The document is a Questions and Answers file for Solicitation FA850125Q0011, providing detailed site-specific information for a Honeywell Vindicator Intrusion Detection System installation at the 78th SFS Armory on Robins Air Force Base in Georgia. Key technical details include a 50+ year old facility with a 22 ft by 32 ft room, concrete perimeter walls, suspended ceilings, and no existing IDS system. The project requires installing 3 PIRs, 3 BMS, 2 duress buttons, and associated Vindicator equipment, with specific requirements for cable infrastructure that must be run in conduit. Site visits were originally scheduled for 14 March 2025 and amended to 17 March 2025 from 0900-1100, with after-hours access permitted with prior notification from the 78th SFS. The procurement requires all necessary labor, personnel, supervision, management, tools, equipment, transportation, and materials for a complete system installation, with strict equipment specifications that do not allow "or equal" substitutions or plenum wire.

View the file

Other files for this federal contract opportunity

Other files attached to 78th SFS-Vindicator Alarm System, newest first.
File Type Posted
Questions and AnswersVindicator.docx DOCX document
Questions and AnswersVindicator.docx DOCX document
Questions and AnswersVindicator.docx DOCX document
Solicitation Amendment FA850125Q00110002 SF 30.pdf PDF
Solicitation Amendment FA850125Q00110001 SF 30.pdf PDF
Questions and AnswersVindicator.docx DOCX document
CDRL 78 SFS Armory Training.pdf PDF
BrandNameJustification.pdf PDF
Solicitation - FA850125Q0011.pdf PDF
Sentinel Defense_SOW 30 Jan 2025.pdf PDF
CDRL 78 SFS Armory Testing.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA850125Q0011:

Questions and Answers:

Is there a site visit scheduled for this project?

a. Yes - 14 March 2025 from 1300 – 1400

b. Amended on 12 March 2025 new site visit date and time are as follows:

i. 17 March 2025 from 900 – 1100

1. How old is the facility?

a. 50+ years old roughly

2. How much square footage is in the facility?

a. Room is 22 ft by 32 ft.

3. How stable is the power?

a. Yes

4. Is there a dropped ceiling in all areas of installation?

a. Yes

5. What type of walls are in the perimeter areas?

a. Concrete

6. Do we need to drill between the walls, to run our cable infrastructure?

a. Yes, cable and wires need to be in conduit

7. Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?

a. Yes

8. Are the door frames metal and concrete filled?

a. Door frame is made out of metal.

9. Please provide a comprehensive list of quantities of all IDS items needed (e.g. total number of motion sensors, glass breaks, etc.) per location.

a. 3 – PIRs

b. 3 – BMS

c. 2 - Duress Buttons and Vindicator associated equipment.

10. Do you currently have existing IDS Sensors in your doors? Please specify which doors.

a. No current IDS in the room.

11. What is the manufacturer of the existing IDS system?

a. There is no existing IDS system in this current room.

12. Will we be able to reuse the existing cable? If so, what type of cable is there currently?

a. No existing cabling.

13. Are Ceilings Suspended? Or Hard Lid?

a. Suspended.

14. Is there existing Cable Trays for wiring above ceilings?

a. No.

15. Can Existing Wiring be utilized?

a. No existing wiring.

16. Is a “UPS” required? If so, What Time/Power Duration is required?

a. Only battery backup is required in the distribution box in the room.

17. re “Or Equal” Equipment substitutions allowed?

a. No. Please refer to ‘BrandNameJustification’ in attachments

18. Is “Plenum Wire” acceptable?

a. No.

19. Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?

a. Yes, if the contractor has prior notification with the 78 SFS.

20. What is the height of Exterior Cameras? (If any)

a. N/A

21. Please provide/post other “Q & A” requests.

a. All Q’s received for this solicitation will be posted as an attachment on SAM.gov listing

22. Please provide a list of equipment to be installed a.

23. Are there pipe chases between floors?

a. No.

24. What is the range of the budget for this project, and is it already appropriated?

a.

25. Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed?

a.

26. How many feet of new wire will have to be run?

a. Your Site Survey will allow you to determine this.

27. What kind of cipher lock and quantities are required e.g. X-10.

a. No cipher locks needed.