Pour down Facility Industry Day Briefing.pptx
PPTX presentation 316 KB Posted
- Attached to
- Pour Down Facility
- Solicitation number
- FA8224-12-R-0035
About this file
Industry Day Briefing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8224-12-R-0027 Pour Down Facility.doc | DOC document | |
| FA8224-12-R-0027-0002.doc | DOC document | |
| FA8224-12-R-0027-0003.doc | DOC document | |
| FA8224-12-R-0027-0001.doc | DOC document | |
| Solicitation Q A 2_23 Aug.pdf | ||
| Solicitation Q A 3_23 AUG.pdf | ||
| Solicitation Q A 1_ 16 Aug.pdf | ||
| Solicitation Q A 3_23 AUG.docx | DOCX document | |
| FA8224-12-R-0027-0003.pdf | ||
| Solicitation Q A 2_23 Aug.docx | DOCX document | |
| FA8224-12-R-0027-0002.pdf | ||
| PWS_Pour Down Facility_15AUG.doc | DOC document | |
| PWS_Pour Down Facility_15AUG.pdf | ||
| FA8224-12-R-0027-0001.pdf | ||
| Solicitation Q A 1_ 16 Aug.docx | DOCX document | |
| Questions from Pour Down Facility Industry Day - 02Jul12 - mas.docx | DOCX document | |
| DI-ALSS-81530.pdf | ||
| DI-MISC-81397.pdf | ||
| DI-MGMT-80257.pdf | ||
| osha300.pdf | ||
| PWS_Pour Down Facility_20120718.doc | DOC document | |
| DI-SAFT-81563.pdf | ||
| DI-ENVR-81375.pdf | ||
| FA8224-12-R-0027 Pour Down Facility.doc | DOC document | |
| DI-MGMT-80227.pdf | ||
| CDRL.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRY DAY
28 June 2012
Ogden Air Logistics Center
O G D E N A I R L O G I S T I C S C E N T E R
Briefing Purpose Acquisition Planning
Provide interested bidders with an overview of the 309th MXW Mission and Needs
Describe the basic strategy for this acquisition
Opportunity for industry to provide input and/or recommendations to the draft RFP Warfighters First Choice
Rules of Engagement No agreements, promises or other commitments are made or implied by the Government or Contractors participating in Industry day and the One-on-One sessions.
Questions will be answered to the best of the team’s knowledge of plans, desires, and general situation as it exists at this time.
Please recognize that this project is in acquisition planning and subject to approval.
Warfighters First Choice
Procurement Overview 309th MXW Organization and Requirements Overview Group Discussion Site Visit Lunch Break One-on-One’s 12:15-ChemicoMays 12:45- GENCO/Safe Ports 1:20-Automotive and industrial Supply 1:55-URS Corporation 2:30-EM-Assist Agenda
Procurement History Re-compete of existing Delivery Order
FA8201-09-D-0006-0059
Period of Performance 25 March 2012 - 23 September 2012
FA8201-09-D-0006-0041
Period of Performance 1 April 2011 – 31 March 2012
Contemplating Small Business Set-Aside NAICS: 561210 – Facilities Support Services Size Standard: $35.5M
Proposed Procurement Methodology Lowest Price Technically Acceptable (LPTA) Step One - Evaluate Price Step Two - Determine Technical Acceptability (Acceptable/Unacceptable)
Primary Place of Performance is Hill Air Force Base, UT
Anticipate:
Single Award Definitive (C type) Contract - One-year Basic plus 4 one-year options
Firm Fixed Price type contract FFP CLIN for Hazardous Material Pour-Down Facility
Anticipated CLIN Structure is as follows:
Option years will increment second character in CLIN by the option year being exercised (e.g. Base Year CLIN 0001, Option Year 1 CLIN 0101, etc.)
| CLIN Type | CLIN Description | |
| 0001 | Firm-Fixed Price | Hazardous Material Pour-Down Facility |
| 0X01 | Firm-Fixed Price | Hazardous Material Pour-Down Facility |
Tentative Schedule
| Date | Event |
| 28 June 2012 | Industry Day |
| July 2012 | Issuance of Formal Solicitation |
| August 2012 | Receipt of Proposals |
| September 2012 | Proposal Evaluation |
| 21 September 2012 | Contract Award |
309th MXW Overview Provide the support and resources necessary for Sustainment and operation of the hazardous materials (HAZMAT) pour down facility.
Basic Services Order, receive, and track using the Hill AFB Waste Inventory Tracking System (WITS), Enterprise Environment Safety & Occupational Health Management Information System (EESOH-MIS) and the Standardized Data System (SDS).
Print, associate, and provide OSHA-compliant hazardous chemical labels on pour-down and shop day-use containers.
‘Pour-down' the HAZMAT to size containers usable on aircraft and aircraft component maintenance lines Distribute these products to the requiring cell activities Recycle or dispose of the products so as to minimize HAZMAT waste Provide analysis of monthly workload trends
309th MXW Overview Cont.
Provide monthly cost reports for operations and submit the reports with the monthly billing Provide reports on internal and external inspections and reconciliation audits listing findings, root cause, and remedies for each finding Respond and take corrective action within five (5) calendar days to the quarterly Hazardous Materials Annual Inventory Reconciliation and Evaluation (HM-AIRE) performed by 75 CEG/CEVC
Industry Feedback What is the industry standard for measuring workload?
Is the number of transactions sufficient as a workload estimator?
Industry Standards
OSHA
HAZMAT
Contractor provided equipment Vs. Government shared equipment.
Containers, computers, printers, label printers, pumps, vehicles, forklifts, trucks.
Has sufficient information been provided build a proposal?
image3.jpeg image1.png image2.png
File details come from the government source that posted it. Updated .