CWBSMatrix.docx
DOCX document 20 KB Posted
- Attached to
- Next Generation All Aluminum Pallets Federal contract opportunity
- Solicitation number
- FA8534-19-R-0001
About this file
This document contains a solicitation for the manufacturing and production of aluminum pallets and a related CWBS matrix. The solicitation seeks proposals for an indefinite delivery, requirements-type contract with options to manufacture and produce item 463L Air Cargo Pallets to MIL-DTL-27443 specifications. The basic period quantity is 5 first article pallets for testing, with decreased rate production of 10,000 pallets in the first option year and full rate production of 15,000 pallets in the second and third option years, and 13,000 pallets in the remaining option years. Proposals are due by January 30, 2019 and award will be made using tradeoff procedures considering past and present performance equally with cost/price. The selected contractor must deliver 5 first article pallets for testing at Robins AFB within 12 months of award. The related CWBS matrix template requires offerors to populate labor hours and material requirements for the WBS elements listed.
CWBS Matrix
View the file
Other files for this federal contract opportunity
Show all 50
Next Generation All Aluminum Pallets has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT xx Dated: 14 September 2018
The offeror shall fill out Matrix below by inserting rows and populating with the offeror’s CWBS level 3 elements in column 4. Afterwards, proceed to populate columns 5 thru 7. Do not include prices (costs).
MATRIX OF CWBS ELEMENTS/ MTL & LABOR for All-Aluminum Pallets
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| CLIN |
| CWBS- LEVEL 1 |
| CWBS- LEVEL 2 |
| CWBS- LEVEL 3 |
| Labor Category |
| Labor Hours |
| Narrative Description of How You Determined Material Requirements to Accomplish this WBS Element (additional sheets may be attached for extended explanations) |
| 1. MATERIAL MANAGEMENT |
| 1.1 Parts |
1.2 Product Support (infrastructure)
1.3 Program Administration
| 2. PROGRAM ENGINEERING SUPPORT |
| 2.1 Systems Engineering |
2.2 Change Activity
2.3 Tech Data Maintenance
2.4 Program Administration
| 3. PRODUCTION |
| 3.1 Extrusion manufacturing |
3.2 Pre-weld machining
3.3 Friction stir weld (FSW)
3.4 Intermediate Machining
3.5 Final FSW and TIG weld
3.6 Final Assembly and Testing