CDRL A004 - Conference Minutes.pdf

PDF 87 KB Posted

Attached to
Tunner Aircraft Cargo Loader (ACL) Bridge Federal contract opportunity
Solicitation number
FA8534-24-R-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document is a Contract Data Requirements List (CDRL) that specifies a requirement for Conference Minutes to be delivered as part of a federal contract opportunity. The CDRL provides details on the frequency, format, and distribution requirements for the Conference Minutes. It indicates the minutes should be submitted no more than 7 days after each progress and readiness review, Program Management Review, Status Review Board, guidance conference, and Integrated Baseline Review. The briefing charts presented at these meetings should be included with the minutes. The CDRL also notes that the government has 45 days to approve or disapprove the submission, and the contractor has 15 days to respond with a revised submittal for any disapprovals.

The related federal contract opportunity is for a 5-year, Fixed Price Incentive Firm Target/Firm Fixed Price Indefinite Delivery/Requirements-type contract to provide overhaul, power pack unit overhaul, and unscheduled depot-level maintenance for the 60K Tunner Aircraft Cargo Loader. The government intends to award a sole source bridge contract to Leonardo DRS. The solicitation is anticipated to be released around May 20, 2024 through the Government Point of Entry. Foreign participation is not permitted for this opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Tunner Aircraft Cargo Loader (ACL) Bridge, newest first.
File Type Posted
CDRL A009 - Accident Report.pdf PDF
Atch_9Pricing_Instructions Final.docx DOCX document
CDRL A007 - OIM.pdf PDF
CDRL A005 - CASR.pdf PDF
Atch 7 - Tunner Registration Number Final.docx DOCX document
Atch 4 Safety Appendix Final.docx DOCX document
CDRL A006 - Test Report.pdf PDF
CDRL A010 - QAPP.pdf PDF
CDRL A002 - IPMDAR.pdf PDF
Atch_8-Cost_Proposal_Adequacy_Structure.pdf PDF
CDRL A008 - IUID.pdf PDF
CDRL A003 - CFSR.pdf PDF
CDRL A001 - CWBS.pdf PDF
Atch 6. Tunner OH Incentives.docx DOCX document
Attachment 5- Tunner OH GFP. Final.xlsx XLSX spreadsheet
Atch 2- FD2060-24-31655 Tunner OH Bridge QASP_COR Final.pdf PDF
Atch 1-Tunner OH PWS Final (005).docx DOCX document
FA8534-24-R-0011 Final.pdf PDF
FA8534-24-R-0011 Draft 11 July 2024.pdf PDF
Atch_2-QASP.pdf PDF
Atch_9-Cost_Proposal_Adequacy_Structure.pdf PDF
Atch_8-Tunner_Registration_Numbers.docx DOCX document
Atch_7-Provisions_for_ROK.docx DOCX document
Atch_3-TDP.pdf PDF
Atch_5-Tunner_GFP.xlsx XLSX spreadsheet
Atch_4-Safety_Appendix.docx DOCX document
Atch_10-Pricing_Instructions.pdf PDF
Atch_6-Tunner_TSSA_Determination.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER

Form Approved OMB No. 0704-0188

15. TOTAL

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

DIST

22202-4302.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

0003/1003/2003/3003/4003 A/B/C/D/E X

Tunner Loader

A/B/C/D/E004 Conference Minutes SEE BLK 16

DI-ADMN-81250B OH PWS 4.5.1.5 AFLCMC/WNZ

LT

N/A C

SEE BLK 16

SEE BLK 16

SEE BLK 16

SEE BLK 16

DCMA 0 1 0

AFLCMC/WNZ 0 1 0

AFLCMC/WNKAC 0 1 0

0 0

Blk 3: OH Progress & Readiness Reviews; Program Management Reviews, Status Reviews, & IBR.

Blk 7: Letter of transmittal (LT) only; no DD250 required. For each deliverable, the Contractor shall transmit the CDRL deliverable by an electronically signed LT to the Contracting Officer’s Representative (COR) via email and other agreed upon media. The LT shall provide the following elements: Transmittal Statement, Contractor's Name, LT Tracking umber, Contractor Number, CDRL Data Item Number, and Deliverable Description.

Blk 8: When there is “N/A” in block 8, the Government still has the inherent right to disapprove the data item deliverable. The Government shall have 45 days after receipt of Contractor’s submission to approve/disapprove the submission; if approval/disapproval is not received within 45 days of receipt, approval shall be automatic. The Contractor shall have 15 days to respond with a revised submittal for any Government disapprovals.

Blk 9: Distribution Statement C: Distribution is authorized to U.S. Government agencies and their contractors (administrative or operational use). Other requests for this document shall be referred to AFLCMC/WNZ.

Blk's 10-13: Follow the PWS reference above to determine when to convene the progress and readiness reviews. Minutes shall be submitted no more than 7 days after each progress and readiness review, PMR, SRB, guidance conference, and IBR. Briefing charts presented shall be included with the submittal of the minutes.

For the SRB minutes, attach the call-center log inputs since the last SRB.

Blk 14:

AFLCMC/WNZ AFLCMC/WNKAC

235 Byron Street, Suite 19A 235 Byron Street, Suite 19A Robins AFB, GA 31098-1813 Robins AFB, GA 31098-1813

N/A

NSP

BRANTLEY.KYLE.AN

DREW.1545276115

Digitally signed by

BRANTLEY.KYLE.ANDREW.154527611

Date: 2024.02.07 10:30:10 -05'00'

07 Feb 2024 GRIEPENBURG.DE

IDRE.H.1289435464

Digitally signed by

GRIEPENBURG.DEIDRE.H.1289435

Date: 2024.02.16 09:08:40 -05'00'

20240216

1 1

File details come from the government source that posted it. Updated .