About this file
From the source
Revised Schedule B Price File
Other files for this federal contract opportunity
Other files attached to Floor Coating IDIQ, newest first.
| File |
Type |
Posted |
| Amendment 3.doc |
DOC document |
|
| FA8201-11-R-0032 Amend 1 Q A.pdf |
PDF |
|
| WD UT100046.pdf |
PDF |
|
| WD UT100037.pdf |
PDF |
|
| 09900 Painting Specifications.doc |
DOC document |
|
| Supplemental Schedule B Floor Coating.xls |
XLS spreadsheet |
|
| 01000 General Requirements |
— |
|
| Line Item Descriptions.docx |
DOCX document |
|
| 09960 High Performance Coatings.doc |
DOC document |
|
| WD UT100048.pdf |
PDF |
|
| Solicitation FA8201-11-R-0032.pdf |
PDF |
|
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
CLIN 001 Hill AFB
| Revised 04 Oct 2011 Floor Coating | | | | | | | | | | | | | | | | |
| Supplemental Schedule B | | | | | | | | | | | | | | | | |
| HILL AFB | | | | | | | | | | | | | | | | |
| | Year 1 (Basic) | | | Year 2 | | | Year 3 | | | Year 4 | | | Year 5 | | |
| Line Item and Description | Unit | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total |
| Demolition, haul off base and disposal of existing flooring | | | | | | | | | | | | |
| AA | Vinyl Floor Tile (non-asbestos) | sf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| AB | Carpet | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| AC | Equipment Hold Down Bolts/Studs | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| Demolition, haul off base and disposal of existing / Installation of new (Labor and Material) | | | | | | | | | | | | |
| BA | Wooden Cove Base | lf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| BB | Vinyl Cove Base | lf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| BC | Coating Removal | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| BD | 2" Wide Tape Removal | lf | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 |
| Surface Preparation to Include: (Labor & Material) | | | | | | | | | | | | |
| CA | Masking w/ Plastic Sheeting | lf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| CB | Lettered Signs-Safety | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CC | Diamond Grinding and shot Blasting | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| CD | Power Washing | sf | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 |
| CE | Epoxy patching | sf | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 |
| CF | Saw Cutting Concrete | lf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| CG | Saw Cut and Seal Joints | lf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| Floor Coating System to Include (labor and material) | | | | | | | | | | | | |
| DA | Acrylic Sealer | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| DB | Primer / Sealer Coating | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| DC | Epoxy Solids Coating | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| DD | Prepare-Apply 3/16" Epoxy/Urethane | sf | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 | 15,000 | $0.00 |
| DE | Urethane Coating | sf | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 |
| DF | Two Colored Urethane | sf | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 | 12,500 | $0.00 |
| DG | Single Color Safety Paint | sf | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 |
| DH | Double Color Safety Paint | sf | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 | 2,000 | $0.00 |
| DI | Lettering Cover Plates 3/4" | ea | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DJ | Lettering Cover Plates 2" | ea | 750 | $0.00 | 750 | $0.00 | 750 | $0.00 | 750 | $0.00 | 750 | $0.00 |
| DK | Dock Numbers | ea | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DL | Chemically resistant Coating | sf | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 |
| DM | Static Dissipation Coating | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DN | NonSkid Abrasive | sf | 9,000 | $0.00 | 9,000 | $0.00 | 9,000 | $0.00 | 9,000 | $0.00 | 9,000 | $0.00 |
| DO | Novalic Coating | sf | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 |
| DP | 3" Paint Stripes | lf | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 |
| DQ | Rapid Curing Epoxy | sf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| DR | Squadron Logo | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| Dust Barrier Construction (labor and material) | | | | | | | | | | | | |
| EA | 10' Tall Dust Barrier | sf | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 | 5,000 | $0.00 |
| EB | 20' Tall Dust Barrier | sf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| EC | Dust Barrier Over 20' | sf | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 | 1,000 | $0.00 |
| Equipment (Rental) | | | | | | $0.00 | | | $0.00 | | | $0.00 | | | 0 | |
| FA | Scissor Lift/JLG Less Than 40' | ea | 3 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 |
| FB | Scissor Lift/JLG 40'-60' | ea | 3 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 |
| FC | Scissor Lift/JLG 60'-80' | ea | 3 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 |
| Electrical | | | | | | $0.00 | | | $0.00 | | | $0.00 | | | 0 | |
| GA | Licensed Electrician | hr | 10 | $0.00 | 10 | $0.00 | $0.00 | 10 | $0.00 | $0.00 | 10 | $0.00 | $0.00 | 10 | $0.00 | $0.00 |
| GB | Generator | da | 3 | $0.00 | 3 | $0.00 | $0.00 | 2 | $0.00 | $0.00 | 3 | $0.00 | $0.00 | 3 | $0.00 | $0.00 |
| Yearly Totals: | | Year 1 (Basic) | $0.00 | Year 2 | $0.00 | Year 3 | $0.00 | Year 4 | $0.00 | Year 5 | $0.00 |
| CLIN Total: | $0.00 | | | | | | | | | | |
| Total Contract Cost per year | | | Year 1 (Basic) | $0.00 | Year 2 | $0.00 | Year 3 | $0.00 | Year 4 | $0.00 | Year 5 | $0.00 |
| Over-All Contract Total | | $0.00 | | | | | | | | | | |
CLIN 002 Little Mountain
| Revised 04 Oct 2011 Floor Coating | | | | | | | | | | | | | | | | |
| Supplemental Schedule B | | | | | | | | | | | | | | | | |
| Little Mountain | | | | | | | | | | | | | | | | |
| | Year 1 (Basic) | | | Year 2 | | | Year 3 | | | Year 4 | | | Year 5 | | |
| Line Item and Description | Unit | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total |
| Demolition, haul off base and disposal of existing flooring | | | | | | | | | | | | |
| AA | Vinyl Floor Tile (non-asbestos) | sf | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| AB | Carpet | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| AC | Equipment Hold Down Bolts/Studs | ea | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| Demolition, haul off base and disposal of existing / Installation of new (Labor and Material) | | | | | | | | | | | | |
| BA | Wooden Cove Base | lf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| BB | Vinyl Cove Base | lf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| BC | Coating Removal | sf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| BD | 2" Wide Tape Removal | lf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| Surface Preparation to Include: (Labor & Material) | | | | | | | | | | | | |
| CA | Masking w/ Plastic Sheeting | lf | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 | 2,500 | $0.00 |
| CB | Lettered Signs-Safety | ea | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| CD | Diamond Grinding and shot Blasting | sf | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 | 1,750 | $0.00 |
| CE | Power Washing | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CF | Epoxy patching | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CG | Saw Cutting Concrete | lf | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| CH | Saw Cut and Seal Joints | lf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| Floor Coating System to Include (labor and material) | | | | | | | | | | | | |
| DA | Acrylic Sealer | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DB | Primer / Sealer Coating | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DC | Epoxy Solids Coating | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DD | Prepare-Apply 3/16" Epoxy/Urethane | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DE | Urethane Coating | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DF | Two Colored Urethane | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DG | Single Color Safety Paint | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DH | Double Color Safety Paint | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DI | Lettering Cover Plates 3/4" | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| DJ | Lettering Cover Plates 2" | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| DK | Dock Numbers | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| DL | Chemically resistant Coating | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DM | Static Dissipation Coating | sf | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 |
| DN | NonSkid Abrasive | sf | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 |
| DO | Novalic Coating | sf | 70 | $0.00 | 70 | $0.00 | 70 | $0.00 | 70 | $0.00 | 70 | $0.00 |
| DP | 3" Paint Stripes | lf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| DQ | Rapid Curing Epoxy | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DR | Squadron Logo | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Dust Barrier Construction (labor and material) | | | | | | | | | | | | |
| EA | 10' Tall Dust Barrier | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| EB | 20' Tall Dust Barrier | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| EC | Dust Barrier Over 20' | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| Equipment (Rental) | | | | | | | | | | | | |
| FA | Scissor Lift/JLG Less Than 40' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| FB | Scissor Lift/JLG 40'-60' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| FC | Scissor Lift/JLG 60'-80' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Electrical | | | | | | | | | | | | |
| GA | Licensed Electrician | hr | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| GB | Generator | da | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Yearly Totals: | | Year 1 (Basic) | $0.00 | Year 2 | $0.00 | Year 3 | $0.00 | Year 4 | $0.00 | Year 5 | $0.00 |
| CLIN Total: | $0.00 | | | | | | | | | | |
CLIN 003 UTTR
| Revised 04 Oct 2011 Floor Coating | | | | | | | | | | | | | | | | |
| Supplemental Schedule B | | | | | | | | | | | | | | | | |
| UTTR | | | | | | | | | | | | | | | | |
| | Year 1 (Basic) | | | Year 2 | | | Year 3 | | | Year 4 | | | Year 5 | | |
| Line Item and Description | Unit | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total | Quantity | Amount | Total |
| Demolition, haul off base and disposal of existing flooring | | | | | | | | | | | | |
| AA | Vinyl Floor Tile (non-asbestos) | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| AB | Carpet | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| AC | Equipment Hold Down Bolts/Studs | ea | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 | 5 | $0.00 |
| Demolition, haul off base and disposal of existing / Installation of new (Labor and Material) | | | | | | | | | | | | |
| BA | Wooden Cove Base | lf | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| BB | Vinyl Cove Base | lf | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 | 50 | $0.00 |
| BC | Coating Removal | sf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| BD | 2" Wide Tape Removal | lf | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| Surface Preparation to Include: (Labor & Material) | | | | | | | | | | | | |
| CA | Masking w/ Plastic Sheeting | lf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| CB | Lettered Signs-Safety | ea | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| CD | Diamond Grinding and shot Blasting | sf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| CE | Power Washing | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CF | Epoxy patching | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| CG | Saw Cutting Concrete | lf | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 |
| CH | Saw Cut and Seal Joints | lf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| Floor Coating System to Include (labor and material) | | | | | | | | | | | | |
| DA | Acrylic Sealer | sf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| DB | Primer / Sealer Coating | sf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| DC | Epoxy Solids Coating | sf | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 | 1,500 | $0.00 |
| DD | Prepare-Apply 3/16" Epoxy/Urethane | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DE | Urethane Coating | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DF | Two Colored Urethane | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DG | Single Color Safety Paint | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DH | Double Color Safety Paint | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DI | Lettering Cover Plates 3/4" | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DJ | Lettering Cover Plates 2" | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DK | Dock Numbers | ea | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DL | Chemically resistant Coating | sf | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 | 250 | $0.00 |
| DM | Static Dissipation Coating | sf | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 | 125 | $0.00 |
| DN | NonSkid Abrasive | sf | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 | 1,250 | $0.00 |
| DO | Novalic Coating | sf | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 | 25 | $0.00 |
| DP | 3" Paint Stripes | lf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DQ | Rapid Curing Epoxy | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| DR | Squadron Logo | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Dust Barrier Construction (labor and material) | | | | | | | | | | | | |
| EA | 10' Tall Dust Barrier | sf | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 | 500 | $0.00 |
| EB | 20' Tall Dust Barrier | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| EC | Dust Barrier Over 20' | sf | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 | 100 | $0.00 |
| Equipment (Rental) | | | | | | | | | | | | |
| FA | Scissor Lift/JLG Less Than 40' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| FB | Scissor Lift/JLG 40'-60' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| FC | Scissor Lift/JLG 60'-80' | ea | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 |
| Electrical | | | | | | | | | | | | |
| GA | Licensed Electrician | hr | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 | 10 | $0.00 |
| GB | Generator | da | 2 | $0.00 | 2 | $0.00 | 2 | $0.00 | 2 | $0.00 | 2 | $0.00 |
| Yearly Totals: | | Year 1 (Basic) | $0.00 | Year 2 | $0.00 | Year 3 | $0.00 | Year 4 | $0.00 | Year 5 | $0.00 |
| CLIN Total: | $0.00 | | | | | | | | | | |
File details come from the government source that posted it.
Updated .