FY15 MSDIS Problem Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA825016R0011-0003.pdf | ||
| Labor_Rate_Matrix.xlsx | XLSX spreadsheet | |
| Questions_and_Answers.docx | DOCX document | |
| UPDATED_IS3_Section_L_and_M.docx | DOCX document | |
| FY14_Busines_Case_-_MSDIS.docx | DOCX document | |
| Updated_PWS.docx | DOCX document | |
| FA825016R0011_0002.pdf | ||
| MSDIS_Information_Support_Plan.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| FY14_AEIS_-_Business_Process_Reengineering.docx | DOCX document | |
| Updated_Section_L_and_M.docx | DOCX document | |
| FY14_BusinessCase_-_AEIS.docx | DOCX document | |
| FA825016R0011-0001.pdf | ||
| R011CoverLetter.pdf | ||
| R0011WageDetermination.pdf | ||
| FA825016R0011.pdf | ||
| DD254.pdf | ||
| R0011_IS3_Section_Land_M_20180824.pdf | ||
| R0011ContractDataRequirements.pdf | ||
| R011_Cover_Letter.pdf | ||
| R011_IS3_NETCENTS_PWS_20160817.pdf | ||
| Labor_Rate_Matrix.xlsx | XLSX spreadsheet |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of the Air Force
Material Support Division Information System
Defense Business System
Acquisition – Problem
Statement
Version FY15 1.1 21 April 2015
Based on Business Case Template Version 3.0, May 2012
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 i
Document Revision History Version Date Summary of Changes
Version 1.0 04/08/2014 Initial Document
Version 1.1 04/21/2015 Addressed Review Comments
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 ii
Table of Contents
Section 1. Executive Summary
Section 2. Introduction
2.1. Purpose
2.2. Background
Section 3. Problem Statement
3.1. “As-Is” Analysis
3.1.1. The Problem
3.1.2. Problem Description and Context
3.1.3. Root Cause Analysis
3.1.4. DOTMLPF-P Constraints, “As-Is” State
Table 1 – DOTMLPF-P Constraints, “As-Is” State
3.2. “To-Be” Analysis
3.2.1. High-Level Outcomes (HLOs)
Table 2a - HLOs Table 2b – HLOs and Measurement Criteria
3.2.2. Business Process Re-Engineering (BPR)
Table 3a – Business Outcomes Table 3b – Business Outcomes and E2E Alignment (“To-Be” State) Table 3c – Business Outcomes and Measurement Criteria (“To-Be” State)
3.2.3. DOTMLPF-P Impact, “To-Be” State
Table 4 – DOTMLPF-P Impacts, “To-Be” State
3.3. Recommended Course of Action
3.4. Rough-Order-of-Magnitude (ROM) Cost Estimate
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 1
Problem Statement Signature
Functional Sponsor: Date:
CEDRIC B. GEORGE, Brig Gen, USAF
Deputy Director of Resource Integration
DCS/Logistics, Installations & Mission Support
Problem Statement Approval
Precertification Authority (PCA): Date:
MARILYN M. THOMAS, SES
Director of Business Transformation and
Acting Deputy Chief Management Officer
DoD DCMO IRB: CONCUR / NON-CONCUR Date:
DAVID TILLOTSON III, SES, DoD, SES
Deputy Chief Management Officer
Department of Defense
TillotD Typewritten Text
TillotD Typewritten Text
TillotD Typewritten Text 29 April 2015
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 2
Section 1. Executive Summary
The Material Support Division Information System (MSDIS) is an Air Force Logistics core system containing a suite of seven modules that support Logistics Business Processes across the Air Force and
Defense Logistics Agency (DLA). The modules include Spares Requirements Review Board (SRRB), Depot Supply Chain Management Analysis Tool (DSCM AT), Planning for DLA-Managed Consumables
(PDMC), Manpower Analysis Tool (MAT), Metric Financial Tool (MFT), MSD/GSD Engineering
Project Sustainment Tool (MPST) and Enterprise Materiel Solutions (EMS). Please reference section 2.2 below for full system and module description and background.
This FY15 Business Case Lifecycle submission is a compilation of Problem Statements that apply to
MSDIS at the system level as well as individual modules. Problem statements are listed below:
MSDIS System Level:
1. Government personnel are not able to manipulate and update process functions and user access levels across the suite to accommodate daily standard work and changing business rules
2. Lack of data reliability due to current manual interfaces and processes used to obtain data
3. Lack of collaboration and information flow to allow for required notification among stakeholders
4. Inability to support changes within the system due to organizational structure or business process changes directed by DoD and/or Air Force initiatives.
5. Non-standardization of ability to export, print, and produce reports, metrics and briefings using
Commercial Off the Shelf (COTS) solutions
SRRB:
1. Storage and maintenance of records is not currently adequate and readily accessible by user leading to the potential for audit findings
DSCM:
1. Currently not able to support or access historical supportability analysis information
2. Currently do not have a single-look page capability for end items in a particular focus area
3. No notification to users when key supportability issues change for part
4. Inability to manipulate assignment of Production Numbers (PDNs)/Bill of Materials (BOM) to an aircraft
5. Inadequate/incomplete results from Short-to-Need report to other DSCM functions
6. Inability to assign and/or control user permissions based on depot support role resulting in possible unauthorized changes
7. Inability to customize column heading, filters, drop downs, etc. to accommodate daily standard work and change in business rules
PDMC:
1. No existing Air Force system accommodates the PDMC process end-to-end to improve materiel availability of DLA-managed consumables across the Air Force Enterprise. The current PDMC module represents only a partial solution for forecasting deviations in historical demand trends.
System must support the material availability of DLA managed consumables across the AF enterprise.
MAT:
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 3
1. Currently, charts, reports, and internal data-sets are not customizable for changes in personnel and business rules
2. Inability to scale module to add additional users
3. Non-standard management and tracking of overtime and comp-time
4. Tracking of resources assigned to personnel (computers, etc.) is a time-consuming manually intensive program resulting in possible human error
MFT:
1. Execution management for end of fiscal year closeout is a high stress, manual process involving continuous management of evolving executable requirements, spend plans, and funds balances
2. Distribution of funding and associated forecasts are developed at the squadron level, however, would gain fidelity if developed at lower indentures and aggregated at the squadron level
3. Tracking execution of NIIN level materiel requirements from final determination of computed requirement through the Purchase Instrument process and the obligation of funding is currently limited in scope to a single fund type
4. Currently, charts, reports, and internal data-sets are not customizable for changes in personnel and business rules
5. Inability to scale module to add additional users
MPST:
1. Current capability does not allow users the ability to provide required data for Test Program Set
(TPS) currently programmed for Consolidated Sustainment Activity Group (CSAG)/General
Support Division (GSD) requirements only
2. Inability to customize and manipulate process functions within selected forms to accommodate daily standard work and change in business rules
3. Inability to provide search function for specific field criteria
4. Systematic upgrades and core programming restructuring are required to align with current code standards following a .Net infrastructure and enhanced Object Oriented Programing.
ROM Cost Estimate: Low: $1.6 million, Expected: $2 million, High: $6 million
Section 2. Introduction
2.1. Purpose
Obtain IRB Chair approval of the described Problem Statements. Full system assessment was conducted during the BPR Exercise for the FY15 National Defense Authorization Act (NDAA) Organizational
Execution Plan (OEP) submission.
2.2. Background
MSDIS is an Air Force Logistics core system and is a suite of seven modules that support Logistics
Business Processes across the Air Force Sustainment Center (AFSC) and Defense Logistics Agency
(DLA). MSDIS provides an integration force between AFSC and other AF organizations. The following is a short description of each module: SRRB supports all MAJCOM cost per flying hour (CPFH) factors;
DSCM AT supports depot maintenance parts supportability analysis; PDMC which is the AF enterprise solution for forecasting deviations in historical demand trends; MAT which supports vacancy fill requests, human resource decisions, and the appraisal process; MFT which uses data from financial legacy systems to distribute, forecast, track and execute CSAG-S dollars; MPST which records and reports on all aspects of Engineering and Test Program Set projects including funding execution for the
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 4
AFSC enterprise; and EMS for additional functionality (e.g., termination tracking, homeless item tracking, offline shipments and inter-service support reporting) used throughout the logistics community.
MSDIS provided standardization and enterprise solutions during the stand-up of Air Force Global
Logistics Support Center (AFGLSC) and continues those efforts within the current 5-Center construct.
The proposed development and standardization initiatives for MSDIS support the usability and interoperability of the MSDIS system to transform DoD/USAF business processes. Headquarters Air
Force (HAF) and Air Force Cost Analysis Improvement Group (AFCAIG) processes used to create all
MAJCOM CPFH factors are supported through the SRRB module of MSDIS. Materiel forecasting and strategic supportability of depot maintenance activities throughout AFMC are accomplished with the
DSCM AT module of MSDIS. The PDMC module is a systemic collaboration process between DLA and
Air Force for future program changes of DLA managed piece parts and has been identified as the Air
Force system of choice for PDMC management. The MAT module provides human resource management data validation, correction, and automation supporting vacancy fill requests, management of human resource authorizations, and the appraisal process. The MFT module enhances financial visibility and analytical support by integrating data from legacy financial systems with budget, distribution, forecast, and execution management functionality. Reliability and Maintainability R&M engineering decision support for the 86K unique assets under Consolidated Sustainment Activity Group-Supply
(CSAG-S) management is provided by the MPST module. Functionality in the EMS module provides standardization across the Air Force supply chain enterprise for key materiel support processes (e.g., inventory and resource management).
Historically, status quo of the current capabilities often represented manual processes that are both time consuming and unreliable as it relates to the required data. Throughout the system lifecycle, MSDIS has transformed business processes from an inefficient batch process flow into a synchronized near real-time flow providing quicker access to accurate and near real-time information through streamlined data routing, thereby increasing the quality of decision making. The business processes are more visible and each process and its operational quality are more transparent allowing for better measurement, better management and better access to stakeholders.
Section 3. Problem Statement
3.1. “As-Is” Analysis
3.1.1. The Problem
The other above mentioned MSDIS problem statements are identified in support of information technology (IT) efficiencies, streamlining current business processes, increasing data accuracy and integrity, supporting effective communication among stakeholders and complying with enterprise standardization initiatives.
SRRB needs to be able to meet any audit findings, process changes or organizational changes required.
This includes being able to access, maintain and archive required official records within the database.
The DSCM AT module needs the ability to provide and maintain historical data. Users also need the ability to produce a single-look document (one page view) for end items in a particular focus area.
DSCM users and stakeholders need the ability to receive proper notification from the system for key supportability issues. In order to achieve more accurate part supportability assessment DSCM users need to be able to manipulate assignment of Production Numbers (PDNs)/Bill of Materials (BOM) to an aircraft. When produced, the Short-to-Need report must link to other DSCM functions and must be adequate and complete. Administrators need the ability to assign and/or control user permissions based
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 5 on depot support role to avoid possible unauthorized changes. In order to produce effective analysis users need to be able customize column heading, filters, drop downs, etc. to accommodate daily standard work and change in business rules.
The PDMC module is currently a partial solution it that cannot be used until the following areas are completed. PDMC must facilitate the collaboration process from customer submission to generation of the DDE (supply plan). It must produce reports and queries to support analysis and review of data and facilitate AF/DLA collaboration. PDMC must have analysis capability to allow for Continuous Process
Improvement (CPI) and have ability to support changes due to future organizational/process changes.
Without Problem Statement resolution, PDMC will not have an effective and automated tool to facilitate its process end-to-end and enabling effective, efficient AF/DLA collaboration, generation of meaningful metrics and continuous process improvement track and communicate changes in historical trends. This will greatly increases manually processes that could be impacted by human error. The current semi-manual processes will remain in effect with room for error and less accurate forecasting for DLA managed items.
The MAT module needs to be scalable and customizable to support additional users and enhanced metrics reporting. In order to more effectively track and manage overtime and compensatory time, users need the ability to submit requests and management needs a mechanism to approve and track requests. In order to manage resources assigned to personnel, users need the ability to link assigned assets to individual personnel through an automated tracking system.
The MFT module needs to be scalable and customizable to support additional users and enhanced metrics reporting. Users need the ability to track NIIN level execution of funds based on multiple fund types from requirement to execution. In order to gain fidelity at lower indentures, users need to be able to distribute and forecast funding to the lowest levels of the organization. Users need automated tracking of remaining execution requirements, spend plans, and funds balances and incorporation near-real-time data to facilitate a smooth end of year closeout process.
The MPST module needs to provide the user community the ability to provide required data for TPS projects. Currently, the system is programmed for CSAG/GSD requirements only. Users need the ability to customize and manipulate process functions within all forms to accommodate daily standard work and change in business rules. Users also need the ability to search the tool for specific form related criteria.
3.1.2. Problem Description and Context
From a strategic perspective in order to continue to support the Air Force Logistic community and meet the capability for increased versatility, higher performance, and greater efficiency, the problem areas identified negatively impact the Air Force and DLA’s ability to perform mission essential logistics business processes. MSDIS is a primary analytic support tool and is integral to demand and supply planning functions across Air Force and DLA logistics activities. Logical software is required for decisions to be implemented with speed and accuracy without the human operator in the decision-making loop. MSDIS also requires the capability to support business process changes resulting from policy changes, enhanced metrics reporting, and process management traceability within the system to step end-user through various business process scenario.
The SRRB module is an annual collaborative effort to develop the total Air Force FYDP flying hour spares requirement for Air Force Corporate Structure (AFCS) funding approval. It establishes the guidelines, roles and responsibilities for preparation of Headquarters Air Force Materiel Command
(AFMC) Working Capital Fund (WCF) and Fund Holders’ budget submissions based upon projected spares computations. These reparable and consumable items are managed through the Supply Division of the Consolidated Sustainment Activity Group (CSAG-Supply).
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 6
The DSCM AT module provides depot maintenance parts supportability analysis and is critical to weapon system availability. The capability successfully brings all maintenance and supply stakeholders (AF and
DLA) into a single supportability information system and builds cohesion and cooperation in strategically solving parts supportability problems. DSCM AT provides analysis of anticipated requirements over an eight quarter rolling future horizon, against available and anticipated resources across all AFMC/AFSC
Air Logistic Complexes (ALCs). Without problem statement resolution DSCM AT will continue to have to incorporate metrics from older, less accurate systems which requires additional work to try to secure necessary insights to guide depot production support decisions. DSCM AT team members will be unable to address senior leader questions about the status of key parts problems and trends. Stakeholders will have to operate without DSCM AT data, slowing or preventing their execution of key responsibilities.
Analysts will not be able to look at problems from a holistic perspective. Supply chain personnel will have to scan all parts on an ongoing basis looking for any changes, with varying degrees of success and effectiveness. Aircraft supportability assessments will continue to be cumbersome and, in some cases, have limited fidelity. Short-to-Need results will have less value in execution of the analysis. There is higher risk of any user changing critical data / functions, regardless of whether such a change is within their functional responsibilities. Basic supportability analysis logic / approach efficiencies will not be recognized.
PDMC is currently a partial solution it cannot be used until the following areas are completed. PDMC must facilitate the collaboration process from customer submission to generation of the DDE (supply plan). It must produce reports and queries to support analysis and review of data and facilitate AF/DLA collaboration. PDMC must have analysis capability to allow for Continuous Process Improvement (CPI) and have ability to support changes due to future organizational/process changes. Without Problem
Statement resolution, PDMC will not have an effective and automated tool to track and communicate changes in historical trends. This will greatly increases manually processes that could be impacted by human error.
MAT was designed to automate data compilation and facilitate analysis of human resource, manpower, payroll, and appraisal functions. This system automated critical functions required to manage civilian personnel, including supporting information for Requests for Personnel Action, TDY approval, appraisals and the ability to match personnel and payroll data to decrease errors. Without Problem Statement resolution, potential users will not realize the time savings gained through using MAT. Charts and reports will not be updated based on changing business and organizational processes. Management will not have a high fidelity process to track overtime and comp-time requests and will not have good visibility into request. Resources will not be systematically linked to individual, so they will be tracked using a time-intensive process and a potential for loss of equipment.
MFT was designed to integrate financial activities into a single cohesive process by centralizing data sources, automating data analysis to generate usable information, and developing a systematic format for executing a myriad of financial activities. MFT provides for the end-to-end management of financial operations. It facilitates distribution, realignment, forecasting, obligation and tracking of funds. It also tracks unfunded requirements. Without Problem Statement resolution, potential users will not realize the time savings and error reductions that MFT offers. Chart and reports will not be updated based on changing organization and business structures. All fund types will not be included in the module. Funds will not be distributed and forecasted at the lowest level. Closeout processes will continue to be time-intensive and high stress and there will not be access to near real-time data or automated tracking.
MPST is used by engineering stakeholders across the Air Force Supply Chain and beyond to approve, validate, prioritize, collaborate on, and document the requirements and execution of multi-billion dollar
CSAG-S engineering and Test Program Set (TPS) projects. Without problem statement resolution IT efficiencies will not be recognized. User will continue to rely on manual processes for external reporting of data using spreadsheets for monthly data tracking, inability to view metrics which are housed outside
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 7 the system and required to be manually uploaded for financial audit tracking purposes. More laborious entries duplicate processing, inconsistent flows, human errors and inefficiencies will be seen as the system is not able to keep up with policy driven initiatives, changes, and new program process developments. System will become outdated with no alternative solution.
3.1.3. Root Cause Analysis
The root causes for the variety of problems seen across all MSDIS functional activities are as follows:
1. Lack of robustness in COTS/GOTS (e.g., Microsoft Office Suite) applications to support the more complex aspects of USAF mission. Further, COTS/GOTS applications were not designed to manage the numerous data sets and millions of records required to adequately support the mission.
2. Difficulty and high expense of modifying aged legacy systems (e.g., D200 Requirements Management
System) as well as existing Enterprise solutions and/or initiatives (e.g., LIMS-EV, ESCAPE). Many of the Air Force legacy systems are designed on old programming standards and infrastructures that are not easily adapted to the ever changing supply chain processes. These systems cannot be modified to add-on new web capabilities without redesign of the entire system which is typically viewed as cost prohibitive.
3. Manpower constraints have exacerbated the problem because individuals are covering multiple workloads and it is progressively more difficult to keep up with processes that are manually intensive.
Further budget cuts and manpower restrictions will cause increasing problems. This drives the need for automation of business processes in the interest of time and efficiency.
4. Lack of standardized and streamlined operations due to Logistics transformation initiatives and the ever changing DoD operating environment which result in constant changes to existing business practices.
Each of these changes results in requirements for enhancement of the associated automated business solutions. This also creates difficulty in arriving at a resolved state with the information system.
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 8
3.1.4. DOTMLPF-P Constraints, “As-Is” State
DOTMLPF-P Analysis was conducted at the System level. Analysis specific to an individual module will be annotated separately within the table as needed.
Table 1 – DOTMLPF-P Constraints, “As-Is” State
Category Impact
Doctrine: No Doctrine constraints identified
Organization: Geographically separated organizations have extensive operations functioning under “Virtual” structures and bring significant operational challenges. Current material solution (MSDIS) allows for better cross functionality and collaboration across multiple locations. AFSC has extensive operations functioning under virtual organizational structures.
Training: No Training constraints identified.
Materiel: Current Material IT Systems do not provide complete solutions for current problems identified within the BCL.
Leadership and Education: While senior leadership are engaged in reforming strategies, strategic changes and educational advancements do not resolve information/data gaps or eliminate deficiencies that are addressed by this effort.
Personnel: Strategic personnel changes may allow full advantage of the information
/data offered by the system. However, personnel changes alone do not resolve the problems and capability gaps identified above. This system facilitates and magnifies the impact of proper personnel management but the system impact is not negated or lessened by personnel management.
Facilities: None identified
Policy: Policy changes alone have not been sufficient to maximize this capability. Current policy that drives requirements include the following by module:
DSCM AT: AFPD 21-1, AFMCI 21-130, AFMCI 21-101, AFMCI 21-
102, AFMCI 21-103, AFMCMAN 23-1, Centralized Asset
Management's (CAM) Logistics Requirements Determination Process
(LRDP) Guide and Handbook, AFSCMAN 20-101, AFI 21-102;
PDMC: AFMCI 23-205; SRRB: AFI 23-120; EMS: AFMAN 23-110,
AFMCMAN 23-1, AFMCMAN 23-2, DoD 4140.1R, AFMCI 20-102;
AFSC 20-102 Supplement (in draft); DFARS 217.75; & AFI23-101, AFMCR 400-21 . MFT: AFI 65-501, DoD 7000.14, AFI 23-101; MAT:
AFI 36-101, AFI 38-201, AFI 38-204, AFI 38-101, AFI 36-1004, AFI
44-107, AFMCI 36-603, AFMAN 36-203; MPST: Guidance
Memorandum 448 SCMW OI 63-118 for Safety of Flight – Analysis, 448 SCMW OI, TPS v4.2, 448 SCMW_EN, Policy on matching SE
Program and AFSC FM Goals, 448 SCMW OI 620118
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 9
3.2. “To-Be” Analysis
3.2.1. High-Level Outcomes (HLOs)
Table 2a – HLOs
SMP/DoD Goal or Objective HLO Title HLO Description
MSDIS SMP Goal 3:
Goal 3: Build agile and secure information capabilities
MSDIS IT and
Process Efficiencies
Standardize and streamline capabilities to provide consistent and efficient information assurance and business functionality.
MSDIS SMP Goal 3:
Goal 3: Build agile and secure information capabilities
MSDIS Data
Reliability
Automate data interfaces where available to ensure authorized source and fidelity.
SRRB SMP Goal 3:
Build agile and secure information capabilities
Records
Maintenance and
Disposition
Ensure templates and data are archived and user has access to archived data.
DSCM SMP Goal 3:
Build agile and secure information capabilities
Historic Look Back Create ability to look backward up to
24 months to identify whether supportability issues that currently exist were present in the past, as well as determining whether previously identified adverse trends have been wholly corrected.
DSCM SMP Goal 3:
Build agile and secure information capabilities
Single Look
Capability for Items in a Focus Area
Generate a single-page look that includes all end-items relevant to a particular focus area—either
Exchangeables, aircraft, or whole engines.
DSCM SMP Goal 3:
Build agile and secure information capabilities
Notification of
Supportability
Changes
Generate automatic e-mails to notify users of changes in the status of key issues related to parts they have identified as critical for oversight.
DSCM SMP Goal 3:
Build agile and secure information capabilities
Assignment of
PDNs and BOMs to
Aircraft
Expand ability to assign PDNs /
BOMs to an aircraft, including assigning multiple BOMs or removing BOMs.
DSCM SMP Goal 3:
Build agile and secure information capabilities
Short-to-Need
Report
Expand / modify the information used in the calculations and create linkages from the results / analysis pages to other relevant pages within DSCM
AT
DSCM SMP Goal 3:
Build agile and secure information capabilities
User Permissions Ensure ability to apply specific responsibilities and authorities to users, based on their function within the depot support process.
DSCM SMP Goal 3:
Build agile and secure information capabilities
Ability to Customize
Based on Daily
Standard Work and
Changes to Business Processes
Update formatting within tool to allow for creation of additional drop downs, filters, columns etc.
PDMC SMP Goal 3: End to End solution Ensure process collaboration from
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 10
Build agile and secure information capabilities for PDMC Process customer submission to generation of the DDE (supply plan); produce reports and queries to support analysis and review of data and facilitate AF/DLA collaboration and allow for Continuous Process
Improvement.
MFT SMP Goal 2:
Strengthen DoD financial management to respond to
Warfighter needs and sustain public confidence through auditable financial statements
Distribute and
Forecast Funds to the Lowest Levels
Expand the distribution and forecasting modules to allow funds management down to the lowest funding, accounting, forecasting level within the fund type and affected organization. Build levels of indenture by fund type and organization that allows distribution to the lowest feasible level and aggregation to the levels required for management.
MFT SMP Goal 2:
Strengthen DoD financial management to respond to
Warfighter needs and sustain public confidence through auditable financial statements
Automation of
Closeout Process
Expand tracking capabilities MFT to include automated tracking of remaining execution requirements, spend plans, and funds balances.
Incorporate near-real-time data already resident in the system with end-of-year execution plans to effectively track obligations and provide reports.
MFT SMP Goal 2:
Strengthen DoD financial management to respond to
Warfighter needs and sustain public confidence through auditable financial statements
Add Additional
Fund Types for
NIIN level Tracking
Expand capability to track NIIN level execution for all materiel funds. Incorporate all fund type requirements into the requirements tracking module and systematically track execution from final requirement through Purchase
Instrument, obligation, and expenditure of funding.
MFT SMP Goal 2:
Strengthen DoD financial management to respond to
Warfighter needs and sustain public confidence through auditable financial statements
Scale for Additional
AF/Non AF Users
Develop for expansion of datasets to continue to incorporate additional organizational levels and core program restructuring required to align with current code standards following a .Net infrastructure and enhanced Object Oriented
Programing.
MFT SMP Goal 2:
Strengthen DoD financial management to respond to
Warfighter needs and sustain public confidence through auditable financial statements
Ability to Customize
Charts, Reports, and datasets
Increase user control of datasets.
Develop user determined, customizable reports, and custom queries capabilities.
MAT SMP Goal 3: Ability to Customize Increase user control of datasets.
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 11
Build agile and secure information capabilities
Charts and Reports and datasets
Develop user determined, customizable reports, and custom queries capabilities.
MAT SMP Goal 3:
Build agile and secure information capabilities
Scale for Additional
AF/Non AF Users
Develop for expansion of datasets to continue to incorporate additional organizational levels and core program restructuring required to align with current code standards following a .Net infrastructure and enhanced Object Oriented
Programing.
MAT SMP Goal 3:
Build agile and secure information capabilities
Standardize
Overtime and
Comp-time
Tracking
Develop overtime/comp-time management functionality to include formal requests, approvals, tracking, management, and usage.
MAT SMP Goal 3:
Build agile and secure information capabilities
Automate Tracking of Resources
Assigned to
Personnel
Automate tracking of assigned assets by linking assigned assets to assigned personnel within the manpower tracking system. Create attributes under each personnel record for the inclusion of assigned equipment/resources.
MPST SMP Goal 3:
Build agile and secure information capabilities
Ability to Provide
Required
Information for TPS
Projects
Develop TPS specific forms for project execution tracking and reporting.
MPST SMP Goal 3:
Build agile and secure information capabilities
Customize and
Manipulate within
Process Functions
Add, delete, improve data elements within selected forms to facilitate change of business rules.
MPST SMP Goal 3:
Build agile and secure information capabilities
Search Project
Fields
Create multiple field search criteria.
MPST SMP Goal 3:
Build agile and secure information capabilities
Upgrade to .Net
Infrastructure
Re-code module from current infrastructure to .Net infrastructure.
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 12
Table 2b – HLOs and Measurement Criteria
HLO Title
Measurement Criteria
Benefits Risks Assumptions (A), Constraints (C), Dependencies (D) Measurement
Current
(Baseline)
Value
Targeted
Threshold
Value
Targeted
Objective
Value
MSDIS IT and
Process
Efficiencies
Automated process vs.
Manual processes
Current manual processes are time consuming and introduce human errors
Automate personnel notification;
Improve communicatio n and collaboration;
Updates to daily standard work processes
Fully automate capability and government controlled modifications to business processes
Minimize dependence on contractor support for business process changes and workflow activities
Human error, time consuming processes and dependence on contract support
A. Constantly changing IT environment and support
C. Resources, funding and constantly changing business rules and standards
D. Funding approval and contract support
MSDIS Data
Reliability
Data is received directly from the
Authoritative
Data Source
(ADS)
Data is received through manual processes and/or file dumps
75% data transmitted automatically from ADS.
Remaining obtained manually from
ADS.
100% data transmitted automatically from ADS
100% reliable, authoritative data
Human error, data integrity and reliability
A. Determination of ADS and approval process
C. Determination of ADS and approval process
D. Confirmation of ADS and approval to implement functionality
Record
Maintenance
Disposition
(SRRB)
Limited access to archived records and access requires contract support
Government access to current, immediate access to current year and last year’s data.
Government access current and immediate access to current year
+3 years
Government access current and immediate access to current year +
6 yrs
Past looks to determine accuracy and meet requirements of dispositions
Cannot access data resulting in negative audit results
A. Increase storage capacity
C. Storage capacity. Format must be maintainable.
D. Formatting must be user friendly and maintainable
Historic Look
Back (DSCM
AT)
Number of months in the past that users can see supportability status of items of interest
Current month only
12 months 24 months Be able to identify whether supportability issues that currently exist were present in the past, as well as determining whether previously identified
Inability to store and retrieve necessary data to cover a 24 month period; ability to manipulate past data within the tool without affecting present day supportability
A. Necessary data sources will be (and remain) available
C. N/A
D. Must complete the requirements definition of business rules for this process
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 13 adverse trends have been wholly corrected analyses
Single Look
Capability for
Items in a Focus
Area (DSCM
AT)
Number of focus areas with functional single-look capability
(from 0 to 3 with the possible areas being
Exchangeables, Aircraft, and
Whole
Engines)
No current capability
Two focus areas (Aircraft and
Exchangeable s)
All three focus areas
Enable users to conduct analysis across the entire range of end-items in the focus area (including visibility on associated components), leading to identification of trends causing non-supportability or selection of a particular segment of the focus area for deeper analysis
Computational capability to handle the very high volume of data to support the large number of end-items on a single-look page;
A. Necessary data sources will be (and remain) available
C. Possible hardware (server, etc.)
limitations (see Risks)
D. Must complete the requirements definition of business rules for this process
Notification of
Supportability
Changes (DSCM
AT)
Percentage of times changes to designated information is automatically reported to subscribing stakeholders
0% 70% 90% Enable a supply chain stakeholder to effectively monitor a large number of critical parts to support uninterrupted depot production
Possible problems with automatic e-mail notifications going to multiple domains (.us.mil, .dla.mil, etc.)
A. Must be able to capture e-mail addresses of stakeholders subscribing to automatic notification for a particular end-item or component
C. N/A
D. Must complete the requirements definition of business rules for this process
Assignment of
PDNs and BOMs to Aircraft
(DSCM AT)
Percentage of
MDSs with ability to effectively manipulate
PDNs / BOMs assigned to them (e.g., assign multiple
PDNs to an aircraft coming in for multiple repairs, remove
0% 70% 100% Provide more accurate parts supportability assessments for depot aircraft repairs and improve the effectiveness of
DSCM analysts supporting them
Uncertainty whether current programming language will support this functionality
A. Necessary data sources will be (and remain) available
C. N/A
D. Must continue to receive latest version of PDNs / BOMs for each MDS from AFLCMC Program Offices (either directly or via G005M)
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 14
PDNs from weapon systems when they are no longer valid, etc.)
Short-to-Need
Report (DSCM
AT)
Percentage of data fields on
Short-to-Need report that are accurate and percentage of necessary linkages that function correctly
35% on data accuracy;
50% on linkages
80% for each 100% for data
90% for linkages
Make the short-to-need analysis more valuable for supply chain stakeholders and will make execution of the analysis more efficient
Unclear or incomplete definition of data linkage requirements
A. Necessary data sources will be (and remain) available
C. N/A
D. N/A
User Permissions
(DSCM AT)
Percentage of users appropriately limited by the role they have been assigned
0% 90% 100% Enable the tool to authorize only people with a validated need and responsibility to make changes to specific areas of the tool (e.g., planners have authorization to make changes to bills of material, but other basic users will not, etc.)
Ability for the tool to handle cases where multiple roles are assigned to a single user
A. Responsibilities and authorities will be defined for each identified role and the role for each user will be assigned by their supervisor
C. N/A
D. Business rules must be provided identifying the responsibilities and authorities for each designated role
Ability to
Customize Based on Daily
Standard Work and Changes to
Business
Processes
(DSCM AT)
Percentage of requested updates completed and remaining fully functional
0% 75% 90% Allow users to more effectively use results presented for analysis purposes
Ability to handle multiple “sort” operations on a single screen
A. Necessary data sources will be (and remain) available
C. N/A
D. N/A
End to End
Solution for
PDMC Process
PDMC
automated process tool
No existing automated solution
90% automation of
PDMC
100% automation of
PDMC
Right parts on the shelf in support of depot
Inaccurate forecasts to DLA
A. Access to data sources in a timely manner
C. Scheduling and approval process.
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 15
(PDMC) process process repair and field
TCTO
requirements
Definition of business rules
D. Data feeds and refined clarification of business rules
Automation of
Closeout
Process (MFT)
Elimination of manual closeout execution tracking
Daily summary documents beginning on/around 1
Aug
Weekly summary documents vs.
daily
Fully integrated item level tracking within the system
Man-hour savings in excess of 1,000 per closeout cycle;
Improved funding distribution;
Improved accuracy of funding distribution
Increased dependence on
A: Available server support will meet anticipated demand
A: Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Distribute and
Forecast Funds to the Lowest
Levels (MFT)
Fund and forecast visibility down at lowest organization level
Squadron
Level visibility
RCCC and execution level visibility
RCCC and execution level visibility
Improved visibility of forecast, allocations, and balances;
Improved funds management;
Increased complexity;
Additional requirements to manage additional levels
A: Available server support will meet anticipated demand; Government personnel training will be available;
Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Add Additional
Fund Types for
NIIN level
Tracking (MFT)
Integration of requirements spanning materiel support
0% Repair
Requirement s integrated
100%
Contract
Repair
Requirements
100%
Remaining applicable
Materiel fund types
- Validate statutory requirements for
Purpose, Time, and Amount
- Proactive track funds execution
- Increased dependence on single system
A: Available server support will meet anticipated demand
A: Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Ability to
Customize
Charts, Reports, and datasets
(MFT)
User capability to manage organizational changes
10% User management enabled
25% of common datasets user customizable
80% of common datasets user customizable
- Ability to respond to visibility changes without code changes
- Ability to adapt to organizational changes without code changes
- Increased demands on the user/super-users/functional experts
A: Available server support will meet anticipated demand
A: Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Scale for
Additional
AF/Non AF
Percentage increase of registered
224 current users
10% increase 20% increase - Increase in standardized FM data usage
- Increased dependence on single system
A: Available server support will meet anticipated demand
A: Contract support will be funded
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 16
Users (MFT) users
- Decrease in usage of non-standard system data data C: Contract scope is sufficient
D: Infrastructure is able to support
Standardize
Overtime and
Comp-time
Tracking (MAT)
New functionality enabled
0% 100% Comp-time management enabled
100%
Overtime management enabled
- Manual paperwork eliminated
- Accuracy improved
- Automated follow-up enforced
- Increased dependence on single system data
A: Available server support will meet anticipated demand
A: Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Automate
Tracking of
Resources
Assigned to
Personnel (MAT)
New functionality enabled / key assets linked to personnel data
0% Key assets linked to Personnel data
25% 100% - Improved asset accountability
- Reduced asset loss
- Increased dependence on single system data
A: Available server support will meet anticipated demand
A: Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Ability to
Customize
Charts and
Reports and datasets (MAT)
User capability to manage organizational changes
12% User management enabled
25% of common datasets user customizable
80% of common datasets user customizable
- Ability to respond to visibility changes without code changes
- Ability to adapt to organizational changes without code changes
- Increased demands on the user/super-users/functional experts
A: Available server support will meet anticipated demand
A: Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Add Additional
Users (MAT)
Number of registered users
858 current users
25% increase 50% increase - Increase in standardized personnel data usage
- Decrease in usage of non-standard system data
- Increased dependence on single system data
A: Available server support will meet anticipated demand
A: Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Ability to
Provide Required
Information for
Required information
Not available
0% 100% 100% -Comply with new regulation
-Reduce human
-Additional audit finding A: Available server support will meet anticipated demand. Contract support will be funded
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 17
TPS Projects
(MPST)
versus
Available error
-Make official record
C: Contract scope is sufficient
D: Infrastructure is able to support
Customize and
Manipulate within Process
Functions
(MPST)
Required information
Not available versus
Available
0% 100% 100% -Comply with new regulation
-Reduce human error by standardizing across all project types
-Audit finding will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Search Project
Fields (MPST)
Percentage of downloadable custom searches
0% 75% 100% -Increase usability
-Decrease workload on programmers
- A: Available server support will meet anticipated demand. Contract support will be funded
C: Contract scope is sufficient
D: Infrastructure is able to support
Upgrade to .Net
Infrastructure
(MPST)
Code compliance with .Net structure
0% 25% 100% - Scalable
- Homogenous across current coder skillsets
- Ever changing mandated restrictions
A: Government system and process requirements will not negate .Net benefits
C: Contract scope is sufficient
D: Infrastructure is able to support
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 18
3.2.2. Business Process Re-Engineering (BPR)
Table 3a – Business Outcomes
HLO Title Business Outcome Business Outcome Definition
MSDIS IT and Process
Efficiencies
1. Ensure government access to updates for daily standard work
Ability to manipulate and update process functions and user access
2. Automated notification Automate notifications to allow for collaboration and information flow
3. Comply with DoD and AF directed initiatives
Allow changes in the system due to organizational structure and business process changes
4. Standardized reporting functionality
Ability to export/download /print/produce reports, metrics and briefings
MSDIS Data Reliability 1. Automated ADS Automate transmission of ADS to ensure reliability and fidelity
Records Maintenance and
Disposition (SRRB)
1. Establish a historical records repository
Establish archiving and records maintenance processes to ensure authentication, audibility and accessibility for all required users as needed
Historic Look Back (DSCM
AT)
Conduct supportability analyses based on data from previous months, up to
24 months prior
Will provide users the ability to access and process in the tool necessary information from the past in order to identify supportability issues that existed in that time-frame
Single Look Capability for
Items in a Focus Area (DSCM
AT)
Establish a single page analysts can go to in order to get a holistic understanding of parts supportability issues in one of three areas of interest
Will provide all information on a single page needed for analysts to look across the entire range of end-items in the focus area (including visibility on associated components) to identify potential parts supportability problems
Notification of Supportability
Changes (DSCM AT)
Manage supportability assessments for a large number of end-items
Will provide subscribers an automatic notification of changes in the status of key issues related to parts they have identified as critical for oversight, enabling them to manage parts by exception when changes occur if they so choose
Assignment of PDNs and
BOMs to Aircraft (MDS)
(DSCM AT)
Provide users greater agility in how they manage assignment of PDNs /
BOMs to a MDS
Will create the ability to assign multiple PDNs to an aircraft coming in for multiple repairs, remove PDNs from weapon systems when they are no longer valid, etc.
Short-to-Need Report (DSCM
AT)
1. Provide accurate insights on parts that are not fully supportable
Will expand / modify the information used in the short-to-need calculations and depicted on the results page
2. Provide short to need information to other modules in the tool to support full-spectrum supportability analysis
Will create proper linkages from the results / analysis pages to other relevant pages within DSCM AT
User Permissions (DSCM AT) Provide high-fidelity parts supportability analysis for depot operations by limiting data-change access to appropriate users
Will limit the areas a user can make changes in to only those for which they are responsible to provide information assurance
Ability to Customize Based on
Daily Standard Work and
Optimize usability of the tool Will adjust formats of header information, display additional data, and provide additional filter and / or drop-down capability
Business Case: MSDIS, Version FY15 1.1, 21 April 2015 19
Changes to Business Processes
(DSCM AT)
End to End Solution for
PDMC Process (PDMC)
1. Reports Generation Produce reports and queries to support analysis and review of data and facilitate AF/DLA collaboration
2. Assign PDNs and BOMs to aircraft
Expand ability to assign PDNs / BOMs to an aircraft, including assigning multiple BOMs or removing BOMs.
3. Improved Piece Part forecast Accept requirements changes and apply them against BOMs , supply demands and end item requirements for piece part forecasts
4. Revised requirements forecasts built on “what if” analysis and results
Ability to change requirement variables and see the impact to the forecast requirement
Automation of Closeout
Process (MFT)
Automate management of fiscal year-end closeout
Will provide a single source for identification, reporting, execution of remaining executable requirements (materiel buy, repair, and overhead). Will enable the reallocation of funding across the using organization to meet execution requirements.
Distribute and Forecast
Funds to the Lowest Levels
(MFT)
Increase resolution of funding visibility
Increase levels of delineation and aggregation within the funding distribution, forecasting, and execution tracking. Enable visibility down to lowest level of funds execution. Enable discrepancy identification down to the lowest level of the organization.
Add Additional Fund Types for NIIN level Tracking
(MFT)
Enable materiel execution tracking at the NIIN level
Establish connection between Purchase Instruments and NIIN level materiel repair requirements. Enable the automated tracking of NIIN level execution from finalization of formal requirements through obligation and expenditure.
Ability to Customize Charts, Reports, and datasets (MFT)
Increase user enabled customization Develop capabilities to enable user/super-user/functional experts to customize datasets within the system to enable custom reports/views/ and ability to adapt to organizational…