RFP-DRAFT_AIRFIELD_MGT_29_JUL_2013.doc
DOC document 709 KB Posted
- Attached to
- Airfield Management Services at Robins AFB, GA Federal contract opportunity
- Solicitation number
- FA8501-13-R-0016
About this file
This is a draft of the RFP for Airfield Management. The final RFP should be released in the next 3 days.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Airfield Mgt Oper Mgr (AMOM)
FFP
The contractor shall provide an Airfield Management Operations Manager (AMOM) in accordance with paragraph 1.1.1 of the Performance Work Statement, dated 01 May 2013.
FOB: Destination
PURCHASE REQUEST NUMBER: F3Q1AC3105A001
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Airfield Management-Shift 1(day shift)
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 1(day shift)- 0650 to 1500 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Airfield Management-Shift 2(swing shift)
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 2 (swing shift)-1450 to 2300 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Airfield Managment-Shift 3 (mid shift)
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 3 (mid-shift)- 2250-0700 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
Wage Adjustment-Shift 1(day shift)
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
Wage Adjustment-Shift 2(swing shift)
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
Wage Adjustment-Shift 3(mid shift)
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
DATA
Data in accordance with attached DD Form 1423: A001- Transition Plan & A002- Environmental Health and Safety Plan. See attached form for description and frequency.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Mgt Oper Mgr (AMOM) |
FFP
The contractor shall provide an Airfield Management Operations Manager (AMOM) in accordance with paragraph 1.1.1 of the Performance Work Statement, dated 01 May 2013.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Management-Shift 1(day shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 1(day shift)- 0650 to 1500 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Management-Shift 2(swing shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 2 (swing shift)-1450 to 2300 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Managment-Shift 3 (mid shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 3 (mid-shift)- 2250-0700 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 1(day shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 2(swing shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 3(mid shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Mgt Oper Mgr (AMOM) |
FFP
The contractor shall provide an Airfield Management Operations Manager (AMOM) in accordance with paragraph 1.1.1 of the Performance Work Statement, dated 01 May 2013.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Management-Shift 1(day shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 1(day shift)- 0650 to 1500 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Management-Shift 2(swing shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 2 (swing shift)-1450 to 2300 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Managment-Shift 3 (mid shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 3 (mid-shift)- 2250-0700 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 1(day shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 2(swing shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 3(mid shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Mgt Oper Mgr (AMOM) |
FFP
The contractor shall provide an Airfield Management Operations Manager (AMOM) in accordance with paragraph 1.1.1 of the Performance Work Statement, dated 01 May 2013.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Management-Shift 1(day shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 1(day shift)- 0650 to 1500 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Management-Shift 2(swing shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 2 (swing shift)-1450 to 2300 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Managment-Shift 3 (mid shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 3 (mid-shift)- 2250-0700 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 1(day shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 2(swing shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 3(mid shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Mgt Oper Mgr (AMOM) |
FFP
The contractor shall provide an Airfield Management Operations Manager (AMOM) in accordance with paragraph 1.1.1 of the Performance Work Statement, dated 01 May 2013.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Management-Shift 1(day shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 1(day shift)- 0650 to 1500 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Management-Shift 2(swing shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 2 (swing shift)-1450 to 2300 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Airfield Managment-Shift 3 (mid shift) |
FFP
The Contractor shall provide all personnel, vehicles, fuel, office supply materials, and other items (except as specified in Section 3-Govt Furnished Property & Services of the PWS) or services necessary to perform Airfield Management Services at Robins AFB, GA, specifically Shift 3 (mid-shift)- 2250-0700 hrs (see PWS para 1.3.2.1), in accordance with the Performance Work Statement (PWS) attached. NOTE: The contractor warrants that the prices proposed in this solicitation (and resulting contract) do not include any allowance for any contingency to cover increased costs covered by a wage adjustment IAW the Collective Bargaining Agreement (CBA) attached, and FAR 52.222-43 Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 1(day shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 2(swing shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Wage Adjustment-Shift 3(mid shift) |
FFP
Annual Wage Adjustment in accordance with the Collective Bargaining Agreement (attached), the Service Contract Act, and FAR 52.222-43.
NET AMT
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Destination |
| Government |
| Destination |
| Government |
| 0008 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1002 |
| Destination |
| Government |
| Destination |
| Government |
| 1003 |
| Destination |
| Government |
| Destination |
| Government |
| 1004 |
| Destination |
| Government |
| Destination |
| Government |
| 1005 |
| Destination |
| Government |
| Destination |
| Government |
| 1006 |
| Destination |
| Government |
| Destination |
| Government |
| 1007 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2002 |
| Destination |
| Government |
| Destination |
| Government |
| 2003 |
| Destination |
| Government |
| Destination |
| Government |
| 2004 |
| Destination |
| Government |
| Destination |
| Government |
| 2005 |
| Destination |
| Government |
| Destination |
| Government |
| 2006 |
| Destination |
| Government |
| Destination |
| Government |
| 2007 |
| Destination |
| Government |
| Destination |
| Government |
| 3001 |
| Destination |
| Government |
| Destination |
| Government |
| 3002 |
| Destination |
| Government |
| Destination |
| Government |
| 3003 |
| Destination |
| Government |
| Destination |
| Government |
| 3004 |
| Destination |
| Government |
| Destination |
| Government |
| 3005 |
| Destination |
| Government |
| Destination |
| Government |
| 3006 |
| Destination |
| Government |
| Destination |
| Government |
| 3007 |
| Destination |
| Government |
| Destination |
| Government |
| 4001 |
| Destination |
| Government |
| Destination |
| Government |
| 4002 |
| Destination |
| Government |
| Destination |
| Government |
| 4003 |
| Destination |
| Government |
| Destination |
| Government |
| 4004 |
| Destination |
| Government |
| Destination |
| Government |
| 4005 |
| Destination |
| Government |
| Destination |
| Government |
| 4006 |
| Destination |
| Government |
| Destination |
| Government |
| 4007 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-4 |
| Inspection Of Services--Fixed Price |
| AUG 1996 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| POP 01-NOV-2013 TO |
31-OCT-2014
| N/A |
| SEE SCHEDULE - F3Q1AC |
SEE SCHEDULE
ROBINS AFB GA 31098
F3Q1AC
| 0002 |
| POP 01-NOV-2013 TO |
31-OCT-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 0003 |
| POP 01-NOV-2013 TO |
31-OCT-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 0004 |
| POP 01-NOV-2013 TO |
31-OCT-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 0005 |
| POP 01-NOV-2013 TO |
31-OCT-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 0006 |
| POP 01-NOV-2013 TO |
31-OCT-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 0007 |
| POP 01-NOV-2013 TO |
31-OCT-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 0008 |
| POP 01-NOV-2013 TO |
31-OCT-2014
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 1001 |
| POP 01-NOV-2014 TO |
31-OCT-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 1002 |
| POP 01-NOV-2014 TO |
31-OCT-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 1003 |
| POP 01-NOV-2014 TO |
31-OCT-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 1004 |
| POP 01-NOV-2014 TO |
31-OCT-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 1005 |
| POP 01-NOV-2014 TO |
31-OCT-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 1006 |
| POP 01-NOV-2014 TO |
31-OCT-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 1007 |
| POP 01-NOV-2014 TO |
31-OCT-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 2001 |
| POP 01-NOV-2015 TO |
31-OCT-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 2002 |
| POP 01-NOV-2015 TO |
31-OCT-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 2003 |
| POP 01-NOV-2015 TO |
31-OCT-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 2004 |
| POP 01-NOV-2015 TO |
31-OCT-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 2005 |
| POP 01-NOV-2015 TO |
31-OCT-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 2006 |
| POP 01-NOV-2015 TO |
31-OCT-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 2007 |
| POP 01-NOV-2015 TO |
31-OCT-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 3001 |
| POP 01-NOV-2016 TO |
31-OCT-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 3002 |
| POP 01-NOV-2016 TO |
31-OCT-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 3003 |
| POP 01-NOV-2016 TO |
31-OCT-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 3004 |
| POP 01-NOV-2016 TO |
31-OCT-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 3005 |
| POP 01-NOV-2016 TO |
31-OCT-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 3006 |
| POP 01-NOV-2016 TO |
31-OCT-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 3007 |
| POP 01-NOV-2016 TO |
31-OCT-2017
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 4001 |
| POP 01-NOV-2017 TO |
31-OCT-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 4002 |
| POP 01-NOV-2017 TO |
31-OCT-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 4003 |
| POP 01-NOV-2017 TO |
31-OCT-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 4004 |
| POP 01-NOV-2017 TO |
31-OCT-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 4005 |
| POP 01-NOV-2017 TO |
31-OCT-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 4006 |
| POP 01-NOV-2017 TO |
31-OCT-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
| 4007 |
| POP 01-NOV-2017 TO |
31-OCT-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F3Q1AC
CLAUSES INCORPORATED BY REFERENCE
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.247-55 |
| F.O.B. Point For Delivery Of Government-Furnished Property |
| JUN 2003 |
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2013) (DEVIATION)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, File Transfer Protocol, or PayWeb.
(1) To access PayWeb, the vendor may go to the following site: https://onronline.onr.navy.mil/payweb/
(2) For instructions on PayWeb payment request submission, please contact the office identified below:
(Contracting Officer: Insert applicable ONR Regional Office information)
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table
| Field Name in WAWF |
| Data to be entered in WAWF |
Pay Official DoDAAC
Issue By DoDAAC
Admin DoDAAC
Inspect By DoDAAC
Ship To Code
Ship From Code
Mark For Code
Service Approver (DoDAAC)
Service Acceptor (DoDAAC)
Accept at Other DoDAAC
LPO DoDAAC
DCAA Auditor DoDAAC
Other DoDAAC(s)
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(3) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
WIDE AREA WORKFLOW – RECEIPT AND ACCEPTANCE (WAWF-RA)
In accordance with DFARS 252.232-7003, Electronic Submission of Payment Requests, use of electronic payment requests is mandatory. WAWF-RA is the Department of Defense system of choice for submission of invoices and receipt/acceptance documents. Detailed information regarding WAWF-RA is available on the internet at https://wawf.eb.mil.
The following codes will be required to correctly route your document(s) through WAWF-RA. The information (especially the TYPE OF DOCUMENT and DODAAC codes) should be entered exactly as shown below:
CONTRACT NUMBER: TBD
DELIVERY ORDER NUMBER: N/A
TYPE OF DOCUMENT: COMBO
CAGE CODE: TBD
ISSUE BY DODAAC: FA8501
ADMIN DODAAC: FA8501
INSPECT BY DODAAC: Leave Blank
SERVICE ACCEPTOR / SHIP TO: F3Q1AC
LOCAL PROCESSING OFFICE: Leave Blank
PAY OFFICE DODAAC: F03000
After creating the document, select the “ADDITIONAL E-MAIL NOTIFICATIONS” link and enter the following email addresses:
CONTRACT ADMINISTRATOR: brandi.morris@robins.af.mil
INSPECTOR: ernest.eady@robins.af.mil ACCEPTOR: ernest.eady@robins.af.mil You can access payment information from the DFAS web site at https://myinvoice.csd.disa.mil/index.html.
Section H - Special Contract Requirements
H-900 H-900
SUPERVISION OF CONTRACTOR EMPLOYEES
(a) The Contractor personnel are employees of the Contractor and under the administrative control and supervision of the Contractor. The Contractor, through its personnel, shall perform the tasks prescribed herein and in Task Orders issued hereunder. The Contractor shall select, supervise, and exercise control and direction over its employees under this contract. The Contractor shall not supervise, direct, or control the activities of the Government personnel or the employee of any other contractor, except any subcontractor employed by the Contractor on this contract. The Government shall not exercise any supervision or control over the Contractor in the performance of contractual services under this contract. The Contractor is accountable to the Government for the actions of its personnel.
(b) In performance of this contract, the Contractor’s management responsibilities include, but are not limited to, the following:
(1) Ensure employees understand the work to be performed on task orders to which they are assigned.
(2) Ensure employees know their management chain and adhere to company policies and exhibit professional conduct in the best interests of the Government.
(3) Ensure employees adhere to applicable law and regulation governing contractor performance and relationships with the Government.
(4) Ensure contract employees do not create actual or apparent personal service relationships.
(5) Regularly assess employee performance and provide feedback to improve overall task performance.
(6) Ensure high quality results are achieved through task performance.
H-901
PERSONNEL ACCESS
During the life of this contract, the Contractor’s personnel shall have access to Government facilities as required. During all operations on Government premises, the Contractor’s personnel shall comply with the rules and regulations governing the conduct of personnel and the operation of the facility. The Government reserves the right to require Contractor personnel to “sign in” upon entry and “sign out” upon departure from the Government facilities. Certain Government agencies may have security requirements, which necessitate the use of building access passes. No direct charges to any Task Order issued on this contract may be made for personnel or facility security clearances.
H-902
CONDUCT OF CONTRACTOR PERSONNEL
The Contracting Officer may direct that employees of the Contractor, including employees of a subcontractor at any tier, no longer perform work under this contract on a military installation if the Contracting Officer determines that the employees’ actions would be grounds for removal from the Federal civil service if the employees were civilian employees of the United States or if the employees have been ordered not to re-enter the installation by the commander of that installation. Any delays or increased costs of performance resulting from the Contracting Officer’s direction under this clause shall not be considered to be excusable delay or beyond the control and without the fault or negligence of the Contractor, and shall not be grounds for an equitable adjustment.
H-903
CONTRACT HOLIDAYS
(a) The prices/costs in Section B of the contract shall include holiday observances. Accordingly, the Government shall not be billed for such holidays, except when services are specifically required by the Government and are actually performed on a holiday. Holidays, energy days, furlough days, administrative closure days, etc., in addition to the holidays listed in paragraph (b) below, which may be designated by the Government at any time, shall not be billable unless the assigned Contractor employee actually performs the work on these days, with advance approval by the PCO. The exception to this rule is for firm-fixed price contracts based on the Contractor delivering an end item or product.
(b) The following days are contract holidays: New Year’s Day, *Martin Luther King Jr.,’s Birthday, *Presidents’ Day, *Memorial Day, Independence Day, *Labor Day, *Columbus Day, Veteran’s Day, *Thanksgiving Day, and Christmas Day.
*as celebrated
H-904
GOVERNMENT INSTALLATION CLOSURE
(a) If necessary, the Government (Installation Commander or designee) may decide to close all or part of a Government installation in response to an unforeseen emergency or similar occurrence. Sample emergencies include, but are not limited to, adverse weather (e.g., snow, flood, etc.), an act of God (e.g., tornado, earthquake, etc.), or a base disaster (e.g., natural gas leak, fire, etc.).
(b) The Contractor shall be officially dismissed upon notification of closure. The Contractor shall promptly secure all government furnished property appropriately and evacuate in an expedient, but safe, manner.
(c) With regard to work under the contract, the Government shall retain the following rights:
(1) The Government may grant a time extension, via a modification, due to delays caused by a closure, equal to the time of the closure – subject to availability of funds and period of performance limitations.
(2) The Government may forego the work. The Contractor will not be paid for work not performed.
(3) The Government may reschedule the work at a time satisfactory to both parties.
(d) Government Installation Closure Notification Procedures:
(1) After an official decision to close the installation has been made by the responsible Government representative, local radio and television stations shall be notified of the closure.
(2) The Contractor is directed to listen to or watch one of the local radio or television stations for notification of installation closures and delays.
(e) This clause is not applicable to the curtailment or closure of Government functions when a shutdown of non-exempt functions is ordered by the Government due to a lapse of appropriations or other reason. The Contractor will be notified by the Government as to the effect a shutdown will have on contract performance.
H-905
CONTRACTOR IDENTIFICATION
(a) Contractor personnel and their subcontractors must identify themselves as contractors or subcontractors during meetings, telephone conversations, in electronic messages, or correspondence related to this contract.
(b) Contractor-occupied facilities (on AFMC or other Government installations) such as offices, separate rooms, or cubicles must be clearly identified with Contractor supplied signs, name plates or other identification, showing that these are work areas for Contractor or subcontractor personnel.
H-906
KEY PERSONNEL CHANGES
The Contractor shall notify the Contracting Officer in advance of any replacement of the Contractor’s Program Manager and Contractor’s Quality Assurance Personnel. The Contractor shall provide all applicable documents showing the replacement individual(s) meets all qualifications for the position, as specified in the PWS.
H-907
LABOR CATEGORY DESCRIPTION AND QUALIFICATIONS
(a) The Contractor shall provide the categories of personnel meeting the minimum requirements listed in the Performance Work Statement (PWS) to perform the functions as described in this solicitation and the resulting contract. The descriptions/requirements listed in the PWS represent the minimum acceptable qualifications for Contractor personnel to perform on this contract.
(b) The Contractor shall do everything possible to insure continuity of effort by using the same personnel throughout the period of the Task Order. However, if a person leaves the employment of the Contractor before the Task Order is complete, an individual of comparable qualifications must be chosen to replace that person.
(c) The Contractor’s personnel must have or be able to obtain secret clearances.
H-908
BASE SUPPORT
Base support shall be provided by the Government to the Contractor in accordance with this provision.
(a) Base support includes Government-controlled working space, material, equipment, desktop computers, laptop computers, telephone services (including automatic data processing), or other support which the Government determines can be made available at, or through, any Air Force installation where this contract shall be performed. All Government property in the possession of the Contractor, provided through the base support provision, shall be used and managed in accordance with the Government Property clauses.
(b) Unless otherwise stipulated in the contract schedule, support shall be provided on a no-charge-for-use basis and the value shall be a part of the Government's contract consideration.
(c) The Contractor agrees to immediately report (with a copy to the cognizant CAO) inadequacies, defective Government-Furnished Property (GFP), or nonavailability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support. Facilities shall not be purchased under this provision. Additionally, the Contractor (or authorized representative) shall not purchase, or otherwise furnish any base support requirement provided by the provision (or authorize others to do so), without prior written approval of the Contracting Officer regarding the price, terms, and conditions of the proposed purchase, or approval of other arrangements.
(d) The Government support to be furnished under this contract is listed in paragraph (a) above. Because of the nature and location(s) of the work performed, the value of such equipment is undeterminable. The Contractor shall not incur any cost resulting from nonsupport prior to Contracting Officer concurrence in accordance with this provision.
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
| 52.202-1 |
| Definitions |
| JAN 2012 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| APR 1984 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| OCT 2010 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| JAN 1997 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| JAN 1997 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| AUG 2012 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| DEC 2010 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| FEB 2012 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| MAY 2012 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-12 |
| Subcontractor Certified Cost or Pricing Data |
| OCT 2010 |
| 52.215-17 |
| Waiver of Facilities Capital Cost of Money |
| OCT 1997 |
| 52.215-18 |
| Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions |
| JUL 2005 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| JAN 2011 |
| 52.219-9 |
| Small Business Subcontracting Plan |
| JAN 2011 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.219-25 |
| Small Disadvantaged Business Participation Program--Disadvantaged Status and Reporting |
| DEC 2010 |
| 52.219-27 |
| Notice of Service-Disabled Veteran-Owned Small Business Set-Aside |
| NOV 2011 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| FEB 1999 |
| 52.222-26 |
| Equal Opportunity |
| MAR 2007 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| SEP 2010 |
| 52.222-36 |
| Affirmative Action For Workers With Disabilities |
| OCT 2010 |
| 52.222-37 |
| Employment Reports on Veterans |
| SEP 2010 |
| 52.222-41 |
| Service Contract Act Of 1965 |
| NOV 2007 |
| 52.222-50 |
| Combating Trafficking in Persons |
| FEB 2009 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.223-16 |
| IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products |
| DEC 2007 |
| 52.223-16 Alt I |
| IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) Alternate I |
| DEC 2007 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-4 |
| Payments Under Transportation Contracts and Transportation-Related Services Contracts |
| APR 1984 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-9 |
| Limitation On Withholding Of Payments |
| APR 1984 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-19 |
| Availability Of Funds For The Next Fiscal Year |
| APR 1984 |
| 52.232-23 Alt I |
| Assignment of Claims (Jan 1986) - Alternate I |
| APR 1984 |
| 52.232-25 |
| Prompt Payment |
| OCT 2008 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--Central Contractor Registration |
| OCT 2003 |
| 52.233-1 |
| Disputes |
| JUL 2002 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.244-5 |
| Competition In Subcontracting |
| DEC 1996 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| DEC 2010 |
| 52.245-1 |
| Government Property |
| APR 2012 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-25 |
| Limitation Of Liability--Services |
| FEB 1997 |
| 52.247-5 |
| Familiarization With Conditions |
| APR 1984 |
| 52.247-7 |
| Freight Excluded |
| APR 1984 |
| 52.247-8 |
| Estimated Weights or Quantities Not Guaranteed |
| APR 1984 |
| 52.247-12 |
| Supervision, Labor, or Materials |
| APR 1984 |
| 52.247-13 |
| Accessorial Services - Moving Contracts |
| APR 1984 |
| 52.247-14 |
| Contractor Responsibility for Receipt of Shipment |
| APR 1984 |
| 52.247-15 |
| Contractor Responsibility for Loading and Unloading |
| APR 1984 |
| 52.247-16 |
| Contractor Responsibility for Returning Undelivered Freight |
| APR 1984 |
| 52.247-17 |
| Charges |
| APR 1984 |
| 52.247-21 |
| Contractor Liability for Personal Injury and/or Property Damage |
| APR 1984 |
| 52.247-22 |
| Contractor Liability for Loss of and/or Damage to Freight Other Than Household Goods |
| APR 1984 |
| 52.247-27 |
| Contract Not Affected by Oral Agreement |
| APR 1984 |
| 52.247-28 |
| Contractor's Invoices |
| APR 1984 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| JAN 2009 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country |
| DEC 2006 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.215-7000 |
| Pricing Adjustments |
| DEC 2012 |
| 252.215-7002 |
| Cost Estimating System Requirements |
| DEC 2012 |
| 252.219-7003 |
| Small Business Subcontracting Plan (DOD Contracts) |
| AUG 2012 |
| 252.219-7004 |
| Small Business Subcontracting Plan (Test Program) |
| JAN 2011 |
| 252.223-7006 |
| Prohibition On Storage And Disposal Of Toxic And Hazardous Materials |
| APR 2012 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2012 |
| 252.225-7006 |
| Quarterly Reporting of Actual Contract Performance Outside the United States |
| OCT 2010 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| FEB 2013 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| SEP 2004 |
| 252.231-7000 |
| Supplemental Cost Principles |
| DEC 1991 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.237-7010 |
| Prohibition on Interrogation of Detainees by Contractor Personnel |
| NOV 2010 |
| 252.239-7001 |
| Information Assurance Contractor Training and Certification |
| JAN 2008 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items and Commercial Components (DoD Contracts) |
| JUN 2012 |
| 252.245-7000 |
| Government-Furnished Mapping, Charting, and Geodesy Property |
| APR 2012 |
| 252.245-7001 |
| Tagging, Labeling, and Marking of Government-Furnished Property |
| APR 2012 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| APR 2012 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 5352.223-9001 |
| Health and Safety on Government Installations |
| DEC 2012 |
CLAUSES INCORPORATED BY FULL TEXT
52.203-16 Preventing Personal Conflicts of Interest (DEC 2011)
(a) Definitions. As used in this clause--
Acquisition function closely associated with inherently governmental functions means supporting or providing advice or recommendations with regard to the following activities of a Federal agency:
(1) Planning acquisitions.
(2) Determining what supplies or services are to be acquired by the Government, including developing statements of work.
(3) Developing or approving any contractual documents, to include documents defining requirements, incentive plans, and evaluation criteria.
(4) Evaluating contract proposals.
(5) Awarding Government contracts.
(6) Administering contracts (including ordering changes or giving technical direction in contract performance or contract quantities, evaluating contractor performance, and accepting or rejecting contractor products or services).
(7) Terminating contracts.
(8) Determining whether contract costs are reasonable, allocable, and allowable.
Covered employee means an individual who performs an acquisition function closely associated with inherently governmental functions and is--
(1) An employee of the contractor; or
(2) A subcontractor that is a self-employed individual treated as a covered employee of the contractor because there is no employer to whom such an individual could submit the required disclosures.
Non-public information means any Government or third-party information that--
(1) Is exempt from disclosure under the Freedom of Information Act (5 U.S.C. 552) or otherwise protected from disclosure by statute, Executive order, or regulation; or
(2) Has not been disseminated to the general public and the Government has not yet determined whether the information can or will be made available to the public.
Personal conflict of interest means a situation in which a covered employee has a financial interest, personal activity, or relationship that could impair the employee's ability to act impartially and in the best interest of the Government when performing under the contract. (A de minimis interest that would not ``impair the employee's ability to act impartially and in the best interest of the Government'' is not covered under this definition.)
(1) Among the sources of personal conflicts of interest are--
(i) Financial interests of the covered employee, of close family members, or of other members of the covered employee's household;
(ii) Other employment or financial relationships (including seeking or negotiating for prospective employment or business); and
(iii) Gifts, including travel.
(2) For example, financial interests referred to in paragraph (1) of this definition may arise from--
(i) Compensation, including wages, salaries, commissions, professional fees, or fees for business referrals;
(ii) Consulting relationships (including commercial and professional consulting and service arrangements, scientific and technical advisory board memberships, or serving as an expert witness in litigation);
(iii) Services provided in exchange for honorariums or travel expense reimbursements;
(iv) Research funding or other forms of research support;
(v) Investment in the form of stock or bond ownership or partnership interest (excluding diversified mutual fund investments);
(vi) Real estate investments;
(vii) Patents, copyrights, and other intellectual property interests; or
(viii) Business ownership and investment interests.
(b) Requirements. The Contractor shall--
(1) Have procedures in place to screen covered employees for potential personal conflicts of interest, by--
(i) Obtaining and maintaining from each covered employee, when the employee is initially assigned to the task under the contract, a disclosure of interests that might be affected by the task to which the employee has been assigned, as follows:
(A) Financial interests of the covered employee, of close family members, or of other members of the covered employee's household.
(B) Other employment or financial relationships of the covered employee (including seeking or negotiating for prospective employment or business).
(C) Gifts, including travel; and
(ii) Requiring each covered employee to update the disclosure statement whenever the employee's personal or financial circumstances change in such a way that a new personal conflict of interest might occur because of the task the covered employee is performing.
(2) For each covered employee--
(i) Prevent personal conflicts of interest, including not assigning or allowing a covered employee to perform any task under the contract for which the Contractor has identified a personal conflict of interest for the employee…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .