AppCnov18.pdf

PDF 167 KB Posted

Attached to
Landing Gear Repair 2 - Final RFP Federal contract opportunity
Solicitation number
FA8252-11-R-80682
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Landing Gear Repair 2 - Final RFP, newest first.
File Type Posted
TEP18Jan12.xlsx XLSX spreadsheet
FA825211R80682______0005.pdf PDF
QuestionsDated9January2012.pdf PDF
FA825211R80682______0006.pdf PDF
FA825211R80682______0004.pdf PDF
Questions Dated 22 December 2011.pdf PDF
FA825211R80682______0003.pdf PDF
exhibitC21dec.xlsx XLSX spreadsheet
exhibitB21Dec.xlsx XLSX spreadsheet
exhibitD21dec.xlsx XLSX spreadsheet
FA825211R80682______0002.pdf PDF
ExhibitBRevised19Dec11.xlsx XLSX spreadsheet
Post RFP QA for FBO 15Dec11.pdf PDF
PackagingExhibitA.pdf PDF
ExhibitCRevised15Dec11.xlsx XLSX spreadsheet
PWSRevised13Dec2011.pdf PDF
ExhibitARevised19Dec11.xlsx XLSX spreadsheet
RevisedAppB15Dec11.pdf PDF
FA825211R806820001.pdf PDF
ExhibitDRevised19Dec11.xlsx XLSX spreadsheet
SectionLAtchSixRevised13Dec2011.pdf PDF
LGR2PackagingSOW.pdf PDF
PackagingExhibitD.pdf PDF
Exhibit B.xlsx XLSX spreadsheet
Exhibit C.xlsx XLSX spreadsheet
tepworksheet18nov1.pdf.xlsx XLSX spreadsheet
Exhibit A.xlsx XLSX spreadsheet
Exhibit D.xlsx XLSX spreadsheet
CDRLAFTO22.pdf PDF
ExhibitBelinlist.pdf PDF
CDRLforMishapRep.pdf PDF
CDRLSmallBusinessParticipation.pdf PDF
CDRLTDR.pdf PDF
ExhibitCelinlist.pdf PDF
smallbusinessparticipationreport.pdf PDF
CDRLConfMinutes.pdf PDF
CDRLAFTO202.pdf PDF
CDRLCAVAF.pdf PDF
SectionLattachmentsevenrolesandresponsibilities.pdf PDF
FA825211R8068218nov.pdf PDF
ExhibitDelinlist.pdf PDF
appendixb18nov.pdf PDF
CDRLAFTO95.pdf PDF
PWS10Nov11.pdf PDF
ExhibitAelinlist.pdf PDF
attachmentelevensamplefacilitylayout.pdf PDF
Industry Notice —
TEPSpreadsheet2 —
ELIN Delivery Schedule —
LGR2 Industry Comment Responses.pdf PDF
Show all 50

Landing Gear Repair 2 - Final RFP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OGDEN AIR LOGISTICS CENTER

UNITED STATES AIR FORCE

HILL AIR FORCE BASE, UTAH 84056

APPENDIX “C”

SAFETY, FIRE PROTECTION AND HEALTH SPECIFICATION

INDUSTRIAL SAFETY REQUIREMENTS

Complete Depot Overhaul of Landing Gear End Items

PR NO: FD2020-12-80139

DATE: May 25, 2011

David D. Battle

Contract Safety Manager

75 ABW/SEG

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements.

The contractor will implement a safety program plan that ensures protection of

Government personnel and property. The program will consist of, as a minimum:

1. Mishap reporting, as defined in paragraph B1 below.

2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific

Requirements, and will be used during the performance of the work described in the contract.

The Safety Plan will be approved by 75 ABW/SEG (Safety Office) prior to commencement of any work described in this contract.

3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.

4. Competent personnel to provide surveillance of the Safety Plan.

5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.

6. All contractor personnel shall be trained and qualified to perform their duties safely.

7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.

B. Mishap Notification

1. The contractor shall notify 75 ABW/SEG (801-777-3333), or the Hill AFB Command Post

(777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to 75 ABW/SEG. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.

Mishap notifications shall contain, as a minimum, the following information:

(a) Contract, Contract Number, Name and Title of Person(s) Reporting

(b) Date, Time and exact location of accident/incident

(c) Brief Narrative of accident/incident (Events leading to accident/incident)

(d) Cause of accident/incident, if known

(e) Estimated cost of accident/incident (material and labor to repair/replace)

(f) Nomenclature of equipment and personnel involved in accident/incident

(g) Corrective actions (taken or proposed)

(h) Other pertinent information

2. The contractor shall cooperate with any and all government mishap investigations.

Additionally if requested by government personnel or designated government representative

(GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.

3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.

4. The contractor shall support and comply with the safety investigation and reporting requirements of AFI 91-204, Chapters 1 – 5.

C. General Safety Requirements:

If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.

The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees.

SECTION II – SPECIFIC REQUIREMENTS

The contractor’s prepared Safety Plan shall:

Demonstrate a management commitment to employee safety and health

Identify applicable rules and regulations

Identify the roles and responsibilities of Management, Supervisors, Employees and

Safety Coordinator

Identify work to be performed and location of expected operations

Provide a description of safety program, safety monitoring responsibilities, organizational structure, and contact information for on-site personnel

Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures

Identify employee safety and health training requirements and the documentation process

Include emergency response plans and procedures that relate to protection of government personnel and property

Include hazard reporting procedures and identify individual(s) responsible for the correcting identified hazards

Identify first aid and injury procedures

Identify procedures for accident reporting and investigation

Identify the process for tracking controlled hazards in contractors work area

The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:

http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0

SYSTEM MODIFICATION-WHICH ALTERS FORM, FIT OR FUNCTION: Contractor shall comply with Mil Standard 882D, Standard Practice for System Safety, 10 Feb 00 and AFI

91-202, The US Air Force Mishap Prevention Program, 1 Aug 98, Chap 9 for system modifications, which alter form, fit, or function.

ELECTRICAL: Contractor shall comply with the standards in 29 CFR 1910 Subpart S, 29

CFR 1926 Subpart K, AFOSH STD 91-501, Air Force Consolidated Occupational Safety

Standard, 7 Jul 04, Chap 8, and NFPA 70. All electrical wiring must be IAW National

Electrical Code (NEC) 70. Electrical wiring and equipment shall be a type listed by UL or another recognized listing agent. Contractor’s Safety Plan shall also address:

-Selection and use of work practices

-Training (basic electrical safety knowledge)

-Use of equipment (handling, visual inspection, rating of equipment)

-GFCI Protection for outside contractor drops and wet/damp areas

-Arc Flash

FIRE PROTECTION FOR FACILITIES: Contractor’s procedures shall comply with NFPA

10, Portable Fire Extinguishers, 2007 Edition; NFPA 13, Installation of Sprinkler Systems, 2007

Edition; NFPA 33, Spray Application Using Flammable or Combustible Materials, 2007

Edition; NFPA 70, National Electrical Code, 2008 Edition; NFPA 72, National Fire Alarm

Code, 2007 Edition; NFPA 91, Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and

Noncombustible Particulate Solids, 2004 Edition.

MATERIALS HANDLING AND STORAGE: Contractor shall comply with the standards in

29 CFR 1926.250, 953, 957 and 29 CFR 1910.101, Subparts F, H & N; and 29 CFR 1910.178, Powered Industrial Truck. Contractor’s Safety Plan shall also address:

-Storage and handling of materials

-Disposal of trash from elevations

-Personnel lifting techniques--proper storage to prevent shifting, for stability, etc.

-Rigging (requirements, inspection, components, and qualifications)

-Equipment (use in handling materials)

-Industrial trucks (training, inspection, maintenance, and safe use) http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10135 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10928 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10117

File details come from the government source that posted it. Updated .