Attach_5_AF_Form_1222.pdf

Air Force Form PDF 50 KB Posted

Attached to
Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Solicitation number
FA8051-16-BOILERINSPECT
Issued by

About this file

Attach 5 - AF Form 1222

View the file

Other versions and copies of AF Form 1222

File Revision Posted Attached to
CDRL_Attachment_4_-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013).docx Jul 12, 2013 OCONUS PACAF AND USAFE BOILER INSPECTIONS FY17
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 PACAF Boiler Inspection Services
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 Boiler Inspections at Clear/Eielson AFB, AK
Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx Jul 12, 2013 Boiler/UPV Inspection Services in Alaska
Attachment_3-AF_FORM_1222-AF_EQUIVALENT_(7-12-13)-Tests.docx Revision not stated OCONUS PACAF AND USAFE BOILER INSPECTIONS FY17
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated PACAF Boiler Inspection Services
Attch_2_AFCEC_SUPPLEMENTAL_AF_FORM_1222.pdf Revision not stated Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Attch_3_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(10-30-15).pdf Revision not stated Air Force Boiler and Unfired Pressure Vessel Inspections (AFCEC, Tyndall AFB, FL)
Attachment_2_-_Instructions_for_Completing_the_AF_Form_1222.pdf Revision not stated Air Force Boiler and UPV Inspections, Korea
Attachment_1_-_AF_Form_1222-AF_Equialent.docx Revision not stated Air Force Boiler and UPV Inspections, Korea
Attachment_2-_Instructions_for_Completing_the_AF_Form_1222.pdf Revision not stated Air Force Boiler and UPV Inspections, Alaska
Attachment_1-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated Air Force Boiler and UPV Inspections, Alaska
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated Boiler Inspections at Clear/Eielson AFB, AK
Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx Revision not stated Boiler/UPV Inspection Services in Alaska
Show all 14

Who attaches AF Form 1222

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOILER OR

PRESSURE VESSEL

INSPECTION REPORT

CAST IRONFIRE TUBE

8. PLANT OR BLDG. WATER TUBE EXPANSION TANK

OTHER (Specify)

10. PLANT MANNED UNMANNED 11A. PRESSURE PREVIOUS INSPECTION 11B. PRESSURE THIS INSPECTION

12. USE 13A. YEAR BUILT 13B. YEAR INSTALLED

POWER STEAM HEATING 14A. PRIMARY FUEL (Boiler) 14B. SECONDARY FUEL (Boiler)

PROCESS STORAGE 15. DESIGN WORKING PRESSURE OR TEMPERATURE

16. MANUFACTURERHTHW HEAT EXCHANGE

OTHER (Specify) 17. MANUFACTURER'S RATING MBTU

18A. NATIONAL BOARD NUMBER 18B. USAF NUMBER

19. METHOD OF FIRING (Boilers) 20. SAFETY RELIEF VALVES SETTING 21. EXPLAIN IF PRESSURE CHANGED

22. PRESSURE GAGE TESTED YES NO 23. PURPOSE OF HYDROSTATIC TEST NEW RETEST

24. LAST HYDROSTATIC TEST

DATE:

25. HYDROSTATIC TEST

DATE:

YES NO

PSI: PSI:

26. STATEMENT OF BASE CIVIL ENGINEER

REPAIRS MADE SINCE LAST INSPECTION NONE OTHER (Specify)

27. INTERNAL INSPECTION

DESCRIBE INSPECTION FULLY (State location of any damage or deposits, i.e., scale, grease, oil or others; any corrosion, pitting, grooving, cracking or lamination; any evidence of overheating, broken or loose items, etc.)

28. EXTERNAL INSPECTION

CONDITION OF BOILERS VESSELS AND PLANT (Describe fully and state location of any corrosion, leakages, evidence of overheating, soot or other destructive accumulations, or safety or ASME violations, etc.)

29. SETTINGS, LININGS, SUPPORTS AND BAFFLES

INSPECTION OF SAFETY DEVICE

30. SAFETY 32. TOTAL CAPACITY31. SIZE 33. CONDITION AND HOW TESTED

RELIEF

VALVES NUMBER: CFM: BTU/HR: LB/HR:

35. CORRECTION TAKEN (If none give reason)34. PRESSURE

GAGES

37. CONDITION36. OTHER

ITEMS

38. REGULATORS 39. CONDITION

AND

CONTROLS

40. ASME CODES

NOYESDOES PLANT COMPLY WITH CODE, WELDING, MATERIALS, CONFIGURATION, ETC?

AF IMT 1222, 19990201, V2 PREVIOUS EDITION IS OBSOLETE.

1. TYPE OF INSPECTION 2. DATE OF INSPECTION

INTERNAL AND EXTERNAL A VA

INTERNAL EXTERNAL UNDER HYDROSTATIC TEST B VB 3. INSPECTION/DELIVERY ORDER NO.

EXTERNAL UNDER OPERATION C VC

EXTERNAL UNDER HYDROSTATIC TEST VD 4. CONTRACT NUMBERD

EXPANSION/RECEIVER TANK E VE

5. INSTALLATION 6. STATE 7. ZIP CODE 9. TYPE

INSPECTOR STATEMENT

41. WAS BOILER OR VESSEL PREPARED FOR THOROUGH EXAMINATION (If NO, state what was not and why in Remarks and Recommendations of Inspector.)

YES NODOES PLANT COMPLY WITH CODE, WELDING, MATERIALS, CONFIGURATION, ETC?

42. WAS BOILER ENTERED FOR THE INSPECTION (If NO, state what was not and why in Remarks and Recommendations of Inspector.)

YES NO

REMARKS AND RECOMMENDATIONS OF THE INSPECTOR

43. LIST ALL DEFICIENCIES TO BE CORRECTED OR REPAIRED (Use a continuation sheet if necessary._)

44. TYPED NAME AND TITLE OF INSPECTOR 45. NAME AND TITLE OF AIR FORCE REPRESENTATIVE

ACCOMPANYING INSPECTOR

46B. DATE OF SIGNATURE 46C. INSPECTOR'S NATIONAL BOARD46A. SIGNATURE OF INSPECTOR

COMMISSION NUMBER

47. ACTION TAKEN ON RECOMMENDATIONS

DATE AND ACTION TAKEN OR TO BE TAKEN

50. DATE OF SIGNATURE48. TYPED NAME, TITLE AND GRADE OF OFFICER IN CHARGE 49. SIGNATURE OF OFFICER IN CHARGE

AF IMT 1222, 19990201, V2 (REVERSE)

A:
2 DATE OF INSPECTION:
B:
C:
3 INSPECTIONDELIVERY ORDER NO:
D:
E:
4 CONTRACT NUMBER:
5 INSTALLATION:
6 STATE:
7 Z P CODE:
9 TYPE:
FIRE TUBE:
CAST IRON:
8 PLANT OR BLDG:
EXPANSION TANK:
OTHER Specify:
MANNED:
MANNED_2:
11A PRESSURE PREVIOUS INSPECTION:
11B PRESSURE THIS INSPECTION:
12 USE:
13A YEAR BUILT:
13B YEAR INSTALLED:
STEAM HEATING:
14A PRIMARY FUEL Boiler:
14B SECONDARY FUEL Boiler:
PROCESS:
STORAGE:
15 DESIGN WORKING PRESSURE OR TEMPERATURE:
HEAT EXCHANGE:
16 MANUFACTURER:
OTHER Spec:
17 MANUFACTURERS RATING MBTU:
18A NATIONAL BOARD NUMBER:
18B USAF NUMBER:
19 METHOD OF FIRING Boilers:
20 SAFETY RELIEF VALVES SETTING:
21 EXPLAIN IF PRESSURE CHANGED:
YES:
NO:
NEW:
NEW_2:
RETEST:
25 HYDROSTATIC TEST:
NO_2:
OTHER:
DESCRIBE INSPECTION FULLY State location of any damage or deposits ie scale grease oil or others any corrosion pitting grooving crack ng or amination any evidence of overheating broken or loose items etc:
28 EXTERNAL INSPECTION:
CONDITION OF BOILERS VESSELS AND PLANT Describe fu y and state locat on of any corrosion leakages evidence of overheating soot or other destruct ve accumulat ons or safety or ASME violations etc:
29 SETTINGS LININGS SUPPORTS AND BAFFLES:
30 SAFETY REL EF VALVES:
32 TOTAL CAPACITY:
LBHR:
33 CONDITION AND HOW TESTED:
34 PRESSURE GAGES:
35 CORRECTION TAKEN If none give reason:
36 OTHER ITEMS:
37 CONDITION:
39 CONDIT ON:
undefined: YES_2
41 WAS BOILER OR VESSEL PREPARED FOR THOROUGH EXAMINATION If NO state what was not and why: Off
n Remarks and Recommendations of Inspector: Off
42 WAS BOILER ENTERED FOR THE INSPECTION: Off
NO_4: Off
43 LIST ALL DEFICIENCIES TO BE CORRECTED OR REPAIRED Use a continuation sheet if necessary:
44 TYPED NAME AND TITLE OF INSPECTOR:
45 NAME AND TITLE OF AIR FORCE REPRESENTATIVE ACCOMPANYING INSPECTOR:
46A SIGNATURE OF INSPECTOR:
46B DATE OF SIGNATURE:
46C INSPECTOR S NATIONAL BOARD COMMISSION NUMBER:
47 ACTION TAKEN ON RECOMMENDATIONS:
DATE AND ACTION TAKEN OR TO BE TAKEN:
48 TYPED NAME TITLE AND GRADE OF OFFICER IN CHARGE:
49 SIGNATURE OF OFFICER IN CHARGE:
50 DATE OF SIGNATURE:
VA: Off
VB: Off
VC: Off
VD: Off
VE: Off
Text22:
Text23:
Repairs:
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Text1:
Text2:
Text3:
Text4:
Text5:
Text6:

File details come from the government source that posted it. Updated .