DI-QCIC-81891-T-ATR-Tailored.pdf

PDF 139 KB Posted

Attached to
Constant Speed Drive Performance Based Logistics
Solicitation number
FA8109-15-R-0001
Issued by

About this file

Data Item Description DI-QCIC-81891-T

View the file

Other files

File Type Posted
FA8109-15-R-0001-0003.pdf PDF
CSD__RFP__Inquiry_and_Comment_Tracker_12_Apr__16.xlsx XLSX spreadsheet
FA810915R0001_______0002.pdf PDF
GFP_Attachment_1_5_Apr_16.pdf PDF
FA8109-15-R-0001-0001.pdf PDF
FA8109-15-R-0001_EZ_Source_PPI_Tool.accdb —
CSD_PBL_Preproposal_Conference_Meeting_Minutes.pdf PDF
HO4-Implementation_Agreement.pdf PDF
SPI-015028980.pdf PDF
HO2-Contract_Metric_Price_Adjustment.pdf PDF
HO5-Contract_Exit_or_Termination_for_Default_Consideration.pdf PDF
SPI-000866695.pdf PDF
AFMC-158-Packaging-Requirements.pdf PDF
DI-MGMT-81900-DMSMS-Health-Analysis-Report.pdf PDF
Rose_State_Professional__Training_Center-Map.pdf PDF
DI-MGMT-80004A-T-Management-Plan-Tailoring.pdf PDF
DI-MISC-81832-T-Counterfeit-Prevent-Tailoring.pdf PDF
DI-ILSS-80727-T-GFM-by-NSN.pdf PDF
SPI-001033554.pdf PDF
SPI-000722292.pdf PDF
FA810915R0001.pdf PDF
GFP_Attachment_2_23_Nov_15.pdf PDF
Pricing_Matrix_PBL_for_CSD_22_OCT_15_Protected.xlsx XLSX spreadsheet
GFP_Attachment_1_7_Jan_16.pdf PDF
DI-MGMT-80368A_and_80368A-T.pdf PDF
Section_M-Evaluation_Factors_For_Award.pdf PDF
HO3-Partnership.pdf PDF
Statement_Of_Work.pdf PDF
Preproposal_Conference_Charts.pptx PPTX presentation
HO1-Air_Force_Payment_Methods_and_Limitation_of_Government_Liability_Clause.pdf PDF
SPI-011416018.pdf PDF
Section_L-Instructions_To_Offerors.pdf PDF
Contract_Data_Requirements_List.pdf PDF
CSD_PBL_Workshare_IA_pending_Source_Selection_(1_Sep_15).pdf PDF
DI-MISC-80704-T-Part-Usage-Report-Tailoring.pdf PDF
SPI-011482109.pdf PDF
CSD_Inquiry_and_Comment_Tracker_3_Feb.pdf PDF
CSD_Inquiry_and_Comment_Tracker_12_Jan_16.pdf PDF
GFP_Attachment_1_7_Jan_16.pdf PDF
Synopsis_(Revised_23_Oct_15)_-_CSD_PBL.pdf PDF
Synopsis_-_CSD_PBL.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: ACCEPTANCE TEST REPORT (ATR) Number: DI-QCIC-81891 Approval Date: 20130118 AMSC Number: N9313 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: AS/PMA251 Applicable Forms: N/A

Use/relationship:

The ATR contains the results of the qualification tests performed by the contractor to demonstrate that the system conforms to the performance specifications, work authorization document, or contract requirements.

This Data Item Description (DID) contains format, content, and intended use information for the data product resulting from the work task described in the Statement of Work (SOW).

Requirements:

1. Format. Contractor’s format is acceptable.

2. Content. The ATR shall contain the following:

a. Test article identification and full description of test specimens utilized, including any deviations for the configuration specified in the applicable test plan.

b. Date and location of test or evaluation.

c. The operator who conducted the test.

d. Results obtained, including specific identification and discussion of objectives demonstrated satisfactorily and those not demonstrated satisfactorily.

e. Contractor’s conclusions, corrective action anticipated, recommendation to correct. deficiencies, and suggested improvements based on evaluation of the test.

f. All analysis and supporting data.

g. All data sheets.

3. End of DI-QCIC-81891.

Source: https://assist.dla.mil -- Downloaded: 2015-07-10T15:59Z Check the source to verify that this is the current version before use.

Tailoring Requirement for Acceptance Test Report (ATR)

DI‐QCIC‐81891

TITLE: ACCEPTANCE TEST REPORT (Tailored) Number: DI‐QCIC‐81891

Use/relationship: {Replace with} The ATR contains the End Item Final Acceptance Test performed by the OEM.

This Data Item Description (DID) contains format, content, and intended use information for the data product resulting from the work task described in the Statement of Work (SOW).

2. Content {Replace with} 2. Content. The ATR shall contain the following:

a. OEM Name, Date, Location, and Test Stand Model & Number

b. End Item Serial Number (S/N) and Part Number (P/N)

c. Results of End Item Final Test (All test data sheets)

END OF DI‐QCIC‐81891‐T

DI-QCIC-81891-T Acceptince Test Report
DI-QCIC-81891-T Acceptince Test Report Tailored v2

File details come from the government source that posted it. Updated .