C015.pdf

PDF 193 KB Posted

Attached to
Ground Power Modernization Federal contract opportunity
Solicitation number
FA8532-22-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains a Contract Data Requirements List (CDRL) and notice of a forthcoming federal contract opportunity. The CDRL outlines engineering data deliverables required for a 144kW Universal Load Bank, including transmittal procedures and distribution statements. Technical data is due for each provisioned item by the Spares Provisioning Conference. The federal contract opportunity will be for 72kW and 144kW Ground Power Units and a 144kW Universal Load Bank. The Air Force plans to award multiple IDIQ contracts for a 10-year period under two separate small business set-aside and full and open competition groups. The 72kW GPU requirement is set aside for small business. First article testing, DT&E, OT&E, and reliability testing will be required. Proposals are due in September 2022 with award anticipated in late 2022. Interested parties should monitor the beta.SAM portal and contact listed Air Force personnel.

View the file

Other files for this federal contract opportunity

Other files attached to Ground Power Modernization, newest first.
File Type Posted
GPM_JA_(400_Hz_Power_Cable_Assembly)_Redacted.pdf PDF
Question and Answer 8.docx DOCX document
RFP Attachment 3 - List of Fill-In Clauses to be Completed - Revised 2.pdf PDF
Pre-Proposal Conference Follow-Up.docx DOCX document
Extraction from RFP Attachment 10_Columns A thru D only.xlsx XLSX spreadsheet
Pre-Proposal Conference Brief Re-upoload.pptx PPTX presentation
Pre-Proposal Conference Brief.pptx PPTX presentation
Question and Answer 4.docx DOCX document
RFP Attachment 5 - Relevancy Table - Revised.pdf PDF
Question and Answer 3.docx DOCX document
FA8532-22-R-0001_0001.pdf PDF
Question and Answer 1.docx DOCX document
FA8532-22-R-0001.pdf PDF
Pre-Proposal Conference.docx DOCX document
Packaging and Marking Requirements_AFMC 158.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
M-900 Evaluation Basis for Award.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 4 Instructions.docx DOCX document
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
D001_TM86-01R.pdf PDF
E006.pdf PDF
E003.pdf PDF
D006.pdf PDF
E002.pdf PDF
B001.pdf PDF
D003.pdf PDF
C008.pdf PDF
C003.pdf PDF
2020111299_98752_InputCable.pdf PDF
RFP Attachment 10 - Price Spreadsheet.xlsx XLSX spreadsheet
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
E005.pdf PDF
E004.pdf PDF
E008.pdf PDF
F002.pdf PDF
C005.pdf PDF
C002.pdf PDF
A003.pdf PDF
C017.pdf PDF
Engineering Data Lists.pdf PDF
D004.pdf PDF
Statement of Work (SOW)_1 Sep 21.pdf PDF
L-900 Instructions to Offerors.pdf PDF
Ground Power Modernization Ordering Guide.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet.pdf PDF
D003_TM86-01R.pdf PDF
D004_TM86-01R.pdf PDF
Show all 50

Ground Power Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page of Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T

(1 Data I tem)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this bur den, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

D. SYSTEM/ITEM

Universal Load Bank: 6150-01-695-3297144 kW

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

Engineering Data for Provisioning (EDFP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81874

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

406 SCMS/GULAB

7. DD250 REQ

See Block 16

9. DIST

STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

IAW AFMC Form 718

14. DISTRIBUTION

b. COPIES

8. APP CODE

See Block 16

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

A. The Prime Provisioning Activity (PPA) is identified in Block 14 with an asterisk (*).

B. For PPLs/SFPPLs, one set of technical data electronic copy will be provided to the PPA with the Logistics Product Data in PLISN sequence, annotated with PLISN, PCCN, SCC, PCC, CAGE and Part Number, with accompanying transmittal correspondence.

C. For PPLs/SFPPLs, one set of technical data electronic will be provided to DLIS (** Block 14), annotated with PLISN, PCCN, SCC, PCC, CAGE, and P/N, with accompanying transmittal correspondence (with a courtesy copy provided to the PPA) D. All transmittal correspondence will cite the applicable Contract Number, PCCN, and SCC. DLIS transmittal correspondence should cite 406 SCMS/GULAB as the PPA and provide a courtesy copy to the PPA.

E. Block 7: Acceptance/Rejection of the technical data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.

F. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.

G. Block 9: Distribution statement D applies.

H. Blocks 10, 12, & 13: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). If complete sets are not provided, identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA. This applies to all non stock-listed items regardless of the type Logistics Product Data and SMR Code (source, maintenance, and recoverability). Technical data is required for each support item appearing on all types of Logistics Product Data, first appearance only on each Logistics Product Data submission, unless directed otherwise by the PPA.

I. The prime contractor and all sub-vendors shall provide required data, translated to the English language, for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims. Letters of refusal must clearly state reason(s) technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA.

J. For DCNs, LLTILs, and CBILs, both sets of technical data will be provided to the PPA.

K. The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP, only cost necessary for reproduction and assemblage.

L. In the event EDFP submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.

IF ROUTINE MAIL:

406SCMS/GULAB *1

235 Byron St.

Suite 19A

Robins AFB, GA

31098-1670

IF PRVT CARRIER:

638 Supply Chain *1 Management Group

406SCMS/GULAB

235 Byron St.

Suite 19A

Robins AFB, GA

31098-1670

IF HARD COPY TO:

DLIS-KPD PSO **1

74 Washington Ave., N, Suite 7

Battle Creek, MI

49037-3084

IF ELECTRONIC:

DLISPSO@dla.mil 1

15. TOTAL

G. PREPARED BY

Tieesha Essex

H. DATE:

8/12/2021

I. APPROVED BY J. DATE

1 1

0004AV C

C015

9/01/2021 mailto:DLISPSO@dla.mil

2021-09-01T08:01:25-0400
HOGAN.JASON.H.1247029288

File details come from the government source that posted it. Updated .