Compiled_Q A_as_of_23_May_2012.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Special Notice - HDIAC BCO Federal contract opportunity
Solicitation number
FA8075-12--R-0001
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Special Notice - HDIAC BCO, newest first.
File Type Posted
Compiled_QandA_as_of_25_June_2012.xlsx XLSX spreadsheet
FA8075-12-R-0001_A02.doc DOC document
Compiled_QandA_as_of_21_June_2012.xlsx XLSX spreadsheet
Compiled_QandA_as_of_11_June_2012.xlsx XLSX spreadsheet
Compiled_QandA_as_of_1_June_2012.xlsx XLSX spreadsheet
Amendment 1 - HDIAC_BCO_RFP_SF30.doc DOC document
Compiled_QandA_as_of_23_May_2012.xlsx XLSX spreadsheet
ESG HDIAC BCO RFP.docx DOCX document
Compiled_Q_and_A_As_of_5_March_2012.xlsx XLSX spreadsheet
Compiled Q and A As of 27 Feb 2012.xlsx XLSX spreadsheet
Cost Track_Mo Fin Report Template_CD.xls XLS spreadsheet
Pre-Solicitation Notice.docx DOCX document
Draft _HDIAC_BCO_RFP.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

HDIAC BCO RFP Q&A As of 23 May 2012
#Solicitation SectionQuestion/CommentResponse
1Section C, Paragraph 1.4.1.4.b – Storage - Classified HoldingsThis reference indicates that classified media holdings are stored in two, five-drawer GSA storage containers, footprint approximately 120 SF. Please confirm the footprint (dimensions) of the 2 cabinets, or, provide clarification regarding total SF estimate.Details as provided in the RFP are complete and accurate. 120sq ft is the size of the room in which the classified material is stored; this room contains the 2 storage cabinets, and includes sitting space and a computer terminal. The cabinet dimensions are 52" x 27 ½" x 20 ½" and 57 ½" x 27 ½ x 19 ½".
2Section L, Subfactor 2, Paragraph L4.4.4The paragraph states “The Offeror shall demonstrate at time of proposal submission it possesses a Secret Facility Clearance and has a cleared facility authorized to store classified materials at the secret level." Can a prime or subcontractor possess the clearance to meet the requirements for classified storage?Yes, "classified storage capability' can be performed by a subcontractor. The Government has no particular expectation or preferred solution. Security requirements are as stated in the PWS and the DD Form 254. It is left to the contractor's discretion as to how best to meet these requirements.
3Is it acceptable for the offeror to use the DD Form 254 issued upon contract award to obtain DSS approval for safeguarding at the secret level?The requirements, as stated in the RFP, are that the cleared facility authorized to store classified materials must be in place at the time of proposal. As such, it is not acceptable to begin pursuing DSS approval for such facility after contract award.
4Can a subcontractor meet the safeguarding requirements until the prime receives approval from DSS for safeguarding (estimated time 30 days)?The classified storage capability may be provided by a sub-contractor, provided it is available for use sufficient to meet the requirements of the RFP; this does not negate the requirement that classified storage be in place at time of proposal, and demonstrated in the proposal by a Facility Clearance Letter signed by DSS (reference RFP Section M3.2.3.2.5). RFP, Section C, PWS paragraph 1.8.2(2) has been revised to more clearly reflect the above requirement. For further clarification or additional questions regarding security matters, offerors are advised to contact their industrial security specialist at DSS.
5There seems to be a conflict in the RFP. At one place the due date for the proposal is 45 days from release. At one place the due date for the technical volume is June 14th. Can you clarify?Volume I (Past Performance) shall be submitted not later than 4:00 PM Local Prevailing Time 30 days after RFP release (14 June). All other Volumes (II, III, and IV) shall be submitted not later than 4:00 PM Local Prevailing Time 45 days after RFP release (29 June). This is identified In Section L2.0, Proposal Instructions, of the RFP.