Attach_5_AF_Form_1222.pdf
Air Force Form PDF 50 KB Posted
- Solicitation number
- FA8051-16-BOILERINSPECT
About this file
Attach 5 - AF Form 1222
View the file
Other versions and copies of AF Form 1222
Show all 14
Who attaches AF Form 1222
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOILER OR
PRESSURE VESSEL
INSPECTION REPORT
CAST IRONFIRE TUBE
8. PLANT OR BLDG. WATER TUBE EXPANSION TANK
OTHER (Specify)
10. PLANT MANNED UNMANNED 11A. PRESSURE PREVIOUS INSPECTION 11B. PRESSURE THIS INSPECTION
12. USE 13A. YEAR BUILT 13B. YEAR INSTALLED
POWER STEAM HEATING 14A. PRIMARY FUEL (Boiler) 14B. SECONDARY FUEL (Boiler)
PROCESS STORAGE 15. DESIGN WORKING PRESSURE OR TEMPERATURE
16. MANUFACTURERHTHW HEAT EXCHANGE
OTHER (Specify) 17. MANUFACTURER'S RATING MBTU
18A. NATIONAL BOARD NUMBER 18B. USAF NUMBER
19. METHOD OF FIRING (Boilers) 20. SAFETY RELIEF VALVES SETTING 21. EXPLAIN IF PRESSURE CHANGED
22. PRESSURE GAGE TESTED YES NO 23. PURPOSE OF HYDROSTATIC TEST NEW RETEST
24. LAST HYDROSTATIC TEST
DATE:
25. HYDROSTATIC TEST
DATE:
YES NO
PSI: PSI:
26. STATEMENT OF BASE CIVIL ENGINEER
REPAIRS MADE SINCE LAST INSPECTION NONE OTHER (Specify)
27. INTERNAL INSPECTION
DESCRIBE INSPECTION FULLY (State location of any damage or deposits, i.e., scale, grease, oil or others; any corrosion, pitting, grooving, cracking or lamination; any evidence of overheating, broken or loose items, etc.)
28. EXTERNAL INSPECTION
CONDITION OF BOILERS VESSELS AND PLANT (Describe fully and state location of any corrosion, leakages, evidence of overheating, soot or other destructive accumulations, or safety or ASME violations, etc.)
29. SETTINGS, LININGS, SUPPORTS AND BAFFLES
INSPECTION OF SAFETY DEVICE
30. SAFETY 32. TOTAL CAPACITY31. SIZE 33. CONDITION AND HOW TESTED
RELIEF
VALVES NUMBER: CFM: BTU/HR: LB/HR:
35. CORRECTION TAKEN (If none give reason)34. PRESSURE
GAGES
37. CONDITION36. OTHER
ITEMS
38. REGULATORS 39. CONDITION
AND
CONTROLS
40. ASME CODES
NOYESDOES PLANT COMPLY WITH CODE, WELDING, MATERIALS, CONFIGURATION, ETC?
AF IMT 1222, 19990201, V2 PREVIOUS EDITION IS OBSOLETE.
1. TYPE OF INSPECTION 2. DATE OF INSPECTION
INTERNAL AND EXTERNAL A VA
INTERNAL EXTERNAL UNDER HYDROSTATIC TEST B VB 3. INSPECTION/DELIVERY ORDER NO.
EXTERNAL UNDER OPERATION C VC
EXTERNAL UNDER HYDROSTATIC TEST VD 4. CONTRACT NUMBERD
EXPANSION/RECEIVER TANK E VE
5. INSTALLATION 6. STATE 7. ZIP CODE 9. TYPE
INSPECTOR STATEMENT
41. WAS BOILER OR VESSEL PREPARED FOR THOROUGH EXAMINATION (If NO, state what was not and why in Remarks and Recommendations of Inspector.)
YES NODOES PLANT COMPLY WITH CODE, WELDING, MATERIALS, CONFIGURATION, ETC?
42. WAS BOILER ENTERED FOR THE INSPECTION (If NO, state what was not and why in Remarks and Recommendations of Inspector.)
YES NO
REMARKS AND RECOMMENDATIONS OF THE INSPECTOR
43. LIST ALL DEFICIENCIES TO BE CORRECTED OR REPAIRED (Use a continuation sheet if necessary._)
44. TYPED NAME AND TITLE OF INSPECTOR 45. NAME AND TITLE OF AIR FORCE REPRESENTATIVE
ACCOMPANYING INSPECTOR
46B. DATE OF SIGNATURE 46C. INSPECTOR'S NATIONAL BOARD46A. SIGNATURE OF INSPECTOR
COMMISSION NUMBER
47. ACTION TAKEN ON RECOMMENDATIONS
DATE AND ACTION TAKEN OR TO BE TAKEN
50. DATE OF SIGNATURE48. TYPED NAME, TITLE AND GRADE OF OFFICER IN CHARGE 49. SIGNATURE OF OFFICER IN CHARGE
AF IMT 1222, 19990201, V2 (REVERSE)
| A: |
| 2 DATE OF INSPECTION: |
| B: |
| C: |
| 3 INSPECTIONDELIVERY ORDER NO: |
| D: |
| E: |
| 4 CONTRACT NUMBER: |
| 5 INSTALLATION: |
| 6 STATE: |
| 7 Z P CODE: |
| 9 TYPE: |
| FIRE TUBE: |
| CAST IRON: |
| 8 PLANT OR BLDG: |
| EXPANSION TANK: |
| OTHER Specify: |
| MANNED: |
| MANNED_2: |
| 11A PRESSURE PREVIOUS INSPECTION: |
| 11B PRESSURE THIS INSPECTION: |
| 12 USE: |
| 13A YEAR BUILT: |
| 13B YEAR INSTALLED: |
| STEAM HEATING: |
| 14A PRIMARY FUEL Boiler: |
| 14B SECONDARY FUEL Boiler: |
| PROCESS: |
| STORAGE: |
| 15 DESIGN WORKING PRESSURE OR TEMPERATURE: |
| HEAT EXCHANGE: |
| 16 MANUFACTURER: |
| OTHER Spec: |
| 17 MANUFACTURERS RATING MBTU: |
| 18A NATIONAL BOARD NUMBER: |
| 18B USAF NUMBER: |
| 19 METHOD OF FIRING Boilers: |
| 20 SAFETY RELIEF VALVES SETTING: |
| 21 EXPLAIN IF PRESSURE CHANGED: |
| YES: |
| NO: |
| NEW: |
| NEW_2: |
| RETEST: |
| 25 HYDROSTATIC TEST: |
| NO_2: |
| OTHER: |
| DESCRIBE INSPECTION FULLY State location of any damage or deposits ie scale grease oil or others any corrosion pitting grooving crack ng or amination any evidence of overheating broken or loose items etc: |
| 28 EXTERNAL INSPECTION: |
| CONDITION OF BOILERS VESSELS AND PLANT Describe fu y and state locat on of any corrosion leakages evidence of overheating soot or other destruct ve accumulat ons or safety or ASME violations etc: |
| 29 SETTINGS LININGS SUPPORTS AND BAFFLES: |
| 30 SAFETY REL EF VALVES: |
| 32 TOTAL CAPACITY: |
| LBHR: |
| 33 CONDITION AND HOW TESTED: |
| 34 PRESSURE GAGES: |
| 35 CORRECTION TAKEN If none give reason: |
| 36 OTHER ITEMS: |
| 37 CONDITION: |
| 39 CONDIT ON: |
| undefined: YES_2 |
| 41 WAS BOILER OR VESSEL PREPARED FOR THOROUGH EXAMINATION If NO state what was not and why: Off |
| n Remarks and Recommendations of Inspector: Off |
| 42 WAS BOILER ENTERED FOR THE INSPECTION: Off |
| NO_4: Off |
| 43 LIST ALL DEFICIENCIES TO BE CORRECTED OR REPAIRED Use a continuation sheet if necessary: |
| 44 TYPED NAME AND TITLE OF INSPECTOR: |
| 45 NAME AND TITLE OF AIR FORCE REPRESENTATIVE ACCOMPANYING INSPECTOR: |
| 46A SIGNATURE OF INSPECTOR: |
| 46B DATE OF SIGNATURE: |
| 46C INSPECTOR S NATIONAL BOARD COMMISSION NUMBER: |
| 47 ACTION TAKEN ON RECOMMENDATIONS: |
| DATE AND ACTION TAKEN OR TO BE TAKEN: |
| 48 TYPED NAME TITLE AND GRADE OF OFFICER IN CHARGE: |
| 49 SIGNATURE OF OFFICER IN CHARGE: |
| 50 DATE OF SIGNATURE: |
| VA: Off |
| VB: Off |
| VC: Off |
| VD: Off |
| VE: Off |
| Text22: |
| Text23: |
| Repairs: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
File details come from the government source that posted it. Updated .