FY14 Business Case - AEIS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA825016R0011-0003.pdf | ||
| Labor_Rate_Matrix.xlsx | XLSX spreadsheet | |
| Questions_and_Answers.docx | DOCX document | |
| UPDATED_IS3_Section_L_and_M.docx | DOCX document | |
| Questions_and_Answers.docx | DOCX document | |
| FY14_AEIS_-_Business_Process_Reengineering.docx | DOCX document | |
| Updated_Section_L_and_M.docx | DOCX document | |
| FY15MSDISProblemStatement.pdf | ||
| FY14_Busines_Case_-_MSDIS.docx | DOCX document | |
| Updated_PWS.docx | DOCX document | |
| FA825016R0011_0002.pdf | ||
| MSDIS_Information_Support_Plan.pdf | ||
| R011CoverLetter.pdf | ||
| FA825016R0011-0001.pdf | ||
| FA825016R0011.pdf | ||
| DD254.pdf | ||
| R0011_IS3_Section_Land_M_20180824.pdf | ||
| R0011ContractDataRequirements.pdf | ||
| R011_Cover_Letter.pdf | ||
| R011_IS3_NETCENTS_PWS_20160817.pdf | ||
| Labor_Rate_Matrix.xlsx | XLSX spreadsheet | |
| R0011WageDetermination.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of the Air Force
748 Supply Chain Management Group
AFSC Enterprise Information System (AEIS)
Business Case
Version 1.3
21 November 2013
Based on Business Case Template Version 3.0, May 2012
Document Revision History
| Version |
| Date |
| Summary of Changes |
| Version 1.0 |
| 19 Aug 2013 |
| Initial submission of sections 1-3 as required. |
| Version 1.1 |
| 20 Sep 2013 |
| Incorporate Comments |
| Version 1.2 |
| 17 Oct 2013 |
| Incorporate Tiger Team inputs |
| Version 1.3 |
| 21 Nov 2013 |
| Updated Signatures |
Table of Contents
| Section 1. | Executive Summary | 2 |
| Section 2. | Introduction | 2 |
| 2.1. | Purpose | 2 |
| 2.2. | Background | 2 |
| Section 3. | Problem Statement | 3 |
| 3.1. | “As-Is” Analysis | 3 |
| 3.1.1. | The Problem | 3 |
| 3.1.2. | Problem Description and Context | 3 |
| 3.1.3. | Root Cause Analysis | 4 |
| 3.1.4. | DOTMLPF-P Constraints, “As-Is” State | 5 |
| Table 1 – DOTMLPF-P Constraints, “As-Is” State | 5 | |
| 3.2. | “To-Be” Analysis | 6 |
| 3.2.1. | High-Level Outcomes (HLOs) | 6 |
| Table 2a - HLOs | 6 | |
| Table 2b – HLOs and Measurement Criteria | 7 | |
| 3.2.2. | Business Process Re-Engineering (BPR) | 8 |
| Table 3a – Business Outcomes | 8 | |
| Table 3b – Business Outcomes and E2E Alignment (“To-Be” State) | 9 | |
| Table 3c – Business Outcomes and Measurement Criteria (“To-Be” State) | 10 | |
| 3.2.3. | DOTMLPF-P Impact, “To-Be” State | 11 |
| Table 4 – DOTMLPF-P Impacts, “To-Be” State | 11 | |
| 3.3. | Recommended Course of Action | 11 |
| 3.4. | Rough-Order-of-Magnitude (ROM) Cost Estimate | 12 |
Business Case: AFSC Enterprise Information System Version 1.2, 17 October 2013 i Problem Statement Signature
Functional Sponsor: Date:
KATHRYN J. JOHNSON, Brig Gen, USAF Director of System Integration DCS/Logistics, Installations & Mission Support
Problem Statement Approval
IRB Chair: Date:
ELIZABETH A. MCGRATH
Vice Chair Defense Business Systems Management Committee
Business Case: AFSC Enterprise Information System Version 1.20, 17 October19 August 2013 1 Executive Summary AEIS is an Air Force web-based CORE system, workflow tool and set of collaboration capabilities that were designed to support key logistics enabling functions to include: finance, human resources , and engineering management within the Supply Chain Management community. Primary capabilities include: 1) enhancing financial visibility and analytical support by integrating data from legacy financial systems with budget, distribution, forecast, and execution management functionality; 2) human resource management data validation, correction, and automation supporting vacancy fill requests, human resource authorizations, and the appraisal process; 3) Reliability and Maintainability R&M engineering decision support for the 86K unique assets under Consolidated Sustainment Activity Group-Supply (CSAG-S) management. Benefits to the mission include massive automation of manual processes, significant manpower savings, standardized analytical models, a forum to collaborate narratives and manage priorities, consistent data used across the user community, and automated error identification. Additional benefits include end-to-end management of logistics enabling functionality following the lifecycle of depot level reparable assets from acquisition budgeting, sustainment budgeting, engineering for R&M improvement, and managing the personnel resources to insure the logistical mission of getting the right parts to the right place at the right time. These capabilities directly support lifecycle supply chain management (acquisition & sustainment) within Working Capital Fund CSAG-S management.
ROM Cost Estimate: AEIS FY14 modernization efforts only are estimated to be approximately $366,000.
Introduction Purpose Obtain Investment Review Board (IRB) Chair approval of the above described Problem Statements to receive funding required to resolve the identified problems. Full system assessment was conducted during the Business Process Re-Engineering (BPR) Exercise for the Fiscal Year (FY)14 National Defense Authorization Act (NDAA) Organization Execution Plan (OEP) submission.
Background AEIS is currently organized under AFSC; however its user base expands across all MAJCOMs, Air Logistics Complexes, HQ Air Force Materiel Command (AFMC), Air Force Life-Cycle Management Center (AFLCMC), and Depot Maintenance organizations. Users include but are not limited to Financial Managers, Commodity Program Managers, Funds Holders, Item, Equipment Specialists, Resource Control Officers, Engineers, Financial Analysts, Resource Managers and Supervisory Personnel. AEIS configuration and development meets Department of Defense (DoD) and Air Force required standard of quality. Quality expectations include non-quantifiable elements of usability and intuitive design as well as quantifiable measures of uncompromised data accuracy and reliability. The overall expectation for financial data is 100% accuracy based on transaction level data reflected in legacy financial systems with automated discrepancy notification to trigger resolution.
Historically, status quo of the current capabilities often represents manual processes that are both time consuming and unreliable as it relates to the required data. AEIS not only speeds the business process and decreases cost, but also delivers a more secure and agile service with an enhanced quality of process. AEIS has transformed business process from the inefficient batch process flow into a synchronized near real-time flow providing quicker access to accurate and near real-time information through streamlined data routing, thereby increasing the quality of decision making. The business processes are more visible, so the process and its operational quality are more transparent, better measured and better managed. While offering the return on investment of an integrated single system, multi-modules allows AEIS to adopt business processes for each module without impacting any of the processes of other modules. Return on investment is extended to that of simpler operations, better support, and easier maintenance. Applying this methodology of standardization across the different modules provides benchmarking data that can be used to compare processes. Standard interfaces and open standards are built to make it easier to integrate processes. AEIS allows an accurate and centralized consolidation of information gathered from various sources. Following standard practices and abiding to industry standard processes and application development helps create a better integrated environment. This reduces the need for custom code, but also allows the use of software generic templates and interfaces with only minor configuration changes. An integrated system provides the most effective data and information storage, and thereby, improves the efficiency and reliability of business processes.
Problem Statement “As-Is” Analysis The Problem Financial Management Functionality - Metric Financial Tool (MFT) Module Problem: Scalability to support additional users based on additional demand for support as well as flexibility in data displayed to correspond to perspective of new users.
Vision: Development for expansion of datasets to incorporate more organizational levels across the AFSC scope of operations, datasets outside traditional AFSC Area of Responsibility to increase customer base and user visibility, expanding metrics/charts automation and ad-hoc/custom generation, predetermined baseline sets, systematic upgrades, and core program restructuring required to align with current code standards following a .Net infrastructure and enhanced Object Oriented Programing.
Human Resource Management - Manpower Analysis Tool (MAT) Module Scalability to support additional users based on additional demand for support as well as flexibility in data displayed to correspond to perspective of new users.
Vision: Development for expansions of datasets to support a broader user base, enhanced metrics reporting similar in scope to requirements within the MFT module, systematic upgrades and core programming restructuring required to align with current code standards following a .Net infrastructure and enhanced Object Oriented Programing.
Reliability & Maintainability Engineering Management - MSD/GSDMPST Module Problem: Development for expansion of datasets to support business process changes resulting from policy changes, enhanced metrics reporting, and process management traceability within the system to step end-user through various business process scenarios.
Vision: Design and function changes to adapt to unanticipated user requirements on limited basis. Minimal functional development is anticipated at this time.
Problem Description and Context From a strategic perspective and in order to continue to support the AF Logistic community AEIS requires the capability for increased versatility, higher performance, and greater efficiency as user base expands to include a wider enterprise. Logic of software required for decisions to be implemented with speed and accuracy without the human operator in the decision-making loop. AEIS also requires the capability to support business process changes resulting from policy changes, enhanced metrics reporting, and process management traceability within the system to step end-user through various business process scenario. The contexts in which these problems affect the AEIS modules are described below.
MFT Module – Metrics Financial Tool: the Consolidated Sustainment Activity Group – Supply (CSAG-S) Working Capital Funds have historically been managed using Microsoft Office applications and processes that are manual intensive. Considerable manpower is spent extracting financial data from multiple legacy systems, summarizing the results and reporting progress to management officials. Manual transcription errors are common. Further, there are numerous financial data calls throughout the year (e.g., critical unfunded) that require significant resources to collect data, summarize the result, and brief management. Measuring financial goals and execution against those goals is all accomplished manually. Financial management processes are non-standardized across the enterprise. This has occurred because each location has its own way of doing business MAT Module – Human Resource Tool: human resource data critical to leadership in order to adequately support their mission are scattered between large legacy systems and locally developed Excel spreadsheets. Individuals spend more time collecting data and populating spreadsheets than they do analyzing their manpower resources and making decisions on how to better manage the limited human resources. The annual appraisal and feedback process is largely manual and dependent on cumbersome spreadsheets to accumulate and disburse information. Information to ensure FIAR complicance is not maintained in a single location and readily available. Many of these problems have occurred because Microsoft Office applications are not robust enough for our mission and legacy systems do not provide necessary capabilities.
MPST Module – Engineering Project Management: Configuration management and control is a significant problem associated with this process because it is managed using Access databases and manual spreadsheets that multiple individuals contribute to without a method of version control, which causes confusion over which version is current. Human error and time is wasted for each individual that must track and update. The database is manually populated by manually transcribing data from multiple legacy systems which takes considerable time and introduces human transcription error. Significant manual effort is required to prioritize the projects for funding and for tracking the execution of the funds.
Root Cause Analysis The root causes for the variety of limitations and related opportunities seen across all functional activities are as follows:
1. Lack of robustness in COTS/GOTS (e.g., Microsoft Office Suite) applications. Personnel are capable of using many of these applications; however the tools were not designed to support the more complex aspects of USAF mission. Joint use of these applications using share drives is an option, but requires Enterprise Information Technology Data Repository (EITDR) registration, certification & accreditation and significant documentation that far exceed the benefit that could be derived. Further, COTS/GOTS applications were not designed to manage the numerous data sets and millions of records required to adequately support the mission.
2. Legacy systems are difficult and expensive to modify. Many of the Air Force legacy systems are designed on old programming standards and infrastructures that are not easily adapted to the ever changing supply chain processes. These systems cannot be modified to add-on new web capabilities without redesign of the entire system which is cost prohibitive.
3. Manpower constraints have exacerbated the problem because individuals are covering multiple desks and it is progressively more difficult to keep up with processes that are manual intensive. This drive the need for automation of business processes in the interest of time and efficiency.
DOTMLPF-P Constraints, “As-Is” State Table 1 – DOTMLPF-P Constraints, “As-Is” State DOTMLPF-P Analysis was conducted at the System level. Analysis specific to an individual module will be annotated separately within the table as needed.
| Category |
| Impact |
| Doctrine: |
| Module design supports current Doctrine. DoD7000.14-R, AFI 65-601, AFI 23-101 |
| Organization: |
| AFSC has extensive operations functioning under virtual organizational structures. Geographically separated operational locations bring significant operational challenges. |
| Training: |
| Decentralized user base. Functions targeted for improvement with the module are inconsistent with resolution based on training. Objectives of the module include providing information not available without system involvement. |
| Materiel: |
| Current Materiel IT Systems do not provide complete solutions for current problems identified within the BCL. |
| Leadership and Education: |
| While senior leadership are engaged in reforming strategies, strategic changes and educational advancements do not resolve information/data gaps or eliminate deficiencies that are addressed by this effort. |
| Personnel: |
| Personnel / workload imbalance shifts focus on task completion and limits analysis. Strategic personnel changes may allow full advantage of the information /data advantages offered by the system. However, personnel changes alone do not resolve the information and capability gap identified above. |
| Facilities: |
| The envisioned process solution does not require investment in facilities. |
| Policy: |
| Policy changes alone have not been sufficient to maximize this capability, close the functional gaps, and invalidate the system advantages. |
“To-Be” Analysis High-Level Outcomes (HLOs) Table 2a - HLOs
| SMP/DoD Goal or Objective |
| HLO Title |
| HLO Description |
Strategic Management Plan (SMP) for MFT
Standardize available toolsets across enterprise user community Goal 2: Strengthen DoD Financial Management
| Scalability to support MFT user base increase |
| Expansion of datasets to incorporate more organizational levels across the AFSC scope of operations to include datasets outside traditional AFSC AOR to increase customer base and user visibility. In addition, development to expand metrics/charts automation to include ad-hoc/custom generation as well as predetermined baseline sets. In addition, systematic upgrades and core program restructuring are required to align with current code standards following a .Net infrastructure and enhanced Object Oriented Programing. Results include standardizing and automating processes for a larger user base and expanding analysis and improving decision support. |
SMP for MAT
Standardize available toolsets across enterprise user community Goal 3: Build Agile and Secure Information Capabilities
| Scalability to support MAT user base increase |
| Expansions of datasets to support a broader user base as well as enhanced metrics reporting similar in scope to requirements within the MFT module. In addition, systematic upgrades and core programming restructuring are required to align with current code standards following a .Net infrastructure and enhanced Object Oriented Programing. Results include standardizing and automating processes for a larger user base and expanding analysis and improving decision support. |
SMP for MPST
Goal 3: Build Agile and Secure Information Capabilities
| MPST Unanticipated User Requirements and scalability to support |
| Functional and Design changes to accommodate changing business processes and/or unidentified user requirements. Results include standardizing and automating processes for a larger user base and expanding analysis and improving decision support. |
| Business Case: AFSC Enterprise Information System Version 1.20, 17 October19 August 2013 | 6 |
| HLO Title | |
| Measurement Criteria | |
| Benefits | |
| Risks | |
| Assumptions (A), Constraints (C), Dependencies (D) |
| Measurement |
| Current (Baseline) Value |
| Targeted Threshold Value |
| Targeted Objective Value |
Scalability to support MFT user base increase
| Number of registered users |
| 201 |
| 230 |
| 240 |
| - Increase in standardized FM data usage |
- Decrease in usage of non-standard system data
| - Increased dependence on single system data |
| A: Available server support will meet anticipated demand |
A: Contract support will be funded C: Contract scope is sufficient D: Infrastructure is able to support
Scalability to support MFT user base increase
| Code compliance with .Net structure |
| 0% |
| 25% |
| 100% |
| - Scalable |
- Homogenous across current coder skillsets
| - Ever changing mandated restrictions |
| A: Government system and process requirements will not negate .Net benefits |
C: Contract scope is sufficient D: Infrastructure is able to support
| Scalability to support MAT user base increase |
| Number of registered users |
| 837 |
| 855 |
| 900 |
| - Increase in standardized personnel data usage |
- Decrease in usage of non-standard system data
| - Increased dependence on single system data |
| A: Available server support will meet anticipated demand |
A: Contract support will be funded C: Contract scope is sufficient D: Infrastructure is able to support
| Scalability to support MAT user base increase |
| Code compliance with .Net structure |
| 0% |
| 25% |
| 100% |
| - Scalable |
- Homogenous across current coder skillsets
| - Ever changing mandated restrictions |
| A: Government system and process requirements will not negate .Net benefits |
C: Contract scope is sufficient D: Infrastructure is able to support
| MPST Unanticipated User Requirements |
| Number of registered users |
| 633 |
| 160 |
| 793 |
| - Retention of user base supports functionality meeting objectives |
| - Dependence on single system data |
| A: Available server support will meet anticipated demand |
A: Contract support will be funded C: Contract scope is sufficient D: Infrastructure is able to support
Table 2b – HLOs and Measurement Criteria
Business Case: AFSC Enterprise Information System Version 1.20, 17 October19 August 2013 7 Business Process Re-Engineering (BPR) Table 3a – Business Outcomes
| HLO Title |
| Business Outcome |
| Business Outcome Definition |
Scalability to support MFT user base increase
| 1. Employment of durable / scalable .Net code |
| Updated code standard to allow improved scalability, design, interoperability, and code consistency across applications. |
Facilitate centralized data source management Reference BPR Submission 2014 AEIS - Business_Process_Reengineering_Assessment_Form_Version2_4 and ACART Assertions are Posted AFAR SharePoint
Scalability to support MAT user base increase
| 1. Employment of durable / scalable .Net code |
| Updated code standard to allow improved scalability, design, interoperability, and code consistency across applications. |
Facilitate centralized data source management Reference BPR Submission 2014 AEIS - Business_Process_Reengineering_Assessment_Form_Version2_4 and ACART Assertions are Posted AFAR SharePoint
| MPST Unanticipated User Requirements |
| 1. Meet user requirements within an ever changing engineering management environment |
| Retain existing using community |
Grow using community Reference BPR Submission 2014 AEIS - Business_Process_Reengineering_Assessment_Form_Version2_4 and ACART Assertions are Posted AFAR SharePoint
Table 3b – Business Outcomes and E2E Alignment (“To-Be” State)
| Business Outcome |
| E2E/BEA Perspective |
| Business Flow |
| Business Process |
| Business Capability |
| MFT - Employment of durable / scalable .Net code |
| Cost Management (CM) |
Perform Cost Assignment
Develop Cost Reports Compare Forecast to Actual Performance
Compare Results to Performance Measurement Criteria
Conduct Research
Consolidate and Interpret Results
Conduct Oversight Analysis
Formulate Report Manage Financial Assets and Liabilities
Forecast, Plan, Program, Budget and Funds Distribution and Control
Financial Reporting
| MAT - Employment of durable / scalable .Net code |
| Cost Management (CM) |
Perform Cost Assignment
Develop Cost Reports
Hire-to-Retire Manage Travel
Sustain Human Resources
Manage Human Resources Compensation and Reimbursements
Manage Travel
Manage Human Resources Information Manage Travel
Manage Personnel Sustainment
Manage Compensation and Reimbursement
Manage Travel
Manage Human Resource Information
| MPST - Meet user requirements within an ever changing engineering management environment |
| Cost Management (CM) |
Perform Cost Assignment
Develop Cost Reports
Concept-to-Product
Develop Product/Project Concept Compare Forecast to Actual Performance
Conduct Research
Consolidate and Interpret Results
Conduct Oversight Analysis
Formulate Report
Collect and analyze Requirements Forecast, Plan, Program, Budget and Funds Distribution and Control
Financial Reporting
Financial Reporting
Manage Financial Assets and Liabilities
Manage Acquisition Oversight Integration
Business Case: AFSC Enterprise Information System Version 1.20, 17 October19 August 2013 9 Table 3c – Business Outcomes and Measurement Criteria (“To-Be” State)
| Business Outcome |
| Measurement Criteria |
Benefits
| Risks |
| Assumptions (A), Constraints (C), Dependencies (D) |
| Measurement |
| Current (Baseline) Value |
| Targeted Threshold Value |
| Targeted Objective Value |
| MFT - Employment of durable / scalable .Net code |
| Code compliance with .Net structure |
| 0% |
| 25% |
| 100% |
| More maintainable, scalable, supportable code structure |
| Funding necessary to support contract initiative |
| A: Government system and process requirements will not negate .Net benefits |
C: Contract scope is sufficient D: Infrastructure is able to support
| MAT - Employment of durable / scalable .Net code |
| Code compliance with .Net structure |
| 0% |
| 25% |
| 100% |
| More maintainable, scalable, supportable code structure |
| Funding necessary to support contract initiative |
| A: Government system and process requirements will not negate .Net benefits |
C: Contract scope is sufficient D: Infrastructure is able to support
| MPST - Meet user requirements within an ever changing engineering management environment |
| Number of registered users |
| 633 |
| 633 |
| 633 |
| Increased usage reflects better support to the using community, increased data, increased standardization |
| Funding necessary to support contract initiative |
| A: Available server support will meet anticipated demand |
A: Contract support will be funded C: Contract scope is sufficient D: Infrastructure is able to support
Business Case: AFSC Enterprise Information System Version 1.20, 17 October19 August 2013 10 DOTMLPF-P Impact, “To-Be” State Table 4 – DOTMLPF-P Impacts, “To-Be” State
DOTMLPF-P Analysis was conducted at the System level. Analysis specific to an individual module will be annotated separately within the table as needed.
| Category |
| Impact |
| Doctrine: |
| System design supports current Doctrine. DoD7000.14-R, AFI 65-601, AFI 23-101 |
| Organization: |
| AFSC has extensive operations functioning under virtual organizational structures. Geographically separated operational locations bring significant operational challenges. This system solution enables seamless functionality and collaboration across the virtual organization. |
| Training: |
| Functions targeted for improvement with the module are inconsistent with resolution based on training. Objectives of the module include providing information not available without system involvement. This system is a force-multiplier of current training initiatives not substitutable with additional training. The system closes the previously identified gaps while training will augment the benefits. |
| Materiel: |
| AEIS will be the material solution. |
| Leadership and Education: |
| While senior leadership are engaged in reforming strategies, strategic changes and educational advancements do not resolve information/data gaps or eliminate deficiencies that are addressed by this effort. |
| Personnel: |
| Strategic personnel changes may allow full advantage of the information /data advantages offered by the system. However, personnel changes alone do not resolve the information and capability gap identified above. This system facilitates and magnifies the impact of proper personnel management but their system impact is not negated or lessened my personnel management. |
| Facilities: |
| None identified. |
| Policy: |
| Policy changes alone have not been sufficient to maximize this capability, close the functional gaps, and invalidate the system advantages. System design will continue to support the following policies that apply to AEIS business processes: DoD7000.14-R, AFI 65-601, AFI 23-101 |
Recommended Course of Action Obtain approval of the Problem Statements by the Investment Review Board (IRB) Chair allowing implementation of the Vision Statements provided for each Problem Statement in Section 3.0 above.
Rough-Order-of-Magnitude (ROM) Cost Estimate ROM Cost Estimate: AEIS FY14 modernization efforts only are estimated to be approximately $366,000.
Business Case: <Insert initiative name, version, date here> 12 image1.jpeg