E016_1423-1.pdf
PDF 459 KB Posted
- Attached to
- AC/MC-130J RADIO FREQUENCY COUNTERMEASURES (RFCM) Federal contract opportunity
- Solicitation number
- FA8523-14-R-30015
About this file
E016 1423-1
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
COMMANDO II RFCM FD2060-14-30015 TBD
E016 AF Technical Manual Contract Requirement (TMCR) Technical Manuals AC-130
Recapitalization Program
TM-86-01N/T SOW para 3.1.17.5 AFLCMC/WISM
DD
A
D
BLK16
ASREQ
BLK16
BLK 16
TM
Exhibit:
FD2060-14-30015
E
Mod#:
AFLCMC/WISM 1 1
BLOCK 4:
This data item shall be tailored as follows:
a). This data item shall be known as: 'Technical Manual
Contract Requirements (TMCR)'. See Attachment 1 (16 April
2012) to this CDRL for AC-130 Recapitalization Program TMCR.
To be used as guidance in development and delivery of the RFCM required changes (including source data) to Technical Order
Data and TCTOs.
b). Delete the following sentences located in Section 1.
Para. 1:
"Contractor MUST tailor this TMCR document, including the associated tables, matrices and Specification/Standard
Interface Requirements (SIRs). The tailored TMCR shall be attached to the CDRL for TO delivery,and shall be included in the proposal as a separate exhibit, referenced in the proposal
SOW. Proposals shall be compatible with the Air Force infrastructure and support the (Program Name) Program’s
Integrated Data System (IDS) requirements."
c). Section 1. Para 12.6; (This provision does not constitute authorization for the contractor to deviate from the delivery requirements set forth in the contract schedule.) is intended for Integrated Master Schedule (IMS).
d). Source Data shall be in editable format.
Block 7: Wide Area Work-flow (WAWF) is to be used for final inspection and acceptance by AFLCMC/WISM.
Blocks 11 - 13:
a). Initial Source Data delivered 30 days after CDR.
b). Final Source Data delivered prior to Operational Test
(OT) start.
c). The Government may alter the Initial and Final delivery dates as determined at Technical Manual Guidance Conferences and In Process Reviews (IPR).
NOTE: TECHNICAL DATA SHALL NOT BE TRANSMITTED VIA EMAIL. ALL
10/30/201410/30/2014
1 2
1 0 1
E
COMMANDO II RFCM FD2060-14-30015 TBD
E016 AF Technical Manual Contract Requirement (TMCR) Technical Manuals AC-130
Recapitalization Program
TM-86-01N/T SOW para 3.1.17.5 AFLCMC/WISM
DD
A
D
BLK16
ASREQ
BLK16
BLK 16
TM
Exhibit:
FD2060-14-30015
E
Mod#:
TRANSMISSION OF TECHNICAL DATA SHALL BE VIA MAIL OR EXPRESS
DELIVERY SERVICES.
SEE CDRL NOTES FOR ADDITIONAL INFORMATION
10/30/201410/30/2014
2 2
1 0 1
| 2014-10-31T09:15:41-0400 | |
| DOWNING.SCOTT.B.1392850968 |
| 2014-11-03T07:57:09-0500 | |
| ASHMORE.TARA.E.1390975089 |
| 2014-11-03T07:57:17-0500 | |
| ASHMORE.TARA.E.1390975089 |
| 2014-10-31T09:15:53-0400 | |
| DOWNING.SCOTT.B.1392850968 |
File details come from the government source that posted it. Updated .