DD260.pdf
DoD Form PDF 137 KB Posted
- Attached to
- Repair Contract for ALR 56A Oscillators
- Solicitation number
- FA852208q25030
About this file
First Article Requirements
View the file
Other versions and copies of DD Form 260
Show all 18
Who attaches DD Form 260
Other files
| File | Type | Posted |
|---|---|---|
| PWS 0825030.pdf | ||
| Form1423_0825030_00_2.pdf | ||
| CDRLs.pdf | ||
| FA852208Q25030.pdf | ||
| AFMC158.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20070614
FD2060-08-25030 202487-001 5865-01-088-1019EW
Contract, Data Package, and all QA provisions of the vendor drawing
Contract, Data Package, and Government approved Acceptance Test Procedures
A006
542 CBSSS/GBEBB
A007
542 CBSSS/GBEBB 265 Perry St. Robins AFB GA 31098-1607
$2,300.00
Air Force Supply
542 CBSSS/GBEB
1. DATEFIRST ARTICLE REQUIREMENTS
(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3) (Additional Instructions on Page 3)
2. P/R/MIPR NUMBER 3. PART NUMBER 4. NSN
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS UNIT(S) OF LOT/ITEM
AND WILL BE: PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES 7. LONG LEAD TIME ITEMS
REQUIRED NOT REQUIREDWILL NOT SERVE AS A MANUFACTURING
STANDARD
WILL
(See FAR 52.209-3 or -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 or -4 Alternate I)
REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST/INSPECTION REQUIREMENTS F. FIRST ARTICLE DELIVERY:
A. CONTRACTOR TESTING GOVERNMENT TESTING
(1) Due within calendar days from date contract.
Performance or other characteristics which the First Articles must meet
(2) Notify calendar days prior to shipment.are
(3) Delivered to government at
B. The detailed technical requirements for First Article approval tests are contained in
(Set Forth Consignee and Address)
(4)Government written notice of approval/disapproval within days after receipt of first article package.
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
(1) DD Form 1423 ELIN
G. Estimated cost of government testing/inspection evaluation.
(2) Delivery due calendar days from date of contract.
(3) Number of days for government approval/disapproval days.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. TEST REPORT REQUIRED
(1) DD Form 1423 ELIN
(2) Due calendar days from date of contract.
(3) Forwarded to
(4) Government written notice of approval/disapproval due days after receipt of contractor's report.
10. DISPOSITION OF FIRST ARTICLES Disapproved First Articles will be returned to the contractor/ will be retained by pending Approved First Articles will be forwarded to disposition instructions from the contractor
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
(insert quantity).FirstArticles will be expended intesting.
will beResidual components of dispproved FirstArticles will be retained byreturned to the contractor/ pending disposition instructions from a. Approved First Articles will be returned to the contractor for shipment with production item.the contractor.
b. Disposition of disapproved First Articles will remain the same as marked above.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
Other Disposition:
AFMC IMT 260, 20020830, V-3 PREVIOUS EDITION IS OBSOLETE
542 CBSSS/GBEBB 265 Perry St. Robins AFB GA 31098-1607/ATTN: Jose Matta
Jose Matta, 579 SMXS/FLT F, 478-222-4302, DSN 472-4302 Robins AFB GA
Billy Jernigan / 561 CBSS/GBLC / 926-3736
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to thea.
Government, DoD, Air Force.
Government, DoD, Air ForceOfferors currently in production of the same or similar article for a received First Article approval under the existing contract.
contract and who haveb.
Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, c.
provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.Air Force,
d. Provided not more than months have elapsed since completion of the contract.
First Article testing will not be waived.e.
See Remarks in block 12 below.f.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISIONA. PROCURING OFFICE
12. REMARKS
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING 14. PR INITIATOR (Name, Organization, Phone) AND/OR APPROVING TEST (Name, Organization, Phone)
AFMC IMT 260, 20020830,Reverse PAGE 2
FD2060-08-25030 202487-001 5865-01-088-1019EW
2. P/R/MIPR NUMBER 3. PART NUMBER 4. NSN
INSTRUCTIONS FOR COMPLETION OF FIRST ARTICLE TEST REQUIREMENTS
(AFMC Form 260)
BLOCKS 1 - 4 AND 14. WILL BE COMPLETED BY THE INITIATOR OF PURCHASE REQUEST.
BLOCKS 5 THRU 11, AND 13. WILL BE COMPLETED BY THE ENGINEER AND/OR EQUIPMENT SPECIALIST. IF LOCAL PURCHASE, INITIATOR OF PURCHASE REQUEST SHALL COMPLETE.
BLOCKS 1 THRU 4. SELF-EXPLANATORY
BLOCK 5. INSERT QUANTITY OF FIRST ARTICLE TO BE TESTED. INDICATE WHETHER THE FIRST ARTICLE ITEM IS PART OF OR IN ADDITION TO THE PRODUCTION QUANTITY. (Normally the First Article in "Contractor Testing" are delivered (if not destroyed) with the production items.) PER FAR 9.301 FIRST ARTICLE MEANS PREPRODUCTION MODELS/SAMPLES, INITIAL PRODUCTION SAMPLES, TEST SAMPLES, FIRST LOTS, PILOT MODELS OR PILOT LOTS.
BLOCK 6. INDICATE WHETHER OR NOT THE FIRST ARTICLE WILL SERVE AS A MANUFACTURING STANDARD. ( FAR 9.306(h)).
BLOCK 7. SEE FAR 52.209-3 OR -4, ALTERNATE II.
BLOCK 8. SEE FAR 9.308
BLOCK 9. MUST BE CHECKED TO INDICATE WHETHER THE CONTRACTOR OR THE GOVERNMENT IS TO PERFORM TESTING. (FAR 9.306)
A. THE SPECIFIC PARAGRAPH(S) OF THE SPECIFICATION MUST BE INCLUDED OR THE PARTICULAR REQUIREMENTS CITED.
B. THE SPECIFIC PARAGRAPH(S) OF THE SPECIFICATION MUST BE INCLUDED OR THE PARTICULAR REQUIREMENTS CITED.
C. THIS PARAGRAPH IS OPTIONAL AND IS REQUIRED ONLY WHEN A TEST PLAN IS REQUIRED. THE REQUIRED ENTRIES
ARE SELF-EXPLANATORY.
D. THE "NUMBER OF DAYS" ENTRY SHOULD BE FAR ENOUGH IN ADVANCE OF THE TESTING TO PERMIT ANY
GOVERNMENT REPRESENTATION AT THE TESTING SITE.
E. THIS PARAGRAPH IS SELF-EXPLANATORY. (NOTE: All dates must be realistic and include adequate production and administrative lead times.)
F. (1). THE DELIVERY DATE MUST BE REALISTIC AND INCLUDE ADEQUATE PRODUCTION AND ADMINISTRATIVE LEAD
TIMES.
(2). THIS NOTIFICATION SHOULD BE NO LESS THAN TEN DAYS.
(3). ENTER ADDRESS WHERE FIRST ARTICLE IS TO BE DELIVERED FOR TESTING.
(4). THIRTY DAYS OR LONGER NOTIFICATION MUST BE CONSIDERED WHEN GOVERNMENT TESTING REQUIRES SPECIAL
FIXTURE AND/OR AIRCRAFT.
G. THIS ESTIMATE SHOULD BE AS ACCURATE AS POSSIBLE AND INCLUDE GOVERNMENT LABOR COSTS FOR TESTS;
TOOLS/TEST EQUIPMENT; GOVERNMENT TEST FACILITY USE; TDY COSTS, TRANSPORTATION OF FIRST ARTICLE TO TEST
SITE; GOVERNMENT EVALUATION OF CONTRACTOR TEST REPORT; ETC.
BLOCK 10. APPLIES TO GOVERNMENT TESTING. APPLIES TO CONTRACTOR TEST ONLY IF ITEMS ARE NOT SUBMITTED AS
PRODUCTION UNITS, IN THESE CASES CITE DISPOSITION.
BLOCK 11. SELF-EXPLANATORY. SIMILAR ARTICLES ARE THOSE WHICH, FOR PURPOSE OF MANUFACTURE, ARE SUBSTANTIALLY THE SAME AS THE ITEM BEING PURCHASED (For example, items that differ only in size or in place of operation (i.e., left vs right side of aircraft)).
BLOCK 12. SELF-EXPLANATORY.
BLOCK 13 AND 14. SELF-EXPLANATORY.