Revised Schedule B Floor Coating.xlsx
XLSX spreadsheet 59 KB Posted
- Attached to
- Floor Coating IDIQ
- Solicitation number
- FA8201-11-R-0032
About this file
Revised Schedule B Price File
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3.doc | DOC document | |
| FA8201-11-R-0032 Amend 1 Q A.pdf | ||
| WD UT100046.pdf | ||
| Line Item Descriptions.docx | DOCX document | |
| 09960 High Performance Coatings.doc | DOC document | |
| WD UT100048.pdf | ||
| Solicitation FA8201-11-R-0032.pdf | ||
| 01000 General Requirements | — | |
| WD UT100037.pdf | ||
| 09900 Painting Specifications.doc | DOC document | |
| Supplemental Schedule B Floor Coating.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 001 Hill AFB
| Revised 04 Oct 2011 Floor Coating | ||||||||||||||||
| Supplemental Schedule B | ||||||||||||||||
| HILL AFB | ||||||||||||||||
| Year 1 (Basic) | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||||||
| Line Item and Description | Unit | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total |
| Demolition, haul off base and disposal of existing flooring | ||||||||||||
| AA | Vinyl Floor Tile (non-asbestos) | sf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| AB | Carpet | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| AC | Equipment Hold Down Bolts/Studs | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| Demolition, haul off base and disposal of existing / Installation of new (Labor and Material) | ||||||||||||
| BA | Wooden Cove Base | lf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| BB | Vinyl Cove Base | lf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| BC | Coating Removal | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| BD | 2" Wide Tape Removal | lf | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 |
| Surface Preparation to Include: (Labor & Material) | ||||||||||||
| CA | Masking w/ Plastic Sheeting | lf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| CB | Lettered Signs-Safety | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CC | Diamond Grinding and shot Blasting | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| CD | Power Washing | sf | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 |
| CE | Epoxy patching | sf | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 |
| CF | Saw Cutting Concrete | lf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| CG | Saw Cut and Seal Joints | lf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| Floor Coating System to Include (labor and material) | ||||||||||||
| DA | Acrylic Sealer | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| DB | Primer / Sealer Coating | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| DC | Epoxy Solids Coating | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| DD | Prepare-Apply 3/16" Epoxy/Urethane | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| DE | Urethane Coating | sf | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 |
| DF | Two Colored Urethane | sf | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 |
| DG | Single Color Safety Paint | sf | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 |
| DH | Double Color Safety Paint | sf | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 |
| DI | Lettering Cover Plates 3/4" | ea | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DJ | Lettering Cover Plates 2" | ea | 750 | $0.00 | 750 | $0.00 | 750 | $0.00 | 750 | $0.00 | 750 | $0.00 |
| DK | Dock Numbers | ea | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DL | Chemically resistant Coating | sf | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 |
| DM | Static Dissipation Coating | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DN | NonSkid Abrasive | sf | 9,000 | $0.00 | 9,000 | $0.00 | 9,000 | $0.00 | 9,000 | $0.00 | 9,000 | $0.00 |
| DO | Novalic Coating | sf | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 |
| DP | 3" Paint Stripes | lf | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 |
| DQ | Rapid Curing Epoxy | sf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| DR | Squadron Logo | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| Dust Barrier Construction (labor and material) | ||||||||||||
| EA | 10' Tall Dust Barrier | sf | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 |
| EB | 20' Tall Dust Barrier | sf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| EC | Dust Barrier Over 20' | sf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| Equipment (Rental) | $0.00 | $0.00 | $0.00 | 0 | ||||||||||||
| FA | Scissor Lift/JLG Less Than 40' | ea | 3 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 |
| FB | Scissor Lift/JLG 40'-60' | ea | 3 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 |
| FC | Scissor Lift/JLG 60'-80' | ea | 3 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 |
| Electrical | $0.00 | $0.00 | $0.00 | 0 | ||||||||||||
| GA | Licensed Electrician | hr | 10 | $0.00 | 10 | $0.00 | $0.00 | 10 | $0.00 | $0.00 | 10 | $0.00 | $0.00 | 10 | $0.00 | $0.00 |
| GB | Generator | da | 3 | $0.00 | 3 | $0.00 | $0.00 | 2 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 |
| Yearly Totals: | Year 1 (Basic) | $0.00 | Year 2 | $0.00 | Year 3 | $0.00 | Year 4 | $0.00 | Year 5 | $0.00 | ||
| CLIN Total: | $0.00 | |||||||||||
| Total Contract Cost per year | Year 1 (Basic) | $0.00 | Year 2 | $0.00 | Year 3 | $0.00 | Year 4 | $0.00 | Year 5 | $0.00 | ||
| Over-All Contract Total | $0.00 |
CLIN 002 Little Mountain
| Revised 04 Oct 2011 Floor Coating | ||||||||||||||||
| Supplemental Schedule B | ||||||||||||||||
| Little Mountain | ||||||||||||||||
| Year 1 (Basic) | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||||||
| Line Item and Description | Unit | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total |
| Demolition, haul off base and disposal of existing flooring | ||||||||||||
| AA | Vinyl Floor Tile (non-asbestos) | sf | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| AB | Carpet | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| AC | Equipment Hold Down Bolts/Studs | ea | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| Demolition, haul off base and disposal of existing / Installation of new (Labor and Material) | ||||||||||||
| BA | Wooden Cove Base | lf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| BB | Vinyl Cove Base | lf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| BC | Coating Removal | sf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| BD | 2" Wide Tape Removal | lf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| Surface Preparation to Include: (Labor & Material) | ||||||||||||
| CA | Masking w/ Plastic Sheeting | lf | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 |
| CB | Lettered Signs-Safety | ea | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| CD | Diamond Grinding and shot Blasting | sf | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 |
| CE | Power Washing | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CF | Epoxy patching | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CG | Saw Cutting Concrete | lf | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| CH | Saw Cut and Seal Joints | lf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| Floor Coating System to Include (labor and material) | ||||||||||||
| DA | Acrylic Sealer | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DB | Primer / Sealer Coating | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DC | Epoxy Solids Coating | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DD | Prepare-Apply 3/16" Epoxy/Urethane | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DE | Urethane Coating | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DF | Two Colored Urethane | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DG | Single Color Safety Paint | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DH | Double Color Safety Paint | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DI | Lettering Cover Plates 3/4" | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| DJ | Lettering Cover Plates 2" | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| DK | Dock Numbers | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| DL | Chemically resistant Coating | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DM | Static Dissipation Coating | sf | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 |
| DN | NonSkid Abrasive | sf | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 |
| DO | Novalic Coating | sf | 70 | $0.00 | 70 | $0.00 | 70 | $0.00 | 70 | $0.00 | 70 | $0.00 |
| DP | 3" Paint Stripes | lf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| DQ | Rapid Curing Epoxy | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DR | Squadron Logo | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Dust Barrier Construction (labor and material) | ||||||||||||
| EA | 10' Tall Dust Barrier | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| EB | 20' Tall Dust Barrier | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| EC | Dust Barrier Over 20' | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| Equipment (Rental) | ||||||||||||
| FA | Scissor Lift/JLG Less Than 40' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| FB | Scissor Lift/JLG 40'-60' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| FC | Scissor Lift/JLG 60'-80' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Electrical | ||||||||||||
| GA | Licensed Electrician | hr | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| GB | Generator | da | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Yearly Totals: | Year 1 (Basic) | $0.00 | Year 2 | $0.00 | Year 3 | $0.00 | Year 4 | $0.00 | Year 5 | $0.00 | |
| CLIN Total: | $0.00 |
CLIN 003 UTTR
| Revised 04 Oct 2011 Floor Coating | ||||||||||||||||
| Supplemental Schedule B | ||||||||||||||||
| UTTR | ||||||||||||||||
| Year 1 (Basic) | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||||||
| Line Item and Description | Unit | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total |
| Demolition, haul off base and disposal of existing flooring | ||||||||||||
| AA | Vinyl Floor Tile (non-asbestos) | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| AB | Carpet | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| AC | Equipment Hold Down Bolts/Studs | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| Demolition, haul off base and disposal of existing / Installation of new (Labor and Material) | ||||||||||||
| BA | Wooden Cove Base | lf | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| BB | Vinyl Cove Base | lf | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 |
| BC | Coating Removal | sf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| BD | 2" Wide Tape Removal | lf | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| Surface Preparation to Include: (Labor & Material) | ||||||||||||
| CA | Masking w/ Plastic Sheeting | lf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| CB | Lettered Signs-Safety | ea | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| CD | Diamond Grinding and shot Blasting | sf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| CE | Power Washing | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CF | Epoxy patching | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CG | Saw Cutting Concrete | lf | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 |
| CH | Saw Cut and Seal Joints | lf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| Floor Coating System to Include (labor and material) | ||||||||||||
| DA | Acrylic Sealer | sf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| DB | Primer / Sealer Coating | sf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| DC | Epoxy Solids Coating | sf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| DD | Prepare-Apply 3/16" Epoxy/Urethane | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DE | Urethane Coating | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DF | Two Colored Urethane | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DG | Single Color Safety Paint | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DH | Double Color Safety Paint | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DI | Lettering Cover Plates 3/4" | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DJ | Lettering Cover Plates 2" | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DK | Dock Numbers | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DL | Chemically resistant Coating | sf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| DM | Static Dissipation Coating | sf | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 |
| DN | NonSkid Abrasive | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DO | Novalic Coating | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DP | 3" Paint Stripes | lf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DQ | Rapid Curing Epoxy | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DR | Squadron Logo | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Dust Barrier Construction (labor and material) | ||||||||||||
| EA | 10' Tall Dust Barrier | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| EB | 20' Tall Dust Barrier | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| EC | Dust Barrier Over 20' | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| Equipment (Rental) | ||||||||||||
| FA | Scissor Lift/JLG Less Than 40' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| FB | Scissor Lift/JLG 40'-60' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| FC | Scissor Lift/JLG 60'-80' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Electrical | ||||||||||||
| GA | Licensed Electrician | hr | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| GB | Generator | da | 2 | $0.00 | 2 | $0.00 | 2 | $0.00 | 2 | $0.00 | 2 | $0.00 |
| Yearly Totals: | Year 1 (Basic) | $0.00 | Year 2 | $0.00 | Year 3 | $0.00 | Year 4 | $0.00 | Year 5 | $0.00 | |
| CLIN Total: | $0.00 |
File details come from the government source that posted it. Updated .