This document contains questions and answers regarding a draft request for proposal for next generation all aluminum pallets. The solicitation will be for an indefinite delivery, requirements-type contract to manufacture item 463L Air Cargo Pallets to specifications in MIL-DTL-27443. The technical data package provided with the draft RFP is the requirement for pallets, and prototypes were manufactured to meet the military standard for alternative materials. The contract will have an 18-month basic period and nine one-year option periods, with production quantities ranging from 5 first article units in the basic period to a maximum of 15,000 units per year in later option periods. Award will be made using tradeoff source selection and best value determination considering past performance and cost/price. The first article test and delivery schedule and responsible party are defined.
Questions and Answers
View the file
Other files for this federal contract opportunity
Show all 50
Next Generation All Aluminum Pallets has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers Next Generation All Aluminum Pallets FA8534-19-R-0001 (Feb 2019)
1. Have drawings 201642455_1, 201642455_2, 201642456, 201642457 or 201642458 been revised since their original release on 7/6/2016?
Government Response: The TDP was provided with the draft RFP, revision B
2. Will the 7/6/2016 TDP be the requirement for this solicitation?
Government Response: The TDP was provided with the draft RFP, revision B
3. Were the prototypes / low rate initial production run pallets manufactured to the 7/6/2016 TDP and proven to meet MIL-DTL-27443F?
Government Response: The MIL-DTL draft was provided with the draft RFP documents. The all-aluminum pallets are manufactured to meet those starndards.
4. Please explain in the solicitation requirements how MIL-DTL-27443F was or is to be met when it specifies alternative materials.
Government Response: The MIL-DTL draft was provided with the draft RFP documents
5. Please define the meaning of the response date posted in the presolicitation notice FA8534-19-R-0001.
Government Response: The response date is a required field when submitting a DRAFT RFP through FBO, it is just a filler and is considered ineffective to the Government.
6. Please advise how I may obtain a copy of the TDP to review and evaluate.
Government Response: The TDP was provided with the draft RFP