This is a Source Pre-Qualification Requirements document for a Transmission Assembly (NSN 1615-01-061-6615, Part Number 212-040-001-111) used in military helicopter systems. The document outlines detailed qualification criteria for potential bidders seeking to repair and overhaul this critical safety component, which is essential for helicopter drivetrain functionality. Key requirements include possessing specialized tooling, demonstrating experience with similar critical safety components, maintaining ISO 9001:2015 certification, performing at least 75% of repair work in-house, and passing a First Article Test. Currently, only Bell Helicopter Textron and Arista are pre-qualified to perform this work, though other Bell-certified Original Equipment Manufacturers (OEMs) may be considered. The total estimated cost for qualification is $6,000 per part, primarily associated with administrative labor to develop and submit the Source Approval Request (SAR) package.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCE PRE-QUALIFICATION REQUIREMENTS
(Public Law 98-525, 10 United States Code Section 2319)
AMSC C: This part requires engineering source approval by the control activity to maintain the quality of the part. An alternative source must qualify according to the design control activity’s procedures as approved by the cognizant government engineering activity, AFLCMC/WIHEZ.
SECTION A: ITEM IDENTIFICATION
The items listed below can be Overhauled and Repaired by separate or the same contractor:
Stock Number (NSN) Part Number Nomenclature Tech Order 1615-01-061-6615 212-040-001-111 Transmission Assy USAF TO 3R7-2-6-3
SECTION B: JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT
Transmission Assembly (P/N: 212-040-001-111) drives the main rotor mast through a series of gears and has accessory drives for the hydraulic pumps, rotor brake disc, tachometer-generator, and tail rotor drive shaft. The transmission is located forward of the engines and is coupled to the engines by a main drive shaft coming from the combining gearbox. A chip detector system is installed in the transmission. It illuminates a light on the chip detector caution panel if metallic particles contact it.
Transmission lubrication is accomplished by a self-contained pressurized oil system, with a submerged oil pump in the sump located in the bottom of the transmission. An oil cooler system is incorporated in the transmission oil system. The transmission oil cooler is installed aft of the engine combining gearbox above the engine oil cooler and receives cooling air from the blowers mounted on the combining gearbox.
Sources must have quality procedures and processes to ensure that the work being performed complies with the respective drawing and Technical Order. Outstanding quality and thoroughness of the overhaul and repair is required. Records shall be maintained for all work performed, including the results of all required inspections. Maintenance records shall be provided to the Government upon request. All disassembly actions, component inspections, time change of components as required, assembly actions, and functional checks shall be performed in accordance with the applicable USAF TOs. After final assembly, all testing required in the TO shall be performed including a 2.8-hour run-in test on a certified test stand. Run-in on aircraft is not acceptable. This component is a Critical Safety Item, and the failure of which will result in an unacceptable chance of loss of aircraft and aircrew. Therefore, repair and overhaul sources must qualify in accordance with the appropriate Government engineering activity, AFLCMC/WIHEZ Engineering office, Robins AFB, GA.
Additionally, the qualification procedures must be approved by AFLCMC/WIHEZ Engineering office. USAF TO 3R7-2-6-3 provides essential information to accomplish repair and maintenance functions on the noted items.
SECTION C: QUALIFICATION REQUIREMENTS
This section contains the minimum requirements necessary to become a qualified bidder on the equipment listed in Section A. The repair and overhaul of this component will return unserviceable component to serviceable condition per the USAF TO listed in Section A. The extent of internal parts replacement required shall be determined by the inspections and the disassembly/assembly required to restore this item to serviceable condition. Some parts are life limited and will require replacement according to the accumulated flight hours and individual part retirement requirement.
a. Potential bidders shall provide a summary of the company’s capabilities as directed in the AF Rotary Wing SAR Package Submission Guide (WIH-ENG-07001, Revision A).
b. Vendors will be required to have the special tooling and test equipment called out in T.O.s listed below:
Technical Order Noun Special Tools and Test Equipment USAF TO 3R7-2-6-3 Transmission Assy Listed in USAF TO 3R7-2-6-3
Alternatives to the special tooling and/or test equipment may be used, provided the potential bidder can demonstrate that they have an equivalent piece of equipment that can accomplish the same task successfully in accordance with the applicable technical data. Each individual similar piece of equipment will require Government evaluation and approval. Alternate tools/equipment must be identified by part number and potential bidders must specify by part number which piece of equipment the alternate is replacing. Alternate tools/equipment must receive approval from the applicable government engineering activity, AFLCMC/WIHEZ (Helicopter Engineering Section) before such tools/equipment are used to overhaul/repair any flight safety critical components. The transmission assembly is a flight safety critical component.
c. Potential bidders shall demonstrate the ability and have experience in repair/overhaul of similar critical safety components, which are currently in use on commercial or military helicopters.
d. Potential bidders shall provide a detailed quality plan implementing AS9100 or ISO 9001 (or equivalent). Provide certification for the quality plan that is in use.
e. Potential bidders shall provide a detailed repair/overhaul plan describing repair, overhaul and inspection procedures and shall provide for:
1. Traceability of batch/lot for repaired / overhauled material.
2. Identification of material sources. Sources for raw materials must be documented for each type of material. No material waivers will be granted.
3. Identification of sources for processes not done in house shall be documented.
f. Potential bidders shall perform a minimum of 75% of the repair and overhaul workload in-house.
Testing shall not be sub-contracted to a third-party facility. The final 2.8-hour transmission run-in test after overhaul shall be accomplished on a certified test stand. The 2.8-hour run-in test may be accomplished outside the overhaul contractor’s facility. Test reports shall be provided following the run-in test. Test parameters and pass/fail criteria are listed in USAF TO in Section A.
g. After qualification, the repair and overhaul plan processes, vendor sources, quality procedures etc.
shall not be changed without the approval of AFLCMC/WIHEZ, obtained through the contracting officer.
h. Conditional approval may be granted based upon the submission of a Source Approval Request providing the documentation requested herein. Full Pre-Qualification Status shall not be granted until bidders pass a one-time First Article Test after approval of a First Article Test Plan. Once vendors have obtained approval and passed First Article Testing, Pre-Qualification status will be granted. NOTE: AF engineering reserves the right to revoke qualification status dependent upon the results of the First Article Testing. Failed FA testing will likely result in disqualification for the current effort and a reopening of the solicitation.
i. The Source Pre-Award Qualification Requirements detailed in this document shall be waived for companies who have already passed qualification or pre/post-award qualification for items listed in Section A and have been listed on the WIHEZ Source Qualification Statement (SQS) for this item.
Additionally, companies who currently possess official certification as a Bell authorized service center for Component Repair & Overhaul for Bell 205, 212, or UH-1 helicopters and have performed a Transmission Assembly Repair and Overhaul in the last 3 years are currently qualified to repair, overhaul and test the items listed in Section A, may be waived from First Article Testing, dependent upon the current status of the bidder, at discretion of WIHEZ engineering.
j. This qualification process shall be waived for companies who have already passed pre-qualification: Bell Helicopter Textron (CAGE 97499), and Arista (CAGE 6SR03) are currently qualified to repair, overhaul, and test the subject items. These are the only vendors currently listed on the SQS. These vendors are Air Force approved and are waived from the requirement to complete a First Article Inspection. Any other OEM Bell certified vendors, of the subject component only, that bid and are awarded this contract will also be waived. OEM certification claims must be verified prior to approval.
k. Potential Bidders shall be ISO 9001:2015 certified. The Air Force may not qualify potential bidders who have had quality problems when delivering similar or identical items to the government. Potential bidders who have produced similar items for the commercial market shall also be considered for qualification and shall also provide all documentation and information directed by the SAR Submission Guide (WIH-ENG-07001)
l. The United States Government reserves the right to witness all post-award qualification testing.
The contractor shall provide test time and location to Rotary Wing SPO Engineering no later than 60 days prior to the start of post-award qualification testing.
m. Potential bidders will have to obtain access to the USAF Technical Order system- the Enhanced
Technical Information Management System (ETIMs). This system is the source for the most up to date USAF TOs.
n. The Government will perform an initial review of all information/material submitted for source qualification consideration. Within 45 working days a response will be provided to the submitter of either acceptance of all required materials/information for source qualification consideration or rejection of the submittal with identification of missing material/information required for successful resubmittal. Once the Government has provided a formal response that all required materials and information have been received that are required for source qualification a final response to potential bidder source qualification will be provided within 180 days. If clarification of information is required during the review process by the Government, then the 180-day review process will be extended by the amount of time required for the potential bidder to provide the additional information.
SECTION D: ESTIMATE OF THE TEST AND EVALUATION COSTS
This cost estimate is required per FAR 9.2029(a)(1)(ii) and 10 U.S.C. 2319(b)(3). It is intended to identify the costs for test and evaluation which will likely be incurred by the potential offeror to become qualified to repair and/or overhaul each part associated with the requirements being sought via the above PR. The total below pertains to only a single part; therefore, this should be multiplied by the number of items a company seeks to qualify.
Section Description Est. Cost
A Shipping N/A B Dimensional/Electronic Verification
a. Chemical N/A
b. Metallurgical N/A
(1) Destructive N/A
(2) Non-Destructive N/A
c. Dimensional N/A
d. Electronic N/A
e. Mechanical N/A
f. Non-Destructive Inspection N/A
C Nuclear Harness N/A D Form, Fit, Function, and Interface N/A E OEM Qualification Testing
a. Laboratory Costs N/A
b. Flight/Data Reduction & Analysis Costs N/A
F Travel to Contractor or Test Site N/A G SAR Package Development/Evaluation $ 6,000.00
TOTAL = $ 6,000.00
Comments & Methodology: The above sections are listed in AFMCI 23-113 (Pg 22-23). The Integrated Product Team (to include Engineering) met to evaluate each category and determined that most of these T&E tasks will not be required by AFLCMC/WIHEZ to be considered for qualification. The vast majority of expenses that will be incurred by the Contractor will likely be associated with administrative labor performed to (1) substantiate their Company's technical capabilities and (2) vet that information internally for finalization of their SAR package for submittal to the Government. This is an estimated level of effort for EACH part. The basis of estimate for Section D consists of an approximated 80 man-hours at a rate of $75/hr.
SECTION E: GOVERNMENT CONTACT
The Government Point of Contact for the technical requirements specified for qualification is:
Coby Giddens Rotary Wing Systems and Integrity Engineer - AFLCMC/WIHEZ, 370 Richard Ray Blvd.
Bldg. 300, Robins AFB, GA 31098-1670.
478-926-7255 coby.giddens.1@us.af.mil
SECTION F: SIGNATURE BLOCK
AFLCMC/WIHEZ Engineer:
AFLCMC/WIHEZ Branch Chief:
mailto:coby.giddens.1@us.af.mil
| SOURCE PRE-QUALIFICATION REQUIREMENTS |
| SECTION A: ITEM IDENTIFICATION |
| SECTION B: JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT |
| SECTION C: QUALIFICATION REQUIREMENTS |
| SECTION D: ESTIMATE OF THE TEST AND EVALUATION COSTS |
| SECTION E: GOVERNMENT CONTACT |
| SECTION F: SIGNATURE BLOCK |