Questions and Answers for FBO 28 April 2010.pdf

PDF 9 KB Posted

Attached to
Common Multi-Platform Boresight System (CMBS)
Solicitation number
FA8533-10-R-22377
Issued by

About this file

Additional Questions and Answers 28 April 10

View the file

Other files

File Type Posted
FA853310R22377______0002.pdf PDF
Revision_1_Statement_of_Work.pdf PDF
Revision_1_PD09WRGBGBEB12.pdf PDF
Revision_1_PD10WRGBGBEB08.pdf PDF
9579776_98752_NULL_J_0001_J_NULL_0001_741_U_N_N_N 1 .pdf PDF
9579777_98752_NULL_A_0001_A_NULL_0001_278_U_N_N_N 1 .pdf PDF
9626025_98752_NULL_E_0001_E_NULL_0001_741_U_N_N_N 1 .pdf PDF
FA853310R22377______0001.pdf PDF
Questions and Answers 21 April 2010.pdf PDF
PD10WRGBGBEB08.doc DOC document
StatementWork_1022377_00_1.doc DOC document
Attachment5.doc DOC document
ELING001.pdf PDF
Attachment3.doc DOC document
FA853310R22377.pdf PDF
ELINH001-H002.pdf PDF
Attachment6.doc DOC document
ELINsA001-E003.pdf PDF
Attachment2.doc DOC document
PD09WRGBGBEB12.DOC DOC document
ELINF001.pdf PDF
Attachment4.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal (RFP) FA8533-10-R-22377 Common Multi-platform Boresight System (CMBS)

Questions and Answers

28 April 2010

A few additional questions were submitted to the Contracting Office on the above referenced RFP subsequent to the publication of the Questions and Answers, dated 21 April 2010. The additional questions and corresponding answers are listed below.

1. Question: Given that 0001AA is quantity one (1), and 0001AB is quantity one (1), and their sum must equal the unit price of CLIN 0001, then shouldn’t CLIN 0001 be quantity one (1)?

Otherwise the overall total for CLIN 0001 will not equal the sum of 0001AA and 0001AB, unless 0001AA is for quantity two (2) (recurring costs for each unit).

Answer: No. Offerors should add the proposed price for SubCLIN 0001AA and the proposed price for SubCLIN 0001AB; the sum of the two values should be inserted in the unit price column of CLIN 0001 then multiplied by a quantity of two. The total amount should be entered in the extended amount column in CLIN 0001.

CLIN 0001 explains that, “The sum of Sub-CLINs 0001AA and 0001AB will equal the unit price of CLIN 0001.” Note that the sum of the SubCLINs should equal the UNIT price.

2. Question: Considering that all the performance requirements in the two PD’s are “mandatory.” Will all technical proposals submitted be evaluated against these comprehensive “mandatory” PD requirements or only those specifically identified requirements in Subfactors one through five under “Technical Acceptability” in Section M (Page 80 of 83); i.e. will technical proposals that address only the Subfactors identified in Sections L & M and not all the “mandatory” PD requirements be considered “technically acceptable”?

Answer: The Government reiterates the instruction to read the RFP provisions, “Proposal Requirements” and “Evaluation Basis for Award” thoroughly. These provisions notify offerors what to submit in their proposal packages as well as how the Government will evaluate proposals in order to make a best value award decision. While the requirements in the two purchase descriptions and the Statement of Work are mandatory, the Government has identified particular information in the RFP provisions that offerors shall address in their technical proposals. The Government will evaluate the technical proposal as well as the completed RFP and performance volume as described in the RFP provisions.

3. Question: Does the external fuel tank reference to wing tanks also include the centerline tank?

Answer: The reference does not include the centerline tank. The centerline tank will be removed from the aircraft during the boresighting process.

4. Question: Is the Government amenable to performance based payments or installment payments in lieu of progress payments?

Answer: The RFP presently contains FAR Clause 52.232-16, Progress Payments, and such will be incorporated into the resultant contract.