DRAFT
PERFORMANCE WORK STATEMENT
AIR FORCE BOILER
and
UNFIRED PRESSURE VESSEL INSPECTION
Blanket Purchase Agreement
30 OCT 2015
TABLE OF CONTENTS
SECTION A, DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.0. Description of Services 2
1.1. Inspection Criteria 2
1.2. Boiler Inspections 2
1.3. Unfired Pressure Vessels 4
1.4. Inspection Requests 5
1.5. Deliveries and Performance 5
2.0 General Information 6
2.1. Definitions 6
2.2. Qualification of Inspectors 7
2.3. Site Preparation 7
2.4. Witness to Inspection 7
2.5. Mileage, Expenses, and Travel Time for Inspector 7
2.6. Workload Data 8
2.7. Quality Control 8
2.8. Quality Assurance 8
SECTION B, SERVICES SUMMARY 9
SECTION C, GOVERNMENT PROVIDED PROPERTY & SERVICES 10
SECTION D, APPENDICES 11
SECTION A
DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.0. DESCRIPTION OF SERVICES: The contractor shall provide technical expertise required to support the Air Force Civil Engineer Center (AFCEC) and Base Civil Engineer (BCE) Boiler and Unfired Pressure Vessel inspection program.
1.1. INSPECTION CRITERIA. In the United States, inspections of American Society of
Mechanical Engineers (ASME) stamped boilers and unfired pressure vessels shall be accomplished in accordance with the rules for inspections in the latest edition of the National
Board Inspection Code and addenda published by the National Board of Boiler and Pressure
Vessel Inspectors, 1055 Crupper Avenue, Columbus OH 43229, ASME CSD-1, NFPA 85 and the Inspection and Testing requirements contained in AFI 32-1068, dated 14 May 2013.
1.2. BOILER INSPECTIONS.
1.2.1. Description of Inspection Types
- Type BA: Internal and external inspection
- Type BB: Internal and external inspection, followed or preceded by external inspection while boiler is under hydrostatic test
- Type BC: External inspection while boiler is operational under pressure
- Type BD: External inspection while under hydrostatic test
- Type BE: Internal and external inspection of expansion tanks used with high temperature hot water boilers
- Combustion Efficiency: In conjunction with the BC Inspection (Fuel type;
natural gas, #2 fuel oil, #6 fuel oil, coal, etc.), check the combustion efficiency of each boiler using a Bacharach Model ECA 450 or equivalent portable flue gas analyzer. Measurements shall be taken in accordance with ASME PTC 19.10-
1981, Flue and Exhaust Gas Analyses, Section 3, Extractive Measurement
Systems. Measurements will be measured or calculated and recorded on Block
51 of the AF Form 1222 Supplemental.
- Ambient Air Temperature of combustion air (required 0 – 120 deg F range); required accuracy of ±2% between 32 – 120°F
- Flue gas exhaust stack temperature (required 0 – 1200 deg F range); required accuracy of ±4% between 32 – 255°F / ±6% between 256 – 480°F / ±8% between 481
– 752°F / ±10% above 753°F
- O2 concentration (required 0 – 15% measurement range); required ±0.3% accuracy
- CO concentration (required 0 – 50,000 ppm range); required accuracy of ±5% of reading or 10 ppm whichever is greater in the range of 0 – 2,000 ppm / ±10% of reading in the range of 2,000 – 40,000 ppm
- Hydrocarbons (required 0 – 5% range); required accuracy of ±5%
Additionally, the boiler inspectors must record additional information:
- Fuel type (natural gas, #2 fuel oil, #6 fuel oil, coal, etc.)
- Energy content (i.e., BTU/lb, BTU/CCF, BTU/gal, etc.) of fuel with ultimate analysis of fuel constituents if available from utility bills
- Combustion efficiency
- % excess air
- % CO2
Note:The combustion analysis will be performed when the outside air is no greater than 30°F and the boiler is up to equilibrium and has stabilized (i.e., not cycling). System operation should not be less than 20 minutes of consistent operation at full (Hi) burner (if applicable) while maintaining a stable steam system pressure. If system load is not acceptable for testing (i.e., boiler cycling), then the system load will be created by manually setting back building water temperature to no less than 130°F prior to performing combustion analysis. All testing will be performed in compliance with Bacharach Instruction 0024-9400.
1.2.2. Exclusions. The following items are excluded from inspection.
- Steam boilers with safety valves set at 15 pounds per square inch gauge (psig) or less and hot water boilers with safety valves set at less than 160 psig
- Pressure vessels of less than one boiler horsepower which are especially constructed for laboratory purposes
- Non ASME Stamped Boilers/UPVs
1.2.3. Boiler Inspection Requirements. The list of ASME boiler inspection requirements, to be provided to the contractor at the time of call, shall include the following information:
- Points of contact at the base and commercial phone number(s)
- The name and location of the Air Force installation
- The building number where the boiler is located
- The National Board number for each boiler
- The required dates that the inspection(s) must be completed
- The type of inspection(s) required
1.2.4. Air Force Installations within the Continental United States
1.2.4.1. Scheduled Inspections. The contractor shall supply to the Government the necessary services, reports, supplies and equipment to perform inspection of high pressure steam boilers
(above 15 psig), high temperature hot water boilers (above 160 psig and/or 250 degrees F) , and associated expansion tanks at Air Force installations in the continental United States. The
Government will make every attempt to place each call not later than 15 calendar days prior to the requested inspection date. Present estimated quantities include approximately 1000 boiler inspections annually at approximately 90 locations. These quantities may vary.
1.2.5. Air Force Installations outside of the Continental United States. The BCE may use the
CONUS inspection guidelines to establish a separate inspection program. Bases in Alaska, Hawaii, Guam, other non-CONUS states, possessions, or territories, and foreign countries may also use the services available to CONUS bases. This contract excludes host countries with their own boiler inspection program and service.
1.2.5.1. Scheduled Inspections. The contractor shall supply to the Government the necessary services, reports, supplies and equipment to perform inspection of high pressure steam boilers
(above 15 psig), high temperature hot water boilers (above 160 psig and/or 250 degrees F) , and associated expansion tanks at Air Force installations in foreign countries. Present estimated quantities include approximately 200 boiler inspections annually at approximately 25 locations.
These quantities may vary.
1.3. UNFIRED PRESSURE VESSELS
1.3.1 Description of Inspection Types
- Type VA: Internal and external inspection
- Type VB: Internal and external inspection, followed or preceded by external inspection during which the pressure vessel is under hydrostatic test
- Type VC: External inspection while under operating conditions and pressure
- Type VD: External inspection while under hydrostatic test
- Type VE: Internal and external inspection with an ultrasonic thickness test of the pressure vessel shell
1.3.2. Exclusions. The following items are excluded from inspection.
- Non ASME stamped UPVs
1.3.3. Unfired Pressure Vessel Inspection Requirements. The list of ASME pressure vessel inspection requirements, to be provided to the contractor at the time of call, shall include the following information:
- Points of contact at the base and commercial phone number(s)
- The name and location of the Air Force installation
- The building number where the pressure vessel is located
- The Serial number or National Board number for each pressure vessel
- The required dates that the inspection(s) must be completed
- The type of inspections required
1.3.4. Air Force Installations within the Continental United States
1.3.4.1. Scheduled Inspections. The Contractor shall supply to the Government the necessary services, reports, supplies, and equipment to perform inspection of unfired pressure vessels
(above 15 psig) and jacketed steam kettles at Air Force installations in the continental United
States (excluding Alaska and Hawaii). The Government will make every attempt to place each call not later than 15 calendar days prior to the requested inspection date. Present estimated quantities include approximately 500 pressure vessel inspections at approximately 90 locations.
These quantities may vary.
1.3.4.2. Special Requirements. A type VE inspection will be recommended by the inspector when an unfired pressure vessel’s shell thickness has thinned to a potentially unsafe level.
Approval from the Contracting Officer (CO) is required to perform the VE inspection. Shell thickness measurements shall include, but not be limited to, any suspect areas, areas of weld joints, and a minimum of half of the shell. Exact locations and quantity of thickness measurements will be at the discretion of the inspector. Hydrostatic tests shall be performed on air receiver tanks when inspections and/or calculations indicate a condition which is questionable for safety valve setting. Hydrostatic tests shall also be performed after a repair has been made to any pressure vessel which could affect its safety.
1.3.5. Air Force Installations outside of the Continental United States. The BCE may use the
CONUS inspection guidelines to establish a separate inspection program. Bases in Alaska, Hawaii, Guam, other non-CONUS states, possessions, or territories, and foreign countries may also use the services available to CONUS bases. This contract excludes host countries with their own boiler inspection program and service.
1.3.5.1. Scheduled Inspections. The Contractor shall supply to the Government the necessary services, reports, supplies, and equipment to perform inspection of unfired pressure vessels
(above 15 psig) and jacketed steam kettles at Air Force installations. The Government will make every attempt to place each call not later than 15 calendar days prior to the requested inspection date. Present estimated quantities include approximately 500 pressure vessel inspections at approximately 25 locations. These quantities may vary.
1.4. INSPECTION REQUESTS
1.4.1. Inspection Requests. The Government, through the CO or person authorized to place calls, will provide the Contractor with a BPA Call Letter to schedule one or more boiler and/or
UPV inspections. The Government personnel authorized to place calls will notify the Contractor by e-mail, telephone, fax, or letter of the required date(s) of inspections.
1.4.2. Deferred Inspections. If, due to circumstances beyond the contractor’s control, they are unable to provide an inspection on a date for which it has been arranged, the CO will be notified by the contractor a minimum of thirty-six (36) hours in advance of the date inspections were to be accomplished. This will result in the call letter being canceled. The Government, likewise, may cancel the call letter provided they notify the contractor at least thirty-six hours (36) in advance of the dates set for inspections. No costs will be assessed by the Government or
Contractor as long as the thirty-six hour notification requirement is met.
1.5. DELIVERIES and PERFORMANCE
1.5.1. Reports. The Contractor’s Authorized Inspector shall prepare an AF Form 1222 (Block
51 Supplemental for combustion efficiency test) for each boiler inspected and each unfired pressure vessel inspected in accordance with the report format and instructions outlined in
Attachment 1 to the contract.
1.5.1.1. Each report shall describe the physical condition of the boiler or pressure vessel inspected and list any deficiencies and necessary repairs or changes required for the boiler or pressure vessel to meet applicable codes, standards, and the requirements of good engineering practice. If the boiler or pressure vessel is determined to be unsafe to operate, it must be immediately conveyed by positive notification to CO, the base and DETACHMENT POC’s, and annotated on the AF Form 1222.
The inspection report shall be typed or printed legibly in ink. Each report shall be individually signed by the Inspector performing the inspection attesting they had performed the inspection and witnessed any required tests or verification procedures. The on-site base Boiler Plant
Operator or designated representative witnessing the inspection will sign the AF 1222. Each report shall include the inspector's National Board Certification Number.
1.5.1.2. Before leaving each Air Force installation following inspections, the Inspector shall provide one (1) copy of each completed and signed AF Form 1222 for each boiler inspection and one (1) copy of each completed and signed AF Form 1222 for each unfired pressure vessel inspected to the Government representative. After completion of an inspection, one (1) copy of the report shall be e-mailed, faxed, or mailed with the completed and signed BPA Call Letter to the CO, AFCEC, and the POC’s listed on the BPA Call Letter.
2.0 GENERAL INFORMATION
2.1. DEFINITIONS. Definitions shall be as found in the following publications:
- The Constitution and Bylaws of the National Board of Inspection Code
- The latest edition of the National Board Inspection Code and all addenda
- American Society of Mechanical Engineers (ASME) Codes
2.1.1. Boilers
2.1.1.1. Steam Boiler. A pressure vessel in which steam is generated by application of heat resulting from the combustion of fuel (solid, liquid, or gaseous)
2.1.1.2. Power Boiler. A boiler in which steam or other vapor is generated at a pressure greater than 15 psig for use external to itself
2.1.1.3. High Temperature Hot Water Boiler. A pressure vessel intended to heat water to temperatures in excess of 250 F at pressures in excess of 160 psig. The heat is applied as a result of combustion.
2.1.1.4. Electric Boiler. A power or high temperature hot water boiler with electricity as a source of heat.
2.1.1.5. Portable Boiler. A power boiler or a high temperature hot water boiler used primarily for temporary location and the construction and usage of which is obviously portable.
2.1.1. Unfired Pressure Vessels.
2.1.1.2. Pressure Vessels. Receptacles used for the containment of pressure, either internal or external. The pressure may be obtained from an external source, or by the application of heat from a direct or indirect source, or any combination thereof.
2.2. QUALIFICATION OF INSPECTORS. The qualification of inspectors shall be as outlined in the Constitution and Bylaws of the National Board of Boiler and Pressure Vessel
Inspectors and the National Board Inspection Code. The Contractor shall provide National
Board Commissioned Inspectors who hold a valid National Board Commission, and who have qualified by written examination under the laws, rules and regulations of a jurisdiction of a state of the United States and are regularly employed as an inspector by an Authorized Inspection
Agency as defined in the references listed above. A National Board Commission shall be effective only, when the holder is regularly employed as an inspector of boilers and pressure vessels by a Jurisdictional Authority of the United States or as an inspector regularly employed by an Authorized Inspection Agency meeting the requirements of the Constitution and Bylaws referenced above. In accordance with the Bylaws referenced above, a holder of a National Board
Commission who is not regularly employed as stipulated by those Bylaws or a person who carries out inspections on a fee basis shall not be considered regularly employed as an inspector.
The Contractor shall provide the CO with evidence of compliance with the above requirements as requested throughout the life of the BPA.
2.2.1 SECURITY ACCESS REQUIREMENTS. Access to certain installations to perform inspections may require the contractor to fill out a Government provided background affidavit.
When this is required, the contractor shall complete and submit the background affidavit within 2 duty days after acceptance of the BPA Call Letter to the CO. In the event the background affidavit is denied for the inspector, the contractor will need to resubmit another affidavit within one duty date of the notification of failure until the contractor has an approved inspector. If the contractor is unable to provide an inspector who can pass the background affidavit and meet the inspection dates, the BPA Call Letter will be canceled.
2.3. SITE PREPARATION. The necessary preparation for equipment inspections shall be at the sole expense and responsibility of the Government. All inspections shall be scheduled between 7:00AM and 5:00PM local time.
2.4. WITNESS TO INSPECTION. The Boiler Plant Foreman, Maintenance Foreman, Mechanical Superintendent, Maintenance Engineer, Base Civil Engineer, Deputy Base Civil
Engineer or Mechanical Engineer responsible for boilers shall accompany the inspector to the inspection site and witness the inspection. This representative shall sign the inspection report certifying that the work has been accomplished. Therefore, the inspection report will serve as a receiving document.
2.5. MILEAGE, EXPENSES, AND TRAVEL TIME FOR INSPECTOR
2.5.1. CONUS: Travel cost for inspections within CONUS shall be included in the inspection unit costs.
2.5.2. OCONUS: Travel cost for inspections outside of the CONUS shall be included in the inspection unit costs for each host country.
2.5.3. Daily Rate: Travel cost and daily inspection rates including a large quantity of vessels will be considered in addition to competitive unit cost per vessel.
2.6. GOVERNMENT CAUSED DELAY/CHANGES IN INSPECTION
TYPE/QUANTITIES. In the event of any Government caused delay or changes from the original BPA Call Letter in terms of quantity, type, or specific boiler/UPV, the Contractor shall immediately notify the CO. Any changes must be approved by the CO.
2.6.1 Delays During Inspections- If during the performance of any individual inspection, the
Contractor is delayed by more than one hour as a result of government actions, the Contractor may be entitled to compensation at an hourly rate stated in this agreement.
2.6.2 Inadequate Site Preparation- In the event that a boiler/UPV is not prepared for inspection in compliance with the National Board Inspection Code criteria and the Contractor is delayed by more than one hour, they may be entitled to compensation at an hourly rate stated in this agreement.
2.6.3 Changes In Inspection Quantities- In the event a boiler/UPV was scheduled for inspection, but is not available the contractor shall contact the CO for approval of a substitution.
The boiler/UPV substituted for the inspection must be annotated and identified on the Call Letter and a completed AF Form 1222 submitted. If another boiler/UPV cannot be substituted, the contractor may receive 50% of the inspection costs. In order to receive the 50% of the inspection costs, the Inspector must complete an AF Form 1222 annotating that the boiler/UPV inspection was not completed and include in the remarks the reason for not completing the scheduled inspection.
2.6.4. No charge shall be made for delays due to no fault of the Government such as weather conditions or acts of God preventing the preparation or shutdown of boilers/UPVs.
2.7. WORKLOAD DATA. Appendix 1 provides a list of projected inspection locations. This data does not imply the Governments obligation to order under this BPA. Work under this contract shall not be limited to these sites.
2.8. QUALITY CONTROL. Contractor shall develop and maintain a quality control program to ensure services are performed in accordance with established required services addressed in the Services Summary (SS). The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor is contractually responsible for tendering to the government services that meet the requirements, terms and conditions of this PWS when performing any inspection as a result of a call placed by the
Government under this BPA.
SECTION B
SERVICES SUMMARY
PERFORMANCE
OBJECTIVE (PO)
PWS PARAGRAPH (Par)
REFERENCE
PERFORMANCE
THRESHOLD
PO 1 Complete inspections per schedule and in accordance
(IAW) inspection criteria
Section A, Pars 1.1., 1.2, & 1.3 Not to Exceed (NTE) 2
Customer Complaints per
Quarter
PO 2 Submit all completed inspection reports to each Base
Section A, Par. 1.5.1.2 NTE 2 weeks delinquent (late) reports per Base
PO 3 All inspection reports must be completely filled out and accurate
Section A, Pars. 1.5.1., 1.5.1.1., &
1.5.1.2
NTE 3 deficiencies (defective reports) per month
SECTION C
GOVERNMENT FURNISHED PROPERTY & SERVICES
Not Applicable to this Contracted Service
SECTION D
APPENDICES
APPENDIX 1: AF Sites
COMMAND BASE COMMAND BASE
ACC BARKSDALE,LA AMC Grand Forks, ND
BEALE,CA CHARLESTON,SC
FT EUSTIS,VA DOVER,DE
DAVIS-
MONTHAN,AZ FAIRCHILD NAS,WA
DYESS,TX MacDill,FL
ELLSWORTH,SD
Joint Base
Army FT Lewis-MC CHORD,WA
HOLLOMAN,NM MC CONNELL,KA
LANGLEY,VA Joint Base FT Dix-MCGUIRE,NJ
NELLIS-Creech, NV
LAKEHURST,NJ
OFFUTT,NE TRAVIS Hosp,CA
MOODY,GA TRAVIS AFB,CA
MT HOME,ID Joint Base Charleston WS,SC
OFFUTT,NE
Army Strategic Logistics Activity Charleston (ASLAC)
SEYMOUR-
JOHNSON,NC Joint Base Langley
SHAW,SC
FT Eustis
WHITEMAN,MO Joint Base Joint Base Elmendorf Richardson, AK
TONOPAH TEST
RANGE,UT Joint Base San Antonio (Lackland, Ft Sam Houston, Camp Bullis, Randolph),TX
Tyndall,FL AETC-Med ALTUS,OK AFGSC Malmstrom, MT
Wilford Hall Med
Center,TX
Minot, SD
LUKE – Medical,AZ
Whiteman, MO
Sheppard
Medical,AZ
FE Warren, WY
KEESLER-
Medical,MS
Barksdale, LA
AETC-CE
COLUMBUS-Joint
Base,MS
AFSPC CAPE CANAVERAL, FL
LAUGHLIN,TX CAVALIER, AK
LITTLE ROCK,AK SCHRIEVER, CO
LUKE –
Medical,AZ
ONIZUKA
MAXWELL-
Gunter,AL
NEW BOSTON
RANDOLPH,TX
PATRICK
SHEPPARD –,TX
Ft MacAurthur/Los Angeles, CA
Altus,OK
VANDENBERG,CA
VANCE,OK
Beale,CA
Goodfellow,TX
Peterson,CO
LACKLAND,TX
Buckley,CO
KESSLER –
Medical,MS
CHEYENNE MTN,CO
SHEPPARD-TX
Thule, Greenland
Luke,AZ
AFDW BOLLING,DC PACAF Eielson,AK
Andrews, MD Joint Base Elmendorf Richardson, AK
AFMC- ARNOLD,TN
JB-Pearl Harbor, HI
BROOKS,TX
Osan,Korea
EDWARDS,CA
Misawa, Japan
EGLIN,FL
Daegu,Korea
HANSCOM,MA
Yokota, Japan
HILL,UT Kunsan, Korea
KIRTLAND,NM Kadena, Japan
LOS ANGELES,CA Andersen, Guam
ROBINS,GA USAFE RAF Menwith Hill, UK
TINKER,OK RAF Alconbury/Moleswort,UK
WRIGHT-
PATTERSON,OH RAF Croughton, UK
RAF Fairford, UK
RAF Lakenheath, UK
AFRC DOBBINS,GA Spangdahlem, Germany
GRISSOM,IN Ramstein, Germany
GEN MITCHELL
ARS Aviano, Italy
PITTSBURGH
ARS,PA Lajes Field, Azores
MINN-ST PAUL
ARS Moron, Spain
O'HARE Izmir, Tukey
WESTOVER Incirlik, Turkey
WILLOW GROVE
YOUNGSTOWN USAFA ACADEMY, CO
Michigan ANG
ANG Michigan ANG
AFSOC Hurlburt
Cannon
File details come from the government source that posted it. Updated .