Attachment-1-ApplicableMatrix.xls
XLS spreadsheet 147 KB Posted
- Attached to
- E-4B Contract Logistic Support Federal contract opportunity
- Solicitation number
- FA8106-15-R-0003
About this file
Solicitation Attachment 1 Applicable Matrix
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix-A-PWS.docx | DOCX document | |
| Appendix-E-QASP.doc | DOC document | |
| Appendix-C-SecurityClassification.pdf | ||
| Attachment-2-WageDetermination.pdf | ||
| Letter_RFP.pdf | ||
| FA810615R0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Applicability Matrix for YR 1
| PWS Paragraph # | Paragraph Title | Basic (FY16), CLIN 0100 and Option 1 (FY 17) CLIN 1100 PM FFP | ||
| Applicability Matrix | Basic (FY16) and Option 1, CLIN 0101, 1101; and 0102 and 1102 | |||
| Year 6 (CY11) |
Applicability
| 1.0 | DESCRIPTION OF SERVICES/GENERAL INFORMATION | no requirements | NSP | |
| 1.1 | BACKGROUND | no requirements | NSP | |
| 1.2 | CONCEPT OF SUPPORT | NSP | ||
| 1.3 | PROGRAM MANAGEMENT | Included | ||
| 1.3.1 | Personnel Management | Partial | Included | |
| 1.3.1.1 | Contractor Personnel Selection | Included | ||
| 1.3.2 | Program Manager | Included | ||
| 1.3.2.1 | Program Manager Qualifications | Included | ||
| 1.3.3. | Program Management Plan (PMP) | Included | ||
| 1.3.3.1 | Monthly Status Report | Included | ||
| 1.3.3.2 | Program Planning and Scheduling Support | Included | ||
| 1.3.3.2.1 | Scheduling | Included | ||
| 1.3.3.2.2 | Risk Management | Included | ||
| 1.3.4 | Integrated Product Team (IPT) | Included | ||
| 1.3.5 | Conferences/Reviews/Meetings | Included | ||
| 1.3.5.1 | Post Award Meeting | Included | ||
| 1.3.5.2 | Recurring Meetings | Included | ||
| 1.3.6 | Funds Management | Included | ||
| 1.4 | GENERAL INFORMATION | Partial | Included | |
| 1.4.1 | Contractor Identification | Partial | Included | |
| 1.4.2 | Contractor Manpower Reporting | Included | Included | |
| 1.4.2.1 | Uses and Safeguarding of Information | Included | ||
| 1.4.3 | Mission Essential Services | Partial | Included | |
| 1.4.4 | Make or Buy Plan | Included | Included | |
| 1.4.5 | Commercial Warranty | Partial | Included | |
| 1.4.6 | Applicable Publications and Documents | Included | ||
| 1.4.7 | Government Access to Contractor Facility | Included | Included | |
| 1.4.8 | Contractor Access to Government Facility | Included | ||
| 1.4.9 | Security Requirements | Included | ||
| 1.4.9.1 | Safeguarding Classified Information | Included | ||
| 1.4.10 | Environmental Requirements/ Compliance Laws/Regs | Included | Included | |
| 1.4.10.1 | Environmental and Safety Training | Included | ||
| 1.4.10.2 | Health and Safety on Government Installations | Included | ||
| 1.4.10.2.1 | Voluntary Protection Program (VPP | Included | ||
| 1.4.11 | Quality Management | Included | Included | |
| 1.4.11.1 | Aircraft Maintenance Quality Assurance | Included | ||
| 1.4.11.2 | Quality Systems Review | Included | ||
| 1.4.11.3 | Depot Maintenance Quality | Included | ||
| 1.4.11.4 | Deficiency Reporting | Included | ||
| 1.4.11.5 | Foreign Object Damage (FOD) Prevention | Included | ||
| 1.4.11.6 | Tool and Equipment Management | Included | ||
| 1.4.11.7 | Parts Quality | Included | ||
| 1.4.11.8 | FAA Certification Standards | Included | ||
| 1.4.12 | Phase-In Period Requirements | Included | Included | |
| 1.4.12.1 | Workforce Requirements | Included | ||
| 1.4.12.2 | Workforce Security | Included | ||
| 1.4.12.3 | Workforce Familiarization | Included | ||
| 1.4.12.4 | Beginning Joint Inventory | Included | ||
| 1.4.12.5 | Subscription Services | Included | ||
| 1.4.12.6 | Historical Information | Included | ||
| 1.4.12.7 | Transition | Included | ||
| 1.4.13 | Phase-Out Requirements | Included | NSP | |
| 1.4.13.1 | Access and Observation | NSP | ||
| 1.4.13.2 | Joint Ending Inventory | NSP | ||
| 1.4.13.3 | Site Visits and Change Over | NSP | ||
| 1.4.14 | Emergency Procedures | Included | ||
| 1.5 | ORIGINAL EQUIPMENT MANUFACTURER (OEM) DATA AND SUPPORT | Included - If authorized under Over & Above | Partial | |
| 1.5.1 | Access and Use of Original Equipment Manufacturer (OEM) Data | Included | Included | |
| 1.5.2 | Phase Out Engineering Data Responsibilities | no requirements | NSP | |
| 1.5.3 | Inventory Management System | Partial | NSP | |
| 1.6 | SUPPORT TASKS | Partial | CLIN 0600 and 1600 | |
| 1.6.1 | Aircraft Mission Support | CLIN 0600 and 1600 | ||
| 1.7 | FIELD SERVICE REPRESENTATIVES (FSRs) | Partial | CLIN 0101 and 1101 | |
| 1.7.1 | FSR Qualifications and Expertise | Included | Other CLIN | CLIN 0101 and 1101 |
| 1.7.2 | FSR Duties and Requirements | no requirements | Other CLIN | CLIN 0101 and 1101 |
| 1.7.2.1 | FSR Training Duties | Other CLIN | CLIN 0101 and 1101 | |
| 1.7.2.2 | FSR Training Requirements and Qualifications | Other CLIN | CLIN 0101 and 1101 | |
| 1.7.2.3 | FSR Operational Support | Other CLIN | CLIN 0101 and 1101 | |
| 1.7.2.4 | FSR Over and Above Support | CLIN 0600 and 1600 | ||
| 1.8 | AIRCRAFT DEPOT MAINTENANCE | no requirements | NSP | |
| 1.8.1 | Aircraft Support Requirements | no requirements | NSP | |
| 1.8.1.1 | Hangar Space | NSP | ||
| 1.8.1.2 | Material, Parts, and Kit Storage | NSP | ||
| 1.8.1.3 | Ramp Space | NSP | ||
| 1.8.1.4 | Active Runway | NSP | ||
| 1.8.1.5 | External Power and Ground Communications | NSP | ||
| 1.8.1.6 | External Water and Cooling | NSP | ||
| 1.8.1.7 | Fuels Storage and Handling | NSP | ||
| 1.8.2 | Depot Aircraft Security | no requirements | NSP | |
| 1.8.2.1 | Classified and Controlled Cryptographic Item (CCI) Equipment | NSP | ||
| 1.8.3 | Strip and Paint | Partial | CLIN 0210 and 1210 | |
| 1.8.4 | Interior Refurbishment | Partial | NSP | |
| 1.8.5 | PDM Pre-Induction Survey and Baseline Testing | NSP | ||
| 1.8.5.1 | Maintenance Debrief | NSP | ||
| 1.8.6 | Handling of Aircraft at Depot Facility | NSP | ||
| 1.8.7 | Inventory | NSP | ||
| 1.8.8 | Equipment Storage | Partial | NSP | |
| 1.8.9 | Preservation | Partial | NSP | |
| 1.8.10 | Programmed Depot Maintenance (PDM) | NSP | ||
| 1.8.10.1 | Access | NSP | ||
| 1.8.10.2 | Recurring PDM Requirements | NSP | ||
| 1.8.10.3 | Non-Recurring PDM Requirements | NSP | ||
| 1.8.10.4 | PDM Over and Above | CLIN 0210 and 1210 | ||
| 1.8.10.4.1 | Over and Above Work Requirements and Procedures | CLIN 0220 and 1220 | ||
| 1.8.10.4.2 | Repairs | CLIN 0210 and 1210 | ||
| 1.8.10.5 | TCTO Validation/ Verification | NSP | ||
| 1.8.10.6 | Disturbed Systems Test | NSP | ||
| 1.8.11 | Drop-in Depot Maintenance | CLIN 0600 and 1600 | ||
| 1.8.12 | Emergency Field Service Support | Included | CLIN 0600 and 1600 | |
| 1.8.13 | Modifications/TCTOs | CLIN 0300, 0310, 0320 and 1300, 1310, 1320 | ||
| 1.8.13.1 | Modifications, TCTOs, Service Bulletins, and Airworthiness Directives | NSP | ||
| 1.8.13.2 | Incorporation of Modifications/TCTOs in PDM schedule | NSP | ||
| 1.8.14 | Depot Schedule | CLIN 0200, 0210, 0220 and 1200,1210,1220 | ||
| 1.8.14.1 | Depot Planning IPT | CLIN 0200, 0210, 0220 and 1200,1210,1220 | ||
| 1.8.15 | PDM Quality | Partial | NSP | |
| 1.8.16 | Equipment and Material Support | Included | NSP | |
| 1.8.17 | Aircraft Delivery | Partial | NSP | |
| 1.9 | SUPPLY CHAIN MANAGEMENT | Included | Partial | |
| 1.9.1 | COMBS Operation | Included | ||
| 1.9.1.1 | Standard Base Supply Functions | Included | ||
| 1.9.1.1.1 | Supply Effectiveness | Included | ||
| 1.9.1.2 | Repair/Replace Administration Program | Included | ||
| 1.9.1.2.1 | Issue Time | Included | ||
| 1.9.1.2.2 | Support Equipment Readiness | Included | ||
| 1.9.1.2.3 | Supply Not in Stock (NIS) Deficiencies | Included | ||
| 1.9.1.2.4 | Response Time (Status of Material) | Included | ||
| 1.9.1.2.5 | Turn Around Time (TAT) | Included | ||
| 1.9.1.3 | Kits and GFM Support | Included | ||
| 1.9.1.4 | COMSEC Equipment Management | Included | ||
| 1.9.1.5 | Response Time (Status of Material) | Included | ||
| 1.9.1.6 | Mission Support Kits | Included | ||
| 1.9.1.6.1 | High Priority Mission Support Kits (HPMSK) | Included | ||
| 1.9.1.6.2 | Deployment Kit | Included | ||
| 1.9.1.6.3 | Special Support Mission (SSM) Kit | Included | ||
| 1.9.1.6.4 | Forward Operating Bas (FOB) Kit | Included | ||
| 1.9.1.7 | Super High Frequency (SHF) Satellite Communications Systems Integration Laboratory (SIL | Included | ||
| 1.9.1.7.1 | SHF SIL Repair Facility Forward Supply Point | Included | ||
| 1.9.1.7.2 | SHF SIL Repair Facility Shipping and Receiving | Included | ||
| 1.9.2 | Materiel Management | Included | Included | |
| 1.9.2.1 | Counterfeit Prevention Plan (CCP) | Included | ||
| 1.9.2.2 | Inventory Management System | Included | ||
| 1.9.2.2.1 | Supportability Analysis | Included | ||
| 1.9.2.3 | Part Substitution | Included | ||
| 1.9.2.4 | Nuclear Hardness | Included | ||
| 1.9.2.5 | Support Data | Included | ||
| 1.9.2.6 | Support Equipment and Special Test Equipment Support | CLIN 0402 and 1402 | ||
| 1.9.3 | Purchasing System | Included | ||
| 1.9.3.1 | Funds Control | Included | ||
| 1.9.3.2 | Supplier Quality Assurance | Included | ||
| 1.9.3.3 | Directed Sources | Included | ||
| 1.9.4 | Obsolescence (Diminishing Manufacturing Sources/Material Shortages) | Included | Included | |
| 1.9.4.1 | PDM Parts Obsolescence Notification | Included | ||
| 1.9.4.2 | Technology Refresh | Included | ||
| 1.9.4.3 | Inventory Disposition | Included | ||
| 1.9.4.4 | Life Limited Parts | Included | ||
| 1.9.5 | Government Supported Items Support | Included | NSP | |
| 1.9.5.1 | GSI Repair | CLIN 0402 and 1402 | ||
| 1.9.5.2 | GSI Depot Maintenance Support | Included | ||
| 1.9.6 | Electronic Repair | Partial | ||
| 1.9.6.1 | Operational Electronic Repair | Included | ||
| 1.9.6.2 | SHF SIL Electronic Repair/Support | Included | ||
| 1.9.6.2.1 | SHF SIL Management | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.2.2 | Facility Management | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.2.3 | Packaging, Handling, Storage and Transportation | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.2.4 | Hazardous Waste Management | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.2.5 | Network Support | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.2.6 | SIL Depot Level Repair and Support | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.3 | Supply Chain Support | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.4 | Software Design, Integration and Test Support | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.5 | Hardware Design, Integration and Test Support | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.5.1 | SHF SIL PDM Support | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.6 | Troubleshooting | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.7 | Training | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.8 | Configuration Management | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.6.8.1 | Technical Data Management | Other CLIN | CLIN 0102 and 1102 | |
| 1.9.7 | Aircraft Depot Maintenance Support | Included | ||
| 1.9.7.1 | NSN Parts from Base Supply | Included | ||
| 1.9.7.2 | Parts Shortage Reporting | Included | ||
| 1.9.7.3 | Major Component Overhaul | Included | ||
| 1.9.7.4 | PDM Forward Supply Point | Included | ||
| 1.9.7.5 | TCTO/SB Kit and GFM Support | Included | ||
| 1.10 | ENGINE SUSTAINMENT MANAGEMENT | Partial | ||
| 1.10.1 | Engine Management | Included | Partial | |
| 1.10.1.1 | Engine Status Report | Included | ||
| 1.10.1.2 | Engine Maintenance Schedule and Notification | Included | ||
| 1.10.1.3 | Engine Program Working Group | Included | ||
| 1.10.1.4 | Engine Condition Monitoring Program | Included | ||
| 1.10.1.5 | Engine Shop Scheduled Maintenance Work Scope | Included | ||
| 1.10.1.6 | Engine Spare Parts Inventory Status | Included | ||
| 1.10.1.7 | War Reserve Engine Spares Level | Included | ||
| 1.10.1.8 | Engine Accident Review Board | Included | ||
| 1.10.2 | Engine Maintenance Program Support | Included | Included | |
| 1.10.3 | Engine Depot Maintenance Repair and Overhaul | no requirements | CLIN 0500 and 1500 | |
| 1.10.3.1 | Engine Depot Maintenance Cost Review Meetings | Included | ||
| 1.10.3.2 | Pre-Induction Inventory and Inspection | CLIN 0500 and 1500 | ||
| 1.10.3.3 | Post Induction Inspection, Test, and Government Source Inspection/Acceptance | CLIN 0500 and 1500 | ||
| 1.10.3.4 | Shop Visit Report | CLIN 0500 and 1500 | ||
| 1.10.3.5 | Parts Scrap Report | CLIN 0500 and 1500 | ||
| 1.10.3.6 | Engine Transportation | CLIN 0500 and 1500 | ||
| 1.10.3.7 | Historical Maintenance Records | Included | ||
| 1.10.3.8 | FAA Records | Included | ||
| 1.10.3.9 | On-Wing Engine Repair | CLIN 0600, 0602,0604 and 1600, 1602, 1604 | ||
| 2 | SECTION II SERVICE SUMMARY | Partial | NSP | |
| 2.1 | PERFORMANCE THRESHOLDS AND OBJECTIVES | Partial | NSP | |
| 2.2 | CONTRACTOR PERFORMANCE EVALUATION | Included | NSP | |
| 2.3 | SURVEILLANCE METHODS | Included | NSP | |
| 2.4 | Pick-Up and Delivery | no requirements | NSP | |
| 3 | SECTION III GOVERNMENT FURNISHED PROPERTY | Included | Included | |
| 3.1 | GFP INVENTORY | Partial | Included | |
| 3.1.1 | Beginning Joint Inventory | Included | ||
| 3.1.2 | GFP Not Supplied | Included | ||
| 3.1.3 | Inventory Reporting | Included | ||
| 3.1.4 | Replacement of GFP | Included | ||
| 3.2 | GOVERNMENT FURNISHED FACILITIES | Included | ||
| 3.2.1 | Offutt AFB Site Facilities | Partial | Included | |
| 3.3 | Tooling and Test Equipment | Included | ||
| 4 | SECTION IV – CDRLS | NSP | ||
| 5 | SECTION V - APPENDICES | NSP | ||
| 5.1 | APPENDIX A: E-4B DIRECTED REPAIRABLE LRUS | NSP | ||
| 5.1.1 | N2CS CONTRACT (ART) REPAIRABLE PARTS | NSP | ||
| 5.1.2 | DRSN CONTRACT (RAYTHEON) REPAIRABLE PARTS – S LIST | NSP | ||
| 5.1.3 | DRSN CONTRACT (RAYTHEON) REPAIRABLE PARTS – S LIST | NSP | ||
| 5.2 | APPENDIX B: APPLICABLE PUBLICATIONS AND DOCUMENTS | Partial | NSP | |
| 5.2.1 | Department of Defense (DoD) Specifications | NSP | ||
| 5.2.2 | DoD Standards | Partial | NSP | |
| 5.2.3 | Air Force Instructions (AFI) | Partial | NSP | |
| 5.2.4 | Air Force Manuals (AFM) | NSP | ||
| 5.2.5 | Air Force Policy Directives (AFPD) and Special Standards | NSP | ||
| 5.2.6 | USAF Technical Orders (TO) | NSP | ||
| 5.2.7 | E-4B Technical Orders (TO) Table 1: 1E-2-DV-1 | NSP | ||
| 5.2.8 | E-4B Technical Orders (TO) Table 2: 1E-4B(II)-1-CD-1 | NSP | ||
| 5.2.9 | E-4B Technical Orders (TO) Table 3: 1E-4B(II)-43-1-1-CD-1 | NSP | ||
| 5.2.10 | E-4B Technical Orders (TO) Table 4: Other Related Tech Orders | NSP | ||
| 5.2.11 | Air Force Materiel Command Manual (AFMCM) | NSP | ||
| 5.2.12 | Documents Associated with Strip and Paint of the E-4B aircraft | NSP | ||
| 5.2.13 | Forms | Partial | NSP | |
| 5.2.14 | E-4B Documents | Partial | NSP | |
| 5.2.15 | Other Documents | NSP | ||
| 5.2.16 | Federal Aviation Administration | Included | NSP | |
| 5.2.17 | Commercial Drawings and Documents | NSP | ||
| 5.2.18 | Industry Publications | NSP | ||
| 5.3 | APPENDIX C: ORIGINAL EQUIPMENT MANUFACTURERS AND SUPPLEMENTAL TYPE CERTIFICATE HOLDERS | NSP | ||
| NSP= Not Separately Priced | no requirements | |||
| Included | Included in CLIN 0100 and 1100 FFP | no requirements | ||
| Included in CLIN 0101 and 1101 FFP | Included | |||
| Included in CLIN 0102 and 1102 FFP | Included | |||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Partial | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Partial | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included | ||||
| Included |
&CE-4B Product Support Integrator (PSI) - FA8106-06-D-0001 &R&P of &N
Sheet1 SOW Paragraph # Paragraph Title Year 10 (FY15) Applicability Matrix Year 6 (CY11) Applicability
| 1.0 | Product Support Integration (PSI) | no requirements | ||
| 1.1 | Definitions | no requirements | ||
| 2.0 | Performance Objectives | Partial | Partial | |
| 2.1 | Service Summary Methodology | Partial | ||
| 2.1.1 | Performance Objective and Thresholds | |||
| 2.1.2 | Surveillance Methods | |||
| 2.2 | Contractor Performance Evaluation | Partial | ||
| 2.3 | ISO 9001:2008/AS9100 Requirements | Partial | ||
| 3.0 | Requirements | Partial | Partial | |
| 3.1 | Program Integration | Partial | Partial | |
| 3.1.1 | Program Management | Included | Partial | |
| 3.1.1.1 | PSI Integrated Product Teams (IPT) | Partial | Included | |
| 3.1.1.2 | Funds Management | Included | Included | |
| 3.1.1.3 | Integrated Master Plan/Integrated Master Schedule (IMP/IMS) | Partial | Included | |
| 3.1.1.4 | Risk Management | Partial | ||
| 3.1.1.5 | Make or Buy Plan | Included | Included | |
| 3.1.1.6 | Emergency Procedures | Included | ||
| 3.1.1.7 | Commercial Warranty | Included | Included | |
| 3.1.1.8 | FAA Certification | Included | Partial | |
| 3.1.1.8.1 | FAA Repair Stations | Included | Included | |
| 3.1.1.8.2 | FAA Parts Standards | Included | Included | |
| 3.1.1.8.3 | FAA Modification Certification | Included - If authorized under Over & Above | Partial | |
| 3.1.1.9 | Aircraft Mission Support | Included | Included | |
| 3.1.1.10 | Conferences/Reviews/Meetings | Partial | Partial | |
| 3.1.1.10.1 | Reserved | Partial | ||
| 3.1.1.10.2 | Non-Recurring Meetings | Partial | Partial | |
| 3.1.1.10.2.1 | Modification Reviews | Included | ||
| 3.1.1.10.2.2 | Technical Order Reviews | |||
| 3.1.1.10.2.3 | 747 User/Maintainer Conferences | Included | Included | |
| 3.1.2 | Strategic Planning | no requirements | Partial | |
| 3.1.2.1 | Strategic Planning Analysis and Integration Team (AIT) | no requirements | ||
| 3.1.2.2 | Strategic Plan | no requirements | Included | |
| 3.1.2.3 | Reserved | no requirements | ||
| 3.1.3 | Systems Integrator - E-4B Platform | Partial | Partial | |
| 3.1.3.1 | Systems Engineering - Platform | Partial | Partial | |
| 3.1.3.1.1 | Systems Engineering Process | Partial | Partial | |
| 3.1.3.1.2 | Interface Control Working Group (ICWG) | |||
| 3.1.3.1.3 | Program Reviews/Meetings | Partial | Partial | |
| 3.1.3.2 | Specialty Engineering - Platform | Partial | Partial | |
| 3.1.3.2.1 | Specialty Engineering - General requirements | Partial | Partial | |
| 3.1.3.2.2 | E-4B Technical Improvement Program (TIP) | |||
| 3.1.3.2.2.1 | User Working Group Meeting (TIP) | |||
| 3.1.3.2.3 | Electrical Loads Analysis (ELA) Improvement Plan (TIP) | Included | Included | |
| 3.1.3.2.4 | Weight Reduction Plan (TIP) | |||
| 3.1.3.2.5 | ECS Improvement Plan (TIP) | Included | ||
| 3.1.3.2.6 | EMI/EMC Improvement Plan (TIP) | Partial | Included | |
| 3.1.3.2.6.1 | EMI/EMC Continuing Requirements Assessment (TIP) | Included | Included | |
| 3.1.3.2.7 | EMSEC Improvement Plan (TIP) | Partial | Partial | |
| 3.1.3.2.7.1 | EMSEC Continuing Requirements Assessment (TIP) | Included | Included | |
| 3.1.3.2.8 | Antenna/RF Effects Improvement Plan (TIP) | Partial | ||
| 3.1.3.2.8.1 | Antenna/RF Effects Continuing Requirements Assessment (TIP) | Included | ||
| 3.1.3.2.9 | Structures Improvement Plan (TIP) | |||
| 3.1.3.2.10 | S/V Improvement Plan (TIP) | Included | Included | |
| 3.1.3.2.10.1 | S/V Continuing Requirements Assessment (TIP) | Included | ||
| 3.1.3.2.11 | Equipment Operating Environment Improvement Plan (TIP) | |||
| 3.1.3.2.12 | Aerodynamic/Air Vehicle Performance Improvement Plan (TIP) | |||
| 3.1.3.2.13 | Acoustics & Vibrations Improvement Plan (TIP) | |||
| 3.1.3.2.14 | Safety | Included | Included | |
| 3.1.3.2.14.1 | Safety Engineering Sustainment Program | Included | Included | |
| 3.1.3.3 | Reserved | no requirements | ||
| 3.1.3.4 | Technical Baseline Development and Management | Partial | Partial | |
| 3.1.3.4.1 | Baseline Maintenance | Partial | Partial | |
| 3.1.3.4.1.1 | Reference Designators | Included | Included | |
| 3.1.3.4.1.2 | ELA Baseline | Included | Included | |
| 3.1.3.4.1.3 | Reserved | no requirements | ||
| 3.1.3.4.1.4 | Survivability/Vulnerability (S/V) Baseline | Included | Included | |
| 3.1.3.4.1.5 | Antenna/RF Effects Baseline | Partial | Included | |
| 3.1.3.4.1.6 | Mod Block 1 Baseline Maintenance | ? | ||
| 3.1.3.4.1.6.1 | Mod Block 1 Weight & Balance Baseline | ? | ||
| 3.1.3.4.1.6.2 | Mod Block 1 ECS Baseline | ? | ||
| Deleted | ||||
| Deleted | ||||
| Deleted | Partial | |||
| 3.1.3.4.2 | Baseline Development | Partial | ||
| 3.1.3.4.2.1 | E-4B Systems Specification | |||
| 3.1.3.4.2.2 | Configuration/Design Baseline | |||
| 3.1.3.4.2.3 | Onboard Aircraft Space Management Baseline | |||
| 3.1.3.4.2.4 | Weight and Balance Baseline | |||
| 3.1.3.4.2.5 | Environmental Control System (ECS) Baseline | |||
| 3.1.3.4.2.6 | Electromagnetic Interference/Electromagnetic Compatibility (EMI/EMC) Baselines | Included | ||
| 3.1.3.4.2.6.1 | EMI/EMC Requirements Baseline | Partial | Included | |
| 3.1.3.4.2.6.2 | EMI/EMC Performance Baseline | Included | ||
| 3.1.3.4.2.7 | EMSEC Baselines | Partial | Included | |
| 3.1.3.4.2.7.1 | EMSEC Requirements Baseline | Partial | Included | |
| 3.1.3.4.2.7.2 | EMSEC Performance Baseline | Included | ||
| 3.1.3.4.2.8 | Structures Baseline | |||
| 3.1.3.4.2.9 | Equipment Operating Environment Baseline | |||
| 3.1.3.4.2.10 | Air Vehicle Performance Baseline | |||
| 3.1.3.4.2.11 | Software Baseline | |||
| 3.1.3.4.2.12 | Acoustic Baseline | |||
| 3.1.3.4.2.13 | Communications System Baseline | |||
| 3.1.3.5 | Product Engineering | |||
| 3.1.3.6 | Configuration Management | Included | ||
| 3.1.3.7 | Test and Evaluation (T&E) | Partial | Partial | |
| 3.1.3.7.1 | Test Evaluation Capabilities | Partial | ||
| 3.1.3.7.2 | Test and Evaluation Management Plan | |||
| 3.1.3.7.3 | Sustainment Test Support | Included | Included | |
| 3.1.3.8 | System Security/Security Accreditation | Partial | ||
| 3.1.3.8.1 | Security Accreditation Recurring Support | Included | ||
| 3.1.3.8.1.1 | Accreditation Tracking | |||
| 3.1.3.8.1.2 | System Security Working Group (SSWG) | |||
| 3.1.3.8.1.3 | Security Certification | Included | ||
| 3.1.3.8.1.4 | System Security Requirements Flow down | |||
| 3.1.3.8.2 | Program Security Guidelines | |||
| 3.1.3.8.2.1 | Top Secret Accreditation | |||
| 3.1.3.8.2.2 | Sensitive Compartmented Information (SCI) Accreditation | |||
| 3.1.3.8.2.3 | Single Integrated Operations Plan-Extremely Sensitive Information (SIOP-ESI) Accreditation | |||
| 3.1.3.8.2.4 | Multiple Classification Accreditation | |||
| 3.1.3.8.2.5 | Information Systems Vulnerability Analysis | Included | ||
| 3.1.3.9 | Software/Firmware Management | |||
| 3.1.3.9.1 | Software Engineering Management | |||
| 3.1.3.9.1.1 | Software Sustainment | |||
| 3.1.3.9.1.2 | Software Library | |||
| 3.1.3.10 | FAA Type Certification | |||
| 3.1.3.10.1 | Certification Baseline Maintenance | |||
| 3.1.3.11 | Technical Tools Development | |||
| 3.1.3.11.1 | Technical Baseline Management Automation | |||
| 3.1.3.11.2 | Design Data Automation | |||
| 3.1.3.11.3 | Requirements Management Automation | |||
| 3.1.4 | Product Support Development/Improvement | Partial | Partial | |
| 3.1.4.1 | Reliability and Maintainability (R&M) | Partial | Partial | |
| 3.1.4.1.1 | Sustainment RM&A Support | Included | Included | |
| 3.1.4.1.2 | RM&A Program Plan | Partial | Included | |
| 3.1.4.1.3 | R&M Reporting | Included | Included | |
| 3.1.4.2 | Part Obsolescence Management | Included | ||
| 3.1.4.2.1 | Obsolescence Management Plan | Included | ||
| 3.1.4.2.2 | Obsolescence Integrated Product Team | Included | ||
| 3.1.5 | Aircraft Modification and Maintenance Integration | |||
| 3.1.5.1 | Aircraft Support Requirements | |||
| 3.1.5.1.1 | Hangar Space | |||
| 3.1.5.1.2 | Material and Fuels Storage | |||
| 3.1.5.1.3 | Ramp Space | |||
| 3.1.5.1.4 | Active Runway | |||
| 3.1.5.1.5 | External Power | |||
| 3.1.5.1.6 | External Water and Cooling | |||
| 3.1.5.2 | Programmed Depot Maintenance (PDM) | Partial | Partial | |
| 3.1.5.2.1 | PDM Preplanning | Included | ||
| 3.1.5.2.2 | PDM Pre-Induction Survey | Included | ||
| 3.1.5.2.3 | PDM Pre-Induction Baseline testing | Partial | Included | |
| 3.1.5.2.4 | Programmed Depot Maintenance Visit | |||
| 3.1.5.3 | Modification Installation | |||
| 3.1.5.4 | Drop-in Depot Maintenance | |||
| 3.1.5.5 | Emergency Field Service Support | Included | ||
| 3.1.5.6 | Reserved | no requirements | ||
| 3.2 | Sustainment | Partial | Partial | |
| 3.2.1 | Engineering Services - Sustainment | Included | Included | |
| 3.2.1.1 | Engineering Services Resources - Sustainment | Included | Included | |
| 3.2.1.2 | Sustaining Engineering Services Activity Reporting | Included | Included | |
| 3.2.1.3 | Sustaining Engineering Service Activities | Included | Included | |
| 3.2.1.3.1 | Operational Safety, Suitability & Effectiveness (OSS&E) | Included | Included | |
| 3.2.1.3.2 | In-Flight Emergency Support | Included | Included | |
| 3.2.1.3.3 | Aircraft Airworthiness Support - Sustainment | Included | Included | |
| 3.2.1.3.3.1 | Evaluation of Service Literature - Sustainment | Included | Included | |
| 3.2.1.3.3.1.1 | Evaluations - Sustainment | Included | Included | |
| 3.2.1.3.3.1.2 | Recommendations - Sustainment | Included | Included | |
| 3.2.1.3.3.2 | Short Compliance FAA ADs | Included | Included | |
| 3.2.1.3.3.2.1 | Emergency ADs | Included | Included | |
| 3.2.1.3.3.2.2 | Urgent ADs | Included | Included | |
| 3.2.1.3.3.3 | Dispatch Deviation Guide and FAA Minimum Equipment List | Included | Included | |
| 3.2.1.3.3.4 | Aircraft Airworthiness Management | Included | Included | |
| 3.2.1.3.3.4.1 | Weapon System Activity, Planning & Accomplishment Recommendations | Included | Included | |
| 3.2.1.3.3.5 | Service Information Configuration Document (SICD) | Included | Included | |
| 3.2.1.3.4 | Engineering Support Tasks (EST) | Included | Included | |
| 3.2.1.3.4.1 | EST Inquiry Support | Included | Included | |
| 3.2.1.3.4.2 | Engineering Support Tasking (EST) 3400 O&M Funds | Included | ||
| 3.2.1.3.4.3 | Engineering Support Tasking (EST) 3010/3600 Funds | Included | ||
| 3.2.1.3.5 | Substitute Parts Analysis and Recommendation | Included | Included | |
| 3.2.1.3.6 | Sustaining Engineering Support | Included | Included | |
| 3.2.1.3.7 | Field and Depot Level Maintenance Plans | Included | Included | |
| 3.2.1.3.7.1 | Depot Maintenance Record Archive | Included | Included | |
| 3.2.1.3.7.2 | Reliability and Maintainability Information System (REMIS) Access | Included | Included | |
| 3.2.1.3.8 | Technical Order (TO) Support | Included | Included | |
| 3.2.1.3.9 | On-Line Allowable Configuration Management (ACM) Support | Included | Included | |
| 3.2.1.3.10 | AFTO 22, AF Form 847/1000 & IDEA Program Support | Included | Included | |
| 3.2.1.3.11 | E-4B Master Data Repository | Included | Included | |
| 3.2.1.3.11.1 | Master Data File Index | Included | Included | |
| 3.2.1.3.11.2 | Data Requests | Included | Included | |
| 3.2.1.3.11.3 | FAA Records Maintenance | Included | Included | |
| 3.2.2 | System Integration Laboratories (SIL) | Partial | Included | |
| 3.2.2.1 | Provide Facility Oversight | Included | Included | |
| 3.2.2.1.1 | Security and COMSEC. | Included | Included | |
| 3.2.2.1.2 | Facility Management. | Included | Included | |
| 3.2.2.1.3 | Escort Uncleared Service Providers. | Included | Included | |
| 3.2.2.1.4 | Off-site Storage. | Included | Included | |
| 3.2.2.1.5 | Transport Materials. | Included | Included | |
| 3.2.2.1.6 | Computer Network. | Included | Included | |
| 3.2.2.1.7 | Maintain SIL Line. | Included | Included | |
| 3.2.2.1.8 | Maintain Software Development Capabilities. | Included | Included | |
| 3.2.2.1.9 | SIL Prototype Modifications | Included | Included | |
| 3.2.2.1.10 | SIL Upgrade Recommendations | Included | Included | |
| 3.2.2.2 | Super High Frequency (SHF) SIL | Included | Included | |
| 3.2.2.2.1 | SHF SIL Software Support | Included | Included | |
| 3.2.2.2.2 | SHF SIL Engineering Liaison | Included | Included | |
| 3.2.2.2.3 | SHF SIL Hardware Support | Included | Included | |
| 3.2.2.2.4 | SHF SIL Configuration Management | Included | Included | |
| 3.2.2.2.5 | SHF SIL Develop Technical Data | Included | Included | |
| 3.2.2.2.6 | Provide Training to SHF Operators | Included | Included | |
| 3.2.2.2.7 | SHF SIL Funds Management | Included | Included | |
| 3.2.2.3 | Message Processing System (MPS) SIL | Included | Included | |
| 3.2.2.3.1 | MPS SIL Operation and Support | Included | Included | |
| 3.2.2.3.2 | MPS SIL Maintenance & Trouble Analysis | Included | Included | |
| 3.2.2.3.3 | MPS SIL Software Support. | Included | Included | |
| 3.2.2.3.4 | MPS SIL Engineering Liaison | Included | Included | |
| 3.2.2.3.5 | MPS SIL Hardware Support | Included | Included | |
| 3.2.2.3.6 | MPS SIL Configuration Management | Included | Included | |
| 3.2.2.3.7 | MPS SIL Identify Support Exceeding Funding Level | Included | Included | |
| 3.2.2.3.8 | MPS SIL Task Prioritization | Included | Included | |
| 3.2.2.4 | Joint SIL (JSIL) | Partial | Add description | |
| 3.2.2.4.1 | JSIL Maintenance | Partial | ||
| 3.2.2.4.2 | JSIL Modification/Enhancement | Partial | ||
| Deleted | ||||
| Deleted | ||||
| Deleted | ||||
| 3.2.3 | Logistics | Partial | Partial | |
| 3.2.3.1 | Supply Support | Included | Included | |
| 3.2.3.1.1 | Operating a COMBS | Included | Included | |
| 3.2.3.1.1.1 | Warehousing | Included | Included | |
| 3.2.3.1.1.1.1 | Demand Processing | Included | Included | |
| 3.2.3.1.1.1.2 | Storage and Issue | Included | Included | |
| 3.2.3.1.1.1.3 | Pick-Up and Delivery | Included | Included | |
| 3.2.3.1.1.1.4 | Receiving | Included | Included | |
| 3.2.3.1.1.1.4.1 | Turn-Ins | Included | added | |
| 3.2.3.1.1.1.5 | Shipping and Transportation | Included | Included | |
| 3.2.3.1.1.2 | COMBS Requirements | Included | Included | |
| 3.2.3.1.1.2.1 | COMBS Parts Cataloging | Included | Included | |
| 3.2.3.1.1.2.2 | COMBS Part Substitution | Included | Included | |
| 3.2.3.1.1.2.3 | COMBS Support Data | Included | Included | |
| 3.2.3.1.1.2.4 | COMBS Support Analysis | Included | Included | |
| 3.2.3.1.1.2.5 | COMBS Stock Control | Included | Included | |
| 3.2.3.1.1.2.5.1 | COMBS Part Obsolescence Management | Included | Included | |
| 3.2.3.1.1.2.6 | COMBS Inventory Disposition | Included | Included | |
| 3.2.3.1.1.2.7 | COMBS Funds Control | Included | Included | |
| 3.2.3.1.1.3 | COMBS Requisitioning | Included | Included | |
| 3.2.3.1.1.4 | Source Selection and Supplier Management | Included | Included | |
| 3.2.3.1.1.4.1.1 | Supplier Quality Assurance | Included | Included | |
| 3.2.3.1.1.4.1.2 | Requisitioning Schedules | Included | Included | |
| 3.2.3.1.1.3.1.3 | COMBS Cost of Repairs | Included | Included | |
| 3.2.3.1.1.4.2 | COMBS Parts Procurement | Included | Included | |
| 3.2.3.1.1.4.3 | COMBS Component Repair or Overhaul | Included | Included | |
| 3.2.3.1.1.4.4 | COMBS Subcontracts Administration | Included | Included | |
| 3.2.3.1.1.4.5 | Overhaul Component Requirement (OCR) Contracts | Included | Included | |
| 3.2.3.1.1.4.6 | Property Accountability Contracts (PAC) Contracts | Included | Included | |
| 3.2.3.1.1.4.7 | Other Purchase Contracts for Sustainment | Included | Included | |
| 3.2.3.1.1.5 | COMBS Inventory Management System (IMS) | Partial | Included | |
| 3.2.3.1.2 | Operational Support from the COMBS | Included | Included | |
| 3.2.3.1.2.1 | COMBS Mission Support Kits | Included | Included | |
| 3.2.3.1.2.1.1 | High Priority Mission Support Kit (HPMSK) | Included | Included | |
| 3.2.3.1.2.1.2 | Deployment/Special Mission Support Kit (D/SSMK) | Included | Included | |
| 3.2.3.1.2.1.3 | Special Support Mission (SSM) Kit | Included | Included | |
| 3.2.3.1.2.1.4 | FOB Kit | Included | Included | |
| 3.2.3.1.2.2 | Reserved | Included | ||
| 3.2.3.1.2.3 | Maintenance Bench Stock | Included | Included | |
| 3.2.3.1.2.4 | Overhaul Component Requirement (OCR) Stock | Included | Included | |
| 3.2.3.1.2.5 | Service Literature Support | Included | Included | |
| 3.2.3.1.2.5.1 | Kits and OFP Support | Included | Included | |
| 3.2.3.1.2.5.2 | Modification Support Requirements | Included | Included | |
| 3.2.3.1.2.5.3 | No Cost Service Bulletin kits | Included | Included | |
| 3.2.3.1.2.6 | Life Limited Parts | Included | Included | |
| 3.2.3.1.3 | Reserved | Included | ||
| 3.2.3.1.4 | COMBS Depot Maintenance Support | Included | Included | |
| 3.2.3.1.4.1 | CAP Support | Included | Included | |
| 3.2.3.1.4.1.1 | NSN Parts From Base Supply | Included | Included | |
| 3.2.3.1.4.2 | Major Component Overhaul | Included | Included | |
| 3.2.3.1.4.3 | OCR Stock | Included | Included | |
| 3.2.3.1.4.4 | TCTO/SB Kit and OFP Support - COMBS | Included | Included | |
| 3.2.3.1.5 | Reserved | Included | ||
| 3.2.3.1.6 | Support Equipment (SE) and Special Test Equipment (STE) Support - COMBS | Included | Included | |
| 3.2.3.1.6.1 | SE/STE Approved for Contractor Support - COMBS | Included | Included | |
| 3.2.3.1.6.2 | SE/STE Item Procurements | Included | Included | |
| 3.2.3.1.6.3 | SE/STE Maintenance | Included | Included | |
| 3.2.3.1.7 | COMBS System Integration Laboratories (SIL) Support | Included | Included | |
| 3.2.3.1.7.1 | Satellite Communications (SATCOM) System Repair Facility | Included | Included | |
| 3.2.3.1.8 | COMBS Electronic Repair Facility Support | Included | Included | |
| 3.2.3.1.9 | Government Supported Items (GSI) Support | Included | Included | |
| 3.2.3.1.9.1 | GSI Repair | Included | Included | |
| 3.2.3.1.9.2 | GSI Depot Maintenance Support | Included | Included | |
| 3.2.3.1.9.3 | GSI Communications Security (COMSEC) and Cryptographic Controlled Item (CCI) Transportation | Included | Included | |
| 3.2.3.1.10 | Logistics Reporting | Included | Included | |
| 3.2.3.1.11 | Logistics Project Management | Included | Included | |
| 3.2.3.2 | Field Service Representatives (FSR) | Included | Included | |
| 3.2.3.2.1 | FSR Areas of Coverage | Included | Included | |
| 3.2.3.2.2 | FSR Operational Support Duties and Requirements | Included | Included | |
| 3.2.3.2.2.1 | FSR Training Duties | Included | Included | |
| 3.2.3.2.2.2 | FSR Technical Activity Report (TAR) | Included | Included | |
| 3.2.3.2.3 | FSR Training Requirements and Qualifications | Included | Included | |
| 3.2.3.2.4 | FSR Operational Support | Included | Included | |
| 3.2.3.2.4.1 | FSR Over and Above Support | Included | Included | |
| 3.2.3.2.4.2 | Reserved | Included | ||
| 3.2.3.2.5 | Subscription Services | Included | Included | |
| 3.2.3.2.5.1 | Flight Management Services | Included | Included | |
| 3.2.3.2.5.2 | Flight Planning Program/Navigation Database | Included | Included | |
| 3.2.3.3 | Unique Repair Facilities | Included | Included | |
| 3.2.3.3.1 | SHF Satellite Communications (SATCOM) System Modification and Repair Capability | Included | Included | |
| 3.2.3.3.1.1 | Facility Maintenance Concept | Included | Included | |
| 3.2.3.3.1.2 | Facility Supply Support | Included | Included | |
| 3.2.3.3.1.2.1 | Facility Overhaul Component Repair (OCR) Stock | Included | Included | |
| 3.2.3.3.1.2.2 | Facility Shipping and Receiving | Included | Included | |
| 3.2.3.3.1.3 | Facility Government Furnished Support | Included | Included | |
| 3.2.3.3.1.4 | Facility Test Equipment | Included | Included | |
| 3.2.3.3.1.5 | Firmware Programming | Included | Included | |
| 3.2.3.3.1.6 | Facility Quality System | Included | Included | |
| 3.2.3.3.1.6.1 | Facility Configuration Control | Included | Included | |
| 3.2.3.3.1.6.2 | Serviceability Inspection/Certification | Included | Included | |
| 3.2.3.3.2 | On-Site Equipment Repair Facility (ERF) | Included | Included | |
| 3.2.3.3.2.1 | ERF Maintenance Concept | Included | Included | |
| 3.2.3.3.2.2 | ERF Work Specifications | Included | Included | |
| 3.2.3.3.2.3 | ERF Normal Duty Hours and Over and Above Support | Included | Included | |
| 3.2.3.3.2.4 | ERF Test Equipment and Tools | Included | Included | |
| 3.2.3.3.2.5 | ERF Serviceability Inspection/Certification | Included | Included | |
| 3.2.3.4 | Engines | Partial | Included | |
| 3.2.3.4.1 | Engine Management Support | Partial | Included | |
| 3.2.3.4.1.1 | Engine Maintenance - Schedule and Notification Requirements | Included | ||
| 3.2.3.4.1.2 | Engine Working Group (EWG) | Included | ||
| 3.2.3.4.1.3 | Engine Accident Review Board | Included | ||
| 3.2.3.4.1.4 | Spare Engine Status | Included | Included | |
| 3.2.3.4.2 | Engine Service Information and FAA AD Review | Included | Included | |
| 3.2.3.4.2.1 | Engine Publications Review | Included | Included | |
| 3.2.3.4.2.2 | Evaluation Content - Engines | Included | Included | |
| 3.2.3.4.2.3 | Engine Service Information Configuration Document (SICD) | Included | Included | |
| 3.2.3.4.3 | Engine Maintenance Specifications/Workscope Planning Guide | Included | Included | |
| 3.2.3.4.4 | Engine Depot Maintenance | Included | Included | |
| 3.2.3.4.4.1 | Engine Shop Scheduled Maintenance Work Scope | Included | Included | |
| 3.2.3.4.4.2 | Receiving Engine at Repair Facility | Included | Included | |
| 3.2.3.4.4.3 | Repair of Government Assets | Included | Included | |
| 3.2.3.4.4.4 | Post Induction Test, Government Source Inspection and Government Acceptance | Included | Included | |
| 3.2.3.4.4.5 | Engine Data/Reporting Requirements | Included | Included | |
| 3.2.3.4.5 | Engine Transportation | Included | Included | |
| 3.2.3.4.6 | Engine Records | Included | Included | |
| 3.2.3.4.6.1 | Aircraft Utilization Data | Included | Included | |
| 3.2.3.4.6.2 | Engine Depot Records Database | Included | Included | |
| 3.2.3.4.6.3 | Engine Condition Monitoring Program | Included | Included | |
| 3.2.3.4.6.4 | Engine Spare Parts Inventory Status | Included | Included | |
| 3.2.3.4.6.5 | Parts Scrap Report | Included | ||
| 3.2.3.4.6.6 | Engine Monthly Status Report | Included | ||
| 3.2.3.5 | Technical Order (TO) Services | Partial | Partial | |
| 3.2.3.5.1 | TO Databases | Included | Included | |
| 3.2.3.5.1.1 | TO Maintenance Manuals | Included | Included | |
| 3.2.3.5.1.2 | Wiring Diagram Manuals (WDM) and Lists, E-4B and Commercial Databases | Included | Included | |
| 3.2.3.5.1.3 | Illustrated Parts Catalog (IPC) | Included | Included | |
| 3.2.3.5.1.4 | TO Updates - Scheduled Inspection and Maintenance Requirements | Included | Included | |
| 3.2.3.5.1.5 | Commercial Publication Change Request (PCR) | Included | Included | |
| 3.2.3.5.2 | TO Library | Included | Included | |
| 3.2.3.5.2.1 | Service Literature-Driven Changes - TOs | Included | Included | |
| 3.2.3.5.2.2 | Fast Reaction Changes - TOs | Included | Included | |
| 3.2.3.5.2.3 | TO Supplements | Included | Included | |
| 3.2.3.5.2.4 | Dissemination and Control of Data - TOs | Included | Included | |
| 3.2.3.5.2.5 | Checklists and Workcards - TOs | Included | Included | |
| 3.2.3.5.2.6 | Mil-Spec Reformatting - TOs | Included | Included | |
| 3.2.3.5.2.7 | TO Title Pages | Included | Included | |
| 3.2.3.5.2.8 | TO Delivery Requirements | Included | Included | |
| 3.2.3.5.2.9 | TO Storage - Master Files | Included | Included | |
| 3.2.3.5.2.10 | Government Furnished Source Data | Included | Included | |
| 3.2.3.5.2.11 | Notification of Inadequate Material | Included | Included | |
| 3.2.3.5.3 | New TOs and Source Data | Included | Included | |
| 3.2.3.5.3.1 | Flight Manual Changes. | Included | Included | |
| 3.2.3.5.3.2 | TO Inspection and Acceptance | Included | Included | |
| 3.2.3.5.3.3 | Contractor Program Management Requirements - Data | Included | Included | |
| 3.2.3.5.3.4 | Classified Documents and Material | Included | Included | |
| 3.2.3.5.4 | TO Conference and Meetings Support | Included | Included | |
| 3.2.3.5.5 | TO Status Reports | Included | Included | |
| 3.2.3.5.6 | Customer Requested TO Changes (Form 252) | Included | Included | |
| 3.2.3.5.7 | TO Digitizing Support | |||
| 3.2.3.6 | Sustainment Reporting for DAL | Included | ||
| 3.2.3.6.1 | Logistics Reporting for DAL | Included | Included | |
| 3.2.3.6.2 | Engines Reporting for DAL | Included | Included | |
| 3.2.3.6.3 | Engineering Reporting for DAL | Included | Included | |
| 3.3 | Modifications | |||
| 3.3.1 | Modification Management | |||
| 3.3.1.1 | Modification Point of Contact | |||
| 3.3.1.2 | Modification Schedules & Tracking | |||
| 3.3.1.3 | Certification of Modifications | |||
| 3.3.1.4 | DoDAF Compliance of Modifications | |||
| 3.3.2 | Engineering Development and Integration - Modification | |||
| 3.3.2.1 | Modification Baseline Configuration | |||
| 3.3.2.2 | Systems Engineering Modification Development Support | Partial | ? | |
| 3.3.2.3 | ELA Modification Support | Partial | ||
| 3.3.2.4 | Weight and Balance Modification Support | Partial | ||
| 3.3.2.5 | ECS Modification Support | Partial | ||
| 3.3.2.6 | EMI/EMC Modification Support | Partial | ||
| 3.3.2.7 | EMSEC Modification Support | Partial | ||
| 3.3.2.8 | Antenna/RF Effects Modification Support | Partial | ||
| 3.3.2.9 | S/V Modification Support | Partial | ||
| 3.3.2.10 | Structures Modification Support | |||
| 3.3.2.11 | Environmental Modification Support | |||
| 3.3.2.12 | Aerodynamic/Air Vehicle Performance Modification Support | |||
| 3.3.2.13 | Acoustics & Vibrations Modification Support | |||
| 3.3.2.14 | Safety Analysis of Modifications | |||
| 3.3.2.15 | Modification Test Support | |||
| 3.3.2.16 | Product Engineering - Modifications | |||
| 3.3.2.16.1 | Design Data - Modifications | |||
| 3.3.2.17 | Software Development - Modifications | |||
| 3.3.2.17.1 | Software Documentation - Modifications | |||
| 3.3.2.17.2 | Software Development Metrics - Modifications | |||
| 3.3.2.18 | Human Factors - Modifications | |||
| 3.3.2.19 | Modification Reliability, Maintainability and Testability (RM&T) Analysis | |||
| 3.3.2.20 | Modification Security Accreditation | |||
| 3.3.3 | Integrated Logistics Support Development - Modifications | |||
| 3.3.3.1 | Logistics Planning and Management - Modifications | |||
| 3.3.3.2 | Logistics Management Information - Modifications | |||
| 3.3.3.3 | Training Requirements Development | |||
| 3.3.3.4 | Technical Publications | |||
| 3.3.3.5 | Time Compliance Technical Order | |||
| 3.3.3.6 | Technical Order Changes and/or TO Formatted Source Data | |||
| 3.3.3.7 | TCTO Reviews and Conferences - Modifications | |||
| 3.3.3.8 | Technical Order Changes/Source Data Contractor Quality Assurance (CQA) and Government Verification | |||
| 3.3.3.8.1 | Contractor Quality Assurance | |||
| 3.3.3.8.2 | Government Verification - TOs | |||
| 3.3.3.9 | TCTO Verification | |||
| 4.0 | Quality | Included | ??? | |
| 4.1 | Environmental Compliance - Quality | Included | Included | |
| 4.2 | Quality Management | Included | Included | |
| 4.3 | Sustainment Quality Assurance | Included | Included | |
| 4.3.1 | Repair Stations - Quality | Included | Included | |
| 4.3.2 | Parts - Quality | Included | Included | |
| 4.3.2.1 | Unapproved TC or STC Parts Quality Control | Included | Included | |
| 4.3.3 | Shipping and Receiving Quality Assurance | Included | Included | |
| 5.0 | Safety | Included | Included | |
| 6.0 | Security | Included | Included | |
| 7.0 | Government Furnished Support | Partial | Partial | |
| 7.1 | Facilities | Included | Included | |
| 7.1.1 | Conservation of Utilities | Included | Included | |
| 7.2 | Training | Included | Included | |
| 7.2.1 | Request for Training | Included | Included | |
| 7.2.2 | Training Records | Included | Included | |
| 7.2.3 | Special Training Qualifications | Included | Included | |
| 7.3 | Property | Partial | Partial | |
| 7.4 | Technical Data | Included | Included | |
| 7.5 | Services | Included | Included | |
| 7.6 | Physical Inventories | Included | Included | |
| 7.6.1 | Phase-in | Included | Included | |
| 7.6.2 | Phase-out | Included | Included | |
| 7.7 | Property Replacement | Included | Included | |
| 7.8 | Property Disposition | Included | Included | |
| Appendix A | Acronyms | no requirements | ||
| Appendix B | Definitions | no requirements | ||
| Appendix C | Applicable Documents | Included | ||
| C.1 | General Information | Included | ||
| C.2 | Department of Defense (DoD) Specifications | Included | ||
| C.3 | DoD Standards | Included | ||
| C.4 | Other Government Publications | Included | ||
| C.4.1 | Air Force Instructions (AFI) | Included | ||
| C.4.2 | Air Force Manuals (AFM) | Included | ||
| C.4.3 | Air Force Policy Directives (AFPD) and Special Standards | Included | ||
| C.4.4 | USAF Technical Orders (TO) | Included | ||
| C.4.5 | E-4B Technical Orders (TO) | Included | ||
| C.4.6 | Air Force Materiel Command Manual (AFMCM) | Included | ||
| C.4.7 | Forms | Included | ||
| C.4.8 | E-4B Documents | Included | ||
| C.4.9 | Other Documents | Included | ||
| C.5 | Federal Aviation Administration | Included | ||
| C.6 | Commercial Drawings and Documents | Included | ||
| C.7 | Industry Publications | Included | ||
| Appendix D | Government Furnished Support | Partial | ||
| D.1 | Government Furnished Facilities | Included | ||
| D.1.1 | Tinker AFB Site Facilities | Included | ||
| D.1.2 | Offutt AFB Site Facilities | Included | Included | |
| D.2 | Government Furnished Training Materials | Included | Included | |
| D.3 | Government Furnished Property | Partial | ||
| D.3.1 | Logistics Property (Table) | Included | ||
| D.3.2 | SHF SIL Property | Included | ||
| D.3.3 | Message Processing System (MPS) SIL Property (Rockwell Collins) | Included | ||
| D.3.4 | Audio Infrastructure Upgrade (AIU) SIL Property | |||
| D.3.5 | Global Air Traffic Management (GATM) SIL Property | |||
| D.3.6 | Survivability/Vulnerability (S/V) Laboratory Property | Included | Included | |
| D.3.7 | Engine Rotable Spares | Included | ||
| D.3.8 | COMBS Contractor Acquired Property (CAP) Inventory | Included | ||
| D.4 | Government Furnished Technical Data | Included | ||
| D.5 | Government Furnished Services | Included | Included | |
| Appendix E | Receipt of Aircraft at Facility | |||
| E.1 | Handling | |||
| E.2 | Inventory | |||
| E.3 | Repairs | |||
| E.4 | Over and Above (O&A) | |||
| E.5 | Electrical Bonding | |||
| E.6 | Preservation | |||
| E.7 | Final Processing Of Aircraft - Finishing | |||
| E.8 | Depreservation | |||
| E.9 | Servicing | |||
| E.10 | Weight and Balance | |||
| E.11 | Preflight | |||
| E.12 | Check Flights | |||
| E.13 | Post Flight | |||
| E.14 | Preparation for Ferry | |||
| E.15 | Forms Preparation | |||
| E.16 | Customer Acceptance | |||
| Appendix F | E-4B PDM Reporting Requirements | |||
| Appendix G | Electrical Bonding Requirements for E-4B Fuel Vapor Areas | |||
| Appendix H | Inventory Management System (IMS) | Included | Included | |
| Appendix I | Quality Assurance | Included | Included | |
| Appendix J | Reserved | Included | ||
| Appendix K | Backshop | |||
| Appendix L | E-4B Technical Order Listing Table | Included |
File details come from the government source that posted it. Updated .