MXDEC-SOW
STATEMENT OF WORK
(SOW)
566 MAINTENANCE E-3 WORK STAND SET
TINKER AIR FORCE BASE, OKLAHOMA
STATEMENT OF WORK #: MXDEC – SOW
6 February 2019
1. INTRODUCTION
The Aircraft Maintenance Group (AMXG) requires the fabrication, delivery and assembly of three (3) set comprehensive modular E3 silhouette maintenance work stand set for use in the aircraft repair docks in Building 2136, at Tinker Air Force Base, Oklahoma. Contractor shall provide a complete turn-key on-site application, fabrication, inspection, testing, documentation, training, delivery, tools, equipment installation, work stand assembly, labor and other incidentals necessary to provide such work stand set in accordance with this Statement of Work (SOW), Specification MXDEC-SOW, attachments and supporting data as provided by the government.
Silhouette stands are work platforms (also referred to as work stands, work stand sets, or stand sets) used in maintenance docks to surround the aircraft for personnel access during Programmed Depot Maintenance (PDM) operations. An E3 Maintenance Work Stand Set consists of stairways, work platforms, auxiliary step platforms and ladders.
Each set provides lighting, compressed shop air and electric supply outlets for operations to be worked below the work stand sections, on the work platform level and on top of the aircraft back and wings. The work stand set provides access to the aircraft work areas for all of the skills needed to perform their operations while serving as fall protection.
1.1. Problem Statement
Currently there is a need for a state-of-the-art, comprehensive modular work stand set to be fabricated to use with the other work stand sets for the E3 aircraft. New work stands that provide Lean process improvement, ergonomics, ISO compliance, ease and speed of set-up, utility distribution, easy connectivity, height adjustments, generic modular design, tool placement, or general flexibility to support the new materials, processes or technology; or for requirements specific to exterior and interior maintenance activities around the aircraft.
1.2. Scope
The contractor shall provide fabrication, delivery, assembly and purchase of a comprehensive modular E3 maintenance work stand set for use in aircraft docks of Building 2136 similar to existing stands. The work stand set is to facilitate one aircraft dock and be capable of being moved and used in any of the other aircraft docks in Building 2136. Contractor shall provide complete fabrication, inspection, testing, documentation, training, delivery, tools, installation/assembly, labor and other incidentals necessary to make the work stand set operational and usable.
The new stands shall allow worker access to the nose of the aircraft, forward entry door, flight deck windows, cheeks, RFD, any antennas forward of BS 400 on top of the E3 and access to the pig pens that run along the backbone of the E3. To minimize weight and facilitate the movement of the stands in the docks, the new stands shall made of aluminum material unless the component is a COTS item. The stands shall be height adjustable to allow for varying height of the aircraft, while maintaining stability. The various working surfaces levels shall be accessed via stairways the meet OSHA standards. The stands shall have means to minimize gaps between the working surface and the aircraft. Stand sections shall be designed to fit together with minimal gaps and have means of keeping sections locked together. All exposed edges when set up shall be protected by guardrails, with certain railings being removable/collapsible to allow forklifts or hoists to raise equipment to working surfaces. In areas where guardrails can be removed/collapsible, there shall be anchor points for the use of full body harnesses and 6ft lanyards in a fall restraint application. Stands shall be painted and weatherproofed and have instructions on any preparations to be stored outside. Stands shall be chemical resistant to oil and solvents. The stands shall have integrated air and electrical connections that allow building compressed air and electrical supply to be connected and accessed throughout the working areas of the stands, with proper labeling and warning signs. The stands shall have durable, corrosion resistant, shock absorbing casters that to be used on smooth and rough concrete, indoors and outdoors.
The casters and stabilizing jacks shall be designed such that the stand can be moved when the stands are adjusted at any height. The stands shall have the means to be towed by vehicles outdoors, across rough concrete. The stands shall have all hardware recessed, including electrical and air lines, to prevent damage from collision. Reflective markings shall be attached to stands to increase visibility of the stands’ extents in low light conditions. There shall be appropriate warning signs attached in easy to see areas.
Stands shall have unique part numbers with descriptive, durable nameplate. Stands shall have means of electrical grounding.
The Government will be provided current owner manuals and specifications for new work stands. The proposed work stand set will meet as a minimum the requirements of Specification MXDEC-SOW. The contractor shall also provide one (1) motorized units to assist in maneuvering the work stands into position around the aircraft. The stand shall have attachments/mounting points that allow the use the motorized units. This unit must be equivalent to the existing Cart Caddy’s’ (see Appendix A) that are in use today.
The Contractor will need to field verify all dimensions before manufacturing. The Contractor shall provide a complete set of commercial drawings and manuals. Stands shall be AFI91-203, Air Force Consolidated Occupational Safety Instruction and CFT standard compliant. This work stand set purchased shall be assembled on-site and accepted by the government. The contractor shall be ISO 9000 compliant.
1.3. Impact Statement
The current stands have many fall gaps between the aircraft and the stands, which allow workers to fall to lower levels, greater than 4’. Some of these are due to the design of the stand, though many of them are due to incorrect placement of the stands in relation to other stands and the aircraft. Additionally, if current stands fail, E3 production operation will be at diminished capacity or work stoppage. In addition, the E3 aircraft maintenance operation will experience safety, ISO, production, engineering, and maintenance worker problems. Exposure to worn out stands, from lack of maintenance due to constant use and inability to remove from service can cause low productivity, this in addition to possible Foreign Object Damage (FOD) when the stands are moved in and out to different docks.
2. DOCUMENTATION
2.1. Specification. Specification MXDEC-SOW describes the requirements and capabilities that shall be incorporated in the new E3 maintenance work stand set.
2.2. Additional Supporting Data. The government will provide assembly drawings and any additional required supporting data, based on authorization and availability, not provided in this SOW documentation package, as requested by contractor within 30 calendar days after receipt of award.
2.3. References: All work and equipment provided under this solicitation shall follow good engineering practices as documented in accepted engineering literature, and shall satisfy as a minimum the following publications of the issue in effect on the date of request for proposal that form a part of this statement of work.
2.3.1 American Welding Society (AWS)
AWS D1.2: Structural Welding Code – Aluminum
2.3.2 American Society of Testing and Materials (ASTM)
ASTM A36: Standard Specification for Carbon Structural Steel.
2.3.3 National Fire Protection Association (NFPA)
NFPA 70-2002: National Electric Code
2.3.4 Occupational Safety and Health Administration (OSHA), including but not limited to:
29 CFR 1910 Subpart D: Walking-Working Surfaces 29 CFR 1910.23: Guarding Floor and Wall Openings and Holes 29 CFR 1910.26: Portable Metal Ladders 29 CFR 1910.27: Fixed Ladders 29 CFR 1910.28: Safety Requirements for Scaffolding
29 CFR 1910.29: Manually Propelled Mobile Ladder Stands and Scaffolds (Towers)
29 CFR 1910 Subpart N: Materials Handling and Storage 29 CFR 1910.179: Overhead and Gantry Cranes 29 CFR 1910.184: Slings 29 CFR 1926.450: Scope, Application and Definitions Applicable to
Subpart L (Scaffolds) 29 CFR 1926.451: General Requirements (Scaffolds) 29 CFR 1926.452: Additional Requirements Applicable to Specific Types of Scaffolds
2.3.5 Air Force Occupational Safety and Health (AFOSH), including but not limited to:
AFOSH 91-5: Welding, Cutting, Brazing AFOSH 91-46: Materials Handling and Storage Equipment AFOSH 91-501: Air Force Consolidated Occupational Safety Standard:
Chapter 7: Walking Surfaces, Guarding Floor and Wall
Openings, Fixed Industrial Stairs, and Portable and Fixed Ladders
Chapter 13: Fall Protection
Chapter 16: Vehicle Mounted Elevating and Rotating Work Platforms, Manually Propelled and Self- Propelled Mobile Work Platforms, and Rolling (Mobile) Scaffolds (Towers)
2.3.6 Tinker Air Force Base Instruction (TAFBI)
TAFBI 32-2001: Fire Prevention – Fire Protection Program
2.3.7 U.S. Air Force Technical Orders (T.O.)
T.O. 1E-3A-3-1: Structural Repair USAF Series E-3B, E-3C And E-3G Aircraft.
T.O. 35-1-3: Corrosion Prevention, Painting and Marking, USAF Equipment
2.4 Order of Precedence. In the event of a conflict between the text of this statement of work and the references cited herein, the text of the statement of work shall take precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
2.5 Definition. Work stands or work stand sections in this statement of work are defined as “Mobile Work Platforms” in AFOSH 91-501.
3. REQUIREMENTS
The contractor shall provide all necessary qualified personnel, management, non-personal administrative and technical services, materials and contractor facilities in support of the requirements of this SOW.
3.1. Task Description
The contractor shall provide engineering services and deliverables to support the following tasks:
3.1.1. Program Management
A program kickoff meeting shall be conducted after task award and prior to delivery of the program plan to ensure all parties fully understand the requirements and are ready to proceed. Additionally, Technical Interchange Meetings (TIMs) shall be convened at intervals as required by the CO.
Informal communication through face-to-face, telephone, electronic mail, and facsimiles throughout the project is encouraged and shall be supported. All communication either formal or informal shall be documented in writing and shall become a permanent portion of the next scheduled TIM minutes. Any communications either formal or informal that are not introduced as official items at the next scheduled TIM shall not be interpreted as approved by or for the government.
3.1.2. Baseline Requirements
The contractor shall provide complete fabrication, inspection, testing, documentation, training, delivery, tools, labor, and other incidentals necessary in accordance with this SOW, the assembly drawings and specification MXDEC-SOW.
3.1.2.1. Requirements Review. The contractor shall hold a requirements review at Tinker AFB within 30 calendar days after contract award. The primary purpose of the review will be the identification of key personnel, and for final clarification of the requirements.
All reports or submittals by the contractor shall be submitted to the Contracting Officer
(CO).
3.1.2.2. Pre-Fabrication Review (PFR). The contractor shall hold a PFR at Tinker AFB within 60 calendar days before work stand fabrication. A fabrication data package and integrated master schedule shall be provided by the contractor five (5) working days prior to the PFR.
The contractor shall address as a minimum the following:
a. Integrated Master Schedule (Fabrication Schedule)
b. Personnel Training
c. Equipment Technical Data
d. Warranty Description
e. Assembly Drawing
The fabrication shall be reviewed by the government and the CO shall provide the contractor written comments. If any change requested by the contractor and approved by the CO, the CO may require an additional submittal of the updated drawings to be submitted within 30 calendar days after review.
3.1.3. Final Verification / Limited Production
Upon completion and acceptance of the task requirement 3.1.2 of this contract, the manufacturer shall begin the fabrication and delivery of the 566 Maintenance Work Stand Set. The contractor shall manufacture a single production 566 work stand set that will be delivered and assembled on-site at Tinker AFB. The contractor shall also support government personnel with a full functional checkout/demonstration of the work stand set with a 566 aircraft. This fit-check shall be performed by government personnel, with the Contractor present for consultation and documentation of this fit-check. If any discrepancies are noted, the Contractor shall document the deficiencies and corrective actions for submission to the CO for approval prior to making corrections on all applicable drawings, work stand components, and documentation. Any changes necessary (technical or non-technical) shall be requested by the government to the CO and then issued by the CO.
3.1.3.1. Fabrication
The contractor shall procure the equipment and hardware necessary to support the fabrication of the 566 work stand set. All equipment and hardware shall be off the shelf items to the fullest extent possible.
The Contractor shall perform all fabrication activities at the contractor’s location and assembled on-site at Tinker AFB.
3.1.3.2. Shipment.
The contractor shall be responsible for work stand preservation, packaging, loading, shipping, unloading, on-site placement and storage at Tinker AFB IAW the manufacturer’s commercial practices unless otherwise specified herein. The contractor shall provide a fully authorized representative on-site at all times during the receipt, assembly, installation, testing, and acceptance. The government shall not provide storage for intermittently shipped equipment.
3.1.3.3. Assembly.
3.1.3.3.1. General Assembly. Safety equipment shall be used during work stand assembly. Safety equipment shall contain up-to-date certifications and shall be in good working condition. Remediation of any component that cannot be assembled properly as a result of errors in manufacturing or deformation due to handling or transportation shall be the responsibility of the contractor. The contractor shall immediately report any discoveries to the CO. Repair methods shall have prior approval by the government before any work is performed. The straightening of steel base fames, tubing, angles, connecting devices, casters or other components shall be done by methods approved by the original component manufacturer and shall follow industry. The contractor shall replace all items damaged beyond acceptable repair.
3.1.3.3.2. Assembly Site Limitations. The contractor shall take the following precautions on-site:
a. All assembly work shall be completed in such a manner as to minimize disruption of government activities. The contractor shall perform any on-site work that shall disrupt government activities during non-production hours and shall be coordinated and approved by the CO.
b. The contractor’s work area shall be maintained clean and orderly.
Debris shall be removed and disposed of daily.
c. Material cutting shall not introduce shavings or chips in, onto or around the aircraft, aircraft access panels, or aircraft engines.
d. All phases of work shall be accomplished safely to comply with OSHA 29 CFR 1910.29, 1926.450, 1926.451, 1926.452, and AFOSH 91-501.
e. The contractor tooling shall not be stored on-site unless in a secured container. All tooling shall be removed at the end of each work shift.
f. The contractor shall be responsible for handling equipment and supplies during progress of the contract.
g. Utility requirements shall be the responsibility of the contractor.
Sources of electrical power and compressed air shall be provided on an “as available” basis. The contractor shall be responsible for ensuring adequate utility supplies and hookups are available on-site prior to the time of need.
h. No welding is permitted within fifty (50) feet of an aircraft.
i. Storage of flammable materials such as paints and solvents shall be in authorized areas and approved through the CO.
j. The contractor shall comply with base requirements on handling hazardous materials. Disposal of hazardous materials shall be coordinated with the CO and performed by the contractor.
k. The contractor employees shall not wear watches, rings, or jewelry within aircraft maintenance areas. Proper personal protective equipment (safety glasses, hearing protection, hard hats, safety shoes and protective coveralls) shall be worn in and around all production areas.
3.1.3.4. Installation Requirements.
3.1.3.4.1. General. The contractor shall provide all necessary equipment necessary to support the delivery, assembly and installation of all items identified in this SOW.
The contractor shall supply all necessary manpower for the on-site installations. The contractor shall coordinate the design and installation details with government and Aircraft Facilities and Engineering (76AMXG/MXDEC) prior to start. Failure to obtain appropriate coordination shall be a cause to stop all activities until proper coordination is obtained.
3.1.3.4.2. Supervision. The contractor shall provide technical supervision and shall be available on-site at all times during the installation, testing, and acceptance by the government.
a. The contractor employees must be able to gain access to Tinker Airforce Base and able to work unsupervised by Tinker personnel. Neither Production nor MXDE engineering will be available to provide contractor supervision during operations.
3.1.3.4.3. Storage. The contractor shall provide lockable storage for security of tools and equipment. The government shall not be responsible for the safety and security of contractor property and shall not assume any risk on behalf of the contractor or any sub-contractors.
3.1.3.4.4. Installation. The contractor shall be responsible for any and all equipment and personnel requirements supporting transportation of equipment during receipt, to and from any storage area, and on the installation site. The storage area may not provide weather protection and are subject to change depending on storage space available. Installation will begin no later than 5 working days after receipt of all fabrication equipment with completion being accomplished within 20 working days after start.
3.1.3.4.5. Fit and Function Tests. The contractor shall perform a complete fit and function test on and around the E3 aircraft. This test shall be conducted in the presence of government personnel under the direction of an authorized contractor representative.
Aircraft personnel, familiar with fitting work stands around the aircraft, shall be provided to perform the assembling and fitting of the work stand sections and components to the aircraft under the supervision of the contractor representative. The contractor is responsible for moving the work stand sections and components into the hangar space in the vicinity of the aircraft as designated by the aircraft production foreman.
a. The entire E3 work stand set will be fully functional upon completion of installation.
3.1.3.4.6. Scheduling. Upon notification to the ACO, the government will establish a storage and preassembly location. Within three (3) working days, the contractor will be notified when and where he may off-load materials on-site. All work shall be performed during normal 8-hour day shift hours (6:45 AM to 4:30 PM) Monday through Friday, and must minimize disruptions to government activities. Contractor shall perform any on-site work that will disrupt government activities during non-production hours and shall be coordinated and approved by the CO. No work will be allowed on weekends or government holidays unless coordinated and approved by the CO.
3.1.3.4.7. Acceptance Standards. Work stands shall be fabricated to be compatible and interchangeable with existing work stands.
3.1.3.4.8. Matching Fit. All components shall be installed in a manner to provide for expansion and contraction; prevent shearing of bolts, screws, and other fasteners;
ensure rigidity of all close fitting sections and components.
3.1.4. Technical Data
Contractor shall provide standard technical data necessary for repair and maintenance.
3.1.4.1. Commercial Off The Shelf (COTS) Manuals. The contractor shall furnish one (1) copy each at completion, of literature and/or catalogs for the following COTS Manuals:
a. Operation Manuals shall include assembly procedures.
b. Maintenance Manuals. The contractor shall supply his recommendations for an on-going maintenance program. Program recommendations shall include recommended inspection criteria, intervals and periodic and long-term maintenance operations. Recommendations shall also include quantities and frequency of repair parts to be kept on hand for frequent repairs.
c. Inspection Manuals
d. Training Manuals
e. Spare Parts List – Contractor’s recommended spare parts list.
3.1.5. Spare Parts and Proprietary Tools. The contractor shall provide a spare parts kit based on the contractor’s recommended spare parts list. Proprietary or uncommon tools required for maintenance or assembly shall be provided with the work stand set in the quantity of two each per work stand set.
3.1.6. Warranty. The contractor shall provide a warranty period equal to the standard industry practice for the entire work stand set, components and tools.
3.2. TASK REQUIREMENT SUMMARY
Task Requirement
SOW
Section
Performance Threshold PROJECT
SUPPORTED
Program Management
3.1.1 Shall meet the SOW
requirements
Program Management
Baseline Requirements
3.1.2 Shall meet the SOW
requirements
Baseline Requirements
Pre-Fabrication Review (PFR)
3.1.2.2. Shall meet the SOW
requirements
Pre-Fabrication
Final Verification / Limited Production
3.1.3 Shall meet the SOW
requirements
Final Verification
Fabrication 3.1.3.1 Shall meet the SOW requirements
Production
Shipment 3.1.3.2 Shall meet the SOW requirements
Production
Assembly 3.1.3.3 Shall meet the SOW requirements
Production
Installation Requirements
3.1.3.4 Shall meet the SOW
requirements
Production
Fit and Function Tests
3.1.3.4.5 Shall meet the SOW
requirements and perform as intended
Production
Scheduling 3.1.3.4.6 Shall meet the SOW requirements
Production
Acceptance Standards
3.1.3.4.7 Shall meet the SOW
requirements and purpose intended
Production
Matching Fit 3.1.3.4.8 Shall meet the SOW requirements and purpose intended
Production
Technical Data 3.1.4 Data is complete and accurate to meet purpose intended
Production
Spare Parts and Proprietary Tools
3.1.5 Spare Parts Kit and Proprietary
Tools are complete and provided IAW SOW
Production
Warranty 3.1.6 Shall meet the SOW requirements
Production
Table 1: Task Requirement Summary
4. GOVERNMENT FURNISHED EQUIPMENT / MATERIAL
4.1. Facilities. Government shall prepare area for final assembly and furnish adequate work space at installation site.
4.2. Personnel. The government shall provide aircraft personnel to assist the contractor in moving the work stand sections into place around the aircraft for performance of fit and function testing, or for contractor requested exceptions when approved by the government. The contractor representative shall coordinate and supervise the movement and placement of the work stand components.
4.3. Technical
4.3.1. The Government shall make available, to the selected contractor, at least one (1) copy of all referenced government regulations and technical orders. The contractor shall not reproduce any government furnished technical data without written approval from the CO.
4.3.2. Existing Drawings. The Government shall make available, to the selected contractor, one (1) assembly drawings of existing work stands. However, all dimensions will need to be field verified by the contractor due to possible manufacturing discrepancies and/or field modifications. These drawings shall not be modified or reproduced without prior approval by the government engineer(s) and contracting officer.
5. SITE VISITS AND CORRESPONDENCE
5.1. Site Visits. The CO is the point of contact scheduling all site visits. Visitor control is located at Pass and ID, at Air Depot and SE 29th St.
5.2. Contractor Representative: The contractor shall appoint and identify to the government a project manager who shall act as the contractor’s representative in all communications with the government throughout the overall project. The project manager shall be qualified to interpret designs and discuss solutions in all areas of the project with government representatives, particularly the using agency (76AMXG/MXDEC). The contractor’s representative shall be on-site to supervise all fabrication, assembly and testing of the equipment.
6. GENERAL INFORMATION
6.1. Quality. The contractor shall comply with all standard industry practices and procedures and manufacturer’s specifications.
6.2. Hours of Operation. The installation site shall be available to the contractor from 0645 to 1630 hours, Monday through Friday, excluding federal holidays.
6.3. Parts and Materials. The contractor shall use only new equipment, hardware, parts, and materials in performance of this statement of work, unless authorized by the Contracting Officer who shall seek technical guidance from the assigned COTR. All equipment, hardware, parts and materials shall be off-the-shelf items to the fullest extent possible.
6.4. Tool Control. The contractor shall comply with the requirements of Tinker AFB’s Tool Control Program while performing contract services in or around the flight line and maintenance production shop areas at Tinker AFB, OK.
6.4.1. The contractor shall maintain a tool inventory checklist of all tools taken to the work site on Tinker AFB, OK.
6.4.2. The contractor shall inventory every tool on their tool inventory checklist at the beginning and end of each day they are working on-site at Tinker AFB, OK and at the end of each job.
6.4.3. The contractor shall secure all tools located at the work site when the contractor is not in the immediate area. No tools shall be left unattended/unsecured at any time.
6.4.4. The contractor shall make the tool inventory checklist and tools available for random inspection by assigned government representatives.
6.5. FOD Prevention. The contractor shall comply with the requirements of Tinker AFB’s Foreign Object Damage and Prevention Program.
6.5.1. The contractor shall practice good housekeeping at all times, in all areas and ensure all tools, equipment, and hardware is accounted for at the end of each task. The contractor personnel shall remove watches, rings, chains, and other jewelry that could be dropped or become loose.
6.5.2. The ACO shall assign government personnel to brief FOD awareness and prevention to the contractor prior to the contractor starting work in FOD critical areas.
The contractor’s on-site project manager shall be responsible for briefing their work force, on Tinker AFB FOD prevention requirements, before each work shift.
6.6. Environmental Protection and Safety.
6.6.1. Environmental Protection. The contractor shall ensure none of their activities on Tinker AFB emit material, fumes or compounds that are hazardous to the ecological systems of Tinker AFB and its surrounding communities. If during this project the Base Environmental Management office determines ecological hazards are being emitted then the contractor shall immediately cease operations until approved mitigation measure are employed. Approval of all mitigation measure shall be at the discretion of the Base Environmental Management and Bioenvironmental offices.
6.6.1.1. Environmental Restrictions. The following materials, substances and compounds are strictly forbidden from use on Tinker AFB and shall not be brought on the installation by the contractor, their direct workers and their subordinate contractors and workers.
6.6.1.2. Lead: Lead and lead-based compounds including lead-based paints are strictly forbidden.
6.6.1.3. Mercury. Mercury, mercury compounds and free mercury are strictly forbidden.
6.6.1.4. Asbestos. Asbestos or asbestos containing materials are strictly forbidden.
6.6.1.5. Ozone Depleting Compounds. All class 1 ozone depleting compounds (ODCs) or any use during manufacture is strictly forbidden.
6.6.2. Bioenvironmental Protection. The contractor shall ensure all activates do not subject worker to bioenvironmental hazards including excessive noise, production of dust particles, toxic fumes, inadequate lighting, inadequate ventilation and excessive heat.
6.6.3. Safety. The contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations and requirements regarding environmental protection. In the event environmental laws or regulations change during the term of this contract, the contractor shall comply with such laws when enacted. The contractor shall comply with all safety practices posted in the assigned work area.
7. SPECIAL REQUIREMENTS
7.1. Security. The contractor shall comply with existing government procedures for obtaining contractor credentials to work on-site, and government procedures for contractor access to government legacy data systems. While inside DoD facilities, the contractor shall wear government-approved identification badges on their outer garment in the chest area. DOD facilities are defined as any space open or covered that is directly owned by or leased to the Department of Defense for the United States of America.
7.2. Base Location. The contractor and contractor representatives shall contact the government representative, assigned by the ACO, for directions to the base. After arriving at the designated entry gate, the contractor shall telephone the assigned government representative for further instructions or to be escorted on to the base.
7.3. Foreign Nationals. A foreign national is defined as any person who does not pose a legal certificate of citizenship in the United States of America. The contractor shall notify the ACO of foreign nationals prior to allowing them entry to any DOD facility.
Special rules shall apply to foreign nationals and shall be explained to the contractor once such individuals have been identified to the ACO.
7.4. Safety Requirements. The contractor shall comply with Industrial Safety Requirements provided in Appendix C of this PWS.
7.5 . Travel. The contractor shall travel, as required, to complete this effort.
7.6. Quality Assurance. The contractor shall establish, document, and maintain a quality system certified to the International Organization for Standardization (ISO) 9001 regulation. This certification is required as a means of ensuring quality control for services under this contract. The contractor shall submit a copy of their ISO 9001 certification to the government prior to beginning work.
7.7. Other Information. The contractor may be required to directly interface with competitive system development and/or upgrade source selection sensitive information.
The contractor shall accomplish non-disclosure agreements prior to any access to competition-sensitive or proprietary data, information, or documents.
7.8. Periods of Performance. Period of performance is 12 months through fabrication and installation of any production work stand set.
APPENDIX "A"
APPENDIX "B"
INDUSTRIAL SAFETY REQUIREMENTS
FILE NO: SEG-04-230
PREPARED BY: OC-ALC/SEG
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements. The contractor shall implement a safety program that ensures protection of Government personnel and property. The program shall consist of, as a minimum:
1. Mishap notification/reporting as defined in Section I.B. below.
2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in THE CONTRACT.
B. Mishap Notification.
1. The contractor shall notify the procuring Safety Office or a designated Government Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who shall forward it to the Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.
2. Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.
Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.
SECTION II - SAFETY PROGRAM ELEMENTS
The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements
Element/Requirement Referenced Benchmark
Mishap Notification/Reporting
Housekeeping
Material Handling Equipment (MHE)
Handling, Storage and use of Flammable/Combustible Liquid
Vehicle Operations
Tool Control
Foreign Object Damage (FOD)
Tobacco Use in the Air Force
AFI 91-204
AFOSH Std 91-501
AFOSH Std 91-46 and AFOSH Std 91-501
AFOSH Std 91-501
AFI 91-207
AFMCI 21-107
AFI 21-101, and AFMCI 21-122
AFI 40-102
SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES
These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.
AFI 91-204, May 01, Safety Investigations and Reports
AFI 91-207, Oct 95, USAF Traffic Safety Program
AFOSH Std 91-66, Oct 97, General Industrial Operations
AFOSH Std 91-501, Sep 02, Air Force Consolidated Occupational Safety Standard
AFI 21-101, Oct 02, Foreign Object Damage (FOD)
AFMCI 21-122, Dec 00, Foreign Object Damage (FOD) and Dropped Object (DO) Awareness and Prevention Program
AFMCI 21-107, May 01, Tool Control
AFI 40-102, Jun 02, Tobacco Use in the Air Force