Question_&_Answers_Part_2.docx

DOCX document 14 KB Posted

Attached to
F-22 Horizontal Stabilizer Fixtures Federal contract opportunity
Solicitation number
FA8224-19-R-A002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Additional questions and answers

View the file

Other files for this federal contract opportunity

Other files attached to F-22 Horizontal Stabilizer Fixtures, newest first.
File Type Posted
Questions_&_Answers_Part_7.docx DOCX document
Questions_&_Answers_Part_6.docx DOCX document
Questions_&_Answers_Part_5.docx DOCX document
CDRL_A001.pdf PDF
Question_&_Answers_Part_4.docx DOCX document
Statement_of_Work_updated.pdf PDF
Question_&_Answers_Part_3.docx DOCX document
Statement_of_Work.pdf PDF
Question_&_Answers.docx DOCX document
Section_L_Past_Performance_Information.docx DOCX document
CDRL_A001.pdf PDF
AFMAN91-203.pdf PDF
CDRL_A003.pdf PDF
CDRL_A002.pdf PDF
FA822419RA002_updated.pdf PDF
Tab_12_Section_L.pdf PDF
CDRL_A001.pdf PDF
Tab_12_FA822419RA002.pdf PDF
CDRL_A003.pdf PDF
Tab_12_Section_M.pdf PDF
CDRL_A002.pdf PDF
Tab_12_Statement_of_Work.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F-22 HORIZONTAL STABILIZER FIXTURES

FA8224-19-R-A002

QUESTIONS & ANSWERS PART 2

Question:

Section B lists CLIN0005 as a priced line item and in the CDRL form 1423-1 has “NSP” in block 17. Should this be separately priced or included in CLIN0001 pricing as for CLIN0006,7?

Answer:

It is the intent that CLIN 0005 be priced separately. CDRL A001 will be updated to remove the “NSP”. However, CLIN 0006 and CLIN 0007 will remain not be separately priced.

In the Performance Specification, Section 2.1.7, Operating Environment, it states that components shall be qualified for the National Electric Code, Class 1, Division 1. Any fixture components or systems shall be qualified to operate in this environment. However, it does not state which Group, “A” through “G” based on the appropriate location where the equipment will be used. An example, the hazardous location motors listed in McMaster-Carr are only good for Groups “D” (Propane), “F” (Combustible carbonaceous dusts), and “G” (Other combustible dusts). Please specify which Group is applicable!

According to our copy of the NEC (National Electric Code, 2008 edition) Class 1 Div 1 is grouped into A,B,C, and D. (P. 677 sec. 500.6). For our purposes we want the fixture to comply with all groups (A through D). This covers a wide array of combustible gases and combustible/flammable liquid produced vapors. Commentary Table 500.1 starting on pg. 679 gives an extensive list of different gases and vapors. As far as we can tell Groups E through G apply to Class II groups. If the code has changed or been updated since our publication was released please let us know.

The S.O.W. 2.1.3 seems to contradict what Figures 4, 6, & 7 are showing.

Statement 2.1.3 reads, “The fixture shall also be capable of controlled rotation of the horizontal stabilizer by placing the axis of rotation in line with the center of gravity of the stabilizer.” . This sentence seems to imply that the center of rotation of the stabilizer will not be congruent with the centerline of the stabilizer pivot shaft.

Figures 4, 6, & 7 seem to imply that the center of rotation and the center of the pivot shaft are the same.

If Statement 2.1.3 is correct as written the sketch below is an indication of the method required to implement the offset while still complying with Statement 2.1.1, “The fixtures shall be capable of supporting the tail utilizing the pivot shaft as the only attach point.”

Paragraph 2.1.3 is correct. “The fixture shall also be capable of controlled rotation of the horizontal stabilizer by placing the axis of rotation in line with the center of gravity of the stabilizer.” The requirement is for the center of rotation of the stabilizer to NOT be congruent with the centerline of the stabilizer pivot shaft, instead it shall be aligned with the center of gravity. Center of gravity location at which the center of rotation should be, is depicted in Figure 3.

Figures 4, 6, and 7 were not intended to detail the center of rotation.

For our Technical Proposal response, what is the font size, type, etc. and what is spacing requirements?

Please provide your responses in “Calibri” or similar font type no smaller than 11 point font size. Paragraphs must be separated by spaces. Use the Statement of Work (SOW) as a guide for spacing and readability.