DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
ROBINS AIR FORCE BASE GEORGIA
9/1/2016
MEMORANDUM FOR ALFCMC / WNZE
ATTENTION: April Benton
FROM: AFLCMC/LZPEM
285 Cochran Street Robins AFB GA 31098-1669
SUBJECT: Response to Data Call, System Munitions Handling Unit (MHU)-196 & MHU-204
1. Subject PWS MHU-196/204 has been reviewed by this office. Request PWS MHU-196/204 document be amended as follows:
4.6.3 Engineering Data: The contractor shall develop/produce/maintain and deliver a Technical Data Package (TDP) that accurately depicts the final product.
The TDP shall represent the approved, tested, and accepted configuration of the defined delivered item(s). TDP data includes, but is not limited to, Computer Aided Design (CAD) data, CAD models, model based definition data sets, Gerber data and Master Bill of Materials (BOM). The TDP shall provide the necessary design, engineering, manufacturing, testing and quality assurance requirements information necessary to enable the procurement or manufacture of an interchangeable item that duplicates the physical and performance characteristics of the original product without additional design engineering effort or recourse to the original design activity or any third party. Vendor Item Control Drawings shall be used to specify the requirements for purchased items when such items have been approved for use in the design and are used without alteration, selection or source qualification (testing of an item prior to procurement action to ensure that it satisfies the specified requirements).
All engineering product definition data created using Government funding as a result of this contract shall be considered a part of the TDP and shall be delivered to the Government with unlimited rights. The TDP shall be delivered in accordance with Air Force Product Data Specification drawing 9579776 Revision M (CAGE 98752), reference attached DD Form 1423 Block 16.
[DI-SESS-81000E/T]
4.6.4 Engineering Data Guidance Conference: The contractor shall support and cochair a Guidance Conference with AFLCMC/LZPEM for engineering data within 60 days after contract award. The Conference shall be convened at a site and on a date agreed upon by the Government contracting officer and the contractor. The contractor shall prepare an agenda and record the minutes of the Guidance
Conference. The contractor shall address, discuss, and provide status on the following:
[DI-ADMN-81249A, DI-ADMN-81250A]
a. Understanding of all CDRL requirements, applicable DIDs, specifications and standards.
b. TDP review requirements and schedules.
c. TDP delivery requirements and schedules.
d. Contractor's drafting practices/procedures/TDP drawing formats/CAD programs.
e. The contractor's quality assurance procedures relating to TDP documents, including quality control of subcontractor and vendor data.
f. The role of subcontractors and vendors who may deliver TDP documents under this contract.
g. The contractor's configuration management system, including methods for releasing documents, approving documents, and incorporating changes into documents.
h. Digital Technical Data Package (TDP) deliverables.
Note: Guidance Conference may be held in conjunction with other meetings or conferences.
4.6.5 In-Process Review (IPR) of the TDP: The contractor shall host, support, and co-chair an IPR of the engineering drawings and associated lists and other documentation to be included in the TDP. The IPR shall be conducted only after the contractor's quality assurance personnel have completely reviewed the data and determined that data are of sufficient quality that Government time will be effectively utilized during the review. IPR may be scheduled when data has reached the 50% percent completion point and shall be held, when possible, in conjunction with other reviews (i.e., PDR, CDR). The contractor shall notify AFLCMC/LZPEM a minimum of 30 days prior to the anticipated date of completion point. The IPR shall focus on the contractor's progress in the preparation of the TDP. The contractor shall support and provide the necessary resources, i.e., meeting agenda, conference room, applicable data, minutes, and appropriate personnel available to answer any questions to perform the IPR effectively. The contractor shall correct all discrepancies identified in the IPR.
All subcontractor/vendor data shall be made available for review. If the quantity of subcontractor/vendor data is of sufficient magnitude, the Government may schedule a separate IPR at the subcontractor's/vendor's facility.
[DI-ADMN-81249A, DI-ADMN-81250A]
4.6.6 Relationship of Contractor with Subcontractors/Vendors: The contractor shall levy on sub-contractors and sub-vendors the same requirements for Technical Data Packages (TDPs) as are levied on them by this contract. This requirement shall apply at all tiers of sub-contractor/vendor levels associated with the program.
4.6.7 Engineering Data Updates and Revisions: The contractor shall (and shall cause subcontractors and vendors to) update and maintain engineering data for the item(s) designed/ developed/modified/produced and funded by this contract for the life of this contract and shall incorporate all changes in accordance with the following:
a. All engineering changes shall be incorporated into the applicable engineering data within 90 days after engineering release/Air Force concurrence or at intervals of five changes, whichever occurs first, except a change involving safety, which shall be incorporated immediately.
b. All engineering changes shall be incorporated into the applicable engineering data prior to delivery of data for review.
c. All engineering changes shall be incorporated into the applicable engineering data prior to delivery of final media.
d. Revisions to existing engineering drawings/models and associated lists and other documentation to be included in the TDP for which the contractor is the current design activity shall result in the delivery of the entire revised document and associated data file. For example, when a portion of a document is revised the entire document shall be delivered.
2. Request the Contracting Officer (CO) assure that the following actions occur:
a. Insure that each solicitation and contract is structured IAW DFARS 227-7103-1(b)(3) and
CHAPTER 5 of DoD5010.12-M as noted:
(1) Paragraph C5.2.1 states “The contractor will have to prepare certain data as a natural consequence of contract performance. Design, development, testing, and production tasks will generate certain data, whether or not a requirement is identified in a DD Form 1423-1and delivery is requested. This factor is the basis for what is called the "over and above concept" for pricing data; the price paid for a data item will be based on what it costs the contractor to furnish that item, over and above the costs the contractor would incur if it were not required at all.”
(2) Para. C5.1.2 states ".....contracting officers, program managers, and technical data management personnel are encouraged to require contractors to separately price each requirement for technical data."
b. Request the contracting office review the solicitation and resulting contract for compliance with the following clauses in accordance with DFARS 227.4:
DFARS TITLE
227.7102 Commercial items, components, or processes
227.7102-1 Policy
227.7102-2 Rights in technical data
227.7103-1 Policy
227.7103-2 Acquisition of technical data
227.7103-3 Early identification of technical data to be furnished to the
Government with restrictions on use, reproduction or disclosure
227.72 Rights in computer software and computer software documentation
227.7202 Commercial computer software and commercial computer software documentation.
(1). Request that the following clauses are incorporated into the contract:
252.227-7013 Rights in Technical Data - Non Commercial Items (Per 227.7103-6(a)
252.227-7014 Rights in Noncommercial Computer Software and Noncommercial
Computer Software Documentation.(Per 227.7203-6(a)(1))
252.227-7015 Technical Data – Commercial Items
252.227-7016 Rights in Bid or Proposal Information
252.227-7017 Identification and Assertion of Use, Release, or Disclosure Restrictions
252.227-7019 Validation of Asserted Restrictions – Computer Software
252.227-7030 Technical Data - Withholding of Payment
252.227-7037 Validation of Restrictive Markings on Technical Data
252.227-7028 Technical Data or Computer Software Previously Delivered to the Government
252.246.7001 Warranty of Data
52.227-21 (a and b) FAR Clause - Technical Data, Declaration, Revision, and Withholding of Payment- Major Systems
c. Request that a copy of the solicitation/contract be forwarded to AFLCMC/LZPEM.
3. Request the Contracting Officer (CO) prohibit the use of Single Process Initiatives (SPI) to include Core Business Manuals (CBM) or any common processes which pertain to the development and delivery of a Technical Data Package (TDP):
Request the CO assure that the contract does not invoke the use of SPI's, CBMs, or any internal contractor common processes in lieu of ASME Standards and Military Standards which pertain to the development and delivery of a TDP. The SPI’s and CBM’s consolidate or eliminate necessary specifications and standards in TDP’s thus prohibiting future competitive acquisitions.
4. The data required by the tasking wording and DD Form 1423-1 will be utilized for logistic support purposes, to include competitive reprocurement in the acquisition of spares. This data will be utilized by logistics personnel, to include data managers, system engineers, equipment specialists, item managers and logistics managers. If this data is not procured, logistic support may be adversely affected. Requirements for engineering data are driven by the following:
a. AFI 63-101/20-101 (07 March 2013 Incorporating Change 1, 21 March 2014), paragraph 6.12 states:
(1) 6.12. Data and Data Rights. The PM shall assess long term data and data rights requirements and corresponding acquisition strategies prior to initiating a RFP to acquire systems, subsystems, or end-items to ensure they provide for rights, access, or delivery of data that the Government requires for systems sustainment and to maintain competition throughout the life cycle. The PM shall address the data rights strategy including the rationale for acquisition and\or non-acquisition of data and data rights at milestones, ASPs, and reviews and shall document the strategy in the Technical Data Rights Strategy and associated data planning documents. The Technical Data Rights Strategy is integrated within the AS and is required for all ACAT programs. Source selections shall consider Government rights to data and include pricing options that correspond to the data and data rights recommended as part of the data strategy. The burden of proof that data is proprietary lies with the contractor. If not acquiring technical data, computer software licenses, or associated intellectual property rights necessary for organic support, a summary of the business case analysis justifying that decision must be approved by the MDA. The PM shall obtain legal counsel when addressing Data Rights or Intellectual Property issues. The PM shall review the government requirement for technical data throughout the life cycle of the system.
6.12.1. The PM shall ensure the program data rights strategy, including the performance work statement (PWS) or SOW for development, production, deployment, and sustainment (for all applicable phases) includes appropriate data rights requirements, access, and necessary deliverables, or options for data and equipment deliverables required to support:
6.12.1.1. Organic source of repair and/or supply decisions.
6.12.1.2. Government Core depot maintenance capability requirements.
6.12.1.3. Expeditionary logistics footprint requirements.
6.12.1.4. Engineering data requirements needed for such activities as OSS&E assurance, integrity programs, sustaining engineering, reliability management, and configuration management.
6.12.1.5. Technical orders (TOs).
6.12.1.6. Reprocurement/modification/upgrade.
6.12.1.7. Demilitarization/Disposal.
6.12.1.8. Open architecture.
6.12.1.9. Information assurance strategies.
6.12.1.10. Technology refreshment or enhancement.
6.12.1.11. Training and training program information.
6.12.1.12. Spare parts procurement
6.12.1.13. Testing and Evaluation
6.12.1.14. Intelligence Mission Data production
6.12.1.15. Contractor Logistics Support
b. AFI 23-101 (8 August 2013) Section 2K, Spare Parts Breakout Program, paragraph 2.11.2.3 states AFMC will:
(1) 2.11.2.3.3. Determine the complete data needs, including re-procurement data for inclusion in contracts.
(2) 2.11.2.3.4. Give written notification, with rationale, to affected organizations when contracts do not include data requirements.
(3) 2.11.2.3.5. Conduct data calls and in-process reviews to ensure that correct and complete data requirements, including re-procurement data, appear in the Engineering, Manufacturing and Development (EMD) or production contract.
(4) 2.11.2.3.6. Identify, select, and, develop data item descriptions for inclusion in the EMD or production contract.
(5) 2.11.2.3.7. Make sure that contracts properly define data requirements and manage the acquisition according to AFI 21-103, Equipment Inventory, Status and Utilization Reporting,.
(6) 2.11.2.3.8. Schedule periodic engineering and procurement data reviews to ensure that the contractor is complying with contractual data requirements in supporting the AFSPBP. These reviews should coincide with existing engineering or data reviews.
c. The Competition in Contracting Act (CICA) of 1984 requires the Government to address and plan for competition of future acquisitions and of spares during acquisition of the system. The law (10 USC 2304(f)(4)) states, “In no case may the head of an agency enter into a contract for property or services using procedures other than competitive procedures on the basis of the lack of advance planning or concerns related to the amount of funds available to the agency for procurement functions.” This does not mean we must buy reprocurement engineering data (Product Drawings/Models and Associated Lists);
however, we must address, support, and document any decision not to buy this engineering data.
d. For these reasons, do not make any changes to the DD Form 1423-1 originated by AFLCMC/LZPEM without coordinating with Brian Nelms.
5. Data requirements are set forth on DD FORM 1423-1 attached hereto.
6. Please reference LZPEM’s control number 2016-95 on all correspondence relating to this subject. Point of contact is Brian Nelms DSN: 472-3045.
X Ken McKinley signing for
Signed by: MCKINLEY.NORMAN.K.1229939706 MICHAEL E. WILLS, Chief
Engineering Data Management, Acquisition and Inspection
AFLCMC/LZPEM
Attachment:
DD FORM 1423-1, Product Drawings/Models and Associated Lists, 9/1/2016 cc: AFLCMC/WNZEA / John Land AFLCMC/WNKABA / Lenora Elliott
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved QMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188), Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP XXXX TM OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
MHU-196 and MHU-204 tasker contract
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81000E/T PWS PARAGRAPH 4.6.3
AFLCMC/LZPEM
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
DD QRTLY SEE BLK 16 b. COPIES
8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
FINAL
A SEE BLOCK
SEE BLK 16 Draft Reg Repro
16. REMARKS AFLCMC/LZPEM
285 Cochran Street
1. Air Force drawings 9626025 rev G, 9579776 rev M and 9579777 rev B (CAGE 98752) are a part of this CDRL ROBINS AFB, GA.
A copy of the drawings may be requested through the Procurement Contracting officer. 31098-1669
2. METADATA SHALL BE IN ACCORDANCE WITH 9579776 PARAGRAPH 10 OPTION
ONE
3. Please reference EDATS control number 2016-95 on all correspondence related to this effort.
PAPER COPY 2
SEE CONTINUATION SHEETS DIGITAL DATA 1
(CLASSIFIED)
Vendor Item Control Drawings shall be used to specify the requirements for purchased items when such items have been approved for use in the design and are used without alteration, selection or source qualification (testing of an item prior to procurement action to ensure that it satisfies the specified requirements). Reference paragraph 7.1 of DI-SESS-81000E.
DIGITAL 1
15. TOTAL 2 0 2
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Brian Nelms 9/1/2016
DD Form 1423-1, Feb 2001 STRAWMAN Revision 20 July 2015 PAGE___1_ OF __8___ PAGES EDATS 2016-95
CONTINUATION OF DD FORM 1423-1 (DI-SESS-81000E/T) Dtd. 9/1/2016, EDATS 2016-95
BLOCK 4: DI-SESS-81000E is tailored as follows:
Requirements: (the below paragraph numbering corresponds with the numbering in the DID)
1. Reference Documents. Delete paragraph 1. in its entirety and replace with “1. Reference Documents. The documents apply as cited in the DD Form 1423-1 and continuation sheets. Unless otherwise noted, the latest revision of the ASME Standard at the time of solicitation shall apply.”
3. Format. Delete in its entirety and replace with “3. Format. Product Drawings/Models and
Associated Lists shall be in the format as specified on this DD Form 1423-1 and continuation sheets, and shall meet the requirements of ASME Y14.1."
4. Content. Delete in its entirety and replace with “4. Content. Product Drawings/Models and Associated Lists shall conform to the requirements of ASME Y14.100-2013, Appendix B, sections B6 through B9.1 and Appendices C,D, E, and F (F-3 through F-3.7) in conjunction with ASME Y14.24-2012, ASME Y14.34, ASME Y14.35M and ASME Y14.41. They shall document directly or by reference the following (items a through q), as applicable:”
6. CAGE code. Delete “TDP Option Selection Work Sheet incorporated in the contract or purchase order.” and replace with “DD Form 1423-1 and continuation sheets.”
7. Selection of drawings. Delete “The TDP Option Selection Work Sheet incorporated in the contract or purchase order will specify whether the contractor or the Government is responsible for selecting the types of drawings and associated lists.” and replace with “The contractor shall comply with ASME Y14.24, Types and Applications of Engineering Drawings”.
BLOCK 7:
“D”—Inspection is at destination and is to ensure this product meets this CDRL and its tasking document.
Shipping list must accurately reflect the shipped product.
“D”—Acceptance is at destination. Acceptance of final data will be by approval of the Engineering Data Management Specialists.
BLOCK 9:
DISTRIBUTION STATEMENT. Distribution statements shall be in accordance with DoD Instruction
5230.24 and included on the first sheet of each drawing near the title block, and shall be as follows:
“DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and their contractors (FOR THEIR ADMINISTRATIVE OR OPERATIONAL USE; 2016-09-01). Other requests for this document shall be referred to AFLCMC / WNZEA.”
EXPORT CONTROL WARNING LABEL. All engineering data shall be marked with Export Control Warning Labels in accordance with DoD Instruction 5230.24, dated August 23, 2012 as follows:
“WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
DESTRUCTION NOTICE. Mark documents with one of the following:
a. For unclassified limited documents: “DESTRUCTION NOTICE. Destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
b. For classified documents: “DESTRUCTION NOTICE. Follow the procedures in DoD 5220.22- M, National Industrial Security Program Operating Manual, Chapter 5, Section 7, or DoD 5200.1R, Information Security Program, Chapter 6.”
BLOCK 10: Revisions/changes to the final delivered data shall be furnished quarterly, commencing the first quarter after destination acceptance of the final reproducible data and continue until the contract is closed. Quarterly updates shall include an updated BOM, reference A.F. Drawing 9579776. Negative reports shall be submitted to AFLCMC/LZPEM.
BLOCK 11: 15 days before end of quarter.
BLOCKS 12 AND 13:
1. All data submittals shall contain a delivery letter and a shipping list. The letter shall contain at a minimum the contract number, delivery order, CLIN, and EDATS number (located on the bottom right corner of the DD Form 1423). The shipping list shall include as a minimum, the document number, revision level, and number of sheets/pages. The data delivered shall be in the same sequence as the shipping list.
Shipments of data must be for a complete Technical Data Package (TDP) that accurately depicts the final product as defined in the tasking document (SOW, PWS, etc.). Shipping list shall specify whether the shipment is updates, final or make-up.
2. Within 90 days after successful government verification of the prototypes, a Bill of Materials (BOM) in accordance with Air Force drawing 9579776 (CAGE 98752) shall be delivered.
3. Within 90 days after successful government verification of the prototypes, one set of paper copies of all "final reproducible data" (reference Block 14 of the DD 1423-1) shall be delivered. A letter of transmittal shall accompany submittal. Paper copy submittal will be reviewed within 120 days after receipt of data, unless additional time is required, at which time the contractor will be notified. When the submittal does not meet the contractual requirements a discrepancy letter will be submitted through Government Contracting Officer with a suspense date for the contractor to resubmit the TDP with corrections incorporated.
a. Submittal of programming files, in accordance with Air Force drawing 9579776 (CAGE 98752), Software and memory Device Data is not required for this (paper) submission.
b. Concurrent with the paper copies the contractor shall submit representative samples of each digital data format of data for this project in accordance with Air Force drawing 9579776 (CAGE 98752), (Native, Neutral, HPGL, Metadata Spreadsheet, Gerber, Software/Memory Device Data, etc.).
4. Within 60 days after approval of paper copy, one set of all “final reproducible digital data” to include Native, Neutral, HPGL, Metadata Spreadsheet, Gerber, Software/Memory Device Data, etc. (reference Block 14 of the DD 1423-1) shall be delivered to AFLCMC/LZPEM, 285 Cochran Street, ROBINS AFB GA. 31098-1669. If changes have been required to the BOM since delivery in paragraph 3 above, resubmittal shall be required. The final digital submittal will be reviewed within 60 days after receipt of data, unless additional time is required, at which time the contractor will be notified. In the event the submittal does not meet the contractual requirements, a discrepancy letter will be submitted through the Government Contracting Officer with a suspense date for the contractor to resubmit the final digital TDP with corrections incorporated.
BLOCK 16:
1. Government Activity and Part Identification: The contractor shall comply with Air Force drawing 9626025 (CAGE 98752), titled “Air Force Drawing Requirement”. This requirement defines format requirements for the generation of Air Force drawings. The contractor shall use the Government activity identifier Commercial and Government Entity (CAGE) code and Air Force drawing numbers. The contractor shall contact the AFLCMC/LZPEM EDMS to obtain the drawing numbers.
1.1. Engineering Change Orders (ECOs): When an existing Air Force CAGE code drawing is revised, all
ECOs shall be incorporated prior to the paper submittal for review.
1.2. Concurrent with the final submittal, all ECO’s against existing Air Force CAGE code drawings shall be incorporated and a copy of the ECO shall be delivered for Air Force revision documentation.
2. Content, format, and media requirements for delivery of Digital Engineering Data: The contractor shall comply with Air Force drawing 9579776 (CAGE 98752).
3. Product Drawings/Models and Associated Lists: Product drawings/models and associated lists shall be prepared to provide the design, engineering, and manufacturing information necessary to enable the procurement or manufacture of an item essentially identical to the original item. The product shall be defined to the extent necessary for a competent manufacturer to produce an item, which duplicates the physical, interface, and functional characteristics of the original product, without additional design engineering effort or recourse to the current design activity. Product data shall reflect the approved, tested and accepted configuration of the defined delivered item. This includes but is not limited to special tooling, interface hardware, special test equipment, and support equipment.
4. Engineering Drawing Practices: The contractor shall use the practices described in ASME Y14.100- 2013. For clarification, the documents listed in section 2 of ASME Y14.100-2013 shall be considered first tier and shall apply. The contractor may find it useful to incorporate the concepts of MIL-HDBK-288 into the preparation of the TDP. MIL-HDBK-288 refers to Engineering Drawing Package (EDP); this term shall be considered synonymous with TDP. In instances where the ASME standards do not fully define requirements concerning preparation of engineering drawings, the contractor may use the guidance provided in the Drawing Requirements Manual (DRM) 11th Edition available from IHS, Inc. copyright 2008.
5. Control Drawings: Control drawings shall be created in accordance with DI-SESS-81000E and ASME Y14.24-2012 to depict engineering criteria used in selecting purchased or vendor developed items. Control drawings shall disclose engineering form, fit, function and performance requirements for the acquisition of interchangeable purchased items of existing designs, or of items specially developed by vendors to the control drawing requirements. When COTS/purchased items are used by the contractor and are part of this effort as defined in the tasking document (SOW, PWS, etc.), control drawings shall be developed and delivered. Control drawings not developed for this contract that are part of the deliverable TDP shall be updated, to show current information (i.e., performance/qualification requirements, vendors/sources names and part numbers.)
5.1. Control drawings are not required for items which are Government directed purchases or for Government Furnished Material/Government Furnished Equipment (GFM/GFE). Such items shall be identified using the GFE/GFM notation on the parts list, etc. The use of a flag note is acceptable.
6. Contract Numbers: When a TDP document is prepared under a Government contract, the Government contract number under which it is prepared shall appear on the first sheet of the document original. When a TDP document is delivered under a Government contract other than the one under which it was prepared, the Government contract number under which it is delivered shall also appear on the first sheet of each copy submitted. If the document is prepared and submitted under the same contract, only the entry for the contract under which it is prepared is required.
7. Application Data: All new and revised drawings shall contain Application Data. The Application Data is mandatory for all drawings. The Application Data shall show the “Next Assembly” and “Used On”. The application data shall be located near the title block on sheet 1, placed on a separate referenced document, or provided on a separate parts list. When the application data appears on a separate referenced document, a cross reference note shall be included on each parent drawing to indicate that a separate referenced document is available. When an item is used in more than three applications, the entry “general usage” may be entered in the “Used On” column.
8. Reference Documents: Documents referenced in a TDP shall be furnished as part of the TDP with the exception of those specified in referenced documents available in Acquisition Streamlining and Standardization Information System (ASSIST) and non-Government standardization documents available from the issuing non-Government standards body, such as the American Society of Mechanical Engineers (ASME). The following types of documents shall not be referenced in a TDP: technical manuals, procedural manuals, maintenance manuals, company drafting manuals, management plans, uncontrolled documents or unreleased documents. However, when information essential to meeting the content of a TDP (such as default surface texture values) is contained within such prohibited documents, that information shall be extracted from the reference document and included in the TDP.
8.1 Prohibited Documents, References, and Phrases: Technical Orders (TOs), Time Compliance Technical Orders (TCTO), pamphlets, recordings, National Stock Numbers (NSNs), To Be Determined (TBD), Statement of Work ((TASKING DOCUMENT)), Performance Work Statement (PWS), Statement of Objectives (SOO), and Contract Data Requirements List (CDRL), shall not be referenced within the TDP.
9. Traceability: The contractor shall prepare the TDP in such a manner to insure that all applicable documents and part or identifying numbers (PINS) i.e., Artwork, Schematics, Software/Programming Data, Test Criteria, etc., are referenced within the TDP for traceability.
9.1 If the contractor is the original equipment manufacturer (OEM), impacted engineering data that are part of the effort as defined in the tasking document (SOW, PWS, etc.) shall be revised to include changes to reflect the delivered item’s configuration.
9.2 If the contractor is not the OEM, the contractor shall ensure impacted engineering data that are part of the effort as defined in the tasking document (SOW, PWS, etc.) are updated and delivered to reflect the delivered items configuration.
10. Preparation Method: American English language shall be used in the preparation of this TDP.
Dimensioning and Tolerancing shall be Decimal Inch in accordance with ASME Y14.5-2009. Size and format of drawings shall be Decimal Inch per ASME Y14.1. All drawings shall be prepared using Third Angle Orthographic Projection method of presentation. The symbol for angle of projection shall be delineated in the Title Block of newly prepared or revised engineering data. (ASME Y14.3-2003 figure 2)
11. TDP Validation: The contractor shall validate that the TDP conforms to the contractual requirements, and that they accurately depict the item(s) developed, modified, or produced under the contract.
12. Clarification of Detailed Test Criteria for Electrical and Avionics Items: Test criteria for items designed or developed with Government funds is an inherent part of the TDP. Test criteria shall be incorporated, either directly on each TDP document or by reference, for each end item, top assembly item, configured item, and lowest assembled item IAW Air Force drawing 9579777 (CAGE 98752), titled “Clarification of Detailed Test Criteria for Electrical and Avionics Items.”
13. Associated Lists: Parts Lists per ASME Y14.34 are required. Parts Lists are required at assembly level. Parts Lists for Contractor Activity identifier CAGE code may be an integral part of a document or it may be a separate document. The identification and quantity of parts shown on the assembly drawing shall agree with the parts list.
14. Marking: Drawings shall specify requirement for marking part number identification on items as required by MIL-STD-130 and other applicable documents referenced therein. Item unique identification (IUID) marking is mandatory for applicable items as determined by the Program Office. (See DFARS 252.211-7003 Item Identification and Valuation) The drawings shall identify the content, method of application, material and location of marking on the part.
15. Printed Board Artwork Master Drawing. The printed board artwork master drawing shall include images of all artwork required to manufacture the printed board. These images will serve as a reference to those images produced from the Gerber data files IAW Air Force drawing 9579776 (CAGE 98752) titled “Product Data Specification”. Also, this drawing shall reference a unique part or identifying number (PIN) with revision data for the digital file set which includes the Gerber, test, and drill data files. The PIN number format structure and characters shall meet the same requirements as for the part number. These requirements are in addition to those in ASME Y14.24 and other related standards.
16. Printed Board Artwork Master, Test, and Drill NC Data. The printed board artwork master, test, and NC drill data shall be delivered IAW Air Force drawing 9579776 (Cage 98752). These requirements are in addition to those in ASME Y14.24 and other related standards.
17. Legacy Stable Base Media (Mylars, undimensioned drawings, master patterns, etc.). Data originally produced on stable base drawing media that has been redrawn/converted/reproduced in a digital format or developed on a CAD platform shall be delivered.
18. Legibility and Reproducibility: All documents prepared or submitted shall meet the legibility and reproducibility requirements of the specification or standard controlling the media in which the data is to be delivered. As a minimum, all lines, symbols, letters, and numerals shall be readable.
19. Protecting Classified Information: TDPs or parts thereof, containing classified information shall be protected and marked in accordance with the Department of Defense National Industrial Security Program Operating Manual for Safeguarding Classified Information, DoD Manual 5220.22-M. When 3D TDP data is used, the solid models shall display classification marking clearly visible when the solid model is first opened.
20. Software and Memory Device Data: Software and Memory Device drawings shall be selected per ASME Y14.24 and CAD/CAM data files shall be delivered per Air Force drawing 9579776 (CAGE 98752).
21. Inspection of TDP: The TDP shall be inspected for the following:
a. Compliance with the requirements of this contract.
b. Inclusion of all documents, including sub-tier references, required to meet the design disclosure requirements of the TDP.
c. Accuracy of the assignment and identification of security markings, restriction statements (for example distribution statements), export control notices, rights-in-data legends, and other special markings.
d. Inclusion of contract numbers and contractor identifications.
e. Legibility and reproducibility.
f. TDP components have not been prepared for requirements, which could be met by existing standardization documents.
g. Completeness and accuracy of the TDP documents, including required quality assurance information, in describing design of the item, its subassemblies, and component parts. The design to be described by the TDP documents is that configuration of the item the Government has approved, tested, or accepted.
h. Both Type 2D and Type 3D TDPs shall open in the appropriate software without regeneration errors or warnings.
22. Source Control Drawing (SOCD) Approval Request. Source control drawing approval requests (as referenced in MIL-STD-31000A and corresponding Appendix A) shall be prepared and submitted to the requiring office in Block 6 of this DD Form 1423-1 prior to the preparation or use of a source control drawing. Each potential source control item shall be approved by the Air Force System Engineer prior to inclusion of the source control drawing in the TDP. SOCD approval requests are used to ensure that only valid source qualification requirements are included in the TDP. Under Public Law, the Government will actively seek multiple sources for any item for which source qualification is a requirement. Air Force engineering will evaluate each request and notice will be promptly given regarding approval/disapproval.
Requests shall be by letter and shall be prepared and submitted as follows:
a. Format - The Source Control Drawing Approval Request shall be in the contractor’s format.
b. Content - The request shall specify the following:
(1) Nomenclature and description of the item.
(2) The critical application(s) for which the item is to be used.
(3) Number of applications per end item.
(4) System performance requirements requiring source qualification.
(6) Procedures and criteria required to qualify a source.
(7) Sources of supply and manufacturers’ part numbers.
(8) Cost of the item involved.
(9) Estimated cost to qualify a source.