FA853310R22377______0002.pdf
PDF 31 KB Posted
- Attached to
- Common Multi-Platform Boresight System (CMBS) Federal contract opportunity
- Solicitation number
- FA8533-10-R-22377
About this file
Amendment 0002 dated 12 May 2010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers for FBO 28 April 2010.pdf | ||
| Revision_1_PD10WRGBGBEB08.pdf | ||
| 9626025_98752_NULL_E_0001_E_NULL_0001_741_U_N_N_N 1 .pdf | ||
| 9579777_98752_NULL_A_0001_A_NULL_0001_278_U_N_N_N 1 .pdf | ||
| FA853310R22377______0001.pdf | ||
| Revision_1_PD09WRGBGBEB12.pdf | ||
| Revision_1_Statement_of_Work.pdf | ||
| 9579776_98752_NULL_J_0001_J_NULL_0001_741_U_N_N_N 1 .pdf | ||
| Questions and Answers 21 April 2010.pdf | ||
| Attachment2.doc | DOC document | |
| ELING001.pdf | ||
| PD10WRGBGBEB08.doc | DOC document | |
| ELINF001.pdf | ||
| Attachment4.doc | DOC document | |
| PD09WRGBGBEB12.DOC | DOC document | |
| Attachment5.doc | DOC document | |
| StatementWork_1022377_00_1.doc | DOC document | |
| Attachment3.doc | DOC document | |
| FA853310R22377.pdf | ||
| Attachment6.doc | DOC document | |
| ELINH001-H002.pdf | ||
| ELINsA001-E003.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8533-10-R-22377-0002
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
FD20601022377
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
642 CBSG PKBB, MAJOR PROGRAMS
460 RICHARD RAY BLVD STE 200
CML PHN 478 222 1902
ROBINS AFB GA 31098-1813
BUYER: Brandi W. Moody/642 CBSG Brandi.Moody@robins.af.mil Phone: (478) 222- 1910 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA853310R22377
9B. DATED (SEE ITEM 11)
30-MAR-2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Brandi.Moody Typewritten Text
Brandi.Moody Typewritten Text 12 May 2010
Brandi.Moody Typewritten Text
Brandi.Moody Typewritten Text
Brandi.Moody Typewritten Text
Brandi.Moody Typewritten Text
Brandi.Moody Typewritten Text
Amendment/Modification FA8533-10-R-22377-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is the following:
1. Reference Purchase Description PD09WRGBGBEB12, dated 8 February 2010: the purchase description has been revised via Revision 2, dated 12 May 2010, attached hereto.
2. Reference Purchase Description PD10WRGBGBEB08, dated 28 January 2010: the purchase description has been revised via Revision 2, dated 12 May 2010, attached hereto.
Request for Proposal FA8533-10-R-22377-0002
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages Revision 2 to PD09WRGBGBEB12.pdf 12MAY2010 1
Revision 2 to PD10WRGBGBEB08.pdf 12MAY2010 1
PD10WRGBGBEB08
28 January 2010
CAGE 98752
Revision 2
12 May 2010
The purpose of Revision 2 to Purchase Description PD10WRGBGBEB08 is to change the following sections as identified below.
3.11 Basic operation. The adapters shall ensure that the boresight operators will not have to remove the external wing-mounted fuel tanks for the boresighting process. The centerline fuel tank may be removed. The aircraft shall not require jacking, leveling or repositioning. The established aircraft reference centerline shall be used. The boresight process shall take no more than eight hours or sixteen man-hours from set-up to aircraft returned to mission-ready condition (objective: boresight completion time shall be no more than four hours or eight man-hours). The adapters shall also provide the capability to perform boresight alignment confidence checks or minor boresight alignments without LRU removal.
PD09WRGBGBEB12
8 February 2010
CAGE 98752
Revision 2
12 May 2010
The purpose of Revision 2 to Purchase Description PD09WRGBGBEB12 is to change the following sections as identified below.
3.3.7 CMBS Basic Operation. The CMBS shall ensure that the boresight operators will not have to remove the external wing fuel tanks for the boresighting process, however the centerline fuel tank may be removed. The aircraft will not require jacking, leveling, or repositioning and the established aircraft reference centerline shall be used. Furthermore, any aircraft movement during the boresight and alignment process shall be detected by the CMBS and will be automatically compensated for misalignment in the weapons component boresight alignment readings.
File details come from the government source that posted it. Updated .