

E006

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Test/Inspection Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

DATA

Item No.

E007

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Overhaul Instructions Manual (OIM)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

E008

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

IUID Marking Plan

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

DATA

Item No.

E009

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 4003 Accident/Incident Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

Type / Ship To Quantity (U/I) *ARO IAW DD1423 _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

DATA

Item No.

E010

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Associated with LI: 4003 Quality Assurance Program Plan (QAPP)

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: E Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015 31DEC2015

DATA

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.304)

(Applicable for fixed-price services, or supplies furnishing services over the simplified acquisition threshold)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*

Title Number Date Tailoring *See Individual Line Item Schedule

(Applicable only if specified in the individual order/call issued hereunder)

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

(Applicable to the furnishing of supplies, services involving the furnishing of supplies, or research and development, when a fixed-price contract is contemplated and the contract amount is expected to exceed the simplified acquisition threshold)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

(Applicable to all orders issued hereunder)

Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0002, 0003, 1002, 1003, 2002, 2003, 3002, 3003, 4002, 4003, A001, A002, A003, A004, A005, A006, A007, A008, A009, A010, B001, B002, B003, B004, B005, B006, B007, B008, B009, B010, C001, C002, C003, C004, C005, C006, C007, C008, C009, C010, D001, D002, D003, D004, D005, D006, D007, D008, D009, D010, E001, E002, E003, E004, E005, E006, E007, E008, E009, E010

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-8 TIME OF DELIVERY (JUN 1997)

(IAW FAR 11.404(a)(2))

DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE

ITEM.

(Applicable when the Government desires delivery by a certain time but requires delivery by a specified later time, and the delivery schedule is to be based on the date of the contract)

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

(Applicable for supplies, services, or research and development)

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c))

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the…