About this file

This is a set of construction design documents for a federal facility improvement project at Tinker Air Force Base in Oklahoma. The project, designated WWYK190099, involves the repair of heating and chilled water piping at Avionics Facility B3708. The work is being managed by the Air Force Materiel Command (AFMC), 72nd Air Base Wing (ABW), Civil Engineer Directorate, with an issue date of December 12, 2025, and is currently at the 35% design phase.

The project scope includes the demolition of existing pipe insulation and vapor retardant material on chilled water piping throughout the building, followed by the installation of new cellular glass insulation with vapor retardant service jackets on all chilled water piping. Work is organized in two phases: Phase One affects rooms 144, 147, and 160 (avionics and instruments production areas), while Phase Two addresses all other rooms in the building where chilled water piping is located. Piping insulation removal and reinstallation must be performed in lengths not exceeding 65 feet per section. The contractor is responsible for protecting production and work areas from debris, field-verifying existing conditions, erecting construction fencing and barricades, coordinating facility access with building users, and repairing any damage to grounds or existing facilities caused by construction operations. New insulation systems must be installed in accordance with UFGS 23 07 00. The design documents include mechanical demolition plans, mechanical new work plans, and mechanical details with pipe insulation and wall penetration specifications.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

WWYK190099

REPAIR HEATING & CHILLED

WATER PIPING

AVIONICS FACILITY B3708

KEY PLAN:

GENERAL NOTES:

DISCIPLINE

PROJECT

LOCATION

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

W W

YK

RE

PA

IR

H

EA

TI

NG

C

HI

LL

ED

W

AT

ER

P

IP

IN

G

AV

IO

NI

CS

F

AC

ILI

TY

B

D

EC

TE

PA

-C

SA

G

G-101

F

BA

KE

R

S

VI

N

ES

\E ng r\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \P

D F

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 04

MD101 MECHANICAL DEMOLITION PLAN

M-101 MECHANICAL NEW WORK PLAN

4 M-501 MECHANICAL DETAILS

Turbine Dr.

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

Arnold St.

Ea st

D r.

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St af f D r.

Reserve Rd.

5th Ave

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

7th St.

"H " A ve

M cN ar ne y Av e.

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To w er R d.

Vanaman Rd.

In du st ria l B lv d.

So ut h St

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Mercury Rd.

1st St.

Br ow n Dr

Po nd

R d.

O ld

A ir

De po t

Airey Dr.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Vandenberg Dr.

Hi llt op R d.

Do rm ito ry

R d.

Dormitory Rd.

"M " A ve

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

Co m m od ity D r.

Doolittle Ave

W hi te D r.

3rd Ave.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Ai r D ep ot

B lv d

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falco n Dr.

Blackb ird

Dr.

W ey la nd

L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Ph an to m

D r.

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

La w re nc e

M un de ll

Nabors Dr.

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ta il

Fe at he r D r.

Holden Dr.

Ai re y C ir.

Smith Ct.

Ra ve n Ct

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll A ve

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

Pr op ul sio n Dr

Stratofortress Dr.

96021

Arnold St.

62501W 62501E

TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

PROJECT

LOCATION

(FUTURE

HAUL ROUTE)

(F

UT

UR

E

HA

UL

R

OU

TE

FUTURE

TRUCK GATE

FUTURE

HAUL ROUTE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

TINKER AFB, OK

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

35%

W W

YK

RE

PA

IR

H

EA

TI

NG

C

HI

LL

ED

W

AT

ER

P

IP

IN

G

AV

IO

NI

CS

F

AC

ILI

TY

B

D

EC

TE

PA

-C

SA

G

Q G

AU

N

A

MD101

F

BA

KE

R

S

VI

N

ES

\E ng r\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \P

D F

ME

CH

AN

IC

AL

D

EM

OL

IT

IO

N

PL

AN

02 04

GENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. PROTECT ALL PRODUCTION AND WORK AREAS FROM DEBRIS DURING DEMOLITION

AND CONSTRUCTION.

3. ALL NEW INSULATION SYSTEMS SHALL BE INSTALLED IAW UFGS 23 07 00

4. PIPE INSULATION THAT PASSES THROUGH THE MECHANICAL ROOM WALL SHALL BE

A NEW CONTINUOUS PIECE, ADDITIONAL PIPING IN THE MECHANICAL ROOM IS N.I.C.

DISCONNECT AND REMOVE EXISTING LIGHT FIXTURES AND CEILING SYSTEM

AS REQUIRED TO DEMOLISH AND REPLACE HVAC PIPING INSULATION.

DEMOLISH ALL EXISTING VAPOR RETARDANT MATERIAL AND INSULATION ON

CHILLED WATER PIPING IN THE BUILDING.

VISUALLY INSPECT EXTERIOR OF THE CHILLED WATER PIPING FOR LEAKS,

CORROSION & OTHER DAMAGE.

MD101

MECHANICAL DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

LEGEND

PIPING NOT SHOWN ON AS-BUILTS, LOCATION DETERMINED BASED ON

FLOW DIAGRAMS, HAS BEEN FIELD VERIFIED.

PHASING PLAN

1. PHASE ON WILL TAKE PLACE IN IN ROOMS 144, 147, & 160. THE REMOVAL OF THE

CEILING AND PIPING INSULATION TO REINSULATE THE CHILLED WATER PIPING

MUST BE DONE IN LENGTHS NO GREATER THAN 65 FEET.

2. PHASE TWO WILL AFFECT ALL OTHER ROOMS IN THE BUILDING WHERE CHILLED

WATER PIPING IS LOCATED. THE REMOVAL OF THE CEILING AND PIPING INSULATION

TO REINSULATE THE CHILLED WATER PIPING MUST BE DONE IN LENGTHS NO

GREATER THAN 65 FEET. ANY SPACES THAT WILL BE BLOCKED OFF TO THE USER

DUE TO WORK MUST BE COMMUNICATED TO THE USER AND ALLOWANCES MADE

FOR ACCESS DURING CONSTRUCTION.

4 5

D

C

3 8 9 10 112

E

B

F

G

H

SOFTWARE

SUPPORT

SOFTWARE

MAINT OFFICE

CLASS 300,000

QUALITY OFFICE

SECURITY OFFICE

FOYER

UNIT CHIEF OFFICE

PRODUCTION

SUPPORT

OFFICE

OFFICE

OFFICE

MECHANICAL ROOM

139 CORRIDOR

164 126

JANITOR

MOTOR

GENERATORS

SEALING ROOM

CO

RR

ID

OR

ENGINEERING

OFFICE

CONFERENCE

ROOM

WOMEN'S ROOM

MENS ROOM

VAULT

CLOSET

HARDWARE

STORAGE

OFFICE

T.O ROOM

SERVER

ROOM

WOMEN

WOMEN

LOCKERS

LOCKERS

BREAK ROOM

OFFICE

AVIONICS &

INSTRUMENTS

PRODUCTION

CLASS 300,000

SCREEN ROOM

B-2 TPS

DEVELOPMENT

PMEL

156 FILTER STORAGE

CO

RR

ID

OR

B-2 AVIONICS

STAGING

PAINT ROOM

STRIPPING

ROOM

149A

STORAGE

149B

STORAGE

SHIPPING/RECEIVING

149C

STORAGE

ROOF ACCESS

OFFICE

OFFICE

CO

RR

ID

OR

CO

RR

ID

OR

MIC SCHEDULING

OFFICE

PARTS STORAGE

3 155 CORRIDOR

COMM

MECHANICAL

400 HZ GENERATORS

EN

TR

AN

CE

CW S C W SCW S CW S

G H S

H W R

H W S

G H R

H W S

H W R

H W S

G H R G H S

G H S

G H R

G H R G H S

G H R G H S

H W S

H W R

H W R

H W R

H W S

H W S

C W R

C W R

C W S

C W S

H W R

H W R

H W S

H W S

C W S

C W R

C W R

H W S H W R

CW S C W S CW S

C W R CW R CW R

H W S H W S H W S

C W R

H W R H W RH W S H W S

H W R H W R H W R

H W R

H W S

H W R

H W R

H W S

H W S

H W R H W S

H W R

H W R

H W S

H W S

H W S H W R

CW S

C W R

CW S

CW R

H W S

G H R G H S

H W R H W S C W R

H W R

H W S

H W S

H W S

C W R C W S H W R H W S

CW R CW RG H R

G H S

H W R

H W R

H W R

C W R H W S H W R H W R

H W R

H W S

C W S

H W R H W RH W S H W S

H W R

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R H W R H W R H W S H W S H W S

H W S

H W S

C W S

C W S

C W R

C W R

C W R

C W R

C W R C W R CW R

CW S CW S C W S

C W S

C W S

C W S

C W S

C W S

C W R

C W R

1 32

1 2

1 2

1 2

1 2

N.I.C.

AutoCAD SHX Text

DHC-19

AutoCAD SHX Text

VAV-18

AutoCAD SHX Text

VAV-6

AutoCAD SHX Text

VAV-5

AutoCAD SHX Text

VAV-4

AutoCAD SHX Text

AHU-9

AutoCAD SHX Text

AHU-3

AutoCAD SHX Text

UH-10

AutoCAD SHX Text

DHC-27

AutoCAD SHX Text

AHU-4

AutoCAD SHX Text

AHU-8

AutoCAD SHX Text

CV-12

AutoCAD SHX Text

VAV-7

AutoCAD SHX Text

AHU-1

AutoCAD SHX Text

VAV-1

AutoCAD SHX Text

CV-2

AutoCAD SHX Text

VAV-17

AutoCAD SHX Text

CV-9

AutoCAD SHX Text

CV-13

AutoCAD SHX Text

MAU-2

AutoCAD SHX Text

VAV-14

AutoCAD SHX Text

MAU-1

AutoCAD SHX Text

UH-6

AutoCAD SHX Text

UH-7

AutoCAD SHX Text

VAV-16

AutoCAD SHX Text

UH-5

AutoCAD SHX Text

AHU-6

AutoCAD SHX Text

UH-4

AutoCAD SHX Text

UH-3

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

CV-22

AutoCAD SHX Text

VAV-20

AutoCAD SHX Text

AHU-2

AutoCAD SHX Text

AHU-5

AutoCAD SHX Text

VAV-24

AutoCAD SHX Text

MAU-3

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

TINKER AFB, OK

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

35%

W W

YK

RE

PA

IR

H

EA

TI

NG

C

HI

LL

ED

W

AT

ER

P

IP

IN

G

AV

IO

NI

CS

F

AC

ILI

TY

B

D

EC

TE

PA

-C

SA

G

Q G

AU

N

A

M-101

F

BA

KE

R

S

VI

N

ES

\E ng r\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \P

D F

ME

CH

AN

IC

AL

N

EW

W

OR

K

PL

AN

03 04

GENERAL NOTES

M-101

MECHANICAL NEW WORK PLAN

SCALE: 1/8" = 1'-0"

KEYED NOTES

REMOVE ALL MATERIALS SUCH AS RUST, SCALE, DIRT, AND MOISTURE FROM

SURFACES TO RECEIVE INSULATION.

INSTALL NEW CELLULAR GLASS INSULATION WITH VAPOR RETARDANT ALL

SERVICE JACKET ON ALL CHILLED WATER PIPING IN THE BUILDING.

REINSTALL EXISTING CEILING GRID AND LIGHT FIXTURES, REPLACE ANY

CEILING TILES BROKEN DURING REMOVAL OR WITH WATER DAMAGE.

LEGEND

PIPING NOT SHOWN ON AS-BUILTS, LOCATION DETERMINED BASED ON

FLOW DIAGRAMS. HAS BEEN FIELD VERIFIED.

PHASING PLAN

1. PHASE ON WILL TAKE PLACE IN IN ROOMS 144, 147, & 160. THE REMOVAL OF THE

CEILING AND PIPING INSULATION TO REINSULATE THE CHILLED WATER PIPING

MUST BE DONE IN LENGTHS NO GREATER THAN 65 FEET.

2. PHASE TWO WILL AFFECT ALL OTHER ROOMS IN THE BUILDING WHERE CHILLED

WATER PIPING IS LOCATED. THE REMOVAL OF THE CEILING AND PIPING INSULATION

TO REINSULATE THE CHILLED WATER PIPING MUST BE DONE IN LENGTHS NO

GREATER THAN 65 FEET. ANY SPACES THAT WILL BE BLOCKED OFF TO THE USER

DUE TO WORK MUST BE COMMUNICATED TO THE USER AND ALLOWANCES MADE

FOR ACCESS DURING CONSTRUCTION.

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. PROTECT ALL PRODUCTION AND WORK AREAS FROM DEBRIS DURING DEMOLITION

AND CONSTRUCTION.

3. ALL NEW INSULATION SYSTEMS SHALL BE INSTALLED IAW UFGS 23 07 00

4. PIPE INSULATION THAT PASSES THROUGH THE MECHANICAL ROOM WALL SHALL BE

A NEW CONTINUOUS PIECE, ADDITIONAL PIPING IN THE MECHANICAL ROOM IS N.I.C.

4 5

D

C

3 8 9 10 112

E

B

F

G

H

SOFTWARE

SUPPORT

SOFTWARE

MAINT OFFICE

CLASS 300,000

QUALITY OFFICE

SECURITY OFFICE

FOYER

UNIT CHIEF OFFICE

PRODUCTION

SUPPORT

OFFICE

OFFICE

OFFICE

MECHANICAL ROOM

139 CORRIDOR

164 126

JANITOR

MOTOR

GENERATORS

SEALING ROOM

CO

RR

ID

OR

ENGINEERING

OFFICE

CONFERENCE

ROOM

WOMEN'S ROOM

MENS ROOM

VAULT

CLOSET

HARDWARE

STORAGE

OFFICE

T.O ROOM

SERVER

ROOM

WOMEN

WOMEN

LOCKERS

LOCKERS

BREAK ROOM

OFFICE

AVIONICS &

INSTRUMENTS

PRODUCTION

CLASS 300,000

SCREEN ROOM

B-2 TPS

DEVELOPMENT

PMEL

156 FILTER STORAGE

CO

RR

ID

OR

B-2 AVIONICS

STAGING

PAINT ROOM

STRIPPING

ROOM

149A

STORAGE

149B

STORAGE

SHIPPING/RECEIVING

149C

STORAGE

ROOF ACCESS

OFFICE

OFFICE

CO

RR

ID

OR

CO

RR

ID

OR

MIC SCHEDULING

OFFICE

PARTS STORAGE

3 155 CORRIDOR

COMM

MECHANICAL

400 HZ GENERATORS

EN

TR

AN

CE

CW S C W SCW S CW S

G H S

H W R

H W S

G H R

H W S

H W R

H W S

G H R G H S

G H S

G H R

G H R G H S

G H R G H S

H W S

H W R

H W R

H W R

H W S

H W S

C W R

C W R

C W S

C W S

H W R

H W R

H W S

H W S

C W S

C W R

C W R

H W S H W R

CW S C W S CW S

C W R CW R CW R

H W S H W S H W S

C W R

H W R H W RH W S H W S

H W R H W R H W R

H W R

H W S

H W R

H W R

H W S

H W S

H W R H W S

H W R

H W R

H W S

H W S

H W S H W R

CW S

C W R

CW S

CW R

H W S

G H R G H S

H W R H W S C W R

H W R

H W S

H W S

H W S

C W R C W S H W R H W S

CW R CW RG H R

G H S

H W R

H W R

H W R

C W R H W S H W R H W R

H W R

H W S

C W S

H W R H W RH W S H W S

H W R

H W S

H W S

H W S

H W R

H W R

H W R

H W R

H W R H W R H W R H W S H W S H W S

H W S

H W S

C W S

C W S

C W R

C W R

C W R

C W R

C W R C W R CW R

CW S CW S C W S

C W S

C W S

C W S

C W S

C W S

C W R

C W R

1 32

1 2

1 2

1 2

1 2

N.I.C.

AutoCAD SHX Text

DHC-19

AutoCAD SHX Text

VAV-18

AutoCAD SHX Text

VAV-6

AutoCAD SHX Text

VAV-5

AutoCAD SHX Text

VAV-4

AutoCAD SHX Text

AHU-9

AutoCAD SHX Text

AHU-3

AutoCAD SHX Text

UH-10

AutoCAD SHX Text

DHC-27

AutoCAD SHX Text

AHU-4

AutoCAD SHX Text

AHU-8

AutoCAD SHX Text

CV-12

AutoCAD SHX Text

VAV-7

AutoCAD SHX Text

AHU-1

AutoCAD SHX Text

VAV-1

AutoCAD SHX Text

CV-2

AutoCAD SHX Text

VAV-17

AutoCAD SHX Text

CV-9

AutoCAD SHX Text

CV-13

AutoCAD SHX Text

MAU-2

AutoCAD SHX Text

VAV-14

AutoCAD SHX Text

MAU-1

AutoCAD SHX Text

UH-6

AutoCAD SHX Text

UH-7

AutoCAD SHX Text

VAV-16

AutoCAD SHX Text

UH-5

AutoCAD SHX Text

AHU-6

AutoCAD SHX Text

UH-4

AutoCAD SHX Text

UH-3

AutoCAD SHX Text

UH-2

AutoCAD SHX Text

UH-1

AutoCAD SHX Text

CV-22

AutoCAD SHX Text

VAV-20

AutoCAD SHX Text

AHU-2

AutoCAD SHX Text

AHU-5

AutoCAD SHX Text

VAV-24

MAU-3

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

TINKER AFB, OK

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

35%

W W

YK

RE

PA

IR

H

EA

TI

NG

C

HI

LL

ED

W

AT

ER

P

IP

IN

G

AV

IO

NI

CS

F

AC

ILI

TY

B

D

EC

TE

PA

-C

SA

G

Q G

AU

N

A

M-501

F

BA

KE

R

S

VI

N

ES

\E ng r\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \P

D F

ME

CH

AN

IC

AL

D

ET

AI

LS

04 04

GENERAL NOTES

M-501

WALL INSULATION & PIPE PENETRATION DETAIL

SCALE: NTS

M-501

PIPE INSULATION DETAIL

SCALE: NTS

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. PROTECT ALL PRODUCTION AND WORK AREAS FROM DEBRIS DURING DEMOLITION

AND CONSTRUCTION.

3. ALL NEW INSULATION SYSTEMS SHALL BE INSTALLED IAW UFGS 23 07 00

4. PIPE INSULATION THAT PASSES THROUGH THE MECHANICAL ROOM WALL SHALL BE

A NEW CONTINUOUS PIECE, ADDITIONAL PIPING IN THE MECHANICAL ROOM IS N.I.C.

AutoCAD SHX Text

PIPE INSULATION WITH FACTORY

AutoCAD SHX Text

APPLIED JACKETING

AutoCAD SHX Text

PRACTICE FOR THE PROJECT. THESE HAVE BEEN SHOWN FOR A FLANGE AND A

AutoCAD SHX Text

VALVE ONLY, BUT ARE INTENDED TO DEMONSTRATE HOW THE INSULATION IS

AutoCAD SHX Text

THE ABOVE DETAILS ARE TO DEMONSTRATE THE REQUIRED INSULATION

AutoCAD SHX Text

TO BE APPLIED AT ALL UNIONS, FLANGES, COUPLINGS, STRAINERS,

AutoCAD SHX Text

INSULATION SHALL BE MARKED

AutoCAD SHX Text

INDICATING THE LOCATION OF AND IDENTITY OF THE ITEM COVERED.

AutoCAD SHX Text

INSULATION SHALL BE APPLIED OVER ALL UNIONS, FLANGES, COUPLINGS,

AutoCAD SHX Text

STRAINERS, VALVES, FITTINGS AND ALL TRAPS.

AutoCAD SHX Text

VALVES, FITTINGS AND TRAPS. THE INSULATION MANUFACTUERS INSTALLATION

AutoCAD SHX Text

CELLULAR GLASS INSULATION

AutoCAD SHX Text

PRE-FORMED COVER

AutoCAD SHX Text

CELLULAR GLASS INSULATION

AutoCAD SHX Text

OVERSIZED PIPE INSULATION

AutoCAD SHX Text

COLLAR OF OVERSIZED

AutoCAD SHX Text

PIPE INSULATION

AutoCAD SHX Text

PIPE INSULATION WITH FACTORY

AutoCAD SHX Text

APPLIED JACKETING

AutoCAD SHX Text

PROCEDURES AND INSTRUCTIONS SHALL TAKE PRECEDENCE.

AutoCAD SHX Text

PIPE

AutoCAD SHX Text

PIPE INSULATION PER

AutoCAD SHX Text

SPEC 23 07 00

AutoCAD SHX Text

WALL

AutoCAD SHX Text

SLEEVE PER SPECS

AutoCAD SHX Text

CAULK (TYP.) OR FIRESTOPPING

AutoCAD SHX Text

WHERE REQUIRED

AutoCAD SHX Text

CONTINUOUS RUN OF

INSULATION THRU WALLS

01-190099-G101-G101.pdf
Sheets and Views
G101
02-190099-MD101-MD101.pdf
Sheets and Views
MD101
03-190099-M101-M-101.pdf
Sheets and Views
M-101
04-190099-M201-M-201.pdf
Sheets and Views
M-201

File details come from the government source that posted it. Updated .