FA8126-16-R-0002-0002.pdf

PDF 21 KB Posted

Attached to
Enterprise Interface Test Adapter (ITA) and Related Test Equipment Federal contract opportunity
Solicitation number
FA8126-16-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Solicitation amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Enterprise Interface Test Adapter (ITA) and Related Test Equipment, newest first.
File Type Posted
FA8126-16-R-0002__Question_and_Answer__8th_Round_(FINAL).pdf PDF
FA8126-16-R-0002__Question_and_Answer__7th_Round_(FINAL).pdf PDF
FA8126-16-R-0002__Question_and_Answer__6th_Round_(FINAL).pdf PDF
Attachment_1_-_Statement_of_Work_(SOW).pdf PDF
FA8126-16-R-0002-0005.pdf PDF
FA8126-16-R-0002_Amendment_0004.pdf PDF
FINAL_Solicitation_FA8126-16-R-0002__Question_and_Answer_FINAL_5th_Round.pdf PDF
Solicitation_FA8126-16-R-0002__Question_and_Answer_FINAL_3rd_Round.pdf PDF
FA8126-16-R-0002-0003.pdf PDF
Amendment_0003_-_FINAL__52.212-1__8_June_2016.pdf PDF
Solicitation_FA8126-16-R-0002__Question_and_Answer_FINAL_2nd_Round.pdf PDF
Solicitation_FA8126-16-R-0002__Question_and_Answer_FINAL.pdf PDF
Amendment_0002_-_FINAL__52.212-1_Addendum.docx DOCX document
IDIQ_DO_Sample_SOW_-_Solicitation_Update.docx DOCX document
OC-ALC-TPSD-ITAPRS-001.pdf PDF
Amendment_0002_FINAL_52.212-2_Addendum.docx DOCX document
ITA_Pictures.pdf PDF
Companies_in_Attendance_at_the_Presolicitation_Conference.pdf PDF
FA8126-16-R-0002_Amendment_0001.pdf PDF
FA8126-16-R-0002_Solicitation.pdf PDF
Attachment_3_-__52.212-1_Addendum_(FINAL).pdf PDF
Attachment_5_-_Decentralized_Ordering_Procedures_(FINAL).pdf PDF
Attachment_6_-_DRAFT_DD_254_Signed.pdf PDF
FA8126-16-R-0002_Exhibit_A_CDRLs.pdf PDF
Attachment_2_-_Enterprise_ITA_and_Related_Test_Equipment_Sample_Delivery_Order_SOW.pdf PDF
EITA_Pricing_Matrix_5_May_16_Protected.xlsx XLSX spreadsheet
Attachment_1_-_Enterprise_ITA_and_Related_Test_Equipment_Statement_of_Work_(SOW)_Government_Furnished_Property_(GFP).pdf PDF
Attachment_4_-_52.212-2_Addendum_(FINAL).pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3YCEB4065A002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to correct solicitation references/documents due to an administrative oversight.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8126-16-R-0002

X 9B. DATED (SEE ITEM 11)

11-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Jun-2016

CODE

AFSC/PZIMB

SADIE S. KOVASH/405-739-5514

3001 STAFF DR STE 2S73

TINKER AFB OK 73145

FA8126 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8126-16-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following items are applicable to this modification:

AMENDMENT 0002

The purpose of amendment 0002 is to correct references and incorporate documents due to an administrative oversight. The amendment details are separated by document for quick reference:

FAR 52.212-1 Addendum FIRST: FAR 52.212-1 Addendum Table 2.3 Proposal Organization removes the following references in Section VI

6.0 Contract Documentation - 2.2.1 Title Page (SF 1449), 2.2.2 Team List (see Attach 1.1), 2.2.7 Table of Contents,

2.2.8 List of Tables and Figures, 2.2.9 Glossary of Abbreviations and Acronyms and 2.2.2/6.3.4 Team List, Arrangements, and/or Letters of Intent.

SECOND: FAR 52.212-1 Addendum 3.2.3 Subfactor One Contractor Qualifications (b) Quality Certification Statement of Work (SOW) reference is revised from 3.1.12 to 3.1.13.

THIRD: FAR 52.212-1 Addendum 3.2.4 Subfactor Two ITA Development and Support, second bullet SOW reference is revised from 3.1.7 to 3.1.8.

FOURTH: FAR 52.212-1 Addendum 3.2.4 Subfactor Two ITA Development and Support, third bullet SOW reference is revised from 3.2.2.1 to 3.1.2.1.

FIFTH: FAR 52.212-1 Addendum 3.2.4 Subfactor Two ITA Development and Support, fourth bullet SOW reference is revised from 3.1.9 to 3.1.10.

FAR 52.212-2 Addendum FIRST: FAR 52.212-2 Addendum 2.2.1 Subfactor One Contractor Qualifications (b) Quality Certification Statement of Work (SOW) reference is revised from 3.1.12 to 3.1.13.

SECOND: FAR 52.212-2 Addendum 2.2.2 Subfactor Two ITA Development and Support (a) Design Development SOW reference 3.1.7 and 3.1.9 is revised to 3.1.8 and 3.1.10.

Sample Delivery Order SOW FIRST: Sample Delivery Order SOW paragraph 3.1.9 Government Directed Changes has been revised to Sample Delivery Order SOW paragraph 3.1.10.

SECOND: Sample Delivery Order SOW paragraph 3.1.10 Government Directed Changes bullets 1-4 has been revised to 50-250 Changes (quantity of one), 251-500 Changes (quantity of one), 501-750 Changes (quantity of one) and 751-1000 Changes (quantity of one). This revision is consistent with the basic SOW.

THIRD: References to attachments 1-8 in the Sample Delivery Order SOW has been revised to reference attachment 2a.

Sample Delivery Order SOW Attachment 2a FIRST: The Sample Delivery Order SOW Attachment 2a Table of Contents has been revised to include item control drawings for connectors associated with the sample ITA Manufacture example. The specific item control documents are on pages 154 -184.