FA822425R0001 AMARG Engineering Support Services Questions and responses.pdf

PDF 562 KB Posted

Attached to
AMARG Engineering Support Services
Solicitation number
FA822425R0001
Issued by

About this file

This document is a Questions and Responses file for the FA822425R0001 AMARG Engineering Support Services solicitation. The document provides clarifications on various aspects of the contract opportunity, including submission guidelines, past performance requirements, and specific role details. Key clarifications include: acceptable fonts are Times New Roman, Arial, or Calibri (10-12pt), with 1" margins; past performance examples can include ongoing projects with at least one year of performance within 60 months; professional engineering roles like Process Engineer and Technical Insertion Engineer are considered learned professionals and do not correspond to standard Davis-Monthan AFB wage determinations. The solicitation represents a new requirement for AMARG to replace previously government-performed engineering functions, seeking a single award Firm Fixed Price service contract with a one-year base period and three one-year option periods to provide engineering support for aerospace maintenance, storage, preservation, parts reclamation, and aircraft regeneration processes.

View the file

Other files

File Type Posted
Updated TEP Worksheet DRAFT 16 April 2025.xlsx XLSX spreadsheet
FA822425R0001 AMARG Engineering Support Services Questions And Responses.pdf PDF
Updated TEP Worksheet DRAFT.xlsx XLSX spreadsheet
FA822425R0001 AMARG Engineering Support Services Questions And Responses.pdf PDF
FA822425R0001 AMARG Engineering Support Services Questions And Responses.pdf PDF
FA822425R0001 AMARG Engineering Support Services Questions And Responses.pdf PDF
Updated TEP Worksheet_DRAFT.xlsx XLSX spreadsheet
52.222-46 Evaluation of Compensation for Professional Employees.pdf PDF
Solicitation Amendment - FA822425R00010001 Conformed Copy.pdf PDF
Updated 52.212-1 Instructions.pdf PDF
Solicitation Amendment FA822425R00010001 SF 30.pdf PDF
Updated 52.212-2 Evaluations.pdf PDF
Questions And Responses.pdf PDF
AMARG EN PWS - 14Jan2025.pdf PDF
Davis-Monthan AFB Wage Determination 2015-5473 Rev 24.pdf PDF
Contract Security Classification Specification DD254 .pdf PDF
CDRL A003 - PMR Briefing Material.pdf PDF
Solicitation - FA822425R0001.pdf PDF
Updated 52.212-2 Evaluations 02Dec24.pdf PDF
Updated 3 Feb 25 52.212-1 Instructions 02Dec24.pdf PDF
CDRL A002 - Incident-Mishap Report.pdf PDF
CDRL A004 - PMR Meeting Minutes.pdf PDF
TEP Worksheet_DRAFT.xlsx XLSX spreadsheet
CDRL A001 - Monthly Manpower Report.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA822425R0001

AMARG Engineering Support Services

Questions and responses

1. The instructions do not provide any guidance on fonts, margins, or line spacing for offeror submissions. Does the Government have any applicable preferences or standards?

No less than 1” margin – Times New Roman – Arial – Calibri or similar professional PRINT Font – 10 – 12pt – single space.

2. Section 4.4.3 of the instruction’s state, "Inclusion of a TOC is optional but is strongly encouraged ..." Does the table of contents count against any prescribed page limits (e.g., the 20 pages allocated for offeror-specific content for the technical approach)?

No the TOC will not count against the page count.

3. Section 4.4.8 of the instructions states, "The offeror shall provide up to three (3) verifiable past performance examples of recent (within the past 60 months) and relevant successfully completed projects ..." Will the Government accept past performance examples that are ongoing at the time of submission?

Yes – as long as there is at least one year of performance at the time of submission

4. Similarly, will the Government accept past performance examples that were completed within the past 60 months, but include performance that occurred more than 60 months prior to submission (e.g., a task order with a period of performance starting 78 months prior and ending 30 months prior)?

Yes – as long as there is at least year of performance within the 60 months prior to submission.

5. On page 7 of the "Updated 3 Feb 25 52.212-1 Instructions 02Dec24.pdf" file under section "4.4.9.1. Specific Pricing Content" the table provided shows DoL codes which do not correspond to the provided "Davis-Monthan AFB Wage Determination 2015-5473 Rev 24.pdf" file. Will the Government be providing a revised WD with those codes included or a revised Instruction sheet mapping to the WD provided?

The Process Engineer/Industrial Engineer, Facilities Engineer, and Technical Insertion Engineer are considered professional employees/ Learned Professionals under the Anticipated Bureau of Labor Statistics Occupation Profile and will not correspond to the Davis-Monthan AFB Wage Determination 2015-5473 Rev 24.pdf. The occupational codes can be found at https://www.bls.gov/oes/current/oes_stru.htm#17-0000.

Engineering Technician has been changed to Engineering Technician III to reflect the corresponding DoL Occupation Code – Title found in Davis-Monthan AFB Wage Determination 2015-5473 Rev 24.

The following documents have been updated to reflect these changes:

52.212-1 Instructions, page 7, 4.4.9.1 Specific Pricing Content 52.212-2 Evolutions, page 9 under attachments to include “52.222-46 Evaluation of Compensation for Professional Employees” TEP Worksheet

6. Is this a new or a continuing requirement?

This is a new requirement. It was previously met with Government engineers but hiring them has been difficult in the current economic environment.

7. If this is a continuing requirement, who is the incumbent contractor?

N/A

8. If there is an incumbent, are they eligible to submit a proposal? Can the government provide a contract number?

There is no incumbent

9. Is this solicitation a brand-new requirement, or is this type of work currently being performed under different contract(s)?

This is a new requirement for AMARG.

10. One of the roles of the Technical Insertion engineer is to assist with “Change Management.” What type of “Change” does the USAF envision in area of storing, preserving, reclaiming, regenerating, maintaining, and disposing aircrafts and their parts that the Technical Insertion Engineer can assist with? Please provide some examples.

Change management is not a requirement unique to the technical insertion engineer.

It also does not necessarily relate to changes in the area of storing, or preserving, or anything else with aircraft parts. It refers to ensuring any change of any kind in the industrial machines are properly authorized and documented. We have an obligation to maintain configuration control of all processes.

11. The Technical Insertion engineer is supposed to assist with the Small Business Innovation Research (SBIR) Programs and Projects. Please provide some examples of such research programs and projects that he/she will be expected to be engaged with.

I cannot provide specific examples of projects. This responsibility requires researching potentially useful projects, making an engineering determination that such a project is both useful to AMARG and technologically ready for implementation.

The “technologically ready” part is a bit of a sliding scale. Something that has potential but is unproven may be ready for a SIBR phase 1, whereas something ready for a prototype might be ready for a SIBR phase 2, and something ready for full utilization on the production floor might be ready for a SBIR phase 3.

12. Will a Contractor be allowed to begin their assignment with and interim clearance, while they are waiting to become fully cleared?

Yes, contractors can begin work with an interim clearance. When a contractor has an interim clearance, they can do all the same work that they would otherwise be able to do with a full clearance. They cannot begin work if they are simply requested clearance or are waiting for a clearance as it is different from interim clearance. An interim isn’t just granted once clearance is requested.

File details come from the government source that posted it. Updated .