190099_ATT11_Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- FA813726R0017
About this file
This is a set of construction design documents for a federal facility improvement project at Tinker Air Force Base in Oklahoma. The project, designated WWYK190099, involves the repair of heating and chilled water piping at Avionics Facility B3708. The work is being managed by the Air Force Materiel Command (AFMC), 72nd Air Base Wing (ABW), Civil Engineer Directorate, with an issue date of December 12, 2025, and is currently at the 35% design phase.
The project scope includes the demolition of existing pipe insulation and vapor retardant material on chilled water piping throughout the building, followed by the installation of new cellular glass insulation with vapor retardant service jackets on all chilled water piping. Work is organized in two phases: Phase One affects rooms 144, 147, and 160 (avionics and instruments production areas), while Phase Two addresses all other rooms in the building where chilled water piping is located. Piping insulation removal and reinstallation must be performed in lengths not exceeding 65 feet per section. The contractor is responsible for protecting production and work areas from debris, field-verifying existing conditions, erecting construction fencing and barricades, coordinating facility access with building users, and repairing any damage to grounds or existing facilities caused by construction operations. New insulation systems must be installed in accordance with UFGS 23 07 00. The design documents include mechanical demolition plans, mechanical new work plans, and mechanical details with pipe insulation and wall penetration specifications.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
WWYK190099
REPAIR HEATING & CHILLED
WATER PIPING
AVIONICS FACILITY B3708
KEY PLAN:
GENERAL NOTES:
DISCIPLINE
PROJECT
LOCATION
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
W W
YK
RE
PA
IR
H
EA
TI
NG
C
HI
LL
ED
W
AT
ER
P
IP
IN
G
AV
IO
NI
CS
F
AC
ILI
TY
B
D
EC
TE
PA
-C
SA
G
G-101
F
BA
KE
R
S
VI
N
ES
\E ng r\D es ig n\ s\
\2
9\
0_ Su pp or t\0 _3
_D ra w in gs \P
D F
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
01 04
MD101 MECHANICAL DEMOLITION PLAN
M-101 MECHANICAL NEW WORK PLAN
4 M-501 MECHANICAL DETAILS
Turbine Dr.
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Crutcho Creek
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
Arnold St.
Ea st
D r.
SE 74th St
SE 59th St.
Ai r D ep ot
Patrol Rd.
St af f D r.
Reserve Rd.
5th Ave
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
7th St.
"H " A ve
M cN ar ne y Av e.
Mitchell Ave
Al er t R d.
Co ok
A ve
W es t D r.
"E "A ve
Extender Dr.
Sentry Rd.
34th St.
Twining Dr.
5th Ave.
Jo ne s
Globemaster Dr.
To w er R d.
Vanaman Rd.
In du st ria l B lv d.
So ut h St
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
Ai r D ep ot
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
Mercury Rd.
1st St.
Br ow n Dr
Po nd
R d.
O ld
A ir
De po t
Airey Dr.
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Vandenberg Dr.
Hi llt op R d.
Do rm ito ry
R d.
Dormitory Rd.
"M " A ve
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
Co m m od ity D r.
Doolittle Ave
W hi te D r.
3rd Ave.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Ai r D ep ot
B lv d
Turbine Dr. Turbine Dr.
Central Plant Dr.
6th St.6th St.
Falco n Dr.
Blackb ird
Dr.
W ey la nd
L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Ph an to m
D r.
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
La w re nc e
M un de ll
Nabors Dr.
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ta il
Fe at he r D r.
Holden Dr.
Ai re y C ir.
Smith Ct.
Ra ve n Ct
Air Dep ot Ai r D ep ot
Vanaman Rd.
1st St.
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll A ve
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
Pr op ul sio n Dr
Stratofortress Dr.
96021
Arnold St.
62501W 62501E
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
PROJECT
LOCATION
(FUTURE
HAUL ROUTE)
(F
UT
UR
E
HA
UL
R
OU
TE
FUTURE
TRUCK GATE
FUTURE
HAUL ROUTE
OF
TI
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
TINKER AFB, OK
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
35%
W W
YK
RE
PA
IR
H
EA
TI
NG
C
HI
LL
ED
W
AT
ER
P
IP
IN
G
AV
IO
NI
CS
F
AC
ILI
TY
B
D
EC
TE
PA
-C
SA
G
Q G
AU
N
A
MD101
F
BA
KE
R
S
VI
N
ES
\E ng r\D es ig n\ s\
\2
9\
0_ Su pp or t\0 _3
_D ra w in gs \P
D F
ME
CH
AN
IC
AL
D
EM
OL
IT
IO
N
PL
AN
02 04
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. PROTECT ALL PRODUCTION AND WORK AREAS FROM DEBRIS DURING DEMOLITION
AND CONSTRUCTION.
3. ALL NEW INSULATION SYSTEMS SHALL BE INSTALLED IAW UFGS 23 07 00
4. PIPE INSULATION THAT PASSES THROUGH THE MECHANICAL ROOM WALL SHALL BE
A NEW CONTINUOUS PIECE, ADDITIONAL PIPING IN THE MECHANICAL ROOM IS N.I.C.
DISCONNECT AND REMOVE EXISTING LIGHT FIXTURES AND CEILING SYSTEM
AS REQUIRED TO DEMOLISH AND REPLACE HVAC PIPING INSULATION.
DEMOLISH ALL EXISTING VAPOR RETARDANT MATERIAL AND INSULATION ON
CHILLED WATER PIPING IN THE BUILDING.
VISUALLY INSPECT EXTERIOR OF THE CHILLED WATER PIPING FOR LEAKS,
CORROSION & OTHER DAMAGE.
MD101
MECHANICAL DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
LEGEND
PIPING NOT SHOWN ON AS-BUILTS, LOCATION DETERMINED BASED ON
FLOW DIAGRAMS, HAS BEEN FIELD VERIFIED.
PHASING PLAN
1. PHASE ON WILL TAKE PLACE IN IN ROOMS 144, 147, & 160. THE REMOVAL OF THE
CEILING AND PIPING INSULATION TO REINSULATE THE CHILLED WATER PIPING
MUST BE DONE IN LENGTHS NO GREATER THAN 65 FEET.
2. PHASE TWO WILL AFFECT ALL OTHER ROOMS IN THE BUILDING WHERE CHILLED
WATER PIPING IS LOCATED. THE REMOVAL OF THE CEILING AND PIPING INSULATION
TO REINSULATE THE CHILLED WATER PIPING MUST BE DONE IN LENGTHS NO
GREATER THAN 65 FEET. ANY SPACES THAT WILL BE BLOCKED OFF TO THE USER
DUE TO WORK MUST BE COMMUNICATED TO THE USER AND ALLOWANCES MADE
FOR ACCESS DURING CONSTRUCTION.
4 5
D
C
3 8 9 10 112
E
B
F
G
H
SOFTWARE
SUPPORT
SOFTWARE
MAINT OFFICE
CLASS 300,000
QUALITY OFFICE
SECURITY OFFICE
FOYER
UNIT CHIEF OFFICE
PRODUCTION
SUPPORT
OFFICE
OFFICE
OFFICE
MECHANICAL ROOM
139 CORRIDOR
164 126
JANITOR
MOTOR
GENERATORS
SEALING ROOM
CO
RR
ID
OR
ENGINEERING
OFFICE
CONFERENCE
ROOM
WOMEN'S ROOM
MENS ROOM
VAULT
CLOSET
HARDWARE
STORAGE
OFFICE
T.O ROOM
SERVER
ROOM
WOMEN
WOMEN
LOCKERS
LOCKERS
BREAK ROOM
OFFICE
AVIONICS &
INSTRUMENTS
PRODUCTION
CLASS 300,000
SCREEN ROOM
B-2 TPS
DEVELOPMENT
PMEL
156 FILTER STORAGE
CO
RR
ID
OR
B-2 AVIONICS
STAGING
PAINT ROOM
STRIPPING
ROOM
149A
STORAGE
149B
STORAGE
SHIPPING/RECEIVING
149C
STORAGE
ROOF ACCESS
OFFICE
OFFICE
CO
RR
ID
OR
CO
RR
ID
OR
MIC SCHEDULING
OFFICE
PARTS STORAGE
3 155 CORRIDOR
COMM
MECHANICAL
400 HZ GENERATORS
EN
TR
AN
CE
CW S C W SCW S CW S
G H S
H W R
H W S
G H R
H W S
H W R
H W S
G H R G H S
G H S
G H R
G H R G H S
G H R G H S
H W S
H W R
H W R
H W R
H W S
H W S
C W R
C W R
C W S
C W S
H W R
H W R
H W S
H W S
C W S
C W R
C W R
H W S H W R
CW S C W S CW S
C W R CW R CW R
H W S H W S H W S
C W R
H W R H W RH W S H W S
H W R H W R H W R
H W R
H W S
H W R
H W R
H W S
H W S
H W R H W S
H W R
H W R
H W S
H W S
H W S H W R
CW S
C W R
CW S
CW R
H W S
G H R G H S
H W R H W S C W R
H W R
H W S
H W S
H W S
C W R C W S H W R H W S
CW R CW RG H R
G H S
H W R
H W R
H W R
C W R H W S H W R H W R
H W R
H W S
C W S
H W R H W RH W S H W S
H W R
H W S
H W S
H W S
H W R
H W R
H W R
H W R
H W R H W R H W R H W S H W S H W S
H W S
H W S
C W S
C W S
C W R
C W R
C W R
C W R
C W R C W R CW R
CW S CW S C W S
C W S
C W S
C W S
C W S
C W S
C W R
C W R
1 32
1 2
1 2
1 2
1 2
N.I.C.
AutoCAD SHX Text
DHC-19
AutoCAD SHX Text
VAV-18
AutoCAD SHX Text
VAV-6
AutoCAD SHX Text
VAV-5
AutoCAD SHX Text
VAV-4
AutoCAD SHX Text
AHU-9
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
UH-10
AutoCAD SHX Text
DHC-27
AutoCAD SHX Text
AHU-4
AutoCAD SHX Text
AHU-8
AutoCAD SHX Text
CV-12
AutoCAD SHX Text
VAV-7
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
VAV-1
AutoCAD SHX Text
CV-2
AutoCAD SHX Text
VAV-17
AutoCAD SHX Text
CV-9
AutoCAD SHX Text
CV-13
AutoCAD SHX Text
MAU-2
AutoCAD SHX Text
VAV-14
AutoCAD SHX Text
MAU-1
AutoCAD SHX Text
UH-6
AutoCAD SHX Text
UH-7
AutoCAD SHX Text
VAV-16
AutoCAD SHX Text
UH-5
AutoCAD SHX Text
AHU-6
AutoCAD SHX Text
UH-4
AutoCAD SHX Text
UH-3
AutoCAD SHX Text
UH-2
AutoCAD SHX Text
UH-1
AutoCAD SHX Text
CV-22
AutoCAD SHX Text
VAV-20
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
VAV-24
AutoCAD SHX Text
MAU-3
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
TINKER AFB, OK
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
35%
W W
YK
RE
PA
IR
H
EA
TI
NG
C
HI
LL
ED
W
AT
ER
P
IP
IN
G
AV
IO
NI
CS
F
AC
ILI
TY
B
D
EC
TE
PA
-C
SA
G
Q G
AU
N
A
M-101
F
BA
KE
R
S
VI
N
ES
\E ng r\D es ig n\ s\
\2
9\
0_ Su pp or t\0 _3
_D ra w in gs \P
D F
ME
CH
AN
IC
AL
N
EW
W
OR
K
PL
AN
03 04
GENERAL NOTES
M-101
MECHANICAL NEW WORK PLAN
SCALE: 1/8" = 1'-0"
KEYED NOTES
REMOVE ALL MATERIALS SUCH AS RUST, SCALE, DIRT, AND MOISTURE FROM
SURFACES TO RECEIVE INSULATION.
INSTALL NEW CELLULAR GLASS INSULATION WITH VAPOR RETARDANT ALL
SERVICE JACKET ON ALL CHILLED WATER PIPING IN THE BUILDING.
REINSTALL EXISTING CEILING GRID AND LIGHT FIXTURES, REPLACE ANY
CEILING TILES BROKEN DURING REMOVAL OR WITH WATER DAMAGE.
LEGEND
PIPING NOT SHOWN ON AS-BUILTS, LOCATION DETERMINED BASED ON
FLOW DIAGRAMS. HAS BEEN FIELD VERIFIED.
PHASING PLAN
1. PHASE ON WILL TAKE PLACE IN IN ROOMS 144, 147, & 160. THE REMOVAL OF THE
CEILING AND PIPING INSULATION TO REINSULATE THE CHILLED WATER PIPING
MUST BE DONE IN LENGTHS NO GREATER THAN 65 FEET.
2. PHASE TWO WILL AFFECT ALL OTHER ROOMS IN THE BUILDING WHERE CHILLED
WATER PIPING IS LOCATED. THE REMOVAL OF THE CEILING AND PIPING INSULATION
TO REINSULATE THE CHILLED WATER PIPING MUST BE DONE IN LENGTHS NO
GREATER THAN 65 FEET. ANY SPACES THAT WILL BE BLOCKED OFF TO THE USER
DUE TO WORK MUST BE COMMUNICATED TO THE USER AND ALLOWANCES MADE
FOR ACCESS DURING CONSTRUCTION.
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. PROTECT ALL PRODUCTION AND WORK AREAS FROM DEBRIS DURING DEMOLITION
AND CONSTRUCTION.
3. ALL NEW INSULATION SYSTEMS SHALL BE INSTALLED IAW UFGS 23 07 00
4. PIPE INSULATION THAT PASSES THROUGH THE MECHANICAL ROOM WALL SHALL BE
A NEW CONTINUOUS PIECE, ADDITIONAL PIPING IN THE MECHANICAL ROOM IS N.I.C.
4 5
D
C
3 8 9 10 112
E
B
F
G
H
SOFTWARE
SUPPORT
SOFTWARE
MAINT OFFICE
CLASS 300,000
QUALITY OFFICE
SECURITY OFFICE
FOYER
UNIT CHIEF OFFICE
PRODUCTION
SUPPORT
OFFICE
OFFICE
OFFICE
MECHANICAL ROOM
139 CORRIDOR
164 126
JANITOR
MOTOR
GENERATORS
SEALING ROOM
CO
RR
ID
OR
ENGINEERING
OFFICE
CONFERENCE
ROOM
WOMEN'S ROOM
MENS ROOM
VAULT
CLOSET
HARDWARE
STORAGE
OFFICE
T.O ROOM
SERVER
ROOM
WOMEN
WOMEN
LOCKERS
LOCKERS
BREAK ROOM
OFFICE
AVIONICS &
INSTRUMENTS
PRODUCTION
CLASS 300,000
SCREEN ROOM
B-2 TPS
DEVELOPMENT
PMEL
156 FILTER STORAGE
CO
RR
ID
OR
B-2 AVIONICS
STAGING
PAINT ROOM
STRIPPING
ROOM
149A
STORAGE
149B
STORAGE
SHIPPING/RECEIVING
149C
STORAGE
ROOF ACCESS
OFFICE
OFFICE
CO
RR
ID
OR
CO
RR
ID
OR
MIC SCHEDULING
OFFICE
PARTS STORAGE
3 155 CORRIDOR
COMM
MECHANICAL
400 HZ GENERATORS
EN
TR
AN
CE
CW S C W SCW S CW S
G H S
H W R
H W S
G H R
H W S
H W R
H W S
G H R G H S
G H S
G H R
G H R G H S
G H R G H S
H W S
H W R
H W R
H W R
H W S
H W S
C W R
C W R
C W S
C W S
H W R
H W R
H W S
H W S
C W S
C W R
C W R
H W S H W R
CW S C W S CW S
C W R CW R CW R
H W S H W S H W S
C W R
H W R H W RH W S H W S
H W R H W R H W R
H W R
H W S
H W R
H W R
H W S
H W S
H W R H W S
H W R
H W R
H W S
H W S
H W S H W R
CW S
C W R
CW S
CW R
H W S
G H R G H S
H W R H W S C W R
H W R
H W S
H W S
H W S
C W R C W S H W R H W S
CW R CW RG H R
G H S
H W R
H W R
H W R
C W R H W S H W R H W R
H W R
H W S
C W S
H W R H W RH W S H W S
H W R
H W S
H W S
H W S
H W R
H W R
H W R
H W R
H W R H W R H W R H W S H W S H W S
H W S
H W S
C W S
C W S
C W R
C W R
C W R
C W R
C W R C W R CW R
CW S CW S C W S
C W S
C W S
C W S
C W S
C W S
C W R
C W R
1 32
1 2
1 2
1 2
1 2
N.I.C.
AutoCAD SHX Text
DHC-19
AutoCAD SHX Text
VAV-18
AutoCAD SHX Text
VAV-6
AutoCAD SHX Text
VAV-5
AutoCAD SHX Text
VAV-4
AutoCAD SHX Text
AHU-9
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
UH-10
AutoCAD SHX Text
DHC-27
AutoCAD SHX Text
AHU-4
AutoCAD SHX Text
AHU-8
AutoCAD SHX Text
CV-12
AutoCAD SHX Text
VAV-7
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
VAV-1
AutoCAD SHX Text
CV-2
AutoCAD SHX Text
VAV-17
AutoCAD SHX Text
CV-9
AutoCAD SHX Text
CV-13
AutoCAD SHX Text
MAU-2
AutoCAD SHX Text
VAV-14
AutoCAD SHX Text
MAU-1
AutoCAD SHX Text
UH-6
AutoCAD SHX Text
UH-7
AutoCAD SHX Text
VAV-16
AutoCAD SHX Text
UH-5
AutoCAD SHX Text
AHU-6
AutoCAD SHX Text
UH-4
AutoCAD SHX Text
UH-3
AutoCAD SHX Text
UH-2
AutoCAD SHX Text
UH-1
AutoCAD SHX Text
CV-22
AutoCAD SHX Text
VAV-20
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
VAV-24
MAU-3
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
TINKER AFB, OK
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
35%
W W
YK
RE
PA
IR
H
EA
TI
NG
C
HI
LL
ED
W
AT
ER
P
IP
IN
G
AV
IO
NI
CS
F
AC
ILI
TY
B
D
EC
TE
PA
-C
SA
G
Q G
AU
N
A
M-501
F
BA
KE
R
S
VI
N
ES
\E ng r\D es ig n\ s\
\2
9\
0_ Su pp or t\0 _3
_D ra w in gs \P
D F
ME
CH
AN
IC
AL
D
ET
AI
LS
04 04
GENERAL NOTES
M-501
WALL INSULATION & PIPE PENETRATION DETAIL
SCALE: NTS
M-501
PIPE INSULATION DETAIL
SCALE: NTS
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. PROTECT ALL PRODUCTION AND WORK AREAS FROM DEBRIS DURING DEMOLITION
AND CONSTRUCTION.
3. ALL NEW INSULATION SYSTEMS SHALL BE INSTALLED IAW UFGS 23 07 00
4. PIPE INSULATION THAT PASSES THROUGH THE MECHANICAL ROOM WALL SHALL BE
A NEW CONTINUOUS PIECE, ADDITIONAL PIPING IN THE MECHANICAL ROOM IS N.I.C.
AutoCAD SHX Text
PIPE INSULATION WITH FACTORY
AutoCAD SHX Text
APPLIED JACKETING
AutoCAD SHX Text
PRACTICE FOR THE PROJECT. THESE HAVE BEEN SHOWN FOR A FLANGE AND A
AutoCAD SHX Text
VALVE ONLY, BUT ARE INTENDED TO DEMONSTRATE HOW THE INSULATION IS
AutoCAD SHX Text
THE ABOVE DETAILS ARE TO DEMONSTRATE THE REQUIRED INSULATION
AutoCAD SHX Text
TO BE APPLIED AT ALL UNIONS, FLANGES, COUPLINGS, STRAINERS,
AutoCAD SHX Text
INSULATION SHALL BE MARKED
AutoCAD SHX Text
INDICATING THE LOCATION OF AND IDENTITY OF THE ITEM COVERED.
AutoCAD SHX Text
INSULATION SHALL BE APPLIED OVER ALL UNIONS, FLANGES, COUPLINGS,
AutoCAD SHX Text
STRAINERS, VALVES, FITTINGS AND ALL TRAPS.
AutoCAD SHX Text
VALVES, FITTINGS AND TRAPS. THE INSULATION MANUFACTUERS INSTALLATION
AutoCAD SHX Text
CELLULAR GLASS INSULATION
AutoCAD SHX Text
PRE-FORMED COVER
AutoCAD SHX Text
CELLULAR GLASS INSULATION
AutoCAD SHX Text
OVERSIZED PIPE INSULATION
AutoCAD SHX Text
COLLAR OF OVERSIZED
AutoCAD SHX Text
PIPE INSULATION
AutoCAD SHX Text
PIPE INSULATION WITH FACTORY
AutoCAD SHX Text
APPLIED JACKETING
AutoCAD SHX Text
PROCEDURES AND INSTRUCTIONS SHALL TAKE PRECEDENCE.
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE INSULATION PER
AutoCAD SHX Text
SPEC 23 07 00
AutoCAD SHX Text
WALL
AutoCAD SHX Text
SLEEVE PER SPECS
AutoCAD SHX Text
CAULK (TYP.) OR FIRESTOPPING
AutoCAD SHX Text
WHERE REQUIRED
AutoCAD SHX Text
CONTINUOUS RUN OF
INSULATION THRU WALLS
| 01-190099-G101-G101.pdf |
| Sheets and Views |
| G101 |
| 02-190099-MD101-MD101.pdf |
| Sheets and Views |
| MD101 |
| 03-190099-M101-M-101.pdf |
| Sheets and Views |
| M-101 |
| 04-190099-M201-M-201.pdf |
| Sheets and Views |
| M-201 |
File details come from the government source that posted it. Updated .