Pour down Facility Industry Day Briefing.pptx

PPTX presentation 316 KB Posted

Attached to
Pour Down Facility
Solicitation number
FA8224-12-R-0035
Issued by

About this file

Industry Day Briefing

View the file

Other files

File Type Posted
FA8224-12-R-0027 Pour Down Facility.doc DOC document
FA8224-12-R-0027-0002.doc DOC document
FA8224-12-R-0027-0003.doc DOC document
FA8224-12-R-0027-0001.doc DOC document
Solicitation Q A 2_23 Aug.pdf PDF
Solicitation Q A 3_23 AUG.pdf PDF
Solicitation Q A 1_ 16 Aug.pdf PDF
Solicitation Q A 3_23 AUG.docx DOCX document
FA8224-12-R-0027-0003.pdf PDF
Solicitation Q A 2_23 Aug.docx DOCX document
FA8224-12-R-0027-0002.pdf PDF
PWS_Pour Down Facility_15AUG.doc DOC document
PWS_Pour Down Facility_15AUG.pdf PDF
FA8224-12-R-0027-0001.pdf PDF
Solicitation Q A 1_ 16 Aug.docx DOCX document
Questions from Pour Down Facility Industry Day - 02Jul12 - mas.docx DOCX document
DI-ALSS-81530.pdf PDF
DI-MISC-81397.pdf PDF
DI-MGMT-80257.pdf PDF
osha300.pdf PDF
PWS_Pour Down Facility_20120718.doc DOC document
DI-SAFT-81563.pdf PDF
DI-ENVR-81375.pdf PDF
FA8224-12-R-0027 Pour Down Facility.doc DOC document
DI-MGMT-80227.pdf PDF
CDRL.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRY DAY

28 June 2012

Ogden Air Logistics Center

O G D E N A I R L O G I S T I C S C E N T E R

Briefing Purpose Acquisition Planning

Provide interested bidders with an overview of the 309th MXW Mission and Needs

Describe the basic strategy for this acquisition

Opportunity for industry to provide input and/or recommendations to the draft RFP Warfighters First Choice

Rules of Engagement No agreements, promises or other commitments are made or implied by the Government or Contractors participating in Industry day and the One-on-One sessions.

Questions will be answered to the best of the team’s knowledge of plans, desires, and general situation as it exists at this time.

Please recognize that this project is in acquisition planning and subject to approval.

Warfighters First Choice

Procurement Overview 309th MXW Organization and Requirements Overview Group Discussion Site Visit Lunch Break One-on-One’s 12:15-ChemicoMays 12:45- GENCO/Safe Ports 1:20-Automotive and industrial Supply 1:55-URS Corporation 2:30-EM-Assist Agenda

Procurement History Re-compete of existing Delivery Order

FA8201-09-D-0006-0059

Period of Performance 25 March 2012 - 23 September 2012

FA8201-09-D-0006-0041

Period of Performance 1 April 2011 – 31 March 2012

Contemplating Small Business Set-Aside NAICS: 561210 – Facilities Support Services Size Standard: $35.5M

Proposed Procurement Methodology Lowest Price Technically Acceptable (LPTA) Step One - Evaluate Price Step Two - Determine Technical Acceptability (Acceptable/Unacceptable)

Primary Place of Performance is Hill Air Force Base, UT

Anticipate:

Single Award Definitive (C type) Contract - One-year Basic plus 4 one-year options

Firm Fixed Price type contract FFP CLIN for Hazardous Material Pour-Down Facility

Anticipated CLIN Structure is as follows:

Option years will increment second character in CLIN by the option year being exercised (e.g. Base Year CLIN 0001, Option Year 1 CLIN 0101, etc.)

CLIN TypeCLIN Description
0001Firm-Fixed PriceHazardous Material Pour-Down Facility
0X01Firm-Fixed PriceHazardous Material Pour-Down Facility

Tentative Schedule

DateEvent
28 June 2012Industry Day
July 2012Issuance of Formal Solicitation
August 2012Receipt of Proposals
September 2012Proposal Evaluation
21 September 2012Contract Award

309th MXW Overview Provide the support and resources necessary for Sustainment and operation of the hazardous materials (HAZMAT) pour down facility.

Basic Services Order, receive, and track using the Hill AFB Waste Inventory Tracking System (WITS), Enterprise Environment Safety & Occupational Health Management Information System (EESOH-MIS) and the Standardized Data System (SDS).

Print, associate, and provide OSHA-compliant hazardous chemical labels on pour-down and shop day-use containers.

‘Pour-down' the HAZMAT to size containers usable on aircraft and aircraft component maintenance lines Distribute these products to the requiring cell activities Recycle or dispose of the products so as to minimize HAZMAT waste Provide analysis of monthly workload trends

309th MXW Overview Cont.

Provide monthly cost reports for operations and submit the reports with the monthly billing Provide reports on internal and external inspections and reconciliation audits listing findings, root cause, and remedies for each finding Respond and take corrective action within five (5) calendar days to the quarterly Hazardous Materials Annual Inventory Reconciliation and Evaluation (HM-AIRE) performed by 75 CEG/CEVC

Industry Feedback What is the industry standard for measuring workload?

Is the number of transactions sufficient as a workload estimator?

Industry Standards

OSHA

HAZMAT

Contractor provided equipment Vs. Government shared equipment.

Containers, computers, printers, label printers, pumps, vehicles, forklifts, trucks.

Has sufficient information been provided build a proposal?

image3.jpeg image1.png image2.png

File details come from the government source that posted it. Updated .