Common Multi-Platform Boresight System (CMBS)
Awarded Award Notice Posted
- Solicitation number
- FA8533-10-R-22377
- Agency
- AFLCMC Robins AFB Lifecycle Management Center, Department of Defense
- Awarded
- to DRS Training & Control Systems, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA8533-10-D-0014 Federal IDV award
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Added: Mar 04, 2010 2:55 pm
Modified: May 12, 2010 9:36 amTrack Changes
AMENDMENT 0002 has been posted.
Additional Questions and Answers have been posted.
AMENDMENT 0001 has been posted along with questions and answers. Due date has been extended to 17 May 2010.
SOLICITATION has been posted
This requirement is for a 6-year Firm-Fixed Price Requirements-Type Indefinite-Delivery contract for the procurement of the Common Multi-Platform Boresight System (CMBS). This procurement will be for the boresight system along with adaptors for the F-15 and F-16 aircrafts. The technical specifications will be identified in detailed purchase descriptions and a statement of work.
Material: Various
The requirement will consist of one basic period of 24 months and 4 annual options.
The tentative best estimated quantities (BEQs) are as follows:
NSN 4920-01-552-5833RN (Boresight): Basic Qty: FA 2EA, BEQ 9; Opt I: BEQ 8; Opt II: BEQ 9; Opt III: BEQ 10; Opt IV: BEQ 10
NSN 4920-01-552-8581RN (F-16 Adapter): Basic Qty: FA 1EA, BEQ 9; Opt I: BEQ 6; Opt II: BEQ 6; Opt III: BEQ 7; Opt IV: BEQ 7
NSN 4920-01-552-8580RN (F-15 Adapter): Basic Qty: FA 1 EA, BEQ 9; Opt I: BEQ 2; Opt II: BEQ 3; Opt III: BEQ 3; Opt IV: BEQ 3
There is no minimum or maximum order amount established.
FAR Part 15 procedures will be utilized w/ extensive first article testing required before production is ordered.
Multiple USAF shipping locations are involved over the life of the contract.
Delivery schedule: Delivery Requirements will be identified in the RFP
Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFP. The Government will utilize best value acquisition methodology and will evaluate proposals and make award in accordance with the Evaluation Basis for Award provision in the RFP. Offerors will be required to submit a cost/price volume, technical proposal, and performance volume in accordance with the RFP provisions.
It is anticipated that the RFP will be released on or around 29 March 2010 and anticipated award in the August-September 2010 timeframe. Electronic procedures will be used for this solicitation. To request a copy of this solicitation, go to http://www.fedbizopps.gov. All responsible sources, regardless of size status, may submit a proposal package which will be considered by the agency if said proposal package is submitted in accordance with the RFP provisions.
Update #4 ·
Added: Mar 04, 2010 2:55 pm
Modified: Apr 28, 2010 12:34 pmTrack Changes
Additional Questions and Answers have been posted.
AMENDMENT 0001 has been posted along with questions and answers. Due date has been extended to 17 May 2010.
SOLICITATION has been posted
This requirement is for a 6-year Firm-Fixed Price Requirements-Type Indefinite-Delivery contract for the procurement of the Common Multi-Platform Boresight System (CMBS). This procurement will be for the boresight system along with adaptors for the F-15 and F-16 aircrafts. The technical specifications will be identified in detailed purchase descriptions and a statement of work.
Material: Various
The requirement will consist of one basic period of 24 months and 4 annual options.
The tentative best estimated quantities (BEQs) are as follows:
NSN 4920-01-552-5833RN (Boresight): Basic Qty: FA 2EA, BEQ 9; Opt I: BEQ 8; Opt II: BEQ 9; Opt III: BEQ 10; Opt IV: BEQ 10
NSN 4920-01-552-8581RN (F-16 Adapter): Basic Qty: FA 1EA, BEQ 9; Opt I: BEQ 6; Opt II: BEQ 6; Opt III: BEQ 7; Opt IV: BEQ 7
NSN 4920-01-552-8580RN (F-15 Adapter): Basic Qty: FA 1 EA, BEQ 9; Opt I: BEQ 2; Opt II: BEQ 3; Opt III: BEQ 3; Opt IV: BEQ 3
There is no minimum or maximum order amount established.
FAR Part 15 procedures will be utilized w/ extensive first article testing required before production is ordered.
Multiple USAF shipping locations are involved over the life of the contract.
Delivery schedule: Delivery Requirements will be identified in the RFP
Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFP. The Government will utilize best value acquisition methodology and will evaluate proposals and make award in accordance with the Evaluation Basis for Award provision in the RFP. Offerors will be required to submit a cost/price volume, technical proposal, and performance volume in accordance with the RFP provisions.
It is anticipated that the RFP will be released on or around 29 March 2010 and anticipated award in the August-September 2010 timeframe. Electronic procedures will be used for this solicitation. To request a copy of this solicitation, go to http://www.fedbizopps.gov. All responsible sources, regardless of size status, may submit a proposal package which will be considered by the agency if said proposal package is submitted in accordance with the RFP provisions.
Update #3 ·
Added: Mar 04, 2010 2:55 pm
Modified: Apr 21, 2010 2:20 pmTrack Changes
AMENDMENT 0001 has been posted along with questions and answers. Due date has been extended to 17 May 2010.
SOLICITATION has been posted
This requirement is for a 6-year Firm-Fixed Price Requirements-Type Indefinite-Delivery contract for the procurement of the Common Multi-Platform Boresight System (CMBS). This procurement will be for the boresight system along with adaptors for the F-15 and F-16 aircrafts. The technical specifications will be identified in detailed purchase descriptions and a statement of work.
Material: Various
The requirement will consist of one basic period of 24 months and 4 annual options.
The tentative best estimated quantities (BEQs) are as follows:
NSN 4920-01-552-5833RN (Boresight): Basic Qty: FA 2EA, BEQ 9; Opt I: BEQ 8; Opt II: BEQ 9; Opt III: BEQ 10; Opt IV: BEQ 10
NSN 4920-01-552-8581RN (F-16 Adapter): Basic Qty: FA 1EA, BEQ 9; Opt I: BEQ 6; Opt II: BEQ 6; Opt III: BEQ 7; Opt IV: BEQ 7
NSN 4920-01-552-8580RN (F-15 Adapter): Basic Qty: FA 1 EA, BEQ 9; Opt I: BEQ 2; Opt II: BEQ 3; Opt III: BEQ 3; Opt IV: BEQ 3
There is no minimum or maximum order amount established.
FAR Part 15 procedures will be utilized w/ extensive first article testing required before production is ordered.
Multiple USAF shipping locations are involved over the life of the contract.
Delivery schedule: Delivery Requirements will be identified in the RFP
Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFP. The Government will utilize best value acquisition methodology and will evaluate proposals and make award in accordance with the Evaluation Basis for Award provision in the RFP. Offerors will be required to submit a cost/price volume, technical proposal, and performance volume in accordance with the RFP provisions.
It is anticipated that the RFP will be released on or around 29 March 2010 and anticipated award in the August-September 2010 timeframe. Electronic procedures will be used for this solicitation. To request a copy of this solicitation, go to http://www.fedbizopps.gov. All responsible sources, regardless of size status, may submit a proposal package which will be considered by the agency if said proposal package is submitted in accordance with the RFP provisions.
Update #2 ·
Added: Mar 04, 2010 2:55 pm
Modified: Mar 30, 2010 3:10 pmTrack Changes
SOLICITATION has been posted
This requirement is for a 6-year Firm-Fixed Price Requirements-Type Indefinite-Delivery contract for the procurement of the Common Multi-Platform Boresight System (CMBS). This procurement will be for the boresight system along with adaptors for the F-15 and F-16 aircrafts. The technical specifications will be identified in detailed purchase descriptions and a statement of work.
Material: Various
The requirement will consist of one basic period of 24 months and 4 annual options.
The tentative best estimated quantities (BEQs) are as follows:
NSN 4920-01-552-5833RN (Boresight): Basic Qty: FA 2EA, BEQ 9; Opt I: BEQ 8; Opt II: BEQ 9; Opt III: BEQ 10; Opt IV: BEQ 10
NSN 4920-01-552-8581RN (F-16 Adapter): Basic Qty: FA 1EA, BEQ 9; Opt I: BEQ 6; Opt II: BEQ 6; Opt III: BEQ 7; Opt IV: BEQ 7
NSN 4920-01-552-8580RN (F-15 Adapter): Basic Qty: FA 1 EA, BEQ 9; Opt I: BEQ 2; Opt II: BEQ 3; Opt III: BEQ 3; Opt IV: BEQ 3
There is no minimum or maximum order amount established.
FAR Part 15 procedures will be utilized w/ extensive first article testing required before production is ordered.
Multiple USAF shipping locations are involved over the life of the contract.
Delivery schedule: Delivery Requirements will be identified in the RFP
Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFP. The Government will utilize best value acquisition methodology and will evaluate proposals and make award in accordance with the Evaluation Basis for Award provision in the RFP. Offerors will be required to submit a cost/price volume, technical proposal, and performance volume in accordance with the RFP provisions.
It is anticipated that the RFP will be released on or around 29 March 2010 and anticipated award in the August-September 2010 timeframe. Electronic procedures will be used for this solicitation. To request a copy of this solicitation, go to http://www.fedbizopps.gov. All responsible sources, regardless of size status, may submit a proposal package which will be considered by the agency if said proposal package is submitted in accordance with the RFP provisions.
Update #1 ·
Added: Mar 04, 2010 2:55 pm
This requirement is for a 6-year Firm-Fixed Price Requirements-Type Indefinite-Delivery contract for the procurement of the Common Multi-Platform Boresight System (CMBS). This procurement will be for the boresight system along with adaptors for the F-15 and F-16 aircrafts. The technical specifications will be identified in detailed purchase descriptions and a statement of work.
Material: Various
The requirement will consist of one basic period of 24 months and 4 annual options.
The tentative best estimated quantities (BEQs) are as follows:
NSN 4920-01-552-5833RN (Boresight): Basic Qty: FA 2EA, BEQ 9; Opt I: BEQ 8; Opt II: BEQ 9; Opt III: BEQ 10; Opt IV: BEQ 10
NSN 4920-01-552-8581RN (F-16 Adapter): Basic Qty: FA 1EA, BEQ 9; Opt I: BEQ 6; Opt II: BEQ 6; Opt III: BEQ 7; Opt IV: BEQ 7
NSN 4920-01-552-8580RN (F-15 Adapter): Basic Qty: FA 1 EA, BEQ 9; Opt I: BEQ 2; Opt II: BEQ 3; Opt III: BEQ 3; Opt IV: BEQ 3
There is no minimum or maximum order amount established.
FAR Part 15 procedures will be utilized w/ extensive first article testing required before production is ordered.
Multiple USAF shipping locations are involved over the life of the contract.
Delivery schedule: Delivery Requirements will be identified in the RFP
Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFP. The Government will utilize best value acquisition methodology and will evaluate proposals and make award in accordance with the Evaluation Basis for Award provision in the RFP. Offerors will be required to submit a cost/price volume, technical proposal, and performance volume in accordance with the RFP provisions.
It is anticipated that the RFP will be released on or around 29 March 2010 and anticipated award in the August-September 2010 timeframe. Electronic procedures will be used for this solicitation. To request a copy of this solicitation, go to http://www.fedbizopps.gov. All responsible sources, regardless of size status, may submit a proposal package which will be considered by the agency if said proposal package is submitted in accordance with the RFP provisions.
Attachments
| File | Type | Posted |
|---|---|---|
| FA853310R22377______0002.pdf | ||
| Questions and Answers for FBO 28 April 2010.pdf | ||
| 9579776_98752_NULL_J_0001_J_NULL_0001_741_U_N_N_N 1 .pdf | ||
| Questions and Answers 21 April 2010.pdf | ||
| Revision_1_PD10WRGBGBEB08.pdf | ||
| 9626025_98752_NULL_E_0001_E_NULL_0001_741_U_N_N_N 1 .pdf | ||
| 9579777_98752_NULL_A_0001_A_NULL_0001_278_U_N_N_N 1 .pdf | ||
| FA853310R22377______0001.pdf | ||
| Revision_1_PD09WRGBGBEB12.pdf | ||
| Revision_1_Statement_of_Work.pdf | ||
| Attachment5.doc | DOC document | |
| StatementWork_1022377_00_1.doc | DOC document | |
| Attachment3.doc | DOC document | |
| FA853310R22377.pdf | ||
| Attachment6.doc | DOC document | |
| ELINH001-H002.pdf | ||
| ELINsA001-E003.pdf | ||
| Attachment2.doc | DOC document | |
| ELING001.pdf | ||
| PD10WRGBGBEB08.doc | DOC document | |
| ELINF001.pdf | ||
| Attachment4.doc | DOC document | |
| PD09WRGBGBEB12.DOC | DOC document |
Show all 23
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity