Supplemental Schedule B Floor Coating.xls

XLS spreadsheet 174 KB Posted

Attached to
Floor Coating IDIQ Federal contract opportunity
Solicitation number
FA8201-11-R-0032
Issued by
Department of the Air Force Materiel Command Ogden Air Logistics Complex

About this file

Supplemental Schedule B Pricing

View the file

Other files for this federal contract opportunity

Other files attached to Floor Coating IDIQ, newest first.
File Type Posted
Amendment 3.doc DOC document
Revised Schedule B Floor Coating.xlsx XLSX spreadsheet
FA8201-11-R-0032 Amend 1 Q A.pdf PDF
WD UT100046.pdf PDF
WD UT100037.pdf PDF
09900 Painting Specifications.doc DOC document
01000 General Requirements —
Line Item Descriptions.docx DOCX document
09960 High Performance Coatings.doc DOC document
WD UT100048.pdf PDF
Solicitation FA8201-11-R-0032.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 001 Hill AFB

Floor Coating
Supplemental Schedule B
HILL AFB
Year 1 (Basic)Year 2Year 3Year 4Year 5
Line Item and DescriptionUnitQuantityAmountTotalQuantityAmountTotalQuantityAmountTotalQuantityAmountTotalQuantityAmountTotal
Demolition, haul off base and disposal of existing flooring
AAVinyl Floor Tile (non-asbestos)sf250$0.00250$0.00250$0.00250$0.00250$0.00
ABCarpetsf250$0.00250$0.00250$0.00250$0.00250$0.00
ACEquipment Hold Down Bolts/Studsea25$0.0025$0.0025$0.0025$0.0025$0.00
Demolition, haul off base and disposal of existing / Installation of new (Labor and Material)
BAWooden Cove Baself1,000$0.001,000$0.001,000$0.001,000$0.001,000$0.00
BBVinyl Cove Baself1,000$0.001,000$0.001,000$0.001,000$0.001,000$0.00
BCCoating Removalsf25,000$0.0025,000$0.0025,000$0.0025,000$0.0025,000$0.00
BD2" Wide Tape Removallf5,000$0.005,000$0.005,000$0.005,000$0.005,000$0.00
Surface Preparation to Include: (Labor & Material)
CAMasking w/ Plastic Sheetinglf25,000$0.0025,000$0.0025,000$0.0025,000$0.0025,000$0.00
CBLettered Signs-Safetyea25$0.0025$0.0025$0.0025$0.0025$0.00
CDDiamond Grinding and shot Blastingsf17,500$0.0017,500$0.0017,500$0.0017,500$0.0017,500$0.00
CEPower Washingsf2,500$0.002,500$0.002,500$0.002,500$0.002,500$0.00
CFEpoxy patchingsf2,500$0.002,500$0.002,500$0.002,500$0.002,500$0.00
CGSaw Cutting Concretelf250$0.00250$0.00250$0.00250$0.00250$0.00
CHSaw Cut and Seal Jointslf1,000$0.001,000$0.001,000$0.001,000$0.001,000$0.00
Floor Coating System to Include (labor and material)
DAAcrylic Sealersf17,500$0.0017,500$0.0017,500$0.0017,500$0.0017,500$0.00
DBPrimer / Sealer Coatingsf17,500$0.0017,500$0.0017,500$0.0017,500$0.0017,500$0.00
DCEpoxy Solids Coatingsf17,500$0.0017,500$0.0017,500$0.0017,500$0.0017,500$0.00
DDPrepare-Apply 3/16" Epoxy/Urethanesf25,000$0.0025,000$0.0025,000$0.0025,000$0.0025,000$0.00
DEUrethane Coatingsf12,500$0.0012,500$0.0012,500$0.0012,500$0.0012,500$0.00
DFTwo Colored Urethanesf12,500$0.0012,500$0.0012,500$0.0012,500$0.0012,500$0.00
DGSingle Color Safety Paintsf2,000$0.002,000$0.002,000$0.002,000$0.002,000$0.00
DHDouble Color Safety Paintsf2,000$0.002,000$0.002,000$0.002,000$0.002,000$0.00
DILettering Cover Plates 3/4"ea1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DJLettering Cover Plates 2"ea1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DKDock Numbersea1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DLChemically resistant Coatingsf2,500$0.002,500$0.002,500$0.002,500$0.002,500$0.00
DMStatic Dissipation Coatingsf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DNNonSkid Abrasivesf12,500$0.0012,500$0.0012,500$0.0012,500$0.0012,500$0.00
DONovalic Coatingsf1,750$0.001,750$0.001,750$0.001,750$0.001,750$0.00
DP3" Paint Stripeslf10,000$0.0010,000$0.0010,000$0.0010,000$0.0010,000$0.00
Equipment (Rental)
EAScissor Lift, 25' 200lb (Per Day)ea1$0.001$0.001$0.001$0.001$0.00
EBScissor Lift, 25' 200lb (Per Week)ea1$0.001$0.001$0.001$0.001$0.00
ECScissor Lift, 25' 200lb (Per Month)ea1$0.001$0.001$0.001$0.001$0.00
Yearly Totals:Year 1 (Basic)$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.00
CLIN Total:$0.00
Total Contract Cost per yearYear 1 (Basic)$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.00
Over-All Contract Total$0.00

CLIN 002 Little Mountain

Floor Coating
Supplemental Schedule B
Little Mountain
Year 1 (Basic)Year 2Year 3Year 4Year 5
Line Item and DescriptionUnitQuantityAmountTotalQuantityAmountTotalQuantityAmountTotalQuantityAmountTotalQuantityAmountTotal
Demolition, haul off base and disposal of existing flooring
AAVinyl Floor Tile (non-asbestos)sf10$0.0010$0.0010$0.0010$0.0010$0.00
ABCarpetsf25$0.0025$0.0025$0.0025$0.0025$0.00
ACEquipment Hold Down Bolts/Studsea10$0.0010$0.0010$0.0010$0.0010$0.00
Demolition, haul off base and disposal of existing / Installation of new (Labor and Material)
BAWooden Cove Baself250$0.00250$0.00250$0.00250$0.00250$0.00
BBVinyl Cove Baself250$0.00250$0.00250$0.00250$0.00250$0.00
BCCoating Removalsf250$0.00250$0.00250$0.00250$0.00250$0.00
BD2" Wide Tape Removallf250$0.00250$0.00250$0.00250$0.00250$0.00
Surface Preparation to Include: (Labor & Material)
CAMasking w/ Plastic Sheetinglf2,500$0.002,500$0.002,500$0.002,500$0.002,500$0.00
CBLettered Signs-Safetyea10$0.0010$0.0010$0.0010$0.0010$0.00
CDDiamond Grinding and shot Blastingsf1,750$0.001,750$0.001,750$0.001,750$0.001,750$0.00
CEPower Washingsf25$0.0025$0.0025$0.0025$0.0025$0.00
CFEpoxy patchingsf25$0.0025$0.0025$0.0025$0.0025$0.00
CGSaw Cutting Concretelf10$0.0010$0.0010$0.0010$0.0010$0.00
CHSaw Cut and Seal Jointslf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
Floor Coating System to Include (labor and material)
DAAcrylic Sealersf500$0.00500$0.00500$0.00500$0.00500$0.00
DBPrimer / Sealer Coatingsf500$0.00500$0.00500$0.00500$0.00500$0.00
DCEpoxy Solids Coatingsf500$0.00500$0.00500$0.00500$0.00500$0.00
DDPrepare-Apply 3/16" Epoxy/Urethanesf500$0.00500$0.00500$0.00500$0.00500$0.00
DEUrethane Coatingsf500$0.00500$0.00500$0.00500$0.00500$0.00
DFTwo Colored Urethanesf500$0.00500$0.00500$0.00500$0.00500$0.00
DGSingle Color Safety Paintsf500$0.00500$0.00500$0.00500$0.00500$0.00
DHDouble Color Safety Paintsf500$0.00500$0.00500$0.00500$0.00500$0.00
DILettering Cover Plates 3/4"ea5$0.005$0.005$0.005$0.005$0.00
DJLettering Cover Plates 2"ea5$0.005$0.005$0.005$0.005$0.00
DKDock Numbersea5$0.005$0.005$0.005$0.005$0.00
DLChemically resistant Coatingsf25$0.0025$0.0025$0.0025$0.0025$0.00
DMStatic Dissipation Coatingsf50$0.0050$0.0050$0.0050$0.0050$0.00
DNNonSkid Abrasivesf125$0.00125$0.00125$0.00125$0.00125$0.00
DONovalic Coatingsf70$0.0070$0.0070$0.0070$0.0070$0.00
DP3" Paint Stripeslf100$0.00100$0.00100$0.00100$0.00100$0.00
Equipment (Rental)
EAScissor Lift, 25' 200lb (Per Day)ea1$0.001$0.001$0.001$0.001$0.00
EBScissor Lift, 25' 200lb (Per Week)ea1$0.001$0.001$0.001$0.001$0.00
ECScissor Lift, 25' 200lb (Per Month)ea1$0.001$0.001$0.001$0.001$0.00
Yearly Totals:Year 1 (Basic)$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.00
CLIN Total:$0.00

CLIN 003 UTTR

Floor Coating
Supplemental Schedule B
UTTR
Year 1 (Basic)Year 2Year 3Year 4Year 5
Line Item and DescriptionUnitQuantityAmountTotalQuantityAmountTotalQuantityAmountTotalQuantityAmountTotalQuantityAmountTotal
Demolition, haul off base and disposal of existing flooring
AAVinyl Floor Tile (non-asbestos)sf25$0.0025$0.0025$0.0025$0.0025$0.00
ABCarpetsf25$0.0025$0.0025$0.0025$0.0025$0.00
ACEquipment Hold Down Bolts/Studsea5$0.005$0.005$0.005$0.005$0.00
Demolition, haul off base and disposal of existing / Installation of new (Labor and Material)
BAWooden Cove Baself10$0.0010$0.0010$0.0010$0.0010$0.00
BBVinyl Cove Baself50$0.0050$0.0050$0.0050$0.0050$0.00
BCCoating Removalsf250$0.00250$0.00250$0.00250$0.00250$0.00
BD2" Wide Tape Removallf10$0.0010$0.0010$0.0010$0.0010$0.00
Surface Preparation to Include: (Labor & Material)
CAMasking w/ Plastic Sheetinglf2,500$0.002,500$0.002,500$0.002,500$0.002,500$0.00
CBLettered Signs-Safetyea10$0.0010$0.0010$0.0010$0.0010$0.00
CDDiamond Grinding and shot Blastingsf1,750$0.001,750$0.001,750$0.001,750$0.001,750$0.00
CEPower Washingsf25$0.0025$0.0025$0.0025$0.0025$0.00
CFEpoxy patchingsf25$0.0025$0.0025$0.0025$0.0025$0.00
CGSaw Cutting Concretelf125$0.00125$0.00125$0.00125$0.00125$0.00
CHSaw Cut and Seal Jointslf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
Floor Coating System to Include (labor and material)
DAAcrylic Sealersf1,750$0.001,750$0.001,750$0.001,750$0.001,750$0.00
DBPrimer / Sealer Coatingsf1,750$0.001,750$0.001,750$0.001,750$0.001,750$0.00
DCEpoxy Solids Coatingsf1,750$0.001,750$0.001,750$0.001,750$0.001,750$0.00
DDPrepare-Apply 3/16" Epoxy/Urethanesf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DEUrethane Coatingsf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DFTwo Colored Urethanesf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DGSingle Color Safety Paintsf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DHDouble Color Safety Paintsf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DILettering Cover Plates 3/4"ea25$0.0025$0.0025$0.0025$0.0025$0.00
DJLettering Cover Plates 2"ea25$0.0025$0.0025$0.0025$0.0025$0.00
DKDock Numbersea25$0.0025$0.0025$0.0025$0.0025$0.00
DLChemically resistant Coatingsf250$0.00250$0.00250$0.00250$0.00250$0.00
DMStatic Dissipation Coatingsf125$0.00125$0.00125$0.00125$0.00125$0.00
DNNonSkid Abrasivesf1,250$0.001,250$0.001,250$0.001,250$0.001,250$0.00
DONovalic Coatingsf25$0.0025$0.0025$0.0025$0.0025$0.00
DP3" Paint Stripeslf500$0.00500$0.00500$0.00500$0.00500$0.00
Equipment (Rental)
EAScissor Lift, 25' 200lb (Per Day)ea1$0.001$0.001$0.001$0.001$0.00
EBScissor Lift, 25' 200lb (Per Week)ea1$0.001$0.001$0.001$0.001$0.00
ECScissor Lift, 25' 200lb (Per Month)ea1$0.001$0.001$0.001$0.001$0.00
Yearly Totals:Year 1 (Basic)$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.00
CLIN Total:$0.00