Attch_3_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(10-30-15).pdf

Air Force Form PDF 306 KB Posted

Attached to
Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Solicitation number
FA8051-16-BOILERINSPECT
Issued by

About this file

Attch 3 INSTRUCTIONS FOR COMPLETING AF FORM 1222 (10-30-15)

View the file

Other versions and copies of AF Form 1222

File Revision Posted Attached to
CDRL_Attachment_4_-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013).docx Jul 12, 2013 OCONUS PACAF AND USAFE BOILER INSPECTIONS FY17
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 PACAF Boiler Inspection Services
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 Boiler Inspections at Clear/Eielson AFB, AK
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 Boiler/UPV Inspection Services in Alaska
Attachment_3-AF_FORM_1222-AF_EQUIVALENT_(7-12-13)-Tests.docx Revision not stated OCONUS PACAF AND USAFE BOILER INSPECTIONS FY17
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated PACAF Boiler Inspection Services
Attach_5_AF_Form_1222.pdf Revision not stated Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Attch_2_AFCEC_SUPPLEMENTAL_AF_FORM_1222.pdf Revision not stated Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Attachment_2_-_Instructions_for_Completing_the_AF_Form_1222.pdf Revision not stated Air Force Boiler and UPV Inspections, Korea
Attachment_1_-_AF_Form_1222-AF_Equialent.docx Revision not stated Air Force Boiler and UPV Inspections, Korea
Attachment_2-_Instructions_for_Completing_the_AF_Form_1222.pdf Revision not stated Air Force Boiler and UPV Inspections, Alaska
Attachment_1-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated Air Force Boiler and UPV Inspections, Alaska
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated Boiler Inspections at Clear/Eielson AFB, AK
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated Boiler/UPV Inspection Services in Alaska
Show all 14

Who attaches AF Form 1222

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR COMPLETING AF FORM 1222

BOILER OR UNFIRED PRESSURE VESSEL (UPV) INSPECTION REPORT

Use a separate form for each boiler or UPV. The following subparagraph numbers refer to number blocks on the report.

1. Type of Inspection: Enter an “x” in the appropriate box for a Boiler or Pressure vessel. Check the type of inspection accomplished (Type BA, BB, BC, BD, BE or VA, VB, VC, VD, VE). “B” represents a Boiler and “V” represents a Vessel.

2. Date of Inspection: Enter the date inspection was accomplished.

3. Inspection/Delivery Order No: Enter inspection order number or delivery order number as shown on the inspection order.

4. Contract Number: Enter the contract number for the inspection order.

5. Installation: Enter base name or title of the activity for which the inspection is being made.

6. State: Enter the state where the object being inspected is located.

7. Zip Code: Enter zip code where the object being inspected is located.

8. Plant or Building: Enter the building or structure number assigned by the BCE in which the boiler or UPV is located.

9. Type: Enter type of boiler or vessel: Either Fire Tube, Water Tube, Cast Iron, Expansion Tank or Other.

10. Plant: Enter manned or unmanned by checking the appropriate box.

11a.Pressure Previous Inspection: Enter operating pressure of the previous inspection.

11b.Pressure This Inspection: Enter the operating pressure for this inspection

12. Use: Enter the use: Power, Steam Heating, Process, Storage, HTHW, or Heat Exchange by checking the appropriate box.

13a.Year Built: Enter the calendar year in which the boiler or UPV was built.

13b.Year Installed: Enter the year in which the boiler or UPV was installed.

14a Primary Fuel (Boiler): Enter the primary fuel; e.g., natural gas, No. 2 to 6 fuel oil, propane, coal, solid waste, etc.

14b.Secondary Fuel: Enter the secondary or back-up fuel; e.g., natural gas, No. 2 to 6 fuel oil, propane, coal, solid waste, etc.

15. Design Working Pressure or temperature: Enter the design working pressure (psig) or temperature (°F) of the unit.

16. Manufacturer: Enter manufacturer of boiler or UPV.

17. Manufacturer’s Rating MBTU: Enter manufacturer’s rating in MBTU for the unit.

18a.National Board Number: Enter the boiler or UPV National Board number.

18b.USAF Number: Enter the boiler or UPV number assigned by the BCE for the object being inspected.

19. Method of Firing (Boilers): Enter the method of firing, either automatic or manual.

20. Safety Relief Valve Setting: Enter the set pressure and/or temperature (°F) of the safety valve in this inspection.

21. Explain if Pressure Changed: Enter explanation for any pressure or temperature (°F) changes.

20. Pressure Prior Inspection (PSIG): Enter the set pressure or temperature (°F) of the safety valve in prior inspection.

21. Pressure This Inspection (PSIG): Enter the set pressure or temperature (°F) of the safety valve in this inspection.

22. Pressure Gage Tested: Enter YES or NO: Test pressure gage and check to see if the pressure gage has been calibrated and gage has proper range in relation to MAWP.

23. Purpose of Hydrostatic Test: Enter purpose of hydrostatic test. Check NEW or RETEST

24. Last Hydrostatic Test: Enter date of last hydrostatic test and test pressure in psi.

25. Hydrostatic Test: Check YES or No if hydrostatic test is completed. Enter date of the test and the pressure (PSIG).

26. Repairs Made Since Last Inspection: Enter “None” for “no” repairs and “Yes” (Specify) if repairs were made.

Describe fully all repairs since last inspection. Verify repairs comply with NBIC and ASME requirements.

27. Internal Inspection (Describe Inspection Fully): Describe fully and state the location of any damage or deposits on internal surfaces (e.g., scale, oil, or other deposits). State location and extent of corrosion and whether active or inactive.

State location and extent of any erosion, grooving, bulging, warping, cracking, or similar conditions. Report defective rivets, bowed, loose, or broken stays. State condition of all tubes, wall thickness, tube ends, coils, nipples, etc. Describe adverse conditions of pressure gages, water columns, gage glasses, gage cocks, safety valves, etc. Report the condition of settings, linings, baffles, supports, etc. Describe any adverse conditions, safety, or ASME/NBIC violations, etc. Describe any major changes or repairs made since last inspection.

28. External Inspection (Condition of Boilers Vessels and Plant): Describe fully and state location of any corrosion, leakage, evidence of overheating, soot or other destructive accumulations, safety and/or ASME/NBIC violations.

29. Settings, linings, Supports and Baffles: Describe fully the condition of the parts and any corrosion or defects. Verify the installation, operation, and testing of controls and safety devices as required by NBIC, and CSD-1/NFPA 85

30. Inspection of Safety Devices (Safety Relief Valves): Verify the installation, operation and testing of safety devices as required by ASME/NBIC.

31. Size/Number: By device, record size, device number, manufacturer’s name, and set pressure (psig) on Supplemental

Form for additional items.

32. Total Capacity: Record relieving capacity (lbs/hr), etc) on Supplemental Form for additional items.

33. Condition and How Tested: Record the condition, and a brief description of the test or verification procedure performed.

State whether ASME/NBIC requirements have been met. If not in compliance, enter No and document all deficiencies and required repairs on Supplemental Form.

34. Pressure Gages: Enter gage number, condition, corrections or adjustments made, whether tested/calibrated and reason not tested. Verify that the gage has the appropriate range for the process being measured and record on the Supplemental

Form.

35. Correction Taken: (If none, give reason).

36. Other Items - Appliances (e.g., water columns, gage glasses, gage cocks): Enter items inspected and condition. Use

Supplemental Form to record results.

37. Condition-other items. Document condition of other items. Use Supplemental Form, if necessary.

38. Regulators and Controls: Confirm that controls meet requirements of NBIC and CSD-1/NFPA 85. If No, list deficiencies to be corrected and repairs to be made in Block 43.

39. Condition (Regulators and Controls): Describe the condition of regulators and controls.

40. ASME CODES: Does Plant Comply with Code, Welding, Materials, Configuration, Etc.? Check “Yes” or “No”.

41. Was Boiler or Vessel Prepared for Through Examination? (If NO, state what was not and why in Remarks and

Recommendations of Inspector). Does plant Comply with Code, Welding, materials, Configuration, Etc.? Check

“Yes” or “No”. List deficiencies in Block 43.

42. Was Boiler Entered for Inspection? (If NO, state what was not and why in Remarks and Recommendations of

Inspector) Applies to internal inspections only. Check “Yes” or NO”.

43. Remarks and recommendations of the Inspector: List All Deficiencies to be Corrected or Repaired.

44. Typed Name and Title of Inspector: Enter name and title of authorized inspector.

45. Name and Title of Air Force Representative Accompanying Inspector: Enter name and title of Air Force representative witnessing inspection.

46a.Signature of Inspector: Enter signature of authorized inspector.

46b.Date of Signature: Enter date of certified inspector’s signature.

46c.Inspector’s National Board Commission Number: Enter the National Board Number of the authorized inspector.

47. Action Taken on Recommendation: Date and action taken based on certified inspector’s recommendations.

48. Typed Name, Title and Grade of Officer in Charge: Enter name and title of certifying official authorizing corrective actions as a result of the inspection.

49. Signature of Officer in Charge: Enter signature of certifying official in charge.

50. Date of Signature: Enter date of signature for officer in charge

51. Boiler Efficiency Test Results: Enter boiler efficiency test results in SUP 51, Figure 1, of the AFCEC Supplemental

Form for AF Form 1222. Efficiency tests are to be conducted according to ASME Performance Test Codes in ASME

PTC 19.10 81. Method to set up sample test points for efficiency tests is shown in Figure 2 of the Supplemental Form.