Attch 11 Q and A.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- 76 CMXG- AFATS Test Stand
- Solicitation number
- FA813222Q0053
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Requirement: CIP H3TC02 AFATS Test Stands
| SOW Paragraph, Synopsis/Solicitation, or Attachment Reference | Page Number | Contractor Question | Government Response |
| Request copies of the photos taken from the industry day site survey | The photos have been posted with this set of Q&A. | ||
| Request Level 3 drawings of the existing test stands, test fixtures that are utilized with UUT testings, drive controls external to the test stand | The USG does not have Level 3 drawings. We have provided drawings in the technical orders of the existing test stand and UUT. | ||
| Request drawings and BOMs of the existing test stands, test fixtures that are utilized with UUT testings, drive controls external to the test stand | The USG has provided the test stand technical orders and test sections of the UUT. | ||
| Request an additional site survey with the installation contractor prior to firm fixed quote submittal | Yes, per the this question, a second site visit has been scheduled for 05 Jan 2023 | ||
| Request oppurtunity to provide additional quesitons that may come up during additional site survey with installation contractor | Yes, additional questions will be allowed after the 2nd site visit | ||
| Can you confirm that retrofit or upgrade of existing equipment/piping/instrumentation, tubing, facility feeds outside of the test stand shall be Tinker responsibity | Yes, the existing equipment/piping/instrumentation, tubing, facility feeds outside of the test stand is Tinker responsibility. | ||
| SOW 1.1 | 3 | It is our understanding that the training will be required only for the equipment that is replaced as part of this upgrade. | Yes |
| SOW 1.2 | 4 | Could you please provide copies of AFATS Test Stand 02-03 Part Number 8230001-0503-OC level 3 drawings | The USG does not have Level 3 drawings, drawings from the technical orders of the existing test stand have been proivided via DoD SAFE. |
| SOW 3.1 | 7 | "Communication between test stand and Central Computer shall be maintained" Where is the central computer and what is its purpose? What type of communication should be maintained? | The central computer is located in Room 106. It is used for remote maintenance as well as historical data gathering. |
| SOW 3.1 | 7 | Can you confirm that the rusted drain pan should be cleaned and not replaced. An insert may be used for the smaller/lower section where the pan connects to the drain line. |
| New text maybe to address Modify/repair as nessessary to improve drainage | Yes, the rusted drain pan shall be cleaned and modified/repaired as nessessary to improve drainage. | |||
| SOW 3.1 | 7 | Existing naitive files of IPB's shall be provided | The IBP technical order has been provided. | |
| SOW 3.1 | 7 | "No major upgrades to UUT fixtures" Are there any UUT fixture upgrades needed? | There is no UUT fixture upgrades needed. | |
| SOW 3.1 | 7 | Clarification required on what is required for "safety and code compliance reports are required". How does this relate to ASME B31.3 process piping code? Existing test stand is not designed to ASME B31.3 process piping code | The equipment that is replaced as part of this upgrade shall meet ASME B31.3 process piping code. |
Existing test stand is designed to ASME B31.3 process piping code.
| SOW 3.1 | 7 | "All source code shall be provided" Please confirm that source code will be provided for data created for this project. | Source code written in ADA for OS MicroVMS is available. |
| SOW 3.1 | 7 | "All provided items will have unlimited data rights for the government" Can you confirm that data will only be used as it pertains to this project | Yes. Data rights will only be used for maintaining product. |
| SOW 3.1 | 8 | Can you please provide complete drawings for AFATS TS 01-03? | Yes, we can provide complete drawings for AFATS TS 01-03. |
| SOW 3.1 | 8 | "Work on the test stand shall be coordinated with production with no impact on production" How long can the test stand be down for the upgrade? | The test stand can be down 5 months for the upgrade. |
| SOW 3.5.1 | 12 | Refernces Appendix K for Test Stand 01-03 General Configuration. Appendix K is a CDRL item. Can you please provide Test Stand 01-03 General Configuration? | Yes, we can provide Technical Manual for Test Stand 01-03. |
| SOW 3.5.5 | 13 | "Data acquisition system shall be functionally equivalent to the data acquisition system of the AFATS Test Stand 01-03." Can you please provide information for 01-03's Data Acquisition System? | Yes, we can provide Technical Manual for Test Stand 01-03. |
| SOW 3.7 | 17 | Warranty will only be applicable for equipment replaced as part of this moification | Yes |
| SOW 4.9 | 22 | "All Licenses (Developer and Runtiime licenses) (Appendix L). Appendix L refers to the O&M manual, not licenses | Appendix L also refers All Licenses on Section 4.9, page 22. |
| SOW 5.5 | 23 | "The Contractor shall provide new commercial manuals for whole test stand (not just upgraded part) (Appendix L)." Can you please provide current manuals for Test Stand 02-03 including O&M manual and IPB manual | Current manuals for Test Stand 02-03 are available via DoD Safe |
| SOW 10.8.1 | 33 | Will each UUT be provided for test stand checkout use as Shared Property? | No, the Government will run each UUT. The contractor shall be present and responsilble for resolving any discrepancies. |
| Has the gov't considered purchasing a new test stand vs upgrading this stand? | Please send us a free ROM for a new test stand for future purchase. |
File details come from the government source that posted it. Updated .