CWBSMatrix.docx

DOCX document 20 KB Posted

Attached to
Next Generation All Aluminum Pallets Federal contract opportunity
Solicitation number
FA8534-19-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains a solicitation for the manufacturing and production of aluminum pallets and a related CWBS matrix. The solicitation seeks proposals for an indefinite delivery, requirements-type contract with options to manufacture and produce item 463L Air Cargo Pallets to MIL-DTL-27443 specifications. The basic period quantity is 5 first article pallets for testing, with decreased rate production of 10,000 pallets in the first option year and full rate production of 15,000 pallets in the second and third option years, and 13,000 pallets in the remaining option years. Proposals are due by January 30, 2019 and award will be made using tradeoff procedures considering past and present performance equally with cost/price. The selected contractor must deliver 5 first article pallets for testing at Robins AFB within 12 months of award. The related CWBS matrix template requires offerors to populate labor hours and material requirements for the WBS elements listed.

CWBS Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Next Generation All Aluminum Pallets, newest first.
File Type Posted
RFP_Release_-_Questions_from_Industry_6Nov19.docx DOCX document
FA853419R0001_______0004.pdf PDF
MIL-DTL-27443G.pdf PDF
RFP_release_-_Questions_from_Industry_15Oct19.docx DOCX document
Additional_Questions_from_Industry_2Oct19.docx DOCX document
Amended_MIL-DTL-27443G.pdf PDF
EdgeRailExtrusion201993430.STEP STEP file
CargoPalletAssembly201993426.STEP STEP file
CenterPanelExtrusion201993428.STEP STEP file
FA853419R0001_______0002.pdf PDF
Price_Model_Revised.xlsx XLSX spreadsheet
RFP_release_-_Questions_from_Industry.docx DOCX document
ppi_tool.accdb MDB file
Transportation_DD_Form_1653.pdf PDF
Packaging_AF_Form_158.pdf PDF
Tie-Down_Ring_Assembly_(X201993431).STEP STEP file
Side_Panel_Extrusion_(X201993429).STEP STEP file
Cargo_Pallet_Assembly_(X201993426).STEP STEP file
Center_Panel_Extrusion_(X201993428).STEP STEP file
Next_Gen_Past_Performance_Questionnaire_FINAL.docx DOCX document
CDRLS_A001_-_A010.pdf PDF
SOW_Next_Gen.pdf PDF
Drawing_Package.pdf PDF
Section_L_Final.pdf PDF
Price_Model,_final.xlsx XLSX spreadsheet
FA853419R0001.pdf PDF
ppi_tool.accdb MDB file
Center_Panel_Extrusion_(X201993428).STEP STEP file
Side_Panel_Extrusion_(X201993429).STEP STEP file
Q&As_4.pdf PDF
Tie-Down_Ring_Assembly_(X201993431).STEP STEP file
Edge_Rail_Extrusion_(X201993430).STEP STEP file
Cargo_Pallet_Assembly_(X201993426).STEP STEP file
Intermediate_Panel_Extrusion_(X201993427).STEP STEP file
Agenda.docx DOCX document
Information_Sign_in_Sheet.pdf PDF
FA853419R0001.pdf PDF
Revised_Section_M_Aluminum_Pallet.doc DOC document
REVISED_Price_Model.xlsx XLSX spreadsheet
REVISED_SOW_NextGenPallet.pdf PDF
Q&As_Feb_19_final.docx DOCX document
QA_Mar_19_final.docx DOCX document
Draft_-_Next_Gen_Cargo_Pallet_Replacement_MIL_DTL_27443.docx DOCX document
SectionLAluminum.doc DOC document
FA853419R0001.pdf PDF
SOWNextGenPallet2018.pdf PDF
CargoPalletsCDRLS.pdf PDF
PriceModel.xlsx XLSX spreadsheet
DraftForm1653.doc DOC document
PackagingFORM158.pdf PDF
Show all 50

Next Generation All Aluminum Pallets has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT xx Dated: 14 September 2018

The offeror shall fill out Matrix below by inserting rows and populating with the offeror’s CWBS level 3 elements in column 4. Afterwards, proceed to populate columns 5 thru 7. Do not include prices (costs).

MATRIX OF CWBS ELEMENTS/ MTL & LABOR for All-Aluminum Pallets

1
2
3
4
5
6
7
CLIN
CWBS- LEVEL 1
CWBS- LEVEL 2
CWBS- LEVEL 3
Labor Category
Labor Hours
Narrative Description of How You Determined Material Requirements to Accomplish this WBS Element (additional sheets may be attached for extended explanations)
1. MATERIAL MANAGEMENT
1.1 Parts

1.2 Product Support (infrastructure)

1.3 Program Administration

2. PROGRAM ENGINEERING SUPPORT
2.1 Systems Engineering

2.2 Change Activity

2.3 Tech Data Maintenance

2.4 Program Administration

3. PRODUCTION
3.1 Extrusion manufacturing

3.2 Pre-weld machining

3.3 Friction stir weld (FSW)

3.4 Intermediate Machining

3.5 Final FSW and TIG weld

3.6 Final Assembly and Testing