CDRL_A001_Attachments_1-7.pdf

PDF 92 KB Posted

Attached to
Interface Test Adapter for B2 Test Program Set Development
Solicitation number
FA8126-15-Q-0210
Issued by

About this file

CDRL A001 Attachments 1-7

View the file

Other files

File Type Posted
FA8126-15-Q-0210_Amendment_0003.pdf PDF
FA8126-15-Q-0210-0002_Amendment_.pdf PDF
FA8126-15-Q-0210_Q A.docx DOCX document
FA8126-15-Q-0210_Q A.docx DOCX document
FA8126-15-Q-0210_Q A.docx DOCX document
FA8126-15-Q-0210_Q A.pdf PDF
FA8126-15-Q-0210_Q A.docx DOCX document
FA8126-15-Q-0210_Q A.docx DOCX document
FA8126-15-Q-0210-0001.pdf PDF
SGFP-Atch3AppB-FMMPLRUITA-111015.xlsx XLSX spreadsheet
DI-NDTI-80603A_Test_Procedure.pdf PDF
DI-NDTI-80809B_Test_Inspection_Report.pdf PDF
SGFP-Atch3AppB-FMMPLRUITA-111015.pdf PDF
DI-ADMN-81250A_Conference_Minutes.pdf PDF
FA8126-15-Q-0210.doc DOC document
DI-ADMN-81373_Presentation_Material.pdf PDF
DI-SESS-81000E_Product_Drawings_Models_and_Associated_Lists.pdf PDF
A007.pdf PDF
DI-MGMT-80507C_Project_Planning_Chart.pdf PDF
DI-MGMT-80368A_Status_Report.pdf PDF
A003.pdf PDF
A005.pdf PDF
A001.pdf PDF
A006.pdf PDF
A004.pdf PDF
A001_Attachment_8.pdf PDF
A001_Attachments_1-7.pdf PDF
A002.pdf PDF
FMMP_LRU_ITA_SOW-Property111015.docx DOCX document
DI-MGMT-80368A_Status_Report.pdf PDF
CDRL_A007.pdf PDF
CDRL_A003.pdf PDF
CDRL_A001_Attachment_8.pdf PDF
CDRL_A006.pdf PDF
DI-SESS-81000E_Product_Drawings_Models_and_Associated_Lists.pdf PDF
DI-ADMN-81250A_Conference_Minutes.pdf PDF
DI-MGMT-80507C_Project_Planning_Chart.pdf PDF
CDRL_A005.pdf PDF
CDRL_A001.pdf PDF
CDRL_A002.pdf PDF
CDRL_A004.pdf PDF
DI-NDTI-80603A_Test_Procedure.pdf PDF
DI-ADMN-81373_Presentation_Material.pdf PDF
DI-NDTI-80809B_Test_Inspection_Report.pdf PDF
FA8126-15-Q-0210_--DRAFT_Statement_of_Work_(SOW)_Interface_Test_Adapter_(ITA)_for_B-2_Test_Program_Set_(TPS).pdf PDF
FA8126-15-Q-0210_-_DRAFT_REDACTED_-_Brand_Name_Justification_for_Interface_Test_Adapter_(ITA)_for_B2_TPS_Development.pdf PDF
FA8126-15-Q-0210_Q A.docx DOCX document
DRAFT_Statement_of_Work_(SOW)_Interface_Test_Adapter_(ITA)_for_B-2_Test_Program_Set_(TPS).pdf PDF
REDACTED_-_Brand_Name_Justification_for_Interface_Test_Adapter_(ITA)_for_the_B2_TPS_Development.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TDP OPTION SELECTION WORKSHEET

PRODUCT DRAWINGS AND ASSOCIATED LISTS

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT NO. C. CLIN. D. CDRL DATA ITEM NO.

1. DELIVERABLE PRODUCT (X and complete as applicable)

a. ORIGINALS (Dra wing masters) (Identify specification, type, grade and class, etc.)

b. REPRODUCTIONS (Identify specification, type, grade and class, etc., and quantity of each) (See block 9)

X c. DIGITAL DATA (Identify specification, exchange media, etc.)

(See block 9)

2. CAGE CODE AND DOCUMENT NUMBERS (X one)

a. CONTRACTOR

X b. GOVERNMENT (Complete (1) and (2) or (3))

(1) Use CAGE Code (2) Use Document Numbers (3) To Be Assigned By:

3. DRAWING FORMATS AND DRAWING FORMS (X one and complete as applicable)

a. CONTRACTOR FORMATS. Forms to be supplied by contractor.

b. GOVERNMENT FORMATS. Forms to be supplied by contractor.

Samples supplied by (Specify)

X c. GOVERNMENT FORMATS. Forms to be supplied as Government Furnished Material by (Specify)

4. TYPES AND QUANTITY OF DRAWINGS SELECTION (X one)

X a. CONTRACTOR SELECTS b. GOVERNMENT SELECTS (Specify in Item 9)

5. ASSOCIATED LISTS (X and complete as applicable)

a. PARTS LISTS (X one) (1) Integral (2) Separate X (3) Contractor 's Option

b. DATA LISTS (X one) (1) Not Required X (2) Required (Specify levels of assembly)

c. INDEX LISTS (X one) (1) Not Required X (2) Required (Specify levels of assembly)

6. DETAILS (X one)

X a. MULTIDETAIL DRAWINGS PERMITTED b. MONODETAIL DRAWINGS MANDATORY

7. QUALITY ASSURANCE PROVISIONS (X one)

a. NOT REQUIRED. MIL-T-31000, para 3.8 does not apply.

X b. REQUIRED. MIL-T-31000, para 3.8 applies . Quali ty assurance requirements shall be documen ted as QAPs in accordance with MIL-T-31000, Appendix B. (X one)

(1) DARCOM Form 2484 -R Required (2) DARCOM Form 2484 -R Not Required

8. VENDOR SUBSTANTIATION DATA (X one)

X a. NOT REQUIRED b. REQUIRED

DD Form 2554-1

9. OTHER TAILORING (Attach addi tional sheets as necessary) See attachments to form DD Form 2554-1.

ATTACHMENT 1

CONTINUATION OF DD FORM 2554-1, BLOCK 9

ADDITIONAL MATERIAL REQUIREMENTS/INSTRUCTIONS

1. Other TDP documentation requirements imposed by the following specifications, standards or work tasks by the contract or order shall be applied to or referenced on the applicable TDP documents.

2. MIL-STD-130. TDP elements for materiel subject to MIL-STD-130 marking shall specify the marking method, location, and content in accordance with the specific item marking requirements based on criteria provided in the current edition of MIL-STD-130. For materiel subject to the marking requirements of other specifications or standards, the TDP elements shall specify the marking method, location, and content of those requirements.

3. When Portable Document Files PDF files are required, they shall be in accordance with AF Drawing 9579776 Rev L.

4. Selected item drawings are required for all items and assemblies that require the application of Environmental Stress Screening (ESS) selection criteria to meet system requirements. The TDP element shall define, directly or by reference, the ESS selection criteria applied to the item or assembly identified.

5. Incoming ESS inspection procedures used on materiel/items which do not require selected item drawing delineation shall be required directly or by reference on the TDP element identifying that materiel/item.

6. Any ESS utilized during manufacturing/production in addition to the selected item ESS or incoming inspection criteria, shall be required either directly or by reference on applicable TDP documents.

7. Government and Industry Association (ANSI, ASME ISO, etc) documents shall not be submitted.

8. Except as stated herein, use of drawing types and lists not specified in ASME Y14.100 and ASME Y14.24 require government approval prior to selection. When required to document the item design, the drawing types in ASME Y14.100 and ASME Y14.24, as applicable shall be incorporated in the TDPs.

9. Modification Drawing. Modification drawings shall be used only for their intended purpose, which is to show how to modify delivered items, assemblies, installations, or systems.

Modification drawing information shall be incorporated into TDP design documentation by means of revision.

10. Control Drawings. Unlimited rights control drawings (vendor item control or source control) or unlimited rights company standards meeting the form, fit, function, and performance requirements for control drawings shall be provided for commercial items whenever the vendor items are non-reparable or determined non-reparable by government provisioning. (See MIL- STD-31000A for definition of “commercial item”). Control drawings are not required for the commercial item when government provisioning has determined the item to be reparable. In the latter case, the vendor drawings are required for delivery to the government.

11. Vendor Item Control Drawings. Vendor Item Control Drawings, when selected in lieu of or in addition to control drawings for repairable commercial items, shall provide sufficient information to permit Government maintenance and modification of the items.

12. Interchangeability Control Part Numbers shall be established to control, under a single control number, interchangeable source control part numbers under the following conditions.

This number is used to select from source control part number candidates those items which have been qualified for use in specific applications. The number is cited in parts lists in lieu of the source control part numbers. It does not re-identify source control part numbers. When this system is used, each source control part number has but one approved vendor and vendor design.

13. Repairable Source Control Part Numbers. An Interchangeability Control Part Number shall be used to identify, under a single control number, two or more repairable source control part numbers used interchangeably in a specific application. The Interchangeability Control part number will be cited in parts lists.

14. Company standards and specifications selected in accordance with the cancelled MIL- STD-970 may be acceptable but shall not be prepared in lieu of control drawings required in accordance with ASME Y14.24.

15. Standardized Microcircuit Drawings (SMDs) to the extent specified by the Parts Control Program and as directed by the Military Parts Control Advisory Group (MPCAG) (see MIL- HDBK-780) are required for microcircuits.

16. Product drawings (non-modification and non-installation) are required to define end items.

17. Impacted production installation drawings shall be revised to contain ECP traceability notes and prior ECPs.

18. Impacted production detail and assembly drawings shall be revised to include prior changes to reflect delivered item configuration.

19. Duplicate data should not be submitted when a current issue of a TDP document, meeting the requirements herein, has been previously submitted as the result of a government contract to the repository at the location specified on the delivery order, unless requested by the Government. When a document of current issue indicates limited rights and the previous issue indicated unlimited rights, both issues shall be submitted.

20. Engineering data covered by this CDRL must be, or have been, delivered to the Air Force engineering data repository at the location specified on the delivery order. Engineering data delivered to any other destination does not satisfy the requirement for delivery to a repository under this CDRL. For example, copies of drawings sent to engineering offices or placed in Time Compliance Technical Order (TCTO) hardware kits and sent to a government destination do not satisfy the repository delivery requirements of this CDRL. Conversely, unless otherwise specified, delivery of engineering data to an Air Force repository would not satisfy a required task of placing drawing copies in the TCTO kit or delivery to another location.

21. Unless otherwise specified in the contract, all engineering data shall be prepared in the English language in accordance with FAR 52.214-34

22. Sequencing. Regardless of media, delivered engineering data documents shall be in numerical drawing or document sequence and all images for each drawing or document shall be in drawing sheet sequence. The contractor shall sequence complete drawings as well as their accompanying documents and associated lists together in alphanumeric sequence. The leading edge of the documents shall start with sheet 1 in sequentially numbered sheets or pages with the title block being the first frame of each document. Engineering drawing sheets requiring multiple image representation shall have the image that contains the title block appear first with successive images appearing in order until the opposite end of the drawing sheet is represented.

Multi frame sheets shall be prepared with all frames the same size. There shall be a 4” minimum overlap.

23. Multi-sheet documents shall be prepared with all sheets the same size.

24. For newly prepared documents, only one document number shall appear in the document number block.

25. Sheet Numbering: The first sheet shall state the total number of sheets in accordance with ASME Y14.1, Figure 10 (Sheet 1 of 3, for documents having 3 total sheets). "Pages of sheets" or "sheets of pages" are not permitted for newly developed data.

26. Zone Numbers: Formats, except for A and B size drawings, shall include zones for reference purposes. For A and B size drawings, zoning shall be optional. Zones shall be indicated by alphabetical and numerical entries in format margins as well as by sub-divisions or multiples thereof.

a. Zones shall be sequentially numbered with each sheet, i.e., sht 1 zones 1-8, sht 2 zones 9-16, sht 3 zones 17-24, etc.

b. Zone sizes shall be equal, and no less than 1 inch and no more than 5.5 inches.

27. Engineering data delivered to the government repositories as final delivery shall have all outstanding changes incorporated into the data.

28. Each engineering data document shall be marked with its Department of Defense (DOD) Distribution Statement and, when applicable, appropriate documents shall also be marked with the DOD Rights in Data information or other legends/information such as contract numbers that are applicable to the document. If not preprinted, these statements and legends can be machine printed, hand stamped or applied by the overlay method. The words shall be placed in an open area of each document or each segment for documents that require multi-frame filming.

29. Application Data: Application data with “Next Assembly” and “Used On” columns are required for drawings whose detail part or assembly depicted thereon is for an element of a larger item. The Next Assembly (“NEXT ASSY”) column shall show the drawing numbers(s) of the next higher assembly to which the drawing applies. The Used On (“USED ON”) column shall show the model number or equivalent designator of the assembled unit(s) of which the part is an element. Application Data is not required for source control drawings, specification control drawings, vendor item control drawings, company standards, and commercial products (as defined by MIL-STD-31000A). The Application Data shall be located near the Title Block on sheet 1, or placed on a separate reference document, or provided on a separate parts list. When the application data appears on a separate referenced document, a cross reference note shall be included on each parent drawing to indicate that a separate referenced document is available. When application data is included on a separate Parts List, the note required by ASME Y14.34 shall be expanded to read “SEE SEPARATE PARTS LIST FOR PARTS AND

APPLICATION DATA”.

30. Interconnection diagrams are required for wiring harnesses and cable assemblies, except for coaxial cable assemblies

31. Section lining for cut surfaces is required and shall be in accordance with ASME Y14.2.

32. Drawings which contain statements for items such as “Government Furnished Property” or “Government Furnished Equipment” must also include the contract which provided the property or equipment to the contractor, such as “Government Furnished Property under F34601-99-x-xxxx.”

33. Warranty Statements. When required by the contract or purchase order, warranty statements shall be affixed to or entered on each drawing. The statement shall not obliterate nor obscure information on the field of the drawing. The warranty statement shall specify the warranty period and include the contractor or agency that shall correct or repair the deficiency.

Warranty statements entered on TDP documents shall contain, as a minimum, the following information:

a. Warranted item until (Enter warranty expiration date YYMMDD format).

b. Contract number. (Enter the contract number that invokes warranty of TDP documents).

c. Deficiencies in this TDP document shall be corrected by (Enter the contractor and address of the agency that shall correct the deficiency)

34. When required by the contract or purchase order Government Purpose Rights Legends (GPRL) legends or statements shall be affixed to or entered on each applicable TDP document.

Legends shall not obliterate nor obscure information on the field of the drawing.

a General Marking Instructions: The contractor, its subcontractors or suppliers, shall conspicuously and legibly mark the appropriate legend on all technical data that qualify for such markings. The authorized legends shall be placed on the transmittal document or storage container and, for printed material, each page of the printed material containing technical data for which restrictions are asserted. When only portions of a page of printed material are subject to the asserted restrictions, such portions shall be identified by circling, underscoring, with a note or other appropriate identifier. Technical data transmitted directly from one computer or computer terminal to another shall contain a notice of asserted restrictions. Reproductions of technical data or any portions thereof subject to asserted restrictions shall also reproduce the asserted restrictions.

b. The following legends are authorized under this contract:

1. Government Purpose Rights legend

2. Special License Rights legend

3. Notice of Copyright as prescribed by 17 USC 401 or 402

ATTACHMENT 2

ASME Y14.100-2004 & Appendices B,C,D,E Engineering Drawing Practices

Each section of ASME Y14.100 and Appendices B, C, D, E is applicable and as tailored by the following:

1. SCOPE. Para 1.1 Change paragraph to read “This standard and Appendices B, C, D and E establish the essential requirements and reference documents applicable to the preparation and revision of engineering drawings and associated lists. Past versions of MIL/DOD-STD-100 and previous editions of ASME Y14.100, which were contractually invoked for the delivery of drawings shall continue to apply.”

2. Paragraph 4.5.1 Add “if required.” after ASME Y14.1M. Add as new sentence, “Metric dimensioning is applicable only when interfacing with existing items that were dimensioned in metric.

When metric dimensioning is required, the drawings shall define the interface in metric accompanied by a parenthetical decimal inch dimension.”

3. Paragraph 4.19 Graphic Symbols, Designations, Letter Symbols, and Abbreviations. Add as new sentence after sentence one, “When applicable, Section Line representation shall be depicted on drawings.”

4. Non-Mandatory Appendix A. Delete Non-mandatory Appendix A “Tailoring”.

5. Appendix B, Paragraph B5.2, Digital Data. Add new sentence, “All pertinent drawing information required shall be inside the drawing border. Lettering less than 5/32 inches or metric equivalent is not allowed. Use of lettering less than 5/32 inches or metric equivalent requires approval by the government acquiring activity”.

6. Appendix B, Paragraph B5.2, Digital Data. Add new sub-paragraph B5.2.1, “Documents extracted from Computer Aided Design (CAD) platforms or scanned into raster images, shall meet thick and thin line convention density criteria recommended in Figure 1, ANSI Y14.2 (Thick line - 0.032 inches: Thin line - 0.016 inches).”

7. Appendix B, Change existing paragraph B5.2.1 Plotters to “B5.2.2 Plotters”.

8. Appendix B, Add new Paragraph 10, “Zoning. Except for A, A4, B, C or D size Drawings, zoning references shall be used and shall be reflected in the revision block.”

ATTACHMENT 3

REQUIREMENTS FOR PRINTED WIRING BOARD DIGITAL DATA

1. Printed Wiring Board (PWB) Description shall be in digital form in accordance with IPC-D-350.

a. Delivery media shall have CONTENTS.TXT file in ASCII format listing files on the delivery media, drawing number, part numbers(s), assigned CAGE code(s), rights, size of each file in uncompressed form, application data, used on data, revision level of the file, revision level of the used on data drawing, and the purpose of the file.

b. Delivery media containing more than one printed wiring board assembly shall contain directories for each printed wiring board.

c. Delivery media with compressed files shall also contain decompression software.

d. Delivery media shall be free of limited rights or shall be accompanied by documentation giving the Air Force unrestricted use of all files and software contained on the media.

e. All compact disk transfer media shall have identification information printed upon it identifying the contents of the media. The markings shall be accomplished using indelible ink. Gummed labels shall not be used.

As a minimum, the information shall include Contract Number, Contractor Name, EA Number if Applicable, Vol. ID and Date. Other transfer media shall be marked IN ACCORDANCE WITH agreements made by the contractor, contracting officer and the repository POC.

f. PWB data shall:

1. Comply with IPC D-350

2. Be written in ASCII

3. Contain format statement. Example "FSLAN4X43Y43"

5. Identify CAD platform and software used to develop Gerber file.

g. Drill data shall be provided on CD in accordance with ISO 9660

h. Establish document identification for each dataset in a manner that can be identified on using drawings, and used for accurate identification, storage, and recovery in manual and digital repositories.

i. Board filesets shall include the following files as a minimum:

1. Revision letter of aperture file

2. Identify board part number

3. CAGE code

4. Column headings shall identify horizontal (width) and vertical

(height) dimensions which correspond to “X” and “Y” coordinates, respectively, for proper orientation of shapes.

5. Units of measurement (mils, millimeters, etc.)

j. The files shall be properly aligned and include the following images:

1. Circuit layers

2. Board outlines

3. Silk screen of component reference designations

4. Silk screen of component’s outlines as they appear on the

PCB

5. Solder mask

6. Plated and un-plated drill holes

k. Each of the above image files shall include the following information as a minimum:

1. Board part number

2. Revision letter of image

3. CAGE Code

4. Layer order number and/or image name

5. Vertical and horizontal register marks with x-y coordinate dimensions and tolerances

l. The drill data file set shall contain the following information:

1. Board part number

2. File revision

3. CAGE Code

4. File type (Excellon, Plain ASCII Text, etc.)

5. Drill tool sizes

6. Holes x-y coordinates

7. Drill tool (bit) used at each x-y location

8. Identify plated and un-plated holes, if not identified on the master drawing

ATTACHMENT 4

SOFTWARE AND FIRMWARE DATA

This data shall be delivered as follows:

a. Software and firmware data. Drawings defining software that will be or are intended as resident in a firmware device shall be prepared as Software Drawings for the master media and Altered Item Drawings for the firmware.

b. Software drawing. A software drawing describes the characteristics of the software and its master media, used for programming each applicable device or assembly. Software programs will not be defined as truth tables but rather identified as to be supplied as a duplicate of the master media in digital form.

c. Software drawing requirements. The drawing shall specify the type of media (for example, magnetic tape or disk), media PIN, and version identification of the software. In addition, the media characteristics (for example, type, number of tracks, density and size) and the characteristics and formats of the information stored on the media shall be fully described. Any other information necessary to completely describe how the master media is to be used shall also be included.

The PIN of the master media shall be shown as a suffixed identifier of the software drawing. If more than one version of the software is to be installed or used, the drawing shall provide separate suffixes for each version. The notation SOFTWARE DRAWING shall be placed above the title block.

d. Firmware information. For software resident in a programmable device (firmware), both Software Drawings and Firmware Drawings shall be required.

Circuit boards with one or more devices that require programming at that level will be prepared as an assembly drawing. Devices assembled at that level will be supported by appropriate specifications or drawings that specify requirements prior to programming.

e. Firmware drawing. The drawing describing the programming requirements of a single programmed device will be prepared as an Altered Item Drawing. The notation ALTERED ITEM DRAWING shall be placed above the title block.

f. Firmware drawing requirements. The firmware drawing shall define the requirements of the device prior to programming either on this drawing (by referencing the original vendor's Part Identification Number (PIN) or providing complete description of the item) or by vendor item or source control drawing if a Military specification or standardized military drawing item is not available. In addition, the requirements for programming (bit pattern downloading) of the device shall be included. The firmware drawing shall indicate the name and version number of the software being impressed.

The same type of requirements shall be included on drawings for circuit boards with multiple devices programmed at the same time. Inspection requirements for the programmed device shall also be included. If more than one version of the programmed device is to be installed or used, the drawing shall provide a PIN for each version. The drawing shall also include an application chart or table that will cross-reference the master media for each version to each applicable programmed part by their respective PINs.

g. Software source information. The master media for programming the device shall be identified by reference to the appropriate Software Drawing and

PIN.

Attachment 5 Continuation to DD form 2554-1, Block 9

Current Editions of Applicable Specifications, Standards, Regulations, Directives Form a Part of This CDRL

In Their Entirety and as Tailored Herein

Military Spec/Std

Title

MIL-STD-130 Identification Marking of U.S. Military Property MIL-STD-1840B Reference Automated Interchange of Technical Information MIL-STD-1840C Automated Interchange of Technical Information MIL-PRF-28002B Reference Raster Graphics Representation in Binary Format, Requirements for MIL-PRF-28002C Raster Graphics Representation in Binary Format, Requirements for MIL-STD-31000A Technical Data Packages

MIL-PRF-31032A &

Supplements

Printed Circuit Board/Printed Wiring Board, General Specification For

MIL-PRF-5480G Data, Engineering and Technical Reproduction MIL-D-9898C & Not 1 Drawings, Tube Bend MIL-HDBK-59B Reference CALS Implementation Guide MIL-HDBK-288B Review and Acceptance of Engineering Drawing

Packages MIL-HDBK-780D Reference Standard Microcircuit Drawings

DoD Directives/Regulations

Title

DODD 5000.1(D) Defense Acquisition DODI 5000.2 Operation of the Defense Acquisition System DODD 5010.12-M Procedures for the Acquisition of Technical Data DODD 5200.1 Information Security Program

DODD 5220.22-M

Supplement 1

National Industrial Security Program Operating Manual Supplement

DODI 5230.24

DODD 5230.25

Distribution Statements on Technical Documents Withholding of Classified Data From Public Disclosure

Industry Specs/Stds Title

ASME Y14.1 Drawing Sheet Size and Format ASME Y14.2M Line Conventions and Lettering ASME Y14.3 Multi and Sectional View Drawing ASME Y14.5 Dimensioning and Tolerancing ASME Y14.8M Casting and Forging Drawings ASME Y14.24 Types and Application of Engineering Drawings

ASME Y14.34 Associated Lists ASME Y14.35M Revisions of Engr Dwgs and Assoc Lists

ASME Y14.38

ASME Y14.41

Abbreviations and Acronyms Digital Product Definition Data Practices

ASME Y14.100 Engineering Drawing Practices, Appendices B, C, D, E

ASME B46.1 Surface Texture ANSI X3.27 File Structuring and Labeling of Magnetic Tapes for

Information Interchange IPC D-350 Printed Board Description in Digital Form

IPC 6011

RS-274X

ISO 9660

ISO 10149

ISO 10303

Reference

Generic Performance Specification for Printed Boards Gerber Format Users Guide Information Processing - Volume and File Structure of CD-ROM for Information Interchange First Edition Information Technology - Data Interchange on Read-only 120mm Optical Disks (CD-ROM) STandard for the Exchange of Product (STEP) Model Data

Attachment 6

Meetings/Reviews/Audits

Meetings. The Contractor or the Government may request informal, unscheduled meetings, briefings, conferences, reviews or Technical Interchange Meetings (TIM). The Contractor shall attend and participate at any foregoing sessions where support may be required when authorized by the Government.

Post Award Guidance Conference. The purpose of this conference will be to review all contract documentation to assure precise understanding of all contract requirements and to review detailed plans on Contractor implementation. The conference may be held in two phases, hosted by the contractor, a contract phase, held as part of the kickoff meeting and a technical phase approximately 60 days after contract award. The Contractor shall submit an agenda and presentation material prior to each conference phase.

Review of Technical Data Packages. When applicable the Contractor shall support In-Process Reviews (IPR) of the technical data. The drawing IPRs may be scheduled in conjunction with other meetings/reviews/audits. Additional IPRs will be conducted at the discretion of the Government when data deficiencies are found extensive. The Contractor shall correct data deficiencies noted during IPRs as well as to ensure all technical data containing similar deficiencies are also corrected. Minutes shall be delivered to the government for review and approval from all IPRs.

Formal Audits. The contractor shall be responsible for conducting audits in accordance with the following requirements except as amended by the contract.

The contractor shall be responsible for insuring that sub-contractors, vendors and suppliers participate in formal audits. Unless otherwise specified in the Statement of Work, the audits shall be conducted at the contractor’s facility or at a designated subcontractor facility. A formal Functional Configuration Audit (FCA) will be held to validate that the development of a configuration item has been completed satisfactorily. All support documents shall be reviewed. A Physical Configuration Audit (PCA) will be held concurrently with the FCA to verify that the designated configuration item “as built” conforms to the technical documentation which defines the item.

Attachment 7

CONTINUATION OF DD FORM 2554-1, BLOCK 10

NOTES TO BUYER

1. The following listed documents have been developed and provided to the program office for the acquisition of Technical Data Packages (TDPs). Any changes must be coordinated with the Engineering Data Manager (EDM).

a. DD Form 1423-1 and continuation sheets or attachments.

b. DD Form 2554-1,2,3,4 or 5 and continuation sheets or attachments.

2. The following clauses should be considered for inclusion in solicitations and contracts in accordance Federal Defense Regulations (FAR), Defense Federal Acquisition Regulation Supplements (DFARS) and Air Force Material Command Federal Acquisition Regulations (AFMC FARS).

FAR Paragraph Title

52.214-34 English Language Requirement

DFARS Paragraph Title

252.225-7041 Correspondence in English 252.227-7000 Non Estoppel 252.227-7001 Release of Past Infringement 252.227-7013

Rights in Technical Data – Non-Commercial Items

252.227-7014

Rights in Non-commercial Computer Software and Non-Commercial Computer Software Documentation

252.227-7015 Technical Data – Commercial Items 252.227-7017 Identification and Assertion of Use, Release, or

Disclosure Restrictions 252.227-7018 Rights in Non-Commercial Technical Data and

Computer Software – Small Business Innovation Research (SBIR) Program

252.227-7019 Validation of Asserted Restrictions – Computer Software

252.227-7020 Rights in Special Works 252.227-7021 Rights in Data – Existing Works 252.227-7022 Government Rights (Unlimited) 252.227-7023 Drawings and Other Data to Become Property of the

Government 252.227-7025 Limitations on the Use or Disclosure of Government

Furnished Information Marked With Restrictive Legends

252.227-7026 Deferred Delivery of Technical Data or Computer Software

252.227-7027 Deferred Ordering of Technical Data or Computer Software

252.227-7028 Technical Data or Computer Software Previously Delivered to the Government

252.227-7030 Technical Data – Withholding of Payment 252.227-7032 Rights in Technical Data and Computer Software

(Foreign) 252.227-7037 Validation of Restrictive Markings on Technical

Data 252.246-7001 Warranty of Data 252-211-7003 Item Identification and Validation

ATTACHMENT 3
CONTINUATION OF DD FORM 2554-1, BLOCK 9
REQUIREMENTS FOR PRINTED WIRING BOARD DIGITAL DATA
Attachment 5
Continuation to DD form 2554-1, Block 9
Attachment 6
Meetings/Reviews/Audits
Attachment 7
Title
Drawing Sheet Size and Format
Line Conventions and Lettering
Multi and Sectional View Drawing
Dimensioning and Tolerancing
Casting and Forging Drawings
Types and Application of Engineering Drawings
Associated Lists
Revisions of Engr Dwgs and Assoc Lists
Abbreviations and Acronyms
Engineering Drawing Practices, Appendices B, C, D, E
Surface Texture
File Structuring and Labeling of Magnetic Tapes for Information Interchange
Printed Board Description in Digital Form
Generic Performance Specification for Printed Boards