Solicitation Amendment FA821326RB0020001 SF 30.pdf

PDF 404 KB Posted

Attached to
ADM Aging and Surveillance
Solicitation number
FA821326RB002
Issued by

About this file

This is Amendment 0001 to Solicitation FA821326RB002, issued by the Air Force Life Cycle Management Center (AFLCMC) at Hill Air Force Base, Utah, with an effective date of April 9, 2026. The amendment extends the proposal deadline from April 24, 2026 to May 8, 2026 at 4:00 PM local time. The contracting officer is Ryan C. Mitchell, and offerors must acknowledge receipt of this amendment prior to the new deadline through completion and return of the amendment, acknowledgment on each copy of the offer submitted, or separate written communication.

The amendment attaches a revised Performance Work Statement (PWS) for Aging and Surveillance and addresses solicitation questions and responses received from potential contractors. Key changes to the PWS include clarifications regarding Tritonal aging using bombs with known diurnal cycles, modifications to testing requirements in paragraphs 2.2.4.3 and 2.2.4.4 to indicate contractors will not need to purchase equipment for DAX and CYLEX testing, revisions to Table 2 specifying requirements for Ordering Groups 32, 33, 35, and 36, updates to Tables 4, 7, 8, 9, and 10 to establish specific core quantities and test specimen counts for Firm Fixed Pricing, clarification of the Fill/Liner Subscale Testing section (paragraph 2.4), modifications to the Period of Performance to 36 months, and corrections to the Table of Contents and formatting throughout the document. The PWS addresses bomb aging and surveillance testing requirements across multiple bomb sizes (500-lb, 1,000-lb, and 2,000-lb) with specific testing methodologies and performance parameters.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

09 Apr 2026

4. REQUISITION/PURCHASE

REQUISITION NUMBER

5. PROJECT NUMBER (if applicable)

6. ISSUED BY CODE FA8213

FA8213 AFLCMC EBHK

CP 801 586 8482, 6072 FIR AVE BLDG 1233

HILL AFB, UT 84056-5820

UNITED STATES

Nicholas Padgett, Email: ryan.mitchell.21@us.af.mil Telephone: 8015860683 Ryan Mitchell, Email: ryan.mitchell.21@us.af.mil Telephone: 8015860683

7. ADMINISTERED BY (if other than Item 6)

CODE

SCD: PAS:

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

CODE: FACILITY CODE:

9A. AMENDMENT OF SOLICITATION NUMBER

FA821326RB002

9B. DATED (SEE ITEM 11)

25 Mar 2026

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK

ONE

A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Schedule

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

RYAN C. MITCHELL

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

09 Apr 2026

Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA-FAR (48 CFR) 53.243

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of the amendment is to attach a revised PWS and post the questions and comments received, as well as Block 14 (Description of Amendment/Modification):

USAF responses. This amendment also provides an extension to the proposal deadline.

Changes to the PWS are described in Section C of this amendment.

Solicitation questions and comments received are as follows along with USAF responses:

Q: How is aging of Tritonal to be accomplished?

A: Tritonal-filled bombs that have known number of diurnal cycles will be provided for sectioning, coring, and subscale testing.

Q: The paragraph references in Table 2 are a bit confusing. Paragraph 2.0 is the section heading for everything contained in this section with subparagraphs 2.1-2.7. Is the intent to impose paragraphs 2.1 - 2.6? This same question applies to each instance where a major section heading is called out, ie (2.0, 3.0, 4.0) A: Major headings typically have contextual info, so those headings have been included in Table 2 as well.

Q: With regards to paragraph 2.2.4.3, in the past DAX and CYLEX testing has been performed by government labs such as LLNL. Mandating the contractor SHALL use these techniques implies the contractor either has the equipment to perform these tests or will need to procure the equipment. Is that the intent of this paragraph?

A: Added the words "data from" to indicate contractor will not need to purchase equipment and perform this testing.

Q: The subparagraphs in 2.2.4.4 include "shall" language that dictates the contractor must create the methods, purchase the tooling and provide facilities necessary to perform LPWG testing. The first subparagraph in this section provides an "If possible" statement about transitioning this work to contractor facilities. How do we interpret "shall" in these paragraphs? What is the expectation of the Air Force.

A: Modified 2.2.4.4 to clarify USAF requirement.

Q: In Table 8, there is no direction on how to age the subscale performance test specimens:

A: Updated PWS provides detail.

Q: In Table 8, It seems the total core count is not correct. 10 cores are required to perform each Dent Rate test and 15 is a minimum number of cores to perform the Gap Test. To properly do these two tests 25 cores is needed for the zero time test and 200 cores to satisfy 8 pulls to support 4 additional test events. That is a total of 225 cores and that is for one aging temperature profile. The same number of cores would be required for each additional temperature profile.

A: Updated PWS provides defined quantities.

Q: Regarding Table 8, it is not possible to get enough cores from single bombs of any size to perform Dent Rate and Gap Testing properly to get viable data.

A: Updated PWS to account for bomb size limitations for total number of cores that can be tested.

Q: In Table 10, a discreet number of Microtome samples and cores for Firm Fixed Pricing required by Ordering group #25.

A: 2 Samples/cores are required

Q: Paragraph 2.4 Fill/Liner Subscale Testing is too open ended for Firm Fixed Pricing. Performance parameters must be specific.

A: Modified 2.4 Fill/Liner Subscale Testing section.

This amendment extends the proposal deadline to 4:00 PM local time 08 May 2026.

Section A - Solicitation/Contract Form

The following modifications were made:

Information From To Response Due Date 24 Apr 2026 08 May 2026

Section C - Description/Specifications/Statement of Work

Header Miscellaneous Text (Added):

Changes to the PWS on the amendment, FA821326RB0020001 include the following:

- Corrected Table of Contents

- Formatting Changes throughout

FA821326RB0020001

- Changes to Table 2 - Specific Requirements for Each Ordering Group

Ordering Group 32 should read 2.7(A), 3.0-3.3,4.0-6.1

Ordering Group 33 should read 2.7(B), 3.0-3.3,4.0-6.1

Ordering Group 35 should read 2.7(A),2.73.0-3.3, 4.0-6.1

Ordering group 36 should read 2.7(B), 3.0-3.3,4.0-6.1

- Modified verbiage to 2.2.4.2 Coring paragraph to remove ambiguity regarding FFP approach

- Changes to Table 4 - Explosive Core Summary

Edited column heading of last column to read "Minimum Required Number of Cores per Test Series"

Edited many of the numbers under the last column, "Minimum Required Number of Cores per Test Series"

Added Notes 3 and Note 4 to table.

- In paragraph 2.2.4.3, removed the sentence "Other aging periods and/or thermal cycling of energetic samples may be explored using the same or similar tests at the discretion of the AF." This was done is response to a comment received, recommending this effort be cost reimbursable.

- Added verbiage "data from" to 2.2.4.3 as described in the Q&A section, shown in Block 14 Continuation Page of the amendment SF 30.

- Changes to Table 7 - Modified PoP to 36 months to align with paragraph 2.2.4.3 and modified table for clarification.

- Modified Table 7 to make it more amenable to FFP in response to a comment stating the USAF direction on how to apply Tables 6 and Table 7 is vague and cannot be appropriately priced for FFP.

- Modified 2.2.4.4 in response to question seen below about how the USAF interprets "shall" in these paragraphs.

- Modified Table 8, editing the table title and including separating the table into 500-lb, 1,000-lb, and 2,000-lb sections.

- Modified Table 9, including the title and notes,2,6, and 7.

- Modified Table 10, including title, sample and core numbers, and changes to the notes.

- Modified 2.4 Fill/Liner Subscale Testing section.

Section J - List of Attachments

The following Attachment(s) were added:

PWS_ADM Aging and Surveillance Revised

The following Attachment(s) were deleted:

PWS_ADM Aging and Surveillance

FA821326RB0020001

SUMMARY OF CHANGES
Solicitation/Contract Form
Description/Specifications/Statement of Work
List of Attachments

File details come from the government source that posted it. Updated .