RFP_Attachment_4_Total_Resources_Volume.xlsx
XLSX spreadsheet 2 MB Posted
- Attached to
- AC/MC-130J RADIO FREQUENCY COUNTERMEASURES (RFCM) Federal contract opportunity
- Solicitation number
- FA8523-14-R-30015
About this file
RFP Attachment 4_Total Resources Volume
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOE Material Summary Offeror's are required to provide a Material BOE summary that clearly lists the types and quantities of material resources proposed regardless of source (prime and subcontractors) by the SOW and CWBS time phased by Government Fiscal Year. Since the Technical and Schedule Evaluators will be primarily concerned with soundness of an offeror’s approach, including the realism and reasonableness of the types & quantities of materials, proposed unit prices and extended cost should be a sanitized version of the Priced Bill of Material, which offerors must provide in Volume IV Cost/Price. This summary must be provided in Excel to simplify manipulation of the data during evaluation. Otherwise contractor format is acceptable.
SAMPLE-Labor Summary
| An Employee of: | Total of All Government Fiscal Years | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | 1.1.1 Total hours | 204 | ||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | SS1, Component 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | 1.1.1.1.1 | Design | Senior Engineer | 10 | |||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | 1.1.1.1.2 | Fabricate | Technician | 25 | |||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | Junior Engineer | 80 | |||||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | Machinist | 15 | |||||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | Electrical Engineer | 20 | |||||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | 1.1.1.1.3 | Integrate | Senior Engineer | 3 | |||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | Systems Engineer | 20 | |||||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | Technician | 17 | |||||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | 1.1.1.1.4 | Test | Senior Engineer | 4 | |||||||||||||||||||||||||||||||||||||||||||||
| Test Engineer | 10 | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.2 | SS1, Component 2...n | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.# | SIMILAR BREAKDOWN TO 1.1.1.1 EXAMPLE | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | 1.1.2 Total hours | 80 | 500 | 80 | ||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | CSCI 1 | ||||||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | 1.1.2.1.1 | Design | Software Engineer | 20 | 300 | ||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | 1.1.2.1.2 | Fabricate | Software Engineer | 20 | 100 | ||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | 1.1.2.1.3 | Integrate | Software Engineer | 20 | 100 | ||||||||||||||||||||||||||||||||||||||||||||
| ABC Company | 1.1.2.1.4 | Test | Software Engineer | 20 | 80 | ||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.1 | System Assembly, Installation, and Checkout on Site | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.2 | Contractor Technical Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.3 | Site Construction | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.4 | Site/Ship/Vehicle Conversion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Industrial Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Initial Spares and Repair Parts | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13 | Anti Tamper/Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.1 | Plan | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.2 | Implementation/Test |
CLIN 0001 BOE Labor Summary
| An Employee of: | Total of All Government Fiscal Years | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.1 | System Assembly, Installation, and Checkout on Site | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.2 | Contractor Technical Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.3 | Site Construction | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.4 | Site/Ship/Vehicle Conversion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Industrial Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Initial Spares and Repair Parts | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13 | Anti Tamper/Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.1 | Plan | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.2 | Implementation/Test | ||||||||||||||||||||||||||||||||||||||||||||||||
| An Employee of: | Government Fiscal Year 1 | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.1 | System Assembly, Installation, and Checkout on Site | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.2 | Contractor Technical Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.3 | Site Construction | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.4 | Site/Ship/Vehicle Conversion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Industrial Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Initial Spares and Repair Parts | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13 | Anti Tamper/Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.1 | Plan | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.2 | Implementation/Test | ||||||||||||||||||||||||||||||||||||||||||||||||
| An Employee of: | Government Fiscal Year 2 | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.1 | System Assembly, Installation, and Checkout on Site | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.2 | Contractor Technical Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.3 | Site Construction | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.4 | Site/Ship/Vehicle Conversion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Industrial Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Initial Spares and Repair Parts | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13 | Anti Tamper/Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.1 | Plan | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.2 | Implementation/Test | ||||||||||||||||||||||||||||||||||||||||||||||||
| An Employee of: | Government Fiscal Year 3 | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.1 | System Assembly, Installation, and Checkout on Site | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.2 | Contractor Technical Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.3 | Site Construction | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.4 | Site/Ship/Vehicle Conversion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Industrial Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Initial Spares and Repair Parts | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13 | Anti Tamper/Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.1 | Plan | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.2 | Implementation/Test | ||||||||||||||||||||||||||||||||||||||||||||||||
| An Employee of: | Government Fiscal Year 4 | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.1 | System Assembly, Installation, and Checkout on Site | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.2 | Contractor Technical Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.3 | Site Construction | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.4 | Site/Ship/Vehicle Conversion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Industrial Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Initial Spares and Repair Parts | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13 | Anti Tamper/Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.1 | Plan | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.2 | Implementation/Test | ||||||||||||||||||||||||||||||||||||||||||||||||
| An Employee of: | Government Fiscal Year 5 | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.1 | System Assembly, Installation, and Checkout on Site | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.2 | Contractor Technical Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.3 | Site Construction | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.4 | Site/Ship/Vehicle Conversion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Industrial Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Initial Spares and Repair Parts | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13 | Anti Tamper/Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.1 | Plan | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.2 | Implementation/Test | ||||||||||||||||||||||||||||||||||||||||||||||||
| An Employee of: | Government Fiscal Year 6 | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.1 | System Assembly, Installation, and Checkout on Site | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.2 | Contractor Technical Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.3 | Site Construction | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.4 | Site/Ship/Vehicle Conversion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10.5 | Sustainment/Interim Contractor Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Industrial Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.1 | Construction/Conversion/Expansion | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.2 | Equipment Acquisition or Modernization | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11.3 | Maintenance (Industrial Facilities) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Initial Spares and Repair Parts | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13 | Anti Tamper/Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.1 | Plan | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.13.2 | Implementation/Test |
CLIN 0001 BOE Labor Summary
&P
CLIN 0002 BOE Labor Summary
| An Employee of: | Total of All Government Fiscal Years | Labor Category | BOE Reference | 3.1 EMD, System Design | |||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 RFCM Prime Mission Equipment | 3.1.2 System Engineering | 3.1.3 Reserved | 3.1.4 Technology Readiness Assessment | 3.1.5 Critical Technology Demonstration | 3.1.6 Program Protection Plan | 3.1.7 Antenna Study | 3.1.8 Data Rights | 3.1.9 Lead Free Control Plan | 3.1.10 Corrosion Prevention and Control Plan | 3.1.11 Configuration Management | 3.1.12 Program Management | 3.1.13 Risk Management | 3.1.14 Subcontractor/ Supplier Management | 3.1.15 Data Management | |||||||||||||||||||||||||||||||||||
| Notional CWBS | 3.1.1.1 RFCM External Controls and Sustaining Engineering Planning | 3.1.1.2 RFCM Software Design | 3.1.1.3 RFCM Aircraft Interface and Compatibility Design | 3.1.2.1 Human Factors Engineering | 3.1.2.2 Interface Control Working Group | 3.1.2.3 Technical Performance Measures | 3.1.2.4 System Engineering Management Plan | 3.1.6.1 Inspection and Audit | 3.1.6.2 Cybersecurity | 3.1.6.3 Anti-Tamper | 3.1.6.4 Security | 3.1.6.5 Security Classification Data | 3.1.8.1 Unlimited Rights | 3.1.8.2 Government Purpose Rights | 3.1.8.3 Limited or Restricted Rights | 3.1.11.1 Data Accession List | 3.1.12.1 Contractor Integrated Performance Management | 3.1.12.2 Integrated Baseline Reviews | 3.1.12.3 Status Reports | 3.1.12.4 Contract Funds Status Report | 3.1.12.5 Integrated Master Schedule | 3.1.15.1 Data Repository | 3.1.15.2 Government Furnished Data | ||||||||||||||||||||||||||
| 3.1.1.2.1 Software Functional Qualification Test | 3.1.1.3.1 Electrical | 3.1.1.3.2 Environmental Control | 3.1.1.3.3 Airworthiness Certification | 3.1.6.5.1 Safeguarding Classified Material | 3.1.15.2.1 Government Furnished Documentation | ||||||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.0 | Electronic Warfare System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Radio Frequency Counter Measures Prime Mission Product (RFCM PMP) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | RFCM Subsystem 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | RFCM Software Release 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | RFCM Prime Mission Product Integration, Assembly, Test, and Checkout | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout (Trial Kit Install) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | Systems Engineering (SE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | Program Management (PM) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | System Test and Eval (ST&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | Mock-ups/System Integration Labs (SILs) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Test and Evaluation Support | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.5 | Test Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Services | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Facilities | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Technical Publications | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Engineering Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.3 | Management Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.4 | Support Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.5 | Data Repository | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Peculiar Support Equipment (PSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Common Support Equipment (CSE) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.1 | Test and Measurement Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9.2 | Support and Handling Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Operational/Site Activation |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .