***Please ensure to review all attachments in FBO related to the referenced solicitation***
FA8126-15-Q-0210
Vendor Questions and Answers
1) QUESTION: Is it acceptable to use a non-environmental version of the BKW series parts?
Specifically on the FMMP, Bulkhead Parts List, Item 5, shows part numberBKW3E301-0056, would it be acceptable to use a BKW3D301-0056?
2) QUESTION: Also, on the FMMP, Wraparound Plate, part number 05A070W301A87, item 1, could we use BKW4D301-0056 in place of what is shown?
ANSWER for QUESTIONS 1 and 2: The parts in question are Government Furnished Property (GFP). The GFP property should be used. There is no need to use an alternate part.
3) QUESTION: Can you provide the Government Furnished Property list? SOW section 3.1 states GFP is listed in Attachment #3 Appendix B, but the attachment #3 provided is for top level PWB requirements.
ANSWER: The Government Furnished Property list is provided in the solicitation. The document is SGFP-Atch3AppB-FMMPLRUITA-111015.xlsx
4) QUESTION: Where can we find mechanical design specifications/requirements of the ITA front panel? Only a rough sketch of its front view and finish requirement was provided.
ANSWER: The specification for the product is provided with the solicitation inside of the Statement of Work (SOW). The development and delivery of production level drawings is within the scope of the solicitation, paragraph 2.1.2.2.
5) QUESTION: Where can we find mechanical design specifications/requirements of the holding fixture, cooling fixture, extender cards and wrap around self test cards? SOW 2.2.3 lists these as the parts that constitute the ITA.
ANSWER: The specification for the product is provided with the solicitation inside of the SOW.
The development and delivery of production level drawings is within the scope of the solicitation, paragraph 2.1.2.2.
6) QUESTION: Where can we find mechanical design specifications/requirements of the six ITA cables? Only wiring information and parts lists were provided.
ANSWER: The specification for the product is provided with the solicitation inside of the SOW.
The development and delivery of production level drawings is within the scope of the solicitation, paragraph 2.1.2.2.
7) QUESTION: In reviewing the data my team ran across the following Northrop Grumman references we would like your assistance on obtaining/translating the data sheets 05A070W301A87 and BKW3E301-0056.
ANSWER: The BKW/05A connectors will be provided as GFP.
8) QUESTION: Is a VPC enclosure required, or can a vendor provide an enclosure of their own, as long as it meets the design criteria?
ANSWER: VPC enclosure is not required. Changes to the overall ITA shape should be requested through the Government.
9) QUESTION: Is there any asset information available? A general complexity, high, medium, or low would do. We would like to try and ballpark the complexity of the holding fixture. Also how is the air hose mated to the holding fixture? Is there a current design for the air hose? If so, is it available?
ANSWER: Complexity – The complexity is in the high end of the medium category, mostly due to the presence of the holding fixture and hardware required. The air hose from the VDATS B2 Augmentation Bay will mate onto a circular duct which bends 90 degrees and goes through the holding fixture into a set of oval-shaped slats on the UUT. The air hose itself is considered a part of the VDATS Augmentation bay. The contractor does not need to deliver the hose.