Performance Work Statement dated 8 July 14
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clarification_to_Questions_for_Base_Camera_System.docx | DOCX document | |
| UFC-3-580-01.pdf | ||
| PWS_Base_Cameras_System_25_Aug_14.pdf | ||
| Answer's_to_Questions_for_Base_Camera_System.pdf | ||
| ETL_02-12.pdf | ||
| CONTRACT_DATA_REQUIREMENTS_LIST.doc | DOC document | |
| WD_05-2531.doc | DOC document | |
| Instructions_and_Evaluation_Criteria_Base_Camera_System.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8 July 2014
Hill AFB Base Camera Installation For Hill Air Force Base, Utah
Performance Work Statement (PWS)
1. Objective: The objective of this service is to provide Hill AFB, UT the capability to secure protection level areas with the installation and use of video, video recording, and video analytics. This project includes, camera installation, configuration, licensing cameras to video management system, training of government personnel, and purchase and installation of video display monitors.
2. Project Technical Requirements:
2.1 Place of Performance: Hill Air Force Base, Little Mountain, and Utah Test and Training Range (UTTR), Utah
2.2 The contractor shall provide all labor, equipment, licensing, testing, transportation, lifts and supervision to accomplish the camera installation, configuration and training.
2.3 All work shall be accomplished in reference to this PWS within 90 days of award. Any requests or justification for change shall be made to the Contracting Officer in writing and must be approved by the government.
2.4 The contractor shall provide a preliminary schedule with their proposal. Any changes to the schedule after submission of the final schedule will be coordinated and approved by the government. Any request of justification for change after government approval shall be made to the Contracting Officer in writing and must be approved by the government.
2.5 The contractor shall be in compliance with manufacturer's written instruction, applicable standards/specifications and in accordance with recognized industry practices. Personnel involved shall be certified in the installation of security cameras, to include but not limited to connecting security cameras to base network, installing security camera video management system, installing network cable, integrating present and future security cameras to the security camera video management system and training Hill Air Force Base personnel on the use of security camera video management system. Contract personnel shall provide adequate proof of skills upon request. Contractor shall select subcontractor(s) with demonstrated successful past performance in security camera installation.
2.6 The contractor shall be accompanied by government provided escorts during installation of materials in secured areas.
2.7 A Site Survey may be conducted at the request of the contractor. Contractor is responsible for all costs associated with site surveys. The site survey/walk through is recommended due to the magnitude of the project. All requirements identified, clarified, amended or deleted during the site survey will officially documented in a clarification document released via a solicitation amendment after the site survey. Any questions that are not satisfactorily addressed and answered during the site survey shall be submitted in writing.
2.8 The Contractor shall provide appropriate safety measures and daily cleanup at the end of the day.
3 Project Execution:
3.1. All communication work shall comply to the 75 ABW/SC Communications & Information Directorate Hill AFB, Utah Telecommunications Installation Criteria for Facility Design and Renovation (TAB K) dated August 2011, the Engineering Technical Letter, (ETL) 02-12: Communications and Information System Criteria for Air Force Facilities dated 27 Jun 2002, and the Unified Facilities Criteria (UFC) UFC-3-580-01, Telecommunication Building Cabling Systems Planning and Design dated 27 Jun 2007.
3.2. The point of contact and government project manager for this project is Brent Cummings, 75 ABW/SCPD, (W) 801-777-8732, (C) 801-928-0139. The contractor shall notify the government project manager a minimum of 2 business days before beginning any work.
3.3. Site acceptance by the customer, 75 ABW/SCPD is required prior to final invoice.
3.4. Delays i.e. base exercises, inspections, etc. associated with working on an active military installation are at the contractors risk and must be included in the contractor’s proposal.
3.5. On-site work performed under the auspices of this contract shall be performed during normal installation operating hours.
3.6 The contractor shall submit, for project engineer review, a list of materials prior to installation. At completion of the project but, before final acceptance, the contractor shall provide all required red-line drawings and all test results and certifications to 75ABW/SCPD, Project Manager.
3.7. The contractor shall provide all labor and materials required for successful completion of this PWS. The contractor shall provide technical support and service necessary to ensure active management and reliable operations. The contactor shall identify within their proposal the name of their on-site program manager. Any changes to this will be coordinated and approved by the government. The contractor shall be responsible for supervision of all contract personnel and performance of all contractor related functions.
3.8. No personnel presenting potential threats to the health, safety, security, general well-being, or operational mission of the installations and their population shall be employed by the contractor during the execution of this PWS. Contractors working on this project shall have a background check conducted by base security forces for outstanding warrants, etc. The contractor shall coordinate with the site POC to obtain base access for personnel/vehicles if needed.
3.9. The contractor shall be responsible for storage, staging and deployment of any equipment and materials provided as part of this contract unless otherwise mutually agreed upon by the government. If removal of equipment and materials is necessary, the contractor shall be responsible for disposal and shall comply with all applicable industry rules and regulations.
3.10. The contractor will replace, install new or reuse cameras as identified. Any cameras currently in-place that is identified to be replaced is property of the United States Government and will be removed in a manner conducive to repurposing. All cameras not repurposed will be returned to the government program manager at the end of the project. All cameras identified as reuse will remain in-place and be connected to the security camera video management system. If a camera identified as reuse is found by the contractor to be incompatible with security camera management system or found to not be in working order, the contractor program manager will identify the deficiency to the government program manager in writing. The government program manager will identify the recourse for fixing the deficiency that will not alter the scope of this PWS.
3.11. For the purpose of this PWS, general camera locations will be provided. Exact location, height, direction and other special instructions will be provided to the contract program manager during site survey to be scheduled and held no later than 5 business days after the PoP begin date. Survey notes in this PWS contain approximate cable requirements. Distances and conduit requirements are approximations. If not specified, all cable to be used outdoors must be outdoor rated and all cable used indoors can be indoor rated.
3.12. The contractor will provide a video management solution and video management licensing for all cameras on this PWS. The proposed video management solution must be a Department of Defense (DoD) approved product (Department of Defense Information Assurance Certification and Accreditation Process (DICAP) approved), or a Hill AFB Data Center locally approved product (APL). During market research, the only approved video management solutions discovered is VICADS (AF Certification and Accreditation (C&A)), Bosch (AF C&A), and On-SSI Ocularis (local APL). If the contractor’s purposed solution is not one of these three video management solutions, it’s the contractor’s responsibility to provide proof that their purposed solution is an approved product prior to award. The contractor will be responsible for the loading and configuration of all cameras on this PWS. The contractor shall provide training on the configuration and management of video management solution to the government. Training will include, but not limited to, loading, managing and configuring.
3.13. The contractor will provide and install (4) 40” HDTV 1080P flat screen video display monitors, plus wall mounts, for Hill AFB building 408 Security Forces (SFS), Command and Control office, (1) 40” HDTV 1080P flat screen video display monitor plus wall mounts, for the Little Mountain SFS guard shack, and (1) 40” HDTV 1080P flat screen video display monitor, plus wall mounts, at the UTTR SFS guard shack.
3.14 The contractor will provide and install (1) keyboard/camera joystick control at all locations identified in 3.13.
3.15. The contractor will provide no less than a 1 year labor warranty covering replacement or fixing any issues with all products installed in the performance of this PWS. The contractor will provide a minimum of a 4 year hardware warranty covering replacement or fixing any issues with all products installed in the performance of this PWS.
3.16. Minimum Camera Requirements:
Pan Tilt Zoom Camera:
· HDTV 1080P
· High-speed pan/tilt zoom
· 1-5 MP
· Day and night functionality
· Outdoor-ready with Artic Temperature Controls -50°C/-58°F and up to 50°C/122°F
· H.264 video streams
· Power over Ethernet capable Fixed Camera:
· HDTV 1080P
· Focus and Zoom
· 1-5 MP
· Day and night functionality
· Outdoor-ready with Artic Temperature Controls -50°C/-58°F and up to 50°C/122°F
· H.264 video streams
· Power over Ethernet capable 4 Management Objectives:
4.1 The offeror shall manage the projected schedule, performance, risks, warranties, subcontracts, and data to provide and installation that satisfies the government performance requirements.
5 Deliverables:
5.1 All documentation records produced by the contractor under this PWS shall become the property of the United States Government.
6 Other Information:
6.1 The contractor shall process and coordinate with the government program manager before the start of the camera installations. The contractor must coordinate with the government project manager before working on this project to obtain the necessary work permits. The environment is very important to Hill AFB. The contractor shall be required to bring all historical, archaeological, or environmental concerns to the attention to the project manager immediately for resolution. If questionable material is found, the contractor is to stop work and wait for a contracting officer determination.
6.2 Government Support (Requirements): 75 ABW/SCPD will provide the name and contact information for at least one individual with the authority to review and approve work on the project.
6.3 Damages and Repairs:
6.3.1. Hardware Installation: Where cutting, channeling, chasing, or drilling of floors, walls, partitions, ceilings, or other surfaces is necessary for the proper installation, support or anchorage of raceways, mounts, or network infrastructure, the contractor shall obtain permission through the government project manager and if permission is granted, shall carefully perform this work in an approved manner.
6.3.2 Hardware Damage: Any damage to equipment caused by the contractor during handling or installation shall be repaired or replaced. The cost of such repair or replacement shall be borne by the contractor.
6.3.3 Buildings or Architecture Support: Any damage to building, piping, equipment or defacing of finish, plaster, woodwork, landscaping, pavement, concrete, or metal work shall be repaired by skilled mechanics of the trades involved. The cost of such repair work shall be borne by the contractor.
6.4 Manpower Reporting: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Air force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
*Reporting Period: Contractors are required to input data by 31 October of each year.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
7 Service Delivery Summary:
Work is to be accomplished in accordance with the following Service Delivery Summary. Certification by the Government of satisfactory services provided is contingent upon the contractor performing in accordance with the terms and conditions of the referenced contract, this document, the approved technical and price proposal, and all amendments. The Government and the contractor’s representative shall meet when deemed necessary at the contracting officer’s request. Meetings shall occur at the place determined by the contracting officer.
| Performance Objective |
| PWS Paragraph |
| Performance Threshold |
| Accountability of replaced cameras and other replaced materials |
| 3.10 |
| 100% accountability; no deviation |
| Government is notified on all anticipated delays |
| 2.3, 2.4, 3.4 |
| Email notification is provided to government as stated in the PWS or if not stated within 24 hours of any project impact delay or deviation |
| Deliverables are provided to 75 ABW/SCPD Program Manager in a timely manner |
| 2.4, 3.6, 3.7, 6.1, 7.1 |
| Contractor shall provide deliverable to the 75 ABW/SCPD Program Manager |
Note: Remedies for discrepancies shall be in accordance with the inspection clauses at FAR 52.246-2 and FAR 52-246-4.
Attachment 1: Project Scope/ Camera Requirements
| Camera ID |
| PL3 designation |
| Camera Count (single count mostly) |
| PTZ |
| Replace Camera, reuse, or New? |
| Existing camera make and model, replacement camera proposed, added notes. |
| Current state of location notes, Site Survey |
| Survey Notes |
| LM1 |
| Yes |
| 1 |
| No |
| New |
| New setup needs cabling |
| Corner Mount, Cat 5E Outdoor Rated; 100' |
| LM2 |
| Yes |
| 1 |
| Yes |
| New |
| New setup needs cabling |
| High Zoom Camera, Parapet Mount, Cat 5E Outdoor Rated; 200' |
| LM3 |
| Yes |
| 1 |
| Yes |
| New |
| New setup needs cabling |
| High Zoom Camera, Tripod w/ Brace, Cat 5E Outdoor Rated; 200' |
| LM4 |
| Yes |
| 1 |
| Yes |
| New |
| New setup needs cabling |
| Parapet Mount, Cat 5E Outdoor Rated; 200' |
| LM5 |
| Yes |
| 1 |
| No |
| Replace |
| Has BNC cable to site, network in closet |
| Interior Camera with Standard Lighting; replace with new dome and new wall mount; needs encoder/decoder |
| LM6 |
| Yes |
| 1 |
| No |
| Replace |
| Has BNC cable to site, network in closet |
| 2MP IR dome camera with mount; needs encoder/decoder |
| LM7 |
| Yes |
| 1 |
| Yes |
| New |
| New setup needs cabling |
| Parapet Mount, Cat 5E Outdoor Rated; 200' |
| LM8 |
| No |
| 1 |
| No |
| Reuse |
| GE camera |
| Current system in place, fiber from gate to guard shack. Needs some sort of encoder device to distribute video to network. Network connectivity in guard shack available, but available ports not known. |
| Requires encoder to switch; Cat 5E Indoor |
| LM9 |
| No |
| 1 |
| No |
| Reuse |
| GE camera |
| Current system in place, fiber from gate to guard shack. Needs some sort of encoder device to distribute video to network. Network connectivity in guard shack available, but available ports not known. |
| Requires encoder to switch; Cat 5E Indoor |
| LM10 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch |
| Has BNC cable to site, network inside building in semi harsh conditions |
| Semi harsh conditions with possibility of lightning strike, Parapet Mount with brace for high winds, Cat 5E; 150' |
| LM11 |
| Yes |
| 1 |
| Yes |
| New |
| Possibility of reusing conduit on the fence line? Or new trench to take cable to camera |
| Requires 110 power supply, will require trenching, PTZ pole mount |
| UT1 |
| No |
| 1 |
| Yes |
| New |
| New installation, fiber to be run to the site? |
| Cisco Point-to-Point Wireless, Parapet mount |
| UT2 |
| No |
| 1 |
| No |
| New |
| New installation |
| Ceiling Dome; Cat 5E Indoor Rated; 200' |
| UT3 |
| No |
| 1 |
| Yes |
| Replace |
| Has BNC cable to camera, network inside building |
| Encoder/Decoder |
UT4
| 1 |
| No |
| Replace |
| Has BNC cable to camera, network inside building |
| Encoder/Decoder |
| FL1 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch |
| This has a wireless feed on |
| Pole Mount, Requires cable and power from wireless to camera; Cat 5E Outdoor; 25' |
| FL2 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch |
Pole mount, requires 30' trench from building to pole, Cat 5E Outdoor, 100'
| FL3 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch |
| Wires about falling off of pole, strung between building and pole |
| Pole mount, requires 30' trench from building to pole, Cat 5E Outdoor, 100' |
| FL4 |
| Yes |
| Yes |
| Reuse |
| Axis |
| On a light pole on the west side of the building. Desires to have this one moved back closer to the building |
| FL5 |
| Yes |
| Yes |
| Reuse |
| Axis |
| FL6 |
| Yes |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 200'
| FL7 |
| Yes |
| Yes |
| Reuse |
| Axis |
| Yes |
| 1 |
| Yes |
| Replace |
| Building being remodeled. Will not install this camera for a little over a year from now. |
| Corner mount and camera need to be purchased and provided to the PM. Will not be installed at this time due to construction on the building. |
| FL8 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch (obsolete) |
Cat 5E Outdoor; 250', use existing conduit
| FL9 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch (obsolete) |
Cat 5E Outdoor; 250', use existing conduit
| FL10 |
| Yes |
| 1 |
| Yes |
| New |
Cat 5E Outdoor; 250', use existing conduit
| FL11 |
| Yes |
| 1 |
| Yes |
| New |
Cat 5E Outdoor; 200'
| FL12 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch |
Pole mount, Cat 5E Outdoor; 40'
Yes
| Yes |
| Reuse |
| Axis |
| FL13 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosh (burned out) |
| Needs a new pole with struts for mounting. BNC cable run to 2nd floor. |
| Requires tie in to existing lightning protection, use existing BNC |
| FL14 |
| Yes |
| Yes |
| Reuse |
| Axis |
| FL15 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch |
| BNC cable run to 2nd floor |
| Requires tie in to existing lightning protection, use existing BNC |
| FL16 |
| Yes |
| Yes |
| Reuse |
| Axis |
| FL17 |
| Yes |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 200'
| FL18 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch (obsolete) |
Encoder/Decoder required use existing BNC
| FL19 |
| Yes |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 200'
| FL20 |
| Yes |
| Yes |
| Reuse |
| Axis |
| FL21 |
| Yes |
| Yes |
| Reuse |
| Axis |
| FL22 |
| Yes |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 250'
| FL23 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch (obsolete) |
Parapet Mount, Cat 5E; 150' * remove old camera*
| FL24 |
| Yes |
| 1 |
| Yes |
| Replace |
| Unknown, non fuctional |
Parapet Mount, Cat 5E; 150' * remove old camera*
| FL25 |
| Yes |
| 1 |
| Yes |
| Replace |
| Bosch (obsolete) |
Corner mount, Cat 5E Outdoor; 200'
| FL26 |
| Yes |
| Yes |
| Reuse |
| Axis |
| FL27 |
| Yes |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 350' + signal booster
| FL28 |
| Yes |
| Yes |
| Reuse |
| Axis |
| FL29 |
| Yes |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 300'
| CC1 |
| Yes |
| 1 |
| Yes |
| New |
Pole mount, Cat 5E; 125' in conduit
| CC2 |
| Yes |
| 1 |
| Yes |
| New |
Parapet Mount, Cat 5E; 150' in conduit
| CC3 |
| Yes |
| 1 |
| Yes |
| New |
Parapet Mount, Cat 5E; 150' in conduit
| CC4 |
| Yes |
| 1 |
| Yes |
| New |
Parapet Mount, Cat 5E; 150' in conduit
| CC5 |
| Yes |
| 1 |
| Yes |
| New |
Parapet Mount, Cat 5E; 150' in conduit
| G1 |
| No |
| 1 |
| Yes |
| Replace |
| Bosch |
Pole mount, encoder/decoder required
| G2 |
| No |
| 1 |
| No |
| New |
Interior mini dome in ceiling, Cat 5E interior, 50'
| G3 |
| No |
| 1 |
| No |
| New |
| Focus on Parking lot |
| Parapet Mount, Cat 5E Outdoor; 100' |
| G4 |
| No |
| 1 |
| Yes |
| New |
Pole mount, 50' trench, Cat 5E Outdoor; 100'
| G5 |
| No |
| 1 |
| Yes |
| Replace |
Pole mount, encoder/decoder required, use existing BNC
| G6 |
| No |
| 1 |
| No |
| Reuse |
| Bosch |
| This camera is located on a pole looking at the gate. To be removed and placed to look over the parking lot for the VCC. |
| G7 |
| No |
| 1 |
| Yes |
| New |
| New install to replace the fixed camera located on the pole (above) and have PTZ capability to watch both inbound and outbound traffic |
| Pole mount use existing Cat 6 cable |
| G8 |
| No |
| 1 |
| No |
| Reuse |
| Bosch |
tie into existing system and need license
| G9 |
| No |
| 1 |
| No |
| New |
Interior mini dome in ceiling; Cat 6 interior; 30'
| G10 |
| No |
| 1 |
| Yes |
| New |
Parapet Mount, Cat 5E Outdoor; 50'
| G11 |
| No |
| 1 |
| No |
| New |
Interior mini dome in ceiling; Cat 5E interior; 25'
| G12 |
| No |
| 1 |
| Yes |
| Replace |
| Bosch |
Requires existing cable to be moved to self contained hand hole, Pole mount
| G13 |
| No |
| 1 |
| No |
| New |
| LRS1 |
| PL4 |
| 1 |
| Yes |
| Replace |
Pole mount, Cat 5E Outdoor in explosive sealed conduit; 75'
| LRS2 |
| PL4 |
| 1 |
| Yes |
| Replace |
Pole Mount, Point-to-Point Cisco Wirless
| LRS3 |
| PL4 |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor in explosive sealed conduit; 100'
| LRS4 |
| PL4 |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor in explosive sealed conduit; 100'
| LRS5 |
| No |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor in explosive sealed conduit; 100'
| LRS6 |
| PL4 |
| 1 |
| Yes |
| Replace |
Corner mount, Cat 5E Outdoor in explosive sealed conduit; 100'
| LRS7 |
| PL4 |
| 1 |
| Yes |
| Replace |
Corner mount, Cat 5E Outdoor in explosive sealed conduit; 50'
| LRS8 |
| PL4 |
| 1 |
| No |
| New |
Telephoto camera, wall mount, Cat 5E Outdoor in explosive sealed condutit; 50'
| B1 |
| No |
| 1 |
| Yes |
| Reuse |
| Bosch |
tie in to VMS, license required
| B2 |
| No |
| 1 |
| Yes |
| Reuse |
| Bosch |
tie in to VMS, license required
| B3 |
| No |
| 1 |
| Yes |
| Reuse |
| Bosch |
tie in to VMS, license required
| B4 |
| No |
| 1 |
| Yes |
| Reuse |
| Bosch |
tie in to VMS, license required
| B5 |
| No |
| 1 |
| No |
| Reuse |
| Bosch |
tie in to VMS, license required
| B6 |
| No |
| 1 |
| No |
| Reuse |
| Bosch |
tie in to VMS, license required
| B7 |
| No |
| 1 |
| No |
| Reuse |
| Bosch |
tie in to VMS, license required
| B8 |
| No |
| 1 |
| Yes |
| Reuse |
| Bosch |
tie in to VMS, license required
| B9 |
| No |
| 1 |
| Yes |
| Reuse |
| Bosch |
tie in to VMS, license required
| B10 |
| No |
| 1 |
| No |
| Reuse |
| Bosch |
tie in to VMS, license required
| B11 |
| No |
| 1 |
| No |
| Reuse |
| Bosch |
tie in to VMS, license required
| B12 |
| No |
| 1 |
| Yes |
| Replace |
| InFinova |
| Replace this camera and raise it up 10 or so feet on the corner of the building |
| Corner mount, replace existing camera and hang new camera an additional 15' up, Cat 5E Outdoor; 100' |
| B13 |
| No |
| 21 |
| No |
| Reuse |
| Analog cameras, needs a tap off |
| Encoder/Decoder |
| B14 |
| No |
| 12 |
| No |
| Reuse |
| 3XLogic, Analog camera, Chinese OEM |
| Analog cameras, needs a tap off |
| Encoder/Decoder, requires T-connection for multi streaming |
| B15 |
| No |
| 1 |
| No |
| New |
Ceiling Mount, Cat 6 Indoor; 100'
| B16 |
| No |
| 1 |
| No |
| New |
Parapet Mount, Cat 6 Outdoor, requires conduit; 50'
| B17 |
| No |
| 1 |
| No |
| New |
Corner Mount, Cat 6 Indoor; 250'
| B18 |
| No |
| 1 |
| No |
| New |
Corner mount, Cat 6 Indoor; 100'
| B19 |
| No |
| 1 |
| No |
| New |
Pole Mount, Cat 6 Indoor; 50'
| B20 |
| No |
| 1 |
| No |
| New |
Ceiling Mount, Cat 6 Indoor; 75'
| B21 |
| No |
| 1 |
| No |
| New |
Ceiling Mount, Cat 6 Indoor; 150'
| B22 |
| Yes |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 250'
| B23 |
| Yes |
| 1 |
| No |
| Replace |
| Bosch |
Corner mount, Cat 5E Outdoor; 80'
| B24 |
| No |
| 1 |
| Yes |
| Replace |
| Bosch |
Corner mount, Cat 5E Outdoor; 200'
| B25 |
| No |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 200'
| B26 |
| No |
| 1 |
| Yes |
| New |
Corner mount, Cat 5E Outdoor; 450' + signal booster
| B27 |
| No |
| 1 |
| Yes |
| Replace |
Corner mount, Cat 5E Outdoor; 250'
| B28 |
| No |
| 1 |
| Yes |
| Reuse |
| Axis |
requires licenses
| B29 |
| No |
| 1 |
| No |
| Reuse |
| Axis 5014 |
requires licenses
| B30 |
| No |
| 1 |
| No |
| Reuse |
| Axis 5014 |
requires licenses
| B31 |
| No |
| 1 |
| No |
| Reuse |
| Axis 5014 |
requires licenses
| B32 |
| No |
| 1 |
| No |
| Reuse |
| Axis 5014 |
requires licenses
| B33 |
| No |
| 1 |
| No |
| Reuse |
| Axis 5014 |
requires licenses
| B34 |
| No |
| 1 |
| No |
| Reuse |
| Axis 5014 |
requires licenses
| B35 |
| No |
| 1 |
| No |
| Reuse |
| Axis 5014 |
requires licenses
| G1 |
| No |
| 1 |
| No |
| Replace |
BNC Connector, pole mount, encoder/decoder, 100’ Cat5E
| G2 |
| No |
| 1 |
| No |
| Replace |
BNC Connector, pole mount, encoder/decoder, 100’ Cat5E
| G3 |
| No |
| 1 |
| No |
| Replace |
BNC Connector, pole mount, encoder/decoder, 100’ Cat5E
| G4 |
| No |
| 1 |
| No |
| Replace |
BNC Connector, pole mount, encoder/decoder, 100’ Cat5E
| G5 |
| No |
| 1 |
| No |
| Replace |
BNC Connector, pole mount, encoder/decoder, 100’ Cat5E
| G6 |
| No |
| 1 |
| No |
| Replace |
BNC Connector, pole mount, encoder/decoder, 100’ Cat5E