About this file

Document Summary: WWYK060337 Repair Air Ventilation System Room 125 Building 3708

This is a set of technical construction drawings for repair work on an air ventilation system located in Room 125 of Building 3708 at Tinker Air Force Base, Oklahoma. The drawing package includes mechanical, electrical, and demolition plans with detailed specifications and symbols. The project is identified as WWYK060337 and was prepared by AS-builts CLCI on November 26, 2007.

The mechanical scope includes repair and replacement of the air ventilation system with detailed plans showing ductwork routing, exhaust fan installation, filter bank details, and mechanical demolition requirements. The exhaust fan schedule specifies a COOK model 330025 unit with 6840 CFM capacity, 1.0 horsepower, 480 volts, three-phase operation. Electrical drawings provide power plan details, demolition plan specifications, and comprehensive symbols legend for conduit, raceway, wiring, lighting fixtures, receptacles, switches, fire alarm systems, telephone/communication systems, and grounding requirements. General notes require the contractor to submit a schedule of work, coordinate with the electrical contractor, complete new work without disrupting existing electrical service, and comply with the National Electrical Safety Code and Air Force regulations. The contractor must coordinate with the contracting officer for all controlled areas and restricted access.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

060337-G000

060337-M000
060337-M100
060337-M101
060337-E000
060337-E100
060337-E101

File details come from the government source that posted it. Updated .